Plans (10) 0. 824 SE 12th Avenue Portland,Oregon 97214 Tel(503)616-9425 FIELD OBSERVATION REPORT I�. d332T1 i4E 'T'-s www.gcnweb.com PROJECT ID 1062 -Summit Ridge DATE REPORT NO. September 13, 2016 33 OWNER/CLIENT OWNER/CLIENT REPRESENTATIVE D R Horton (DRH) DAY OF WEEK PAGE Don Durst Tuesday 1 of 2 GENERAL CONTRACTOR GENERAL CONTRACTOR REPRESENTATIVE D H I ARRIVAL TIME DEPARTURE TIME N/A 1400 1500 GRADING CONTRACTOR GRADING CONTRACTOR REPRESENTATIVE G-Cam Excavation WEATHER/TEMPERATURE PERMIT Sergey Sunny, 74° F Project# 1062 TYPE OF WORK SOURCE AND DESCRIPTION OF FILL MATERIAL GCNREPRESENTATIVE Structural Subgrade NA LOCATION OF WORK OBSERVED Pendell CONTRACTORS EQUIPMENT OBSERVED IN USE Lot 140 CONTRACTOR ACTIVITY,OBSERVATIONS,CONCLUSIONS,RECOMMENDATIONS. I made this visit at the request of Don Durst to observe the excavated structural subgrade for lot 140. I met with Don Durst during my site visit. I used a% inch diameter steel foundation rod to probe footing structural subgrade. During the probe I observed the structural subgrade to be very stiff soil/very dense. In our opinion the building pad has been prepared in general accordance with our recommendations and will support expected foundation for a single family home. ® ❑ A Preliminary report is provided solely as evidence that the field observation was performed. Observations,and/or conclusions,and/or recommendations FINAL PRELIMINARY conveyed in the final report may vary from and shall take precedence over those indicated in arelimin professional service. My conclusions drawn from this report should be discussed with and evaluated bythe professional invinstrument of involved. ITEMS TO OBSERVE,CHECK,OR TEST DURING NEXT VISIT FIELD REPRESENTATIVE SIGNATURE Ro t- P DATE '1��,��1��1hSept 13, 2016