Plans (10) 0.
824 SE 12th Avenue
Portland,Oregon 97214
Tel(503)616-9425 FIELD OBSERVATION REPORT I�.
d332T1 i4E 'T'-s
www.gcnweb.com
PROJECT ID
1062 -Summit Ridge DATE REPORT NO.
September 13, 2016 33
OWNER/CLIENT OWNER/CLIENT REPRESENTATIVE
D R Horton (DRH) DAY OF WEEK PAGE
Don Durst Tuesday 1 of 2
GENERAL CONTRACTOR GENERAL CONTRACTOR REPRESENTATIVE
D H I ARRIVAL TIME DEPARTURE TIME
N/A 1400 1500
GRADING CONTRACTOR GRADING CONTRACTOR REPRESENTATIVE
G-Cam Excavation WEATHER/TEMPERATURE PERMIT
Sergey Sunny, 74° F Project# 1062
TYPE OF WORK SOURCE AND DESCRIPTION OF FILL MATERIAL
GCNREPRESENTATIVE
Structural Subgrade
NA
LOCATION OF WORK OBSERVED Pendell
CONTRACTORS EQUIPMENT OBSERVED IN USE
Lot 140
CONTRACTOR ACTIVITY,OBSERVATIONS,CONCLUSIONS,RECOMMENDATIONS.
I made this visit at the request of Don Durst to observe the excavated structural subgrade for lot 140.
I met with Don Durst during my site visit.
I used a% inch diameter steel foundation rod to probe footing structural subgrade. During the probe I observed the
structural subgrade to be very stiff soil/very dense.
In our opinion the building pad has been prepared in general accordance with our recommendations and will support
expected foundation for a single family home.
® ❑ A Preliminary report is provided solely as evidence that the field observation was performed. Observations,and/or conclusions,and/or recommendations
FINAL PRELIMINARY conveyed in the final report may vary from and shall take precedence over those indicated in arelimin
professional service. My conclusions drawn from this report should be discussed with and evaluated bythe professional invinstrument of
involved.
ITEMS TO OBSERVE,CHECK,OR TEST DURING NEXT VISIT
FIELD REPRESENTATIVE SIGNATURE
Ro t- P DATE
'1��,��1��1hSept 13, 2016