Loading...
PFI2016-00192 p CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT COMMUNITY DEVELOPMENT Permit#: PF12016-00192 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 09/06/2016 Parcel: SEG2020 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: Comcast Project Description: Adjacent to 14875 SW 72nd Ave. Comcast proposes to overlash(1)-48ct fiber 447'to existing strand, construct 47' new aerial, install fiber 90'through existing conduit and bore1'and place(1)-2"conduit with fiber within the City of Tigard ROW. SEG 2020 Owner: FEES Description Date Amount PFI Permit Fee 09/06/2016 $300.00 PHONE: Contractor: TEXSTAR ENTERPRISES INC 17090 JORDAN RD SELMA,TX 78154 PHONE: 210-656-8775 FAX. Applicant: LINDA MCCLAIN 11308 SW 68TH PARKWAY TIGARD, OR 97223 PHONE: 503-596-3965 Tota 1 $300.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant 1 y, Signature: ,�—G Gt17Ql�C'-'; L�— Issued By: N JJ kuq- Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12016-00192 Type: Condition Name: Status: SeverityL PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code,and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition, American Traffic Safety Services Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area.Traffic control devices, flag persons, etc.,shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time, without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 12-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE. Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 13-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI Utilities 14-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 15-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 16-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>, to establish a preconstruction meeting. PFI_Utilities 17-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. Ken Fisher 503+-816-6146 or Kenny@Tigard-or.gov. Traffic Restrictions for 72nd Ave: No work before 9am and after 3pm PFI_Utilities 18-PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 19-MONUMENT PROTECTION Applied Notice Existing monuments, property corners,and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 20-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI Utilities 21 -OTHER Applied Notice RECEIVED-- AUG 2 4 2016 City of Tigard CITY OF TIGARD PUBLIC WORKS PLANNING/ENGINEERING ENGINEERING Public Facility Improvement (PFI) Permit DESCRIPTION OF WORK(in the right-of-way) TYPE OF WORK Check one: R Utility Connection ® TYPE 1—Franchise Utility Work ❑ Sidewalk/driveway approach Work performed by NWN,PGE ❑ Street improvements and/or utility agency. Detailed description: Comcast proposes to overlash (1)48ct fiber 447'to ❑ TYPE 2–Sidewalk/Driveway/Sewer existing strand,construct 47'new aerial,install fiber 90'through existing conduit Work performed for the purpose of: and bore 1'and place(1)-2"conduit with fiber within the City of Tigard ROW. • Sidewalk installation or repair. - Driveway approach installation Property address/location(s): and/or repair 14875 SW 72nd Ave.Tigard,OR 97224Sanitary sewer lateral installation and/or main line tap ❑ TYPE 3—Full scale Development Applicant: Comcast Project:50342 Work performed with Land use Address: 11308 SW 68th Parkway approval which includes any of the following: City/state: Tigard,OR Zip: 97223 • Subdivisions or Partitions Phone: (503)596-3965 Email: Linda_McClain@comcast.com • Street widening Contact name: Linda McClain Phone: (503)596-3965 • Mainline installation for Sanitary sewer,Storm sewer,Tigard water Contractor: Texstar Enterprises and/or Tigard Water Service Area CCB##: 178798 Expiration: 10/10/2017 SUBMIT COMPLETED APPLICATION TO: Address: 14122 Arndt Rd City of Tigard City/state: Aurora,OR Zip: 97002 Planning/Engineering 503 793-3109 Jimminer texstarenter rises.com 13125 SW Hall Blvd. Phone: ( ) Email: @ p Tigard,OR 97223 Contact name: Jim Miner Phone: (503)793-3109 Applications for"minor work in right-of-way" only may be emailed to: Engineer: K&B Technical Soluntions rrg=ermits .tigard-or.gm Address: PO BOX 2529 City/state: Clackamas,OR Zip: 97015 Phone: 503-650-6041 x217 Email: KJ_Sprecher@kbmail.net Case No.M2o1(o—ODlg2 Contact name: KJ Sprecher Application submittal fee: Additional fees: --Y Estimated value of work is required(if over$5,000):$ Application accepted: (within the public right-of-way) By: AL Date: 1 G'l I IlY Is work related to a LAND-USE DECISION? ❑ Yes W No Application reviewed: If so,please specify (MLP, SDR,SUB,etc.) case#: By: S 6351^ Date: d2(s Applicant notified: Is work related to a BUILDING PERMIT? ❑ Yes B No By:�–ti Date: 1:\CURPLN\Masters\1and Use Applkatlons Rev. /09/2015 � If so,please specify(BUILDING PERMIT)case#: City of Tigard - 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page I of 4 APPLICANTS NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for work. When the owner and the applicant are different people,the applicant must be the purchaser of record ora lessee in possession with written i authorization from the owner or an agent of the owner. The owner(s)must sign this application in the space provided or submit a written authorization with this application. BY SIGNING BELOW,THE APPLICANT(S) SHALL CERTIFY THAT: • The above request does not violate any decd restrictions ha mg he attached to or imposed upon the subject property. • If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. • All of the above statements and the statements in the plot plan,attachments,and exhibits transmitted herewith,are true;and the applicants so acknowledge that any permit issued,based on tivs application,may be revoked if it is found that any such statements are false. • The applicant has read the entire contents of the application,including the policies and criteria,and understands the requirements for approving or denying the application. SIGN�ATPRES of arh owner of the subject property required. l t, KJ Sprecher 08/23/2016 Applicant/Authorized Agent's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date PUBLIC FACILITY IMPROVEMENT PERMIT City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov 503-718-2421 • Page 2 of 4 ONIM"G JJnN3d MoN auvou io Am - - , leu'l--m.*J-OVJS MAX:K-3 woo lSeowoDgjagleS 11ooS 1N3WONVHN3N38Id "1'1131Y669i9(tw-**o 6LB£-969(£OS):auoyd t� sw16Noaau+r�o'emWeod iagAeSpooS:peluo�) Z►fOs vaunnc xxxnaA rzZL6 do'OaVou y Q� I S D:)W O;?) BAY ONZL MS 91901 MURN �J gAY1/Ilflf IY�NpL•f YAYM66i0 11PLTLT -onoM1s1x3 s -lVIL3V ONIISIX31, 'ONI0010 380338 S31VO01 HOJ IIVO Ol A11119ISNWS3if S801OVN1NOO NOIlon'dlSNOO 3HI SI 11£ .Ut•.�'3N�S 'S38nlon8ls ,unun Ho S3lvool DMISix3 330 ° 03SV9 311V S3unun b3H10 llV'Z S \_310d AIIIIIn 9NIISIX3 IV HSV1d3AO NOWONOO -.3V NI038 ONV ONn08Od3O.I ONl H31139 i!O 3NI1 01 03kJOlS3H 3 Y 39 Ol SV3UV HaOM 11V'( N LnONoo ONIISIX3 HonOdH183eI31VId/HSnd o° MOd OUVJIl 30 AU0 NI WIS303d---, 9 NIIM3 IV NOUVIIV1SNI 83813 NI039 g Nl IVNI(18VO MS IWOES V N Z O D m Zdd 133HS 33S 3-)Gd AUIIln ONLLSM3 IV NOU0n81SNO0 3lOd A ONLLSIX3 IV NOI10n81SN00 1V183V N1039 ONV HSY1113AO ON3\ �ONn08083ONn NIO39 ONV N0110n6ISN00 1V183V ON3 ONIMVMO LWb3d Mot!aweLL.4o.Uto - - . Ieu eewar�aYaeoWS-•N�*--3 w 'JSe Oo iag4eS AOOS 1N3WONVHN3 21391d - r nz v31.O9.Oss(cOs) .wo 618E-965(E09)•OU04d N $ Z>EOS SIOLO dop o.';, '6ZSZ xoe od iaq.'eS 403S e7UDO srvoumos mm,n� 6ZZL6 N ><.. .,y JS M W O J z CL 3AV ONZZ MSS MSL8k1 a r.�a�sav rlocsyn U O T O O! mwt ))t 7 -+J M yl w N Z yU< <YO (9 vi OHO UO1zJY �4(1 rY11NY J[ lou1 s '56 e h�� �KU NON viUU� i p S `�`I,�•` N-6- 03 0 I - t 3 0 3AV ONZL MS R o 2U 0 U� 0 U Z� 0 � 2� W m god / 'A S s MISS !Moa o � LL �e w U K a Page 84 2011 Edition Stationary Lane Closure with Flagging Diagram 320 Diagram 320 covers total closure of one lane of a two-lane, two-way roadway. See the detail inset for the layout if using a single flagger to control both directions of traffic on low volume roads (less than 400 ADT)with good sight distance as discussed below. 1. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3—Lights and Lighted Signs for exceptions. 2. For added visibility, a truck-mounted arrow board or PCMS in caution mode may be used. 3. Flaggers at each approach are required if any of the following conditions exist: a. Night Operations. b. Work space is over 200 feet in length. c. Sight distance is less than 750 feet from each approach through the lane closure. d. Traffic volumes are greater than 400 ADT. 4. The length between the Flagger Ahead signs shall not exceed one mile. Use Diagram 340—Lane Closure with Pilot Car if exceeding one mile. 5. Cones should be used to outline the work space when curves or other roadway alignments prevent clear direction for the motorists to pass the work space safely. 6. Cones along the work space are recommended when posted speeds are 45 mph or greater, when working under heavy traffic or when travel lanes are narrower than 11 feet. 7. Extended queue signing (see Diagram 5-4) should be used when traffic queues extend beyond the initial advance warning sign. 8. When flagging near an intersection, the"Flagger Ahead" (CW23-2) sign should be visible to traffic entering from any side road. Additional advance warning and Flagger Ahead symbol signs may be placed on the side road(s). 9. Sign set-up and flagger placement shown may be used for intermittent full road closures of 20 minutes or less. 10. The"ONE LANE ROAD AHEAD" (W20-4) sign is optional and should be considered on high volume or high speed roads, or when extended queues are expected. Chapter 5 December 2011 2011 Edition Page 85 Stationary Lane Closure with Flagging Diagram 320 O y O 00� C �3 < O ttl LU c d ° �o2¢ O 0 � wp LL mM3 Cr H IL Q • m c •• mem • >� •® cr I I ' A 4 1 m . j� " Q2 co� I I • I o I # I • ;. � • • w ��i � • c 0! 02 I CD • two o I LL` Y r R W a CM ? Y, m mgt 1 t r� I � go ------------------ Sign Spacing and Buffer Lengths(feet) I 1 w i6 ERRATA: Posted S acin Between Signs Buffer S ° Speed A B c Space zo Q Td 0 Ui 20 50 SupplementTeble 25 100 100 100 75 30 100 Upd.t.d:r.b�MY 12, 35125 Q Q 2016 40 350 350 350 150 M:ooa'rT,W%,A.Wk-v 45 180 SMbm 50 500 500 500 210 55 250 Si an SpacinR and Buffer Lengths feet Su lenient December 2011 Posted Spacing Between Signs "Buffer" Chapter 5 Speed A B C S ace 60 285 65 700 700 700 325 70 365 Page 106 2011 Edition Diversion into a Continuous Left Turn Lane Diagram 430 Diagram 430 shows work in the travel lane(s) next to a continuous two-way left turn lane with one direction of traffic diverted into the continuous two-way left turn lane. 1. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3—Lights and Lighted Signs for exceptions. 2. For added visibility, a truck-mounted arrow board or PCMS in caution mode may be used. 3. When two or more travel lanes are reduced to a single lane before the diversion, each lane shall be closed separately. Layout traffic control according to ODOT Standard Drawing TM 852 for 5-lane sections. 4. A shifting taper(L/2) may be added in the diverted traffic direction across the continuous two-way left turn lane (as shown). This option is recommended when the speed is 45 mph or greater. Sign Spacing and Buffer Lengths(feet) Posted Spacing Between Signs Buffer Speed A B C Space 20 50 ERRATA: 25 100 100 100 75 30 100 Supplement Table 35 125 40 350 350 350 150 Updated:February 12, 45 180 2016 50 500 500 500 210 �odl Traffic Roadway50 55 1 1 1 250 Si zn Spacing and Buffer Len the feet SUDDlement Posted Spacing Between Signs "Buffer" Speed A B Space 60 2$5 65 700 700 700 325 70 365 Chapter 5 December 2011 2011 Edition Page 107 Diversion into a Continuous Left Turn Lane Diagram 430 Roan WORK MEAD B CENTER jlylt LAW CUXED AHEAD x I A II U2 I . I Buffer Protection Vehicle w9W(both Optional) /See Chapter 4 f 1 Buffer • • U2 I • • • U2 I• I A I lyt B RQAD WORK AHEAD December 2011 Chapter 5 Page 54 2011 Edition Pedestrian Accommodation Diagrams See Diagrams 5-7 and 5-8, below, for pedestrian accommodations in work zones. Pedestrian Accommodation Principles: 1. If the work impacts the sidewalk or pedestrian facility, provide a safe, accessible path, where practical, in accordance with the requirements of the ADA. 2. If not practical to match the width of the existing pedestrian facilities, maintain a 4-ft minimum width. 3. Unless a reasonably safe route can be provided through the work space, pedestrians should be appropriately directed with advance signing to cross the road. Do not divert pedestrians into travel lanes. 4. Install pedestrian closure or detour signing on Type II barricades. Make every practical effort to satisfy the following: • If work closes a sidewalk or sidewalk ramp, close sidewalks at a point where an alternate crossing point or route can be provided. Minimize the amount of out-of-direction travel for pedestrians. • Use a combination of"SIDEWALK CLOSED" (R9-9), "SIDEWALK CLOSED USE OTHER SIDE" (R9-10), "SIDEWALK CLOSED AHEAD CROSS HERE" (R9-11), and "SIDEWALK CLOSED CROSS HERE" (R9-11a) signing to direct pedestrians to an alternate facility. • Where there are business destinations between the nearest crosswalk and the work area, close the sidewalk at the business access nearest the work area, where practical using the SIDEWALK CLOSED sign. Include the SIDEWALK CLOSED AHEAD CROSS HERE sign at the nearest crosswalk prior to the closure. Chapter 5 December 2011 2011 Edition Page 55 Pedestrian Accommodation, Mid-Block Diagram 5-7 The sidewalk should be closed at the nearest intersection on each side of the work area when a safe, ADA-compliant path through the work area of is not available. siDEwuxc�osED soEwwcca.osED -- - - - or nHEnn CROSS/ERE � cRossHERE 24X12 Type'W1• 24x18 (Mount on B(II)L) Type,W1„ SIDEWALK CLOSED 24x12 Type"W1' (Mount on B(II)LR) (2 Regd.) ji SIDEWMI(CLOSED SIDEWAU(CLOSED �- Or MEAD CROSS HERE ~- _ 24x12 Type 24x18 'W 1' (Mount onB(II)R) Type'W1" December 2011 Chapter 5