Loading...
Permit (46) CITY OF TIGARD BUILDING PERMIT 1114 - COMMUNITY DEVELOPMENT Permit#: BUP2016-00276 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 09/15/2016 Parcel: 2S 113AC00103 Jurisdiction: Tigard Site address: 7236 SW DURHAM RD 100 Project: Chancellor Designs Subdivision: None Lot: None Project Description: TI for new tenant:Reducing office space and expanding warehouse space. Contractor: PACIFIC REALTY ASSOCIATES LP Owner: PACIFIC REALITY ASSOCIATES LP 15350 SW SEQUOIA PKWY#300 ATTN: N PIVEN PORTLAND, OR 97224 15350 SE SEQUOIA PKWY#300 PORTLAND,OR 97224 PHONE: 503-624-6300 PHONE: 503-624-6300 FAX: 503-624-7755 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 09/15/2016 $87.17 Demolition Occupancy Grp: Occupancy Load: 29 12%State Surcharge-Building 09/15/2016 $10.46 Dwelling Units: 0 Plan Review 09/15/2016 $56.66 Stories: 0 Height: 0 ft Plan Review-Fire Life Safety 09/15/2016 $34.87 Bedrooms: 0 Bathrooms: 0 Info Process/Archiving-Lg$2.00(over 09/15/2016 $8.00 Value: $1,500 11x17) Floor Areas: Total Area: 7543 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $197.16 Required: Required Items and Reports(Conditions) Fire Sprinkler: Yes Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 da - ' 'ance, • ' .ork is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Notific- e er. Tho - rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to• NC by cal •503.232 •87 or 1,800.3 ..2344. 411, Issued By: s Permittee Signatur: • AP.4175 by 7:00 a.m.for the next availa•e inspection'.te. This permit card shall be kept in a conspicuous place on the job si•-until corn•Ietion•f the project. Approved plans are required on the job site at the time o in r. •n. City of Tigard IIIIIN COMMUNITY DEVELOPMENT DEPARTMENT ■ Building Permit Review — Commercial - No Land Use TIGARD Building Permit #: ,6496/(p—Q&7(v Site Address: -12-3L9 S j J Du mar() 12c Suite/Bldg#: (CO Project Name: Cl 01 VAC-l(DIS— Pe& (Name of commercial business occupying the sp . If vacant,enter Spec Space.) Planning Review Proposal: (Y1cX 1T1( b-,- ' -if k r Spcc!) Existing Business Activity: 0111.C-P Proposed Business Activity: () -s\Ce ( 'V ial' -.5-1(•..) Verify site address/suite# exists and active in permit system. -River Terrace Neighborhood: ❑ Yes ) No Zoning: \" P Permitted Use: 1g Yes El No ❑ Spec Space Confirm no land use required. Business License: 1<v Exists: CI Yes No,applicant notified to obtain business license Notes: �� Approved by Planning: Date: ci tc I I(O Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: er?A.Slit, Site Plans: # Building Plans: # Building Permit#: Center building permit#above. Workflow Routing: la ning ❑-I'ermit Coordinator Landing Workflow Sign-off: Si -off for Planning(include notes from planning review) Route Application Documents: uilding: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: C)/ C '—, By Permit Technician: ,b� "„t _—' ------- __ Date: `��/S //C, I:\Building\Forms\B1dgPermitRvw_COM_NoLandUse_060116.docx Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: El SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes ❑ N/A Tigard Trans SDC: ❑ Yes ❑ N/A Parks SDC: ❑ Yes ❑ N/A ❑ OK to Issue Permit Approved by Permit Coordinator: Date: I:\Building\Forms\BidgPernutRvw COM_NolandUse 070915.docx Building Permit Application Commercial FOR OFFICE USE ONLY a Cl of Tigard :•_, Imo"" Received �f Permit No.: s f - `J g -,� .'I'F .. fi�.Y�! - Date/B / m �), ©�/� — `+► 7 - 13125 SW Hall Blvd.,Tigard,OR 972 Plan Revie7M Other Permit: 1� Phone: 503.718.2439 Fax: 503.598.1960 r p1� Date/B 7�rli .ars,r � it TIGARD Inspection Line: 503.639.4175 Date ReadyTill. in See Page 2 for Internet: www.tigard-or.govNotified/Method: S , ,,„7, Supplemental Information ,,,,,F1_,':1,4;,:',,,:---7-,; 'TYPE o ° A ; I REQUIRED DATA 1-AND�2-FAM'ILYD-R LLING ❑New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ►1 Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the *.vr" - 9m rn. , m p e t Valuation: $ ❑ 1-and 2-family dwelling ®Commercial/industrial 0 Accessory building ❑Multi-family Number of bedrooms: ❑Master builder 0 Other: Number of bathrooms: r JOB SrIEA II FOR TION,'ND,Lo A71UNT Total number of floors: Job site address:7236 SW Durham Rd,Suite 100 New dwelling area: square feet City/State/ZIP:Portland,OR 97224 Garage/carport area: square feet Suite/bldg./apt.no.:100 Project name:Chancellor Designs Covered porch area: square feet Cross street/directions to job site:SW 72"Ave.and Durham Road Deck area: square feet Other structure area: square feet REQUIRED`DAtA: OMMERCIAL-1 1C .LIST Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: 2_9f 2,� Indicate the value(rounded to the nearest dollar)of all } equipment,materials,labor,overhead,and the profit for the 4 CIRIPTI{ r O(K work indicated on this application. Minor change to existing permit. Add tenant,keep one office. Valuation: $$1,500.00 Existing building area: 7,543 square feet New building area: 7,543 square feet ® PIYOPEW OWNERX d i ❑ ' IyANT Number of stories: 1 Name:PacTrust Type of construction: V-N Address: 15350 SW Sequoia Parkway#300 Occupancy groups: City/State/ZIP:Portland,OR 97224 Existing: B,S-2 Phone:(503)624-6300 Fax:(503)624-7755 New: B,S-2 ®f,APPLICANT '- ; ,F 1 tim 1:CONTACT PERSON BUILDING PERMIT FEES*".'''-7•4".-1, (Please refer to fee schedule _ Business name:PacTrust Structural plan review fee(or deposit): Contact name:Leslie Louis FLS plan review fee(if applicable): Address: 15350 SW Sequoia Parkway#300 Total fees due upon application: City/State/ZIP:97224 Amount received: Phone:(503)624-6300 Fax: :(503)624-7755 E-mail:lesliel@pactrust.com 'HOTOVOLTAIC SOLAR PANEL YSTE FEES* y Commercial and residential prescriptive installation of ,�,CONTRACTO x roof-top mounted PhotoVoltaic Solar Panel System. Business name:PacTrust Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address:15350 SW Sequoia Parkway#300 Solar Installation Specially Code checklist. City/State/ZIP:Portland,OR 97224 Permit fee(includes plan review $180.00 and administrative fees): Phone:(503)624-6300 Fax:(503)624-7755 State surcharge(12%of permit fee): $21.60 CCB lie.:153913 ` Total fee due upon application: $201.60 Authorized signature: 1 %_j.i n \ „ry7.1j 0 This permit application expires if a permit is not obtained ll ✓l� Vv �t within 180 days after it has been accepted as complete. Print name: L-e�r(i Qj V D'M ' Date: S'!°et 1412OL * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) City of Tigard • BUILDING DIVISION IN Over-The-Counter (OTC) Building & Fire Protection System Permit E., Appointment Checklist Permit Record#: t624. 6'-0 001-No Contact Name: Phone #: J 3—(o a.c./_(Q 3c(-) Business Name: R„e�,,_.„ -- Appointment Date: 9//cc-CZ /O:GL� Site Address: 701.?,f f j,,,,,tlaw►n BldglSuite : Project Name: 0. . 0 0...Q„,..;-"TD,”;a rtAL Project Description: c_-c, t Of e—"pi, p� Existing Use: -PD New Use: -?j MMD Required: 0 Yes 0 No Related Record#: GENERAL INFORMATION Class of Work: &a— Occupancy Group: Type of Construction: Type of Use: C,CAA Occupancy Load: Oregon Specialty Code: `2 SPECIFICS Number of Stories: Building Height: Mixed Use: Number of Dw Units: Number of Bathrooms: Number of Bedrooms: BUILDING SQ FT-SCHOOL CET OTHER SQUARE FOOTAGES Story Square Footage: Accessory Structure: Covered Porch: Basement: Garage: Deck: Total Square Footage: —(54'2' Carport: Mezzanine: SETBACKS Sideyard Setback—Left Sideyard Setback—Front Sideyard Setback—Right Sideyard Setback—Back CONSTRUCTION Exterior Walls: Openings Protected: Firewall Separation: N: S: N: S: Occupancy Separation: E: W: E: W: Access.Parking Spaces: REQUIRED ITEMS Fire Sprinklers: tlic'/ Fire Alarms: Smoke Detectors: Sprinkler Type: Alarm Type: Protected Corridors: Standpipe Required: Pull Stations Required: Parapet: Hazard Group: Battery Caks Provided: Density: Cut Sheets Provided: Design Area: K Factor: Total Project Valuation: $ t' X3. 00 I $ DC Prov Rvw,COM TI—Ping $ lip , L`T Permit Fee—Add,Alt,Demo DC Provision Review Fee for COM TI(effective 7/1/2015) $ 0 . 12%State Surcharge Project Valuation $ wr A Plan Review,Structural Up to$4,999 $0.00 $ 4 , M Plan Review,Fire Life Safety $5,000-$74,999 $90.00 $ ill' /• Info Proc/Arch,Lg(over 11x17$2.00) $75,000-$149,999 $224.00 $ Info Proc/Arch,Sm(up to 11x17$0.50) $150,000 and over $357.00 $ Metro Construction Excise Tax $ School Construction Excise Tax $ Hourly Rate Fee $ Hourly Rate State Surcharge $ Misc.Admin Fee $ Other: Building Staff: $ Other: -z Date/Time: AP 7. „ T la TAL FEES DUE I:\Building\Forms\OTC_BUP_FPS_070116.docx