Loading...
Permit CITY OF TIGARD BUILDING PERMIT COMMUNITY DEVELOPMENT Permit#: BUP2015-00331 fjG Rri 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 09/14/2016 Parcel: 1 S 126 DC00900 Jurisdiction: Tigard Site address: 9520 SW GREENBURG RD Project: Greenburg Apartments Subdivision: LEHMANN ACRE TRACT Lot: 5 Project Description: Building 2-New 4 unit apartment building Contractor: EVERGREEN BUILDERS Owner: RES-OR TIGARD LLC 7420 SW HUNZIKER RD 730 NW 107TH AVE STE 400 TIGARD, OR 97223 MIAMI, FL 33172 PHONE: 503-625-1183 PHONE: FAX: 503-625-9530 Specifics: FEES Description Date Amount Type of Use: MF Class of Work: NEW Type of Const: VB Permit Fee-RES-New Construction 09/14/2016 $2,750.34 Occupancy Grp: R-2 Occupancy Load: 12%State Surcharge-Building 09/14/2016 $330.04 Dwelling Units: 4 Plan Review 12/02/2015 $1,081.04 Stories: 3 Height: 35 ft Plan Review-Fire Life Safety 12/02/2015 $665.26 Wash Co Trans Dev Tax-Apartment 09/14/2016 $53,080.00 Bedrooms: 8 Bathrooms: 8 Tigard Trans SDC Improvement- 09/14/2016 $31,510.00 Value: $527,055 Apartment Tigard Trans SDC Reimbursement- 09/14/2016 $1,820.00 Apartment Floor Areas: Parks SDC Improvement-MF 09/14/2016 $31,980.00 Total Area: 4324 (apartment/condominium) Parks SDC Reimbursement-MF 09/14/2016 $7,530.00 Accessory Struct: 0 (apartment/condominium) Basement: 0 Parks SDC Neighborhood-MF 09/14/2016 $11,860.00 Carport: 0 (apartment/condominium) Covered Porch: 0 Plan Review 09/14/2016 $706.68 Deck: 192 Plan Review-Fire Life Safety 09/14/2016 $434.88 DC Provision Review,COM New-Bldg 09/14/2016 $175.50 Garage: 1848 DC Provision Review,COM New-Ping 09/14/2016 $175.50 Metro Const.Excise Tax 09/14/2016 $632.47 Mezzanine: 0 Total $149,920.51 Required: Required Items and Reports(Conditions) Fire Sprinkler: Yes Parapet: No Fire Alarm: Yes Protected Corridors: No Smoke Detectors: Yes Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued dy: • Permittee Si nature MairgA WCdr, Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. I t , building Permit App1 Irk .i ' Commercial Z I'OR OFFICL l SE Oyi.v City of Tigard '� , r ved nae • 9/� Pernut No.: y 'gyp(5--CO 33/ 13125 SW Hall Blvd.,Tigard OII of 23' Plan Revie ►` \ „4„..c:=5 Related Permit: Phone: 503-718-2439 Fax 503 598 1960 Date/By: Ins Line: 503-639-4175, Date Ready:y: lens: ® See Page 2 for T i(/,\I:1.1 Inspection Internet: www ttgazd-orgod Notified/Method "/7/1 / Supplemental Information s s r a r-x t " tfaii } . l t' rix,. x s ' �' � iitk } ) .' � ,y,,,,,,,� a :.,'� �� 4 ,.1a., v4_::,..44.-.1,,,. ,, ,...,, 3. :`�, .r, ,4 .. a L.. • x,,,'a`�:W .,.. , New construction 0 Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ❑Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the r l a .. , it{3 work indicated on this application. Valuation: $ ❑ 1-and 2-family dwelling 0 Commercial/industrial •91aESEcer ❑Accessory building X Multi-family Number of bedrooms: ❑Master builder 0 Other: Number of bathrooms: Total number of floors: Job site address: 9 O3 C7-2,=E1.4-Rus Q.ta ' . New dwelling area: square feet • ity/State/ZIP: ---r•t it..R.'� b R ci Z ZZ..3 Garage/carport area: square feet Suite/bldg./apt.#: .- Project name: ( € "- QV g, -t ,42Covered porch area square feet Cross street/diredions to job site: Deck area: square feet ��..RF.e.I..I.1?-it-4.1.., --Rapt Bcp .F.*_ - 'jt_nt,m Other structure area: square feet Subdivision: Lot#: Dos nt, Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Tax map/parcel II equipment,materials,labor,overhead,and the profit for the work indicated on this application. , DE S( ?y )(1�!I,oR WQl 7 l 1. . Valuatioel t Grk,? s � 1 „ N�v..l o l\ t7 Apa�rma�T,.uCp Fx — t { Existing building areasquare feet 3 y iu.�tLe.1Na ( IL ti.I /4 SS�CLj 1 S\rE \it�2ik, - \ building area:. .est square fe a 72 + Number of stories: / ,} Type of construction: Name:t,)eEc%}�u-e..t-0. ApAE-rml:wl� J 1__l_L. . \I-13Address: 1 42_,,, 5L3 �u t.�ZaK> {Z GJ. SV urE Occupancy groups: City/State/ZIP: tU IBRD b9--- q1 ZZ3 Existing: Phone (SC 3) (2 Z •5 1`4:63Fax (503)(0,ZS 9 Sao Neer 'Z s ^ — - - 3 � w 'r ' � 1 _ , , � .- - - . . . w,�* 1�' 01141lCy� t1# i E gMit Business name: E\le'(7 ?,%t..i �j`,y a u_1J Q,2 S Structural plan review fee(or deposit): Contact name:`� Ae�` c T2 L.A�= FLS plan review fee(if applicable): Address: 1 y 2 d i.,� •tau N- \,et%t2 •'�• Ss..t i rE Total fees due upon application: City/State/ZIP: —T\‘.. ,,2 t, o e_ 91 z z j Amount received: Phone:(563 ) is,So• 00,4.S Fax::(c)3) (n 2.5.953 O Or ii s t ;(t o iii• a1')a z E-mail: p;z-C-- .1 i-�i\,Jp>zop eT►cS 1, --'''..7,''',. ow— � �� � bz: 1 . 1,4 t i. Commercial and residential prescriptive installation of r� x ` , ' 3 if 9 '�', -ct, M °,+kms roof-top mounted PhotoVoltaic Solar Panel System. Business name: --- .. two(2)sets of roof plan with connection details \t-e. 1>tZ �>J vu��f e 5 and fire department access,along with the 2010 Oregon Address: `7 Z b � kA.,tJ Zu�c.4 gyp. Si t_re b Solar Installation Specialty Code checklist City/State/ZIP: "T-tu n, p 8 2 9-77-z.3 Permit fee(includes plan review $180.00 and administrafive fees): 4 Phone:(562,) (0 Zs'• \\$3 Fax:(S-63) ('ZS• 9530 State surcharge(12%of permit fee): $21.60 CCB Lic.: I'S 5'-EZ— Total fee due upon appication: $201.60 Authorized signature: This permit application expires if a permit is not obtained 1_ within 180 days after it bas been accepted as complete. 1' Date: * Fee methodology set by Tri-County Building Industry Print name+ �A�`(t_< .3 ET i�� i 0 1-2-ca' i i 5 Service Board I:\Building\Pemiits\BUP COM_PermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB) City of Tigard N COMMUNITY DEVELOPMENT DEPARTMENT T 1 G A R D Building Permit Review — Commercial - With Land Use Building Permit #: l au.,p0.15'- CO 3 3/ Site Address:959`0,054, tc,eviacmcluAr Reir Suite/Bldg#: 2 Project Name: 6e ca4gvt6- 4P7s (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: G o A PTS C I -4 Z. 15c1 itii) ?Stz ",wt Av`o1,eu«r .Q Verify site address/suite# exists and active in permit system. 11-00e11'420 - or 4dce"r5'S ASS1itmdt( 16''Z?-15 .Q" River Terrace Neighborhood: ❑ Yes ZNo Land Use Case#: 31JII ,Z,c l I-'c ,z,/ 1,444 Z d!Y/oi ofic.4ew- / ❑ Plans Match Approved Land Use: ,0'Site Plan ❑ Landscape Plan ❑ Other: "'Urban Forestry Plan ❑ Elevation Plan ,,i2"Building Height: Maximum Height 200/ Actual Height 4033 ,12( Conditions Met: ❑ Prior to Submittal .0 —Prior to Permit Issuance Business License:"oft Exists: ❑ Yes ❑ No, applicant notified to obtain business license ZPublic Facilities Improvement(PFI) Permit: ,a*21uL5 Required: ,� Yes, applicant was notified ❑ No Applied For: ,I Yes ❑ No, stop intake Notes: (yOccy PG6` TAArtstso.tatett, t` soteeiuisq Approved byPlanning: CI 'PP �}v Date: f/ --t �'Revisions (after Building Suby) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: Site Plans: # 3 Building Plans: # 3 Building Permit#: L}Enter building permit#above. Workflow Routing: a Planning Q—Engineering R`Permit Coordinator E3—Building Workflow Sign-off: Er Sign-off for Planning(include notes from planning review) Route Application Documents: ['f Building: original permit application, site plans,building plans, engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: Date: //43/5" l:\BuildingTonns\B1dgPeonitRvw COM WitliLandUse 070915.doex 4 Engineering Review , Slope at building pad: 2� PFI Permit#: ---- Go editions "Met"prior to issuance of building permit Easements (encroachments) per engineering conditions of approval and plat(not typical on SDR/CUP) meter Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes ❑ No Assess Water Quantity Fee in-lieu: ❑ Yes ❑ No LIDA Facility on lot: ❑ Yes ❑ No ❑ NOT Approved by Engineering: Date Notes: e___) /G'Se-.20 Approved by Engineering: • 44 p Date: Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit pproved,NOT Released: o llate: /1///c//..c Notes: , Revisions (after Building Submittal only) • Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: (\11SDC Fees Entered: Wash Co Trans Dev Tax: 'es E N/A '" Tigard Trans SDC: tin"'Yes ❑ N/A Parks SDC: 7Yes ❑ N/A JOK to Issue Permit Approved by Permit Coordinator: I:\Building\Fonns\B1dgPennitRvw_COM_WithLandUse_070915.docx City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 Location: Inspection Date: 9520 SW GREENBURG RD, TIGARD, OR, 97223 Record Type: Record ID: Commercial - Building BUP2015-00331 Inspection Type: Inspector: 299 Final inspection Jeff Grove Result: PASS - CofO Comments: Violation Summary: Inspector Contractor