Report - C
Atir
SUMMIT ENGINEERING L.L.C.
May 27, 2016
Project: New Apartments
9550 SW Greenburg Road
Tigard, OR 97202
Subject: Plan check response - Application no. BUP2015-00330-335
To DAN NELSON,
In response to the plan check for the above referenced project,
1) Provide footing calcs for all spread footings supporting point loads using 3000# psf as per
soils report for long term loading and update plans.
Response: See included calculations per designer.
2) Indicate post locations and sizes on plans.
Response: A post schedule has been added to the plans to indicate post types for gravity
load conditions. All posts required for lateral load conditions are either noted on plan or noted
in the hold-down schedule for hold-down posts.
3) Show 3x members and staggered nailing for E type shear wall on shear wall details.
Indicate top and bottom nailing forA and B shear walls.
Response: Detail has been added to all sheets at the Shearwall schedule.
4) Provide Geo Tech inspection for footing prep and have onsite for footing inspection.
Response: Owner to coordinate. Geotech inspection shall be completed prior to
construction.
5) Show property line firewall protection for north/east corner.
Response: Reference modified plans.
6) Shear wall at rear party walls does not match calcs.
nl.
Response: See revised plans.
7) Show all hold down locations on plans.
Response: All Hold-downs are now shown on all plans, including the foundations. Reference
modified plans.
8) Provide engineer calcs showing depth, length, and width of foundation at hold down
locations.
Response: All buildings were carefully reviewed and footing sizes were checked for all HD's
for uplift. Buildings 1, 5 and 6 have been modified to include larger footings as needed. See
included additional footing calculations and revised building foundation plans.
9) All ground floor units are required to be B type accessible units.
Response: Reference modified plans.
10) Provide 60 inch clearance between appliances and counters on floor plans in u-shaped
kitchen.
Response: Reference modified plans.
11) Show option A or B for B type units.
Response: Reference modified plans.
12) Show details of A type showers including controls, required grab bars.
Response: Reference modified plans.
13) All general notes are to be upgraded to current code requirements.
Response: Reference modified plans.
14) Provide calcs for 17ft 2x10s @ 16" oc joist on third floor framing.
Response: See included calculations per designer.
15) Show connections for back span beam to cantilever beam at both ends.
Response: Reference modified plans.
16) Detail#2 from calcs to be on main plans and type of hold down required.
Response: Reference modified plans.
17) Detail#4 from calcs to be on main plans.
Response: Reference modified plans.
sn Gtl 4
65469PE
OREGON tb
Sincerely, ,
Julie Havelka, PE0 oI/
Summit Engineering, LLC ,
971-251-0194
Julie@summitengineeringllc.com
r'
Plan Check Response for Greenburg Road Project
1. Pad footings were originally designed for 1,500 lbs, proposed footing sizes are sufficient with
3,000 soil bearing pressures.See updated foundation pages for additional footings that were
added.
2. Added post sizes to all framing plans.
3. Added shearwall nailing detail number 30/DS.2
4. Contractor to coordinate with Geo-Tech for footing prep and inspection. Note added to all
foundation plans showing Geo-Tech to be on site.
5. Added firewall protection at this location.
6. This has been revised
7. Plans now show all holdown locations specifically.
8. Engineering calcs updated to include this information.
9. Added note to all ground floor units
10. Note added to u-shaped kitchens
11. All type B units to be option B. Note added.
12. All units are to be Type B Units,except as noted.Shower detail added to Type A units.
13. General notes have been updated on cover sheets and on sheet WT.
14. Calcs added,joists revised to double 2X10's at 16"o.c.at 16'-10"span.
15. Added HUC610 hanger at this location
16. Added to building 2&3 shearwall plans
17. Added to building 2&3 shearwall plans
t
çJ1 c-
i a )Ic)
driii 0 11aa,s , e )\feisci _
44111%- IP
I � i -
_, r �_ -- -7 -..... r Au, t-_ or
/
(z
` ilkI 19.....!Po:! „r■�: A i*' _ � — =�1 `f' 0' -- .....a.#1,
'.Z (N?) qP3 ma
__ _
(\------ , a h,imam. 411111110111111ft IIP Oh. .MIPA d ,C `k. a/__: -- -
�'—�. Via=" –
�1 % .4_�— U
c.g .. 4.r •�A.� ' dm Mt
C\���Iillk iOM �e1M_ -i imp !: .t'�3! M -".,;`.— — 1 1
MO* .r_ e.. ..r. )
-.4.= 1\1-41�XA _'"gam rt it
. ,.z.- 1 i 1a., -.MO
aMillipg
jialkirgr
Qs
C7,ZtACYSI-49
_ _
—
vt,_
„..•ill/...
"g-k
1 N • Altril1111I--.?_.•Nrair
na
- -. 'im% k
z.....7- tt1 Cr?) _...... , ,
di
." mit.-- !nom , i _ is! hair ` .
,
'77,0
)vp-:-------. 11-11 . 11ImmimumillmilimmilmillimlYzcz;7'8--3
C 'Acam -1-010,--14 9 -=>::::1--39.,
c:) - -Nl c-710 I g
.41-2.1Y W --).- c'--_ 2CI.
-- 1 J cy 10 _
_�`_ • 40111,1r —-4 I 4111% -ill? 1.-- -"\—\-- --i1
�J0C1,
........
a, 0 ....
1,) X11 "M fi'f r
, A ivn,,,,,, -is, __. r-so...- ow.--,. - ■• err
' ) �' ai : Map ��.r.Mr.�. _ ��� .: to 4 f►� ► �'"" -
*11 `� Ir tVA,Z a�.rte iw �ew.�.r. i .► \ /�
,� -� / .rim
sem._ , air " _ 7
7 -- 3cr-'1114
X11 --- � -° - - I
(;)- .0t - y + 099g,
c309_3, c.24) ± go go)
,
--/F"r4-
-i--z 11
ti
Dan Nelson
From: Dan Wilson <Dan@cepdx.com>
Sent: Friday, February 19, 2016 4:22 PM
To: Dan Nelson
Subject: 2013 NFPA-72 23.6.1
Hi Dan,
The apartment campus fire alarm design we discussed yesterday may be affected by 2013 NFPA-72 23.6.1
Performance of Signaling Line Circuits(SLCs).A single fault on a pathway connected to the addressable devices shall not
cause the loss of more than 50 addressable devices.
The way many designers make this work is with addressable isolation modules.
When a short circuit on the SLC downstream of an isolation module occurs,the fault is isolated from the addressable
devices upstream from the module.
In a fire alarm system serving multiple buildings, we would install an isolation module on each SLC as it leaves the fire
alarm control panel,on the way to another building.This would be true for single building having more than 50 devices
too.
Dan Wilson, SET
Fire&Life Safety Division
NICET Level IV,Fire Alarm Systems
Capitol Electric Co.,Inc.
11401 NE Marx St,Portland,OR 97220
T:(503)255-9488 I C:(971)506-3072 I D:(503)262-0411
dan@cepdx.com I www.capitolelectricco.com
Co itol
Electric Co., Inc,
"Celebrating 30 Years of Excellence and Innovation"
The information contained in this electronic mail transmission is intended by Capitol Electric Co.,Inc.for the use of the named individual or entity to which it is directed and may
contain information that is confidential or privileged.If you have received this mail transmission in error,please delete it from your system without copying or forwarding it,and
notify the sender of the error by reply e-mail or calling(503)255-9488 so that the sender's records can be corrected.Thank you.
1
FOR OFFICE USE ONLY-SITE ADDRESS:
This form is recognized by most building departments in the Tri-County area for transmitting information.
Please complete this form when submitting information for plan review responses and revisions.
This form and the information it provides helps the review process and response to your project.
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
n '
Tr a smittal Letter
13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 •www.tigard-or.gov
TO: 41/4l ti--35DAT ; :
DEPT: BUILDING DIVISION
AUG 1 S 2016
FROM: 1--,�.�2 ` �2 L,,l�fid '1' ` ( F i : .}
COMPANY: q BUILDING DIVISION
PHONE: 93 L S .c: Oc-t By: "
RE: vS"b 3Uec., ew 1c-oo 3�3c)
(Site Address) (Permit umber)
got 5 — )J331
I
'roject name or sus ivision name an, of num,er /C - r A
a 333
It tf 3 351
ATTACHED ARE THE FOLLOWING ITEMS: 11 tt 335"
Additional set(s)of plans. a Revisions:
Cross section(s)and details. Wall bracing and/or lateral analysis.
Floor/roof framing. Basement and retaining walls.
Beam calculations. Engineer's calculations.
Other(explain):
REMARKS:
'4
Routed to Permit Technician:, Date:
Fees Due: ■ Yes Fee Descri tion: Amo sl ►ue:
Special
Instructions:
Re.rint Permit ser PE : ❑ Yes ❑No ❑ Done
A. .licant Notified: Date: Initials:
I:\Building\Forms\TransmittalLetter-Revisions.doc 05/25/2012
FOR OFFICE USE ONLY—SITE ADDRESS:
This form is recognized by most building departments in the Tri-County area for transmitting information.
Please complete this form when submitting information for plan review responses and revisions.
This form and the information it provides helps the review process and response to your project.
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
Tr •
�� Transmittal Letter
7 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 •www.tigard-or.gov
TO: D C -e`S Or\ DATE RECEIVED:
DEPT: BUILDING DIVISION
RECEIVED
FROM: L ' I_, f'le '2,, -F 14 APR 1 8 2016
COMPANY: 'AV elft rt—e -N Z7 L1 1 kdeA5 Ilk`
UU Dl�l{fit N
PHONE: o3— tOC6o '` 60 ,,�t11 �Ut�iLDINC�S By:
RE: 4510 SSao q$30,95 70aSTai a5-/-0
(Site Alidress) s W &re jaoure ( (Permit Number)
diApaols---ao 331
(Project ct me or sub ' ision'fame and lot number ��1r-�C�3
844,00 15_'--
1-1
ATTACHED ARE THE FOLLOWING ITEMS: -`!'2�cs�-(->c)• 5
; '); i 'l r `� ; Yc.;' Ps} t "per+
Additional set(s)of plans. Revisions:
Cross section(s)and details. Wall bracing and/or lateral analysis.
Floor/roof framing. Basement and retaining walls.
Beam calculations. / Engineer's calculations.
Other(explain):
REMARKS:
eta^
r!..= p`>°st
�..
Routed to Permit Technician: Date: 6 liTINNIIIIMNIEMEWRii1111111
Fees Due: • Yes (iso Fee Descristion:
$
$
Special
Instructions:
Re.rint Permit 'er PE : ❑ Yes ❑No • Done
A I .licant Notified: Date: Initials:
I:\Building\Forms\TransmittalLetter-Revisions.doc 05/25/2012