Loading...
Plans (38) frt S r)-0 1t-I - 007Z(1 . . St,, ..1 g i, 63(f3 Wv.-(Gt-ki- I S--- 6 - i (i- RECENlit , MAY 2 2.Li 1 .. . TIGAkb !VISION' ........ .., 6 • -PL. %,) It f k 31 r•-•., 1 .. 1 i _ . 1/ rovide 2x6 (min) solid blocking z,x. 14- )- ' etween ceiling joists, over the U-. R.L12`PED new header, typical. .=•Qi gi PAgALLAM Ti t ... .,--i cl 1,41k—J (8.G) 4 .1)— \ Lx.) F oe-rf e., .s• \,.., BELAW. . i r^"---t U?1 • ,...,_.)... , ,,,, • --,k- s P Oft REVISED ROOF FRAMING PLAN: 1 — (Partial) 14's = (Log \:.7..2,..ei . , ii4( CO,,/c., .... RENEWS 12-31-243/5. I g-BEAN SPAN SPAN = 8 .5 FT. NEW KITCHEN HEADER BEAM CARRIES ROOF/SNOW LOAD LOAD CASE 1 UNIFORM LOAD ON FULL SPAN LOAD = 580 PLF. LOAD CASE: 1 (et° F.CC k(—72.7111 GLULAM BEAM USED: FB= 2900 PSI, FV= 290 PSI. PC PERP = 550 PSI. E= 2000000 PSI . MAXIMUM SHEARS, MOMENTS, AND DEFLECTIONS: V = 2054 M = 5238 D = 34 /Ix REACTION (LEFT) = 2465 LBS. BEARING AREA REQ'D = 3 . 792308 IN2 . REACTION (RIGHT) = 2465 LBS. BEARING AREA REQ'D = 3 . 792308 IN2 . SX = 18 . 84738 IN3 . AV (MIN) = 9 .238381 IN2 . MINIMUM BEAN BEAM SIZE = 3 . 5 X 7 .25 rqP-4 ite kv\. MAX: DEFLECTION .305899 INCHES = L/ 333 .4434Ce' A(PROVIDED) = 25 .375 IN2. SX (PROVIDED) = 30 . 66146 N3 . D.F. = 1. 057587 IX(PROVIDED) = 111. 1478 IN ERG LENGTH REQD (LEFT) = ,a, 08357 IN. ERG LENGTH REQD (RIGHT) = . 083'517 IN. fb = 2050 psi. - , FOOTING SCHEDULE: Capacities bas d on 1500 psf 0 24" square x 10" thick 6000 lbs. with (2) #4 each way at 3" clear of bottom. Materials: Concrete 3000 psi at 28 da s* Slump (ftg) 3" to " Portland Cement C-150 5-1/2 sacks per c bic yard Aggregates per -33 3/4" maximum ag regate size Water per 0-94 1 Concrete Tempe oture 50-90 F Air Entrained 5-7 Note: The concrete supplier shall assume ull responsibility for the mix design and the overall performance of the concrete, I Rebar ASTM A615 Grade 40 1 * Note: Foundation design was performed lasing f'c = 2500 psi. No "special inspection" is required. Note: Provide solid blocking I post from floor sheathing to center of footing below. ''',340igie. :c. ,A,\,„. ::, ,,,,,c,-,..,,, .._ , i 1 1,- ' '-- - 4,:(';',enzr,',,, ,i 1 i - -„, I • At\le k--t Oe-it se4 -.t „,\ Existing 2x6 rafters at 24" o/c 001110M1111110 2x4 top-of-beam braces at 24" oft Existing 2x4 "posts" at 48" oft. (2) 16d corn nails into each brace (Provide temporary shoring) (2) 16d com nails into beam. ) '\ 1r) „..../.) ,1/4 i.: 7 Illi ; l Existing 2x6 diagonals at 6 ft o/c � rI Install new ones at 24" o/c in , zone of new beam. ($.5.) • i % i , Li4 7.. I Existing 2x6 ceiling joists at 24" o/c (field verify) (711).,,,, i '-,._Frovide solid blocking each end to wall Studs, below. i New Ceiling Beam (3-1/2" x 7-114" (9-1/4"okay) Parallam) �a ' 1�: Simpson "7512" twisted straps eachceiling ( -''' P foist � 1 (Alternate sides-of-joists, as shown) ' ' , '' ,,(41:2Go.,:, . '>41a 1