LATERAL STRUCTURAL DESIGN
CALCULATIONS
FOR
LOT 8, TROY PARK
PORTLAND, OR
ENGR. JOB # FH14-16
u
.5 7 99
IEX.: ATIOs DATE: 12-31-1
Prepared for:
Fowler Home Designs and Timberline Homes
Plan No.: 3112
Date: 10-30-14
The following calculations are for lateral wind and seismic engineering of building addition only. Gravity loading and the
design of foundations and existing building are outside the scope of this design. The design is based on information provided
by the client who is solely responsible for its accuracy. The engineering represents the finished product. Discrepancies
from information provided by the dient invalidate this design. Michael K.Brown,S.E.shall have no liability(expressed,or
implied),with respect to the means and methods of construction workmanship or materials.
Michael K.Brown,S.E.shall have no obligation of liability,whether arising in contract(including warranty),Tort(including
active, passive, or imputed negligence) or otherwise, for loss or use, revenue or profit, or for any other incidental or
consequential damage
MichaelK.Brown,S.E.
5346 E.Branchwood Dr.
Boise,ID 83716
208-850-7542
mikebrown.se@gmail.com
Job Name: Lot 8,Troy Park Timberline Homes By: MKB
Core Job Number: FH14-16 Date: Oct., 2014
Code Basis of Design: Latest Adopted Version of O.S.S.C.and O.R.S.C.
Wind Loading: Either ASCE 7 or O.S.S.0 projected area method allowed.
ASCE 7 used.
Wind: 120 MPH ult wind speed, Exposure B, 12:12 Pitch average roof Side to Side
and 12:12 average Front to Back. Per ASCE 7 Figure 28.66-1:
Front to Back:
Zone A: 25.7 PSF
Zone B: 17.6
Zone C: 20.4
Zone D: 14
For Zones A and B,a=10%of least horizontal dimension or 0.4h (h=mean roof height), but not less than 3'.
Least horizontal dimension = 46 feet
Therefore, use a = 4.6 feet
Side to Side
Zone A: 25.7 PSF
Zone B: 17.6
Zone C: 20.4
Zone D: 14
For Zones A and B,a=10%of least horizontal dimension or 0.4h (h=mean roof height), but not less than 3'.
Least horizontal dimension = 44 feet
Therefore, use a = 4.4 feet
Upper Floor:
Front to Back:
Average force on projected wall = (total force at zone A+total force at zone C)/overall length:
= 20.9 PSF
Average force on projected roof= (total force at zone B +total force at zone D)overall length:
14.36 PSF
Wall Plate Height= 8 feet
Projected Average Roof Height= 8 feet
Total Wind Force at Upper Level = 9136 #, or 199 PLF
Side to Side:
Horizontal Dimension = 44 Feet
Michael K.Brown,S.E.
5346 E.Branchwood Dr.
Boise,ID 83716
208-850-7542
mikebrown.se@gmail.com
Job Name: Lot 8,Troy Park Timberline Homes By: MKB
Core Job Number: FH14-16 Date: Oct., 2014
Average force on projected wall = 20.9 PSF
Average force on projected roof= 14.36 PSF
Projected Average Roof height= 8 Feet
Total Wind Force at Upper Level = 8738 #,or 199 PLF
Mail Level:
Plate height = 9 Feet
Front to Back:
Average force on projected wall = 20.9 PSF
Projected Length = 46 Feet
Total Wind force at Main Level = 9146 #,or 199 PLF
Total Wind force Upper and Main = 18282 #
Side to Side:
Averag force on projected wall = 20.9 PSF
Projected Length = 44 Feet
Total Wind force at Main Level = 8749 #,or 199 PLF
Total overall side to side wind force = 17487 Pounds
Seismic Loading: D1 seismic design category per O.R.S.0
SDS= .83, R= 6.5, W = weight of structure
V = [1.2SEs/(R)] W
V = .154W
Roof Dead Load = 15 psf
Floor Dead Load = 12 psf
Int. wall Dead Load = 6 psf
Ext. wall Dead Load = 12 psf
Seismic Front to Back:
Tributary Roof Length = 44 Feet
Tributary Floor Length = 44 Feet
Equiv.Trib Int wall Length = 5 Feet
Trib. Ext upper wall Height = 4 Feet
Trib. Ext lower wall Height= 4.5 Feet
Wupper= 127.512 plf < 199 plf,therefore wind gov.
Wfloor= 136.29 plf < 199 plf,therefore wind gov.
•
Michael K.Brown,S.E.
5346 E.Branchwood Dr.
Boise,ID 83716
208-850-7542
mikebrown.se@gmail.com
Job Name: Lot 8,Troy Park Timberline Homes By: MKB
Core Job Number: FH14-16 Date: Oct., 2014
Total Seismic Load = 12134.89 Pounds < 18282 Therefore Wind Gov. overall
Seismic Side to Side:
Tributary Roof Length = 46 Feet
Tributary Floor Length = 46 Feet
Equiv.Trib Int wall Length = 5 Feet
Trib. Ext upper wall Height= 4 Feet
Trib. Ext lower wall Height= 4.5 Feet
Wroof= 130.284 plf < 199 plf,therefore wind gov.
Wfloor= 125.664 plf < 199 plf,therefore wind gov.
Total Seismic Force = 11261.71 Pounds, < 17487 Pounds,therefore wind gov. overall
Redundancy factor = 1.0 per ASCE 7, section 12.3.4.2
Upper Level Wall Lines:
Line A:
P = 199 * 21 ft = 4171 #
- Total Shear Wall Length = 12 Feet
V=P/L = 348 PLF Use A wall
Wall Height = 8 Feet Trib Roof Area = 21 Feet
Shortest Wall Length 3 Feet Trib Floor Area = 0 Feet
Mot= 8341 LB FT Factored Dead Load : 411 PLF
Mr= 1850 LB FT
T= 2164 LB Use Type 5 HD
Line B:
P = 199 * 21 ft= 4171 #
Total Shear Wall Length = 7 Feet
V=P/L = 596 PLF Use C Wall
Wall Height = 8 Feet Trib Roof Area = 2 Feet
Shortest Wall Length 3 Feet Trib Floor Area = 0 Feet
Mot= 14299 LB FT Factored Dead Load : 126 PLF
Mr = 567 LB FT
T = 4577 LB Use Type 7 HD
Line A.5:
P = 199 * 23 ft = 4568 #
.Total Shear Wall Length = 8 Feet
V=P/L = 571 PLF Use C wall
Michael K.Brown,S.E.
5346 E.Branchwood Dr.
Boise,ID 83716
208-850-7542
mikebrown.se@gmail.com
Job Name: Lot 8,Troy Park Timberline Homes By: MKB
Core Job Number: FH14-16 Date: Oct., 2014
Wall Height = 8 Feet Trib Roof Area = 6 Feet
Shortest Wall Length 3 Feet Trib Floor Area = 0 Feet
Mot = 13703 LB FT Factored Dead Load : 186 PLF
Mr = 837 LB FT
T= 4289 LB Use Type 6 HD
Line C:
P = 199 * 23 ft = 4568 #
Total Shear Wall Length = 10 Feet
V=P/L = 457 PLF Use B Wall
Wall Height = 8 Feet Trib Roof Area = 6 Feet
Shortest Wall Length 5 Feet Trib Floor Area = 0 Feet
Mot = 18271 LB FT Factored Dead Load : 186 PLF
Mr = 2325 LB FT
T = 3189 LB Use Type 6 HD
Line 1:
P = 199 * 22 ft = 4369 #
- Total Shear Wall Length = 34 Feet
V=P/L = 129 PLF Use A Wall
Wall Height = 8 Feet Trib Roof Area = 10 Feet
Shortest Wall Length 34 Feet Trib Floor Area = 0 Feet
Mot = 34954 LB FT Factored Dead Load : 246 PLF
Mr = 142188 LB FT
T= -3154 LB No Uplift
Line 2:
P = 199 * 10 ft= 1986 #
Total Shear Wall Length = 18 Feet
V=P/L = 110 PLF Use A wall
Wall Height = 8 Feet Trib Roof Area = 10 Feet
Shortest Wall Length 4 Feet Trib Floor Area = 0 Feet
Mot = 3531 LB FT Factored Dead Load : 246 PLF
Mr = 1968 LB FT
T= 391 LB Header and Perp Wall to Resist
Line 1.5:
P = 199 * 15 ft= 2979 #
.Total Shear Wall Length = 13 Feet
V=P/L = 229 PLF Use A Wall
Michael K.Brown,S.E.
5346 E.Branchwood Dr.
Boise,ID 83716
208-850-7542
mikebrown.se@gmail.com
3ob Name: Lot 8,Troy Park Timberline Homes By: MKB
Core Job Number: FH14-16 Date: Oct., 2014
Wall Height= 8 Feet Trib Roof Area = 6 Feet
Shortest Wall Length 13 Feet Trib Floor Area = 0 Feet
Mot = 23832 LB FT Factored Dead Load 186 PLF
Mr = 15717 LB FT
T= 624 LB No Uplift
Line 3:
P = 199 * 22 ft= 4369 #
Total Shear Wall Length = 20 Feet
V=P/L = 218 PLF Use A wall
Wall Height = 8 Feet Trib Roof Area = 10 Feet
Shortest Wall Length 20 Feet Trib Floor Area = 0 Feet
Mot = 34954 LB FT Factored Dead Load : 246 PLF
Mr = 49200 LB FT
T= -712 LB No Uplift
Main Floor Level:
Front to Back:
- Line A:
P = 199 * 20 ft + 4171 = 8147.3 #
Total Shear Wall Length = 11 Feet
V=P/L = 741 PLF Use D wall
Wall Height = 9 Feet Trib Roof Area = 6 Feet
Shortest Wall Length 3 Feet Trib Floor Area = 3 Feet
Mot= 19998 LB FT Factored Dead Load : 234 PLF
Mr = 1053 LB FT
T= 6315 LB Use Type 3 HD
Line B:
P= 199 * 20 ft + 4171 = 8147.3 #
Total Shear Wall Length = 7 Feet
V=P/L = 1164 PLF Use Type G
Wall Height = 9 Feet Trib Roof Area = 6 Feet
Shortest Wall Length 3.5 Feet Trib Floor Area = 10 Feet
Mot= 36663 LB FT Factored Dead Load : 191 PLF
Mr = 1169 LB FT
T= 10141 LB Use Type 8 HD
Michael K.Brown,S.E.
5346 E.Branchwood Dr.
Boise,ID 83716
208-850-7542
. mikebrown.se@gmail.com
Job Name: Lot 8,Troy Park Timberline Homes By: MKB
Core Job Number: FH14-16 Date: Oct., 2014
Line A.5:
P = 199 * 22 ft + 4568 = 8942.17 #
Total Shear Wall Length = 8 Feet
V=P/L = 1118 PLF Use G wall
Wall Height = 9 Feet Trib Roof Area = 6 Feet
Shortest Wall Length 3 Feet Trib Floor Area = 10 Feet
Mot = 30180 LB FT Factored Dead Load : 318 PLF
Mr= 1431 LB FT
T= 9583 LB Use Type 8 HD
Line C:
P = 199 * 22 ft + 4568 = 8942.17 #
Total Shear Wall Length = 21 Feet
V=P/L = 426 PLF Use Type B
Wall Height = 9 Feet Trib Roof Area = 10 Feet
Shortest Wall Length 21 Feet Trib Floor Area = 2 Feet
Mot = 80480 LB FT Factored Dead Load : 169 PLF
Mr= 37309 LB FT
T= 2056 LB Use Type 1 HD
Side to Side:
Line 1:
P = 199 * 22 ft + 4369 = 8744 #
Total Shear Wall Length = 28 Feet
V=P/L = 312 PLF Use A wall
Wall Height = 9 Feet Trib Roof Area = 2 Feet
Shortest Wall Length 28 Feet Trib Floor Area = 2 Feet
Mot = 78692 LB FT Factored Dead Load : 162 PLF
Mr = 63504 LB FT
T= 542 LB No uplift
Line 2:
P = 199 * 10 ft + 1986 = 3974 #
Total Shear Wall Length = 8 Feet
V=P/L = 497 PLF Use B wall
Wall Height = 9 Feet Trib Roof Area = 8 Feet
Shortest Wall Length 2 Feet Trib Floor Area = 0 Feet
Mot = 8942 LB FT Factored Dead Load : 228 PLF
.Mr = 456 LB FT
T= 4243 LB Use HD Type 2
Michael K.Brown,S.E.
5346 E.Branchwood Dr.
Boise,ID 83716
208-850-7542
mikebrown.se@gmail.com
Job Name: Lot 8,Troy Park Timberline Homes By: MKB
Core Job Number: FH14-16 Date: Oct., 2014
Line 1.5:
P = 199 * 15 ft + 2979 = 5962 #
Strap to floor diaphragm and distribute to lines 1 and 3.
Line 3:
P = 199 * 22 ft + 4369 = 8744 #
Total Shear Wall Length = 27 Feet
V=P/L = 324 PLF Use A wall
Wall Height = 9 Feet Trib Roof Area = 6 Feet
Shortest Wall Length 21 Feet Trib Floor Area = 2 Feet
Mot = 61205 LB FT Factored Dead Load : 222 PLF
Mr = 48951 LB FT
T= 584 LB No Uplift
. .
. • .
. .
.. ;
I"
1 v „......
1 v
I.....*,.......
'..
1
-.-a-. 1 i
, i '', • •., ) „
•).•-,,••• I „
• ,, ; :, i '''),,' ,
, 0
11 ,
„.... ..1 1
1,42141 II
1$
11111 1 I
11 ,1 6
11 ,
,.,..,,
,
1
I N ,
._. .„, 1 ...J .,
/..,„
MAIN FLOOR PLAN UPPER FLOOR PLAN
24 VS 9201
NOLL VA313 MIS .11-i012.1
.....
____... J4 IX....!?...
. .. , .
NOLLVA313 6V3N
„,...... . -...........„
- -
00
„,.,..„„....,.....,...,......,-,'•••••••••••••• ••• --6
_.......—
_
i ft„,m,---.-- .,,m..,,,, 1.„.1.7± •..alff.,,,,,,,g1 pi..1.,...., ,„.7.:::::,,,,,fiff,,,,:.;:zi:„.,...±,,,,,,T-_,..„1.,__--t•,.,.;- _,....„...„,,,,,,,„:„..,,,,„f,,,,f,,,.,•:,J,,,,,,,.-,, .• • ,
... .... . _,,,,,, ,+_,...,....,:.., .
i_±.„-:,It ax-F:''''''''''''''5:-!"---='-f--,,--,,-,::::,117-.1.-.F.„7....;,-Y,'..:*-,.. - --tr:i." .---'...7,°',7'-2.,,,;.',''-t'.47•2:q.Y1'---'',.--'',7-r•-'2'..1.--7...=1. .1-
. _..._...tii.E,T.I,
t,
7f:':: :111711*.<74.,..1:-.jg :::
iiP5 i 71 7±.---**--1-2---5-1,.' ,i,;;;,,l-anr- ----..=--''''77,.'- ',.:7-,. ..fE i-- - -- 1....„---4,-, --- ''', ..-,..,;',,,Y.;,",,,;,..H.,..-:.-..-..sz.,...,,,,,...7-... .-,i;.y•-ys..--4.- -.77. Li- F....Y-H-..,-,-;-TH ' ............ 1
j 1
''''''''i."7';'-':-Effr.t.-±,:-.1t-F-,;:s .111f...lits.,__:=,„,„„:„..s..2,;,•_„,..,•_,_,____ _ _,,,,,,,,,,,,,_77,,,„,„7„,•,,,,,,,,,./..
kill
. ,,,,':,.1,,lirl l,', ",,`,1,'.',,i'.:,.l'i,'''„'
'''''. ''''*Alit::;11r:j ,,,,..,;,,I.,.,•,,11 y,N,„,.,,,,,..r,,,, „,,, :,,,;,,, ,,,,,N.,.,,,,
.6!.-!,,i•-,-i,f,,1,1-..0.1.i 41,34,,,J0-4111,06--,,,,, , ,,
ki . -'- -,;-•'' 47
IA te(MOW
NOUNA313 'NONA
1.1:06 NOV
——NOLLVA413 kis 1.1311
......,....---•,-.' •,..•..: _______,:-,..,:-...,,,,,,,
..,........•"•'''''':'..-- --4,0%*".V.,;,ftlatt,-•,:,;,"7" --:-.:,"".1-E---:-..-,..,,,,--::::---:---..:._' „-7:-.:-,v-:
'' 'Ai-.*Vvmst-44-,-- - ,----•=--,,---"--•-=:=-E-..:-:•-----...,..:-:.,------E:,
----------• ''-•'-.±-"1.-.:-....ifl...T.f;--2--1,1'.;-,.',:t.:::; __;'.' .-..:-:].I':-.;•,7•-•-• '
,'''' '''''''''''"':7-':'-'-7..77,-7,-:::"-:1:; ,HE:".,E1'::- ;-"-;;";;L'±;;, -7 ,-":";;"±-,•, 4:E-;-EtTl ..g L- -
i;:-.:7-.,„7,„1 ..! :1 iEE "--';'' '': ',-.EZ.,1;;;E:: :,:,..':--•:;;Z:,,":::,';'-'T'''''''''''', ..-,],7;t:-._,- . - , :::
1r—.., ,,„41. - -
1: ..1
...,
_ _ . ....... .. ., .,...„,,,„_,,,..„,,,,,,,,,,.„,,,J. 1 .-------,
_, .. ._.___,,,,,, 011 1.1___ .
„
---A,
',Nip 14,144,1,:„:',2.,:,,,,,,;.,.,,,•,,,i!),,„... ...,..:,......,..,...,.......,.„,,,,,.
44jrci':;vt,,h,;1;ii,,,,,i6i.,,;',,,,',,-,•":',,..i'-',',,i,,,.Y,,,',',,..:,:ii,',4,..,,:-,":; :,,,-.-i'.,Y„:,',,,ii.',,:y,)'..,.:T,'
..,„..,:
•
$
•
•
SHEAR WALL SCHEDULE
am
MARK REF NOTES: (a,i) Note: (b) EDGE NAILING FEILD NAILING SILL TO CONCRETE SILL TO WOOD SHEAR TRNASFER Lbs
NUMBER SHEATHING NAIL SIZE SPACING SPACING CONNECTION. Note: (c) CONNECTION. Note (g) CLIPS (h) CAPACITY
A 16" OSB (1) SIDE 8d 6" 12" 2" Dia. A.B. @ 48"o/c 16d @ 6"o/c A35 @ 18"o/c 384
B is" OSB (1) SIDE(f) 8d 4" 12" 2"Dia. A.B. @ 24"o/c 16d @ 4"o/c A35 @ 14"o/c 560
C 16" OSB (1) SIDE (e,f) 8d 3" 12" 2"Dia. A.B. @ 18"o/c (m) 16d @ 3" o/c A35 @ 11"o/c 720
D 16" OSB (1) SIDE(e,f) 8d 2" 12" 2"Dia. A.B. @ 16"o/c (m) 16d @ 2"o/c A35 @ 8"o/c 936
E 16" OSB (2) SIDE(d,e,f) 8d 6" 12" 2"Dia. A.B. @ 18"o/c (m) 16d @ 3"o/c A35 @ 10"o/c 768
F 16' OSB (2) SIDE(d,e,f) 8d 4" Staggered 12" 2"Dia. A.B. @ 12"o/c (m) 16d @ 2"o/c A35 @ 7"o/c 1120
G 16" OSB (2) SIDE(d,e,f) 8d 3" Staggered 12" z"Dia. A.B. @ 10"o/c (m) 16d @ 3"o/c(2)rows staggered A35 @ 5"o/c 1440
H 16" OSB (2) SIDE (d,e,f) 8d 2" Staggered 12" z'Dia. A.B. @ 8" o/c (m) 16d @ 2" o/c(2)rows staggered HGA10KT @ 7" o/c 1872
Notes:
a) Wood structural panels shall conform to the requireents for its type in DOC PS 1 or PS 2. All wall construction to conform to AF&PA SDPWS per IBC 2306.3.
b) Use Common Wire Nails for all wood sheathing and cooler nails for gypboard sheathing.
c) A.B. minimum 7" embed into concrete. 3"x3"x%" plate washers req'd at all shear wall A.B. Locate edge of Washer no greater than Z"from sheathed edge of sill plate.
d) Panel joints shall be offset to fall on different framing members or framing shall be 3x or thicker and nails on each side shall be staggered.
e) 3x or Dbl 2x framing at all panel edges and nails shall be staggered.
f) All edges blocked.
g) Common Wire Nails.
h) Clip to be attached from continuous blocking to top of continuous top plates.
Clips are not required at Gyp Bd walls but blocking is attached per the toenailing schedule.
i) See attached typical shearwall details.
j) Sheathing to be Structrual I Sheathing.
k) Values are for framing of H-F.
m) See plan for walls where seismic design shear is greater than 560 plf. 3x or 2x flat blkg at panel edges, Stagger nails.
Where indicated on the plans 3x sills are required with A.B. spacing as per plan and schedule. See note C for plate washers req'd at A.B.
For walls with the larger sills, Anchor Bolt spacing may be increased by a factor of 1.25 from the table above due to thicker sills.
H.oLDowN SCHEDULE .
MARK Boundary Tension of DF Tension of HF Anchor Anchor
NUMBER HOLDOWN Studs Allowable Lbs Allowable Lbs Mono Pour Two Pour
1 HDU2-SDS2.5 OR
PHD2-SDS3 (2)2x 3075 2215 SSTB14 SSTB2OL
2 HDU4=SDS2.5 OR (2)2x 4545 3270 SSTB16L SSTB2OL
PHD5 SDS3
3 HDU8-SDS2.5 (3)2x 7870 5665SSTB28L 7/8"DIA.x24"MIN
EMBED INTO CONC.
A36 THREADED ROD
w/HEAVY SQ. NUT
AND BP7/8-2
BEARING PLATE
WASHER @ BOTT.
4 HDU11-SDS2.5 (1)6x 9535 6865 1"DIA.x42"A36 1"DIA.x42"A36
THREADED ROD w/ THREADED ROD w/
8 HHDQ14-SDS2.5 (1)6x 13710 10745 HEAVY SQ.NUT ANDHEAVY SQ. NUT AND
WASHER @ BOT. WASHER @ BOT.
PROVIDE 24"EMBED PROVIDE 24"EMBED
INTO CONT FTG. INTO CONT FTG.
5 MSTC28 (2)2x 3000 2590 N/A N/A
6 MSTC40 (2)2x 4335 3745 N/A N/A
7 MSTC66 (2)2x 5660 5660 N/A N/A
Notes:
1. Install all holdowns per manufactureer specificaiton per latest Simpson Strong Tie catalog.
2. Match studs on schedule for walls below on all wall to wall holdowns.
3. (Multiple)2x studs nailed together with (2) rows of 16d @ 3" o.c. staggered.
4. Refer to shearwall schedule and typical shearwall details for wall locations and configurations.