Report (42) 44sr)-01g g— vz.2-(,-
f 3ci50swl,.,
SolarCity
3055 Clearview Way
San Mateo,CA.94402
(888)-SOL-CITY f765-2489)1 www.solarcily.corn
August 1,2013
Project/Job#9721567
RE: COVER LETTER
Project: Scott Residence
13490 SW 129th Ave
Tigard,OR 97223
To Whom It May Concern,
A jobsite survey of the existing framing system was performed by an audit team from SolarCity. The attached structural calculations are
based on site observations and design criteria listed below:
Design Criteria:
-Applicable Codes= 2010 OSISC&2010 OSSC,ASCE 7-05,and 2005 NDS
-Roof Dead Load = 9 psf(All MPs)
-Roof Live Load = 14 psf(All MPs)
-Ground/Roof Snow Load= 25 psf
-Risk Category= II,Wind Speed =95 mph, Exposure Category C
-Solar modules =As indicated in attached drawings.
On the above referenced project,the structural roof framing has been reviewed for loading from the PV system on the roof.The
structural review,including the plans and calculations only apply to the section of roof that is directly supporting the PV system and its
supporting elements.After review it was determined that the existing structure is adequate to carry the PV system loading.
The structural roof framing and the new attachments that directly support the gravity loading from PV modules have been reviewed
and determined to meet or exceed requirements of the 2010 OSISC&2010 OSSC.
Please contact me with any further questions or concerns regarding this project.
Sincerely,
iikED
c�'. N F�ss�o
Yoo Jin Kim,P.E. Q ��7
Civil Engineer 'F
Main: 888.765.2489,x5743 OR.
email: ykim@solarcity.com
60N13,2pc�
y,;,i;y, ..L !, IIS
Digitally signed by Yoo Jin Kim
Date:2013.08.01 10:41:58
-07'00'
08.01.2013
Solar City SleekMountTM PV System Version# 13.9
Structural Design Software
PROJECT INFORMATION
Project Name: Scott Residence Atli Tigard
Job Number: 9721567 Building Code: 2010 OSISC&2010 OSSC
System Size: 2.940 kW PV System Based.On: 2009 IBC/IRC
Customer Name: Scott,James H ASCE Code: ASCE 7-05
Addr 13490 SW 129th Ave Upgrades'R
:eq d? No
City/State: Tigard, OR Stamp Req'd? Yes
Zip Code 97223 PV Designer: Trudy Homer
Latitude: 45.422429 Calculations: Tadei Shayo
Longitude: -122.809295 Reviewer: Yoo Jin Kim, P.E.
SC Office: Portland EOR: Yoo Jin Kim, P.E.
MOUNTING STRUCTURE&P V SYSTEM INFORMATION
Mounthig,aructure Imformatjon
Risk Category
II
PV System Type - SolarCity SleekMountTM
Roofing Material Comp Roof
Tile Attachment System Tile Roofs Only NA
Tile Reveal SM Span Only NA
Tile Spanner Bar Direction SM Span Only NA
Standing Seam Spacing SM Seam Only NA
Roof Slope 40°
- Rafter Spacing 24"O.C.
t S € hr
V
Total Number of Modules 12
PV Module Orientation Landscape
Spanning Vents No
Total Area of Array 211 sf
PV Module Width 3.2 ft
PV Module Length 5.4 ft
Attachment Type Coma Mount Tvoe C
Minimum Eave End Setback 12"
Minimum Ridge Setback 12"
PV Module Weight �.� �ti2.5—psf
Hardware Assembly Weight 0.5 psf
Total PV System Weight 3 psf
SEISMIC CONSIDERATIONS
•
Seismic Design Criteria (per USGS)
Seismic Design Code ASCE 7-05
- Latitude 45.4224
Longitude -122.8093
SRA at Short Period Ss 0.971
SRA at is Period S USGS
1 0.347 USGS
Soil Site ClassD
Seismic Design Category SDC IBC 1613.5.2
Seismic Check Required(Ss>_ D USGS
0.4o&SDC>D)? Yes IBC 1613.1
ALTERATION LATERAL DESIGN 10% EXCEPTION CHECK
Weight of"Proposed PV System
PV System Weight 1I I 3 '
211 sf psf 633 lbs
Total Weight of PV System I_ W(pv) 633 lbs
Weight°floor'on'Willing Building
Sum Area of MPs with PV 836 sf
Portion of Roof Weight _ A O id%Load . .f*height
Roof836 sf 9.0 psf 7,524 lbs
Ceiling 836 sf 6.0 psf 5,016 lbs
Interior Walls(Top Half) 463 sf 6.0 psf 2,776 lbs
Exterior Walls(Top Half) 463 sf 36.0 psf 16,654 lbs
Net Weight of Roof Under PV W(ex;n) 31,970 lbs
cI .... In s , im Wight/`Se156110
0/0 Increase of DCR of Lateral ���� � � �` -•
�
Force Resisting System W(v�r)/W(exist) '2.0%5� IBC Sect.
Increase Seismic Shear Load< 10%,-> [OK] 3404.4
Note: Seismic base shear is directly proportional to roof weight.
CALCULATION OF DESIGN WIND LOADS
Wind Design.Criteria
Wind Design Code ASCE 7-05
Wind Design Method Partially/Fully Enclosed Method
Basic Wind Speed V 95 mph
Exposure Category C Section 6.5Fig. 6.5
Roof Style .6.3
Mean Roof Height h Gable/Hip Roof Fig.6-11B/C/D-14A/B
Effective Roof Slope 25 ft Section 6.2
Effective Rafter Spacing 40
Effective Wind Area(1 Module) A 1724"
O.C.
17.6 sf IBC 1509.7.1
Wind.Pressure Calculation Coefficients
Wind Pressure Exposure Kz 0.95
Topographic Factor K Table 6-3
n 1.00 Section 6.5.5
.7
Wind Directionality Factor Kd 0.85
Importance Factor I Table 6-4
1.0 Table 6-1
Velocity Pressure qti qh =0.00256(Kz)(Kzt)(Kd)(VA2)(I)
18.6 psf Equation 6-15
Ext. Pressure Coefficient(Up) GCp(Up) Wil ahC 0.9a r
Ext. Pressure Coefficient(Down) GCp(Down) 0.88 Fig.6-11B/C/D-14A/B
Design Wind Pressure Fig.6-11B/C/D-14A/B
p p=qh(GCp) Equation 6-22
Wind Pressure Up P(up) 17.7 psf
Wind Pressure Down P(down) 16.3 psf
ALLOWABLE ATTACHMENT SPACINGS (IN.)
o
Max Allowable Foot Spacing Landscape , 72"� S . 1i4#P eon
Max Allowable Cantilever Landscape 24 39 A
Standoff Configuration Landscape NA
Max Standoff Tributary Area Trib Staggered
PV Assembly Dead Load W-PV 39.sf
Net Wind Uplift at Attachment T-actual 3 psf
Uplift Capacity of Attachment T-allow -3 637 lbs
Attachment Demand/Capacity DCR o
- 499.. lbs
8/0
CALCULATION OF ROOF DEAD AND LIVE LOADS
Roof Dead.Load Material Lead<
Roof Category Description All MPs
Roofing Material Comp Roof
#of Layers 2 5.0 psf
Underlayment Roofing Paper
Plywood Sheathing 0.5 psf
Board Sheathing Yes 1.5 psf
None 0.0 psf
Rafter Size and Spacing 2 x 4 @ 24 in.O.C. 0.7 psf
Vaulted Ceiling None 0.0 psf
Miscellaneous Miscellaneous Items 1.3 psf
Total Roof Dead Load _ 9 psf(All MPs) 9.0 psf
Reduced Reef Live Load Symbol , Valee ASCE 7.05
Roof Live Load L0 20.0 psf Table 4-1
Member Tributary Area At <200 sf
Roof Slope 10/12
Tributary Area Reduction R1 1
Sloped Roof Reduction R Section 4.9
R2 0.7 Section 4.9
Reduced Roof Live Load Lr Lr= L0(R1)(R2)
Reduced Roof Live Load Lr 14 psf(All MPs) Equation.4-2
14.0 psf
Ceiling headLoad Material Lad
Ceiling Joist Size and Spacing 2 x 4 @ 24 in. O.C. 0.7 psf
Insulation
Yes 1.4 psf
Finish
1/2"Gypsum Board
Miscellaneous 2.2 psf
Miscellaneous Items 1.7 psf
Total Ceiling Dead Load
6.0 psf
a F 0 R T E ' MEMBER REPORT Level,MP1 PASSED
1 piece(s) 2 x 4 Douglas Fir-Larch No. 2 @ 24"OC
Overall Sloped Length:21'1 9/16"
+
o +
_ a
1 �
10.1i
I
11 r
p
II
!
11'S 2'10' 2' ii 4' fil S'T
4
NI
All locations are measured from the outside face of left support(or left cantilever end).All dimensions are horizontal.
Design Results Actual u Location Allowed Result LDF Load:Combination(Pattern) System:Roof
Member Reaction(lbs) 456 @ 10'3" 2916(3.50") Passed(16%) -- 1.0 D+1.0 S(Adj Spans) Member Type:Joist
Shear(lbs) 217 @ 10'7 7/16" 725 Passed(30%) 1.15 1.0 D+1.0 S(Adj Spans) Building Use:Residential
Moment(Ft-lbs) -223 @ 10'3" 456 Passed(49%) 1.15 1.0 D+1.0 S(Adj Spans) Building Code:IBC
Live Load Defl.(in) 0.123 @ 13'3" 0.361 Passed(L/706) -- 1.0 D+1.0 S(Alt Spans) Design Methodology:ASD
Total Load Defi.(in) 0.173 @ 13'3 5/16" 0.481 Passed(1/500) -- 1.0 D+1.0 S(Alt Spans) Member Pitch:10.1/12
• Deflection criteria:LL(L/240)and TL(1/180).
•Overhang deflection criteria:LL(21/240)and TL(21/180).
• Bracing(Lu):All compression edges(top and bottom)must be braced at 20'10 5/8"o/c unless detailed otherwise.Proper attachment and positioning of lateral
bracing is required to achieve member stability.
•A 15%increase in the moment capacity has been added to account for repetitive member usage.
•Applicable calculations are based on NDS 2005 methodology.
Bearing Length Loads to Supports(lbs)
Supports Total Available Required Dead Snow Total Accessories
1-Beveled Plate-SPF 3.50" 3.50" 1.50" 96 155 251 Blocking
2-Beveled Plate-SPF 3.50" 3.50" 1.50" 64 145 209 None
3-Beveled Plate-SPF 3.50" 3.50" 1.50" 85 162 247 None
4-Beveled Plate-SPF 3.50" 3.50" 1.50" 158 298 456 None
5-Beveled Plate-SPF 3.50" 3.50" 1.50" 56 124 180 Blocking
•Blocking Panels are assumed to carry no loads applied directly above them and the full load is applied to the member being designed.
Dead Snow
Loads
Location Spacing (0.90) (1.15) Comments
1-Uniform(PSF) 0 to 15'11 3/4" 24" 9.0 25.0 Roof
2-Uniform(PSF) 0 to 10'8" 24" 3.0 -
Weyerhaeuser Notes
OWeyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. SUSTAINABLE FORESTRY INITIATIVE
Weyerhaeuser expressly disclaims any other warranties related to the software.Refer to current Weyerhaeuser literature for installation details.
(www.woodbywy.com)Accessories(Rim Board,Blocking Panels and Squash Blocks)are not designed by this software.Use of this software is not intended to
circumvent the need for a design professional as determined by the authority having jurisdiction.The designer of record,builder or framer is responsible to
assure that this calculation is compatible with the overall project.Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable
forestry standards.
The product application,input design loads,dimensions and support information have been provided by Forte Software Operator
Forte Software Operator Job Notes
8/1/2013 10:35:28 AM
Forte v4.1,Design Engine:V5.7.0.245TadaShay()
SolarCity
(650)963 5100 Scett.4te
tshayo@solarcity.com
- -- �agclofl
a F O R T E MEMBER REPORT Level,MP2 PASSED
1 pieces) 2 x 4 Douglas Fir-Larch No. 2 @ 24" OC
Overall Sloped Length:28'313/18"
o +
0
12 i i
10.1F e. '
u '
II2' T4' I 6'6. ii 6,4'
El
All locations are measured from the outside face of left support(or left cantilever end).All dimensions are horizontal.
Design Results Actual 0 Location Allowed Result LDF Load:Combination(Pattern) System:Roof
Member Reaction(lbs) 588 @ 8'6" 2916(3.50") Passed(20%) -- 1.0 D+1.0 S(Adj Spans) Member Type:Joist
Shear(lbs) 295 @ 8'1 9/16" 725 Passed(41%) 1.15 1.0 D+1.0 S(Adj Spans) Building Use:Residential
Moment(Ft-lbs) -392 @ 8'6" 456 Passed(86%) 1.15 1.0 D+1.0 S(Adj Spans) Building Code:IBC
Live Load Defl.(in) 0.395 @ 4'7 1/16" 0.479 Passed(1/291) -- 1.0 D+1.0 S(Alt Spans) Design Methodology:ASD
Total Load DeFl.(in) 0.569 @ 4'6 5/8" 0.639 Passed(L/202) -- 1.0 D+1.0 S(Alt Spans) Member Pitch:10.1/12
• Deflection criteria:LL(1/240)and TL(14180).
•Overhang deflection criteria:LL(21/240)and TL(21/180).
• Bracing(Lu):All compression edges(top and bottom)must be braced at 10'1 5/16"o/c unless detailed otherwise.Proper attachment and positioning of lateral
bracing is required to achieve member stability.
•A 15%increase in the moment capacity has been added to account for repetitive member usage.
•Applicable calculations are based on NDS 2005 methodology.
Bearing Length Loads to Supports(lbs)
Supports Total Available Required Dead Snow Total Accessories
1-Beveled Plate-SPF 3.50" 3.50" 1.50" 115 219 334 Blocking
2-Beveled Plate-SPF 3.50" 3.50" 1.50" 186 402 588 None
3-Beveled Plate-SPF 3.50" 3.50" 1.50" _ 159 363 522 None
4-Beveled Plate-SPF 3.50" 3.50" 1.50" 65 145 210 Blocking
•Blocking Panels are assumed to carry no loads applied directly above them and the full load is applied to the member being designed.
Dead Snow
Loads Location
Spacing (0.90) (1.15) Comments
1-Uniform(PSF) 0 to 21'5 3/4" 24" 9.0 25.0 Roof
2-Uniform(PSF) 1'3"to 3'9" 24" 3.0 -
Weyerhaeuser Notes
SUSTAINABLE FORESTRY INITIATIVE
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
��Yii
Weyerhaeuser expressly disclaims any other warranties related to the software.Refer to current Weyerhaeuser literature for installation details.
(www.woodbywy.com)Accessories(Rim Board,Blocking Panels and Squash Blocks)are not designed by this software.Use of this software is not intended to
circumvent the need for a design professional as determined by the authority having jurisdiction.The designer of record,builder or framer is responsible to
assure that this calculation is compatible with the overall project.Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable
forestry standards.
The product application,input design loads,dimensions and support information have been provided by Forte Software Operator
Forte Software Operator --_ Job Nobs 8/1/2013 10:21:01 AM
radai Shayo
Forte v4i.1,Design Engine:V5.7.0.245
SolarCily
(650)963 5100 SCOIt.�tE
tshayo@solarcity.com
Page 1of1