Loading...
Report srls cf7 RECEIVED City of Tigard (22,ceo biz)," JUL o 2 2013 111 1 Building Division CITYOFTIGARD 13125 SW Hall Blvd, Tigard, OR 97223 BUILDINGDNISION Phone: 503.718.2439 Fax: 503.598.1960 T I GARD Inspection Line: 503.639.4175 www.tigard-or.gov 2010 Oregon Solar Installation Specialty Code Check List for Prescriptive Installation of Roof-Mounted PhotoVoltaic Solar Panel System Property Information Installation Address: 10260 SW Hoodview DR City: Tigard Zip: 97224 Owner's Name: Joe Skach Date: 6/27/13 Contractor's Name: Willamette Crest Properties LLC CCB #: 180882 Design Parameters of the Property/Structure If"Yes", does not Flood Hazard Is the installation ❑ Yes qualify for the Area Located in a flood prescriptive path, follow plain/flood way? ® No OSSC or ORSC for design requirements. Wind Ex osure Is the wind exposure ® Yes If"Yes", qualifies for p "C" or less? ❑ No the prescriptive path. Installations on detached Is the Ground Snow single/two-family Load 70 psf or less? dwelling/single/two- If"Yes", qualifies for family townhomes ® Yes the prescriptive path. and/or their accessory Ground structures. ❑ No Snow Load Is the Ground Snow Installations on all Load 50 psf or less? If"Yes", qualifies for structures other than ® Yes the prescriptive path. above ❑ No 1 I:Building/Forms/Photo V oltaic-Checkl ist.docx Is the construction El material wood and does Yes Type of the construction qualify If"Yes", qualifies for Constructionas "conventional light ❑ No the prescriptive path. frame" construction? Is the spacing 24 inches or less? • Pre-engineered trusses. ® Yes If"Yes", qualifies for the prescriptive path. ❑ No Roof framing members Is the spacing 24 inches or less? Nominal lumber. If"Yes", qualifies for ❑ Yes the prescriptive path. ❑ No Is the combined weight ® Yes of the PV modules and If"Yes", qualifies for racking less than or ❑ No the prescriptive path. Solar equal to 4.5 psf? installation Is the solar installation El layout in accordance Yes If"Yes", qualifies for with Section 305.4(3) of the 2010 Oregon Solar 111No the prescriptive path. Code? ❑ Metal Single layer If roofmg material is RoofingCheck the type of 11 of wood shin le/shake one of the three types material roofing material g checked, qualifies for Max. two layers the prescriptive path. ® of composition shingle. Is the roof mounted ® Yes Connections of solar assembly the solar assembly connected to roof If"Yes", qualifies for ❑ No the prescriptive path. to the roof framing or blocking directly? 2 I:Building/Forms/Photo V oltaic-Checklist.docx ❑ Yes If"Yes", qualifies for Is the gauge 26 or less? ❑ No the prescriptive path. 115 lbs for 60 inch spacing or less? If"Yes", qualifies for ❑ Yes the prescriptive path. ❑ No Minimum Uplift rating of Clamps? 75 lbs for 48 inches spacing or less? If"Yes", qualifies for ❑ Yes the prescriptive path. ❑ No Attachment of roof mounted Minimum 24 inches If the spacing falls solar systems Spacing of clamps? within 24 inches and 60 directly to inches Maximum 60 inches inches, qualifies for the standing seam prescriptive path. • metalanels If the width of the panel P Width of roofing is less than 18 inches, panels? 18 inches or less inches qualifies for the prescriptive path. Minimum#10 at 24 inches o/c? Size and spacing of If"Yes", qualifies for fastener? 111 Yes the prescriptive path. ❑ No Is the roof decking of WSP min. 1/2"thickness, ❑ Yes decking connected to If"Yes", qualifies for framing members ❑ No the prescriptive path. w/min. 8d nails @ 6"112" o/c? Is the height less than or Maximum 18 inches equal to 18 inches? Height of the from the top of the If"Yes", qualifies for solar modules module to the roof El Yes the prescriptive path. surface. ❑ No 3 I:Building/Forms/Photo V oltaic-Checklist.docx Submittal Documents required for Prescriptive Installations Show the location of the PV system in relation to buildings, structures, property lines, and, as applicable, flood hazard areas. Site Plan Details must be clear and easy to read. Minimum size of the plan is 8.5 x 11 inches. Attach a simple structural plan showing the roof framing (rafter size, type, and spacing) and PV module system racking attachment. System must be shown in sufficient detail and clarity to assess whether it Structural Plan meets the prescriptive construction requirements as listed earlier above in the matrix. Minimum size of the plan is 8.5 x 11 inches. PV Modules Manufacturer: SolarWorld Model Number: SW270 Listing Agency: IEC 61730; ISO9001,ISO14001 4 I:Building/Forms/Photo V oltaic-Checklist.docx . SunmoduIe ® SW 270 mono/2.5 Frame PERFORMANCE UNDER STANDARD TEST CONDITIONS(STC)* PERFORMANCE AT 800 W/m2,NOCT,AM 1.5 Maximum power P, . 270 Wp Maximum power Pma. 194.9 Wp Open circuit voltage Vp, 38.3 V Open circuit voltage Vo 34.5 V Maximum power point voltage Vmpp 32.1 V Maximum power point voltage Vmp, 28.9 V Short circuit current I 8.90 A Short circuit current Is, 7.19 A Maximum power point current 8.42A Maximum power point current 6.74 A I„.. mpp 'STC:1000 W/m,25°C,AM 1.5 Minor reduction in efficiency under partial load conditions at 25'C:at 200 W/m2,95% (+/-3%)of the STC efficiency(1000 W/m)is achieved. THERMAL CHARACTERISTICS COMPONENT MATERIALS NOCT 46°C Cells per module 60 TCI 0.004%/K Cell type Mono crystalline TCvoc -0.30%/K Cell dimensions 6.14 in x 6.14 in(156 mm x 156 mm) TCP,,,,, -0.45%/K Front Tempered glass(EN 12150) Operating temperature -40°C to 85°C Frame Clear anodized aluminum Weight 46.7 lbs(21.2 kg) SYSTEM INTEGRATION PARAMETERS so Maximum system voltage SC 11 1000 V I Max.system voltage USA NEC 600 V E 7 -1032 SOW I -410 whw' Maximum reverse current 16 A S --0,3why Number of bypass diodes 3 4 41$wh.' 113 psf downward 3 --tA0wn 5 UL Design Loads* Two rail system 64 psf upward • 2 ^100WheP P 170 psf downward L "�,\1 UL Design Loads' Three rail system 64 sf upward rd 0 113 psf downward p LO 20 00 40 S0 IEC Design Loads* Two rail system 50 psf upward 01064*votive IA *Please refer to the Sunmodule installation instructions for the details associated with these load cases. ADDITIONAL DATA �x4 37.44(951) I \ T Power sorting' -0 Wp/+5 W .1-Box IP65 11.33(288) Connector MC4 Module efficiency 16.10 Fire rating(UL 790) Class C 41.30(1050) 0.6(15.3) Version VERSION 2.5 FRAME 2.5 frame • Compatible with both"Top-Down" 65.94(1675) -bottom and"Bottom'mounting methods mounting holesFs Grounding Locations: -4 corners of the frame -4 locations along the length of the module in the extended flanges 1.34(34) 0 0 0 -t O O o 0 { 1 �x4 ur $l,'Z' ..._. - - - 4.20(1041 ' Black&Veatch validated PAN files now available. 39.41(1001) 1 Ask your account manager for more information. 1.22(31) ,_ ._._ ._... .._.. 1)Measuring tolerance traceable to TUV Rheinland:+/-2%(TUV Power Controlled). All units provided are imperial.SI units provided in parentheses. SolarWorld AG reserves the right to make specification changes without notice. SW-01-6004US 01-2013