Loading...
Plans RECEIVED FEB 2 6 2013 CITY OF TIGARD BUILDING DIVISION PROJECT INFORMATION OWNER MOHR RESIDENCE CONTRACTOR ADVANCED ENERGY SERVICES 12523 SW 114TH TERRACE 14755 SE 82ND DRIVE TIGARD,OR 97223 CLACKAMAS,OR 97215 MAIN:503.635.0117 CONTACT:JORDAN WEISMAN BUILDING SINGLE FAMILY RESIDENTIAL PHONE:503-407-6820 DATA ROOF SPECS ASPHALT COMPOSITE SHINGLE ROOF(SINGLE LAYER) — W/2X4 TRUSSES DOUGLAS FIR#2 Q 24"O.C. APPLICABLE 2010 OREGON SOLAR INSTALLATION TILT:35 DEGREES CODES SPECIALTY CODE AZIMUTH:185 DEGREES — ROOF AREA(PLAN VIEW)= 2,890 SF ARRAY AREA= 185 SF. ARRAY IS<25%OF ROOF AREA SYSTEM SOLARWORLD 255W r..---- `..* 10 X 255W=2.55kW MODULE SOLARWORLD SUNMODULE 255W (10 MODULES) SPECS (10)ENPHASE M215 INVERTERS, (L)66"X(W)39.5'X(H)1.34° WEIGHT:47,6°LBS . 1 INVERTER AT EACH MODULE COMBINED WEIGHT OF MODULES AND RACKING IS< i' 4.5PSF. • PROJECT NOTES :. :•. 1. 303,2-PV SYSTEMS AND SUPPORTING STRUCTURE 7, ROOF STRUCTURE IS CONVENTIONAL LIGHT FRAMED i� SHALL COMPLY WITH REQUIREMENTS OF OSSC WOOD CONSTRUCTION WITH 2X4 TRUSSES AT 24"0,C, ' ? t i CHAPTER 6 OR THE ORSC AS APPLICABLE. MAX,EXEMPT FROM ALLOWABLE SPAN REQUIREMENTS f ' 1 ' 2. 303.3•ALL PV MODULES TO BE UL 1703 LISTED. IN TABLE 305,4,1. • i 3. 303,5-PV SYSTEM SHALL HAVE A FIRE 8. 304,9.5-DISCONNECTS,3-BOXES,COMBINER BOXES OR i "4 CLASSIFICATION THAT IS EQUAL TO OR GREATER GUTTERS SHALL NOT BE PLACED IN ANY REQUIRED �` DRIVEWAY THAN THE ROOF ASSEMBLY REQUIRED BY OSSC PATHWAY OR CUTOUT, SECTION 1505.1. 9. ROOF MATERIAL IS ASPHALT COMPOSITE SHINGLE. Area of work. .1'. 4. 303.6-ALL COMPONENTS OF THE PV SYSTEM SHALL BE 10. PER 305.4 ITEM 3:TOTAL SYSTEM WEIGHT SHALL NOT RATED FOR THEIR USE. EXCEED 4.5 PSF. PV MODULES AND RACKING SHALL BE r 5. 303.4-304.8-PV LAYOUT SHALL NOT RESTRICT DIRECTLY ATTACHED TO ROOF FRAMING AS SHOWN IN �MJNMETER EGRESS, LIGHT,VENTILATION,OR ROOF DRAINAGE CONNECTION DETAIL#2.ATTACHMENT SPACING WILL REQUIREMENTS. BE 48"O.C.MAX,AND WHEN ATTACHMENT LOCATED 6. 304.9.1 GENERAL PATHWAY REQUIREMENTS- WITHIN 3'OF ROOF EDGE,HIP,EAVE,RIDGE SHALL BE EXCEPTION 1:ON STRUCTURES WITH A PV ARRAY 24"O.C. MAX. AREA OF 1,000 SF OR LESS INSTALLED ON A ROOF 11. MAX MODULE HEIGHT< 12"OFF ROOF SURFACE. WITH A SLOPE THAT EXCEEDS 2:12 AND WITH AN 12. SECTION 304.7-MECHANICAL EQUIPMENT INTERSECTING ADJACENT ROOF AND WHERE NO CLEARANCES: NOT APPLICABLE,THERE IS NO SECTION IS LARGER THAN 150 FEET MEASURED IN MECHANICAL EQUIPMENT WITHIN OR ADJACENT TO LENGTH OR WIDTH. AREA OF WORK. EXCEPTION 1A: WHERE PV ARRAY DOES NOT EXCEED 25%AS MEASURED IN PLAN VIEW OF TOTAL ROOF AREA OF A STRUCTURE,A MINIMUM OF 12" UNOBSTRUCTED PATHWAY SHALL BE MAINTAINED ALONG EACH SIDE OF ANY HORIZONTAL RIDGE. NORTH 1. SITE PLAN ADVANCED ENERGY SERVICES DATE: FEBRUARY 15, 2013 PROJECT #: AES MOHR (..) Scale: 1" • 30'-0" 14755 SE 82ND DRIVE o' 15' 30' so' CLACKAMAS, OR 97015 MOHR RESIDENCE 503-635-0117 12523 SW 114TH TERRACE CITY F TIGARD TIGARD,OR 97223 Approved CCB# 180882 [s,, / DWG. 1 OF 3 Conditionally Approved [ ] See Letter to:Follow [ ] Atta hod [ Permit Number ' T- f 3-00.• -, Address: (2� •� ( NM i By - WIZ (4 i3/0 Date: Approved plans shall be on job site, kg' OFFICE COPY v f°?t'TACf{M! ai' 1AL1. EE SPACED P40 GREATER. HAfit i!•;i Ht CN CENTTE:R PM ANY D7.- :-<i !.1 WHERE ARRAY i8 LOCATED WITHIN 5 FEET OF A ROOF EDGE,H ,E�'�iE 014 RIDGE. • ' 3ISC SOI.'.31.1.3 ' 2X4 TRUSSES • 24"O C.,TYP. j j • 1 ROOF RIDGEr.'!!;!":44:2!!::: ::• e (!T ::`''4,:!;T:!:'!!'S-41!!?:!!'1!!!!,;!!!!!!41.3..!! !"!!;42,!!!!;:a ,, ;", RAILS,TYP/ 1 / ' . / N ,1 i )/ _L�_,— / 1 fi s 3 ' i r / i I 1 �i / / I / .',,,/ ,„ 3 t S' ' ' 1 / ' / /• _ Asx / / / R i' ' ie',y° a A I / /'(, ' , i . _` ,is .a� '- // ! G _ Area of7.7 CONNECTION • TO ROOF Wark TRUSSES,TYP. • • REFER TO DRAWING 3 • • • FOR ROOF SECTION • • N 0 1. ENLARGED ROOF PLAN Scale: 1/4" - 1'-0" ADVANCED ENERGY SERVICES DATE: FEBRUARY 15, 2013 PROJECT #: AES MOHR 14755 SE 82ND DRIVE MOHR RESIDENCE CLACKAMAS, OR 9701 5 503-635-0117 12523 SW 114TH TERRACE CCB# 180882 TIGARD,DR 97223 DWG. 2 OF 3 SOLAR COLLECTOR MODULE MODULE(4.5 PSF,MAX.) DIMENSION VARIES 1 �ry MODULE DIMENSION I „.0444,0,:....00404 ,+q*+ `+� 10'MAX I SECTION A I 2' SECTION A ' �' intKi off'+. s I I v CONNECT SOLAR MODULE TO I f'f411$4-44-44 +s�s4,44s, ' RAILS WITH I CONNECTORire* 'Hi.s�s.p*# � NEW SOLAR MODULE FOR OD Q FT.OR I I :� �•` ARRAY AND ATTACHMENT LESS OF MODULE SURFACE i 4�§.f*'�$'44 SYSTEM TO EXISTING CORROSION RESISITANT I *'s'*it*s*t 4• I ti ROOF TRUSSES METAL RAIL ANCHOR ( I A�' 4` *; 'li I '�' TO ALTERNATE ROOF\ 14I FRAMING 48"MAX.ON : :j` ?j \ CENTER PER SECTION A-A i ,,y3,, TYPICAL.PROVIDE A I MINIMUM OF 2 RAILS I I \ PER MODULE I I ! \��\ I- y CP 48WMCFRAiENTE0. i 2. CONNECTION DETAIL ''-7\ _ Scale: N75 EXISTING 2X4 TRUSSES ca 24°O.C.,TYP. COLLECTOR MODULE MIN,2 X 4 RAFTER OR TRUSS CONTINUOUS SUPPORT CHORD aP 2'MAX.ON CENTER RAIL AND CONNECTION POST BY RAIL MANUFACTURER 'I ' 1. SECTION SUNMODO EZ ROOF MOUNT AND FLASHING 4, Scale: Scale: NTS WITH 3"STL "AWITH 5/ILX 3" ilimpTh STAINLESES S LAGGB BOLT.INSTALLL PERR MANUFACTURER'S INSTALLATION INSTRUCTIONS 3. CONNECTION DETAIL ADVANCED ENERGY SERVICES DATE: FEBRUARY 15, 2013 PROJECT #: AES MOHR Scale: NTS 14755 SE 82ND DRIVE CLACKAMAS, OR 97015 MOHR RESIDENCE 12523 SW 114TH TERRACE 503-635-0117 TIGARD,OR 97223 CCB# 180882 DWG. 3 OF 3 EQUIPMENT SCHEDULE t NOTES: {, NEC PV LABELING REQUIREMENTS (1)PV ARRAY,10 SOLARWORLD 255W MODULES 2.55 KW SOLAR PV SYSTEM (2)EACH PANEL CONNECTED TO ONE M215 ENPHASE MICRO AC DISCONNECECTS$INVERTER(690.54): INVERTER.10 INVERTERS MAKE UP ONE BRANCH CIRCUIT. .' _..,,> (3)6 AWG BARE COPPER EQUIPMENT GROUNDING CONDUCTOR AND ENPHASE PV Array-10, 255-Watt Soi rworld PV PanelsWSOURC S:SOLARSYSTEM AND TILITYGRID.ARNING:DISCONNECT IS ENERGED FROMO (4)Soladeck onroof5OUTPUT CIRCUIT WIRES. (5)UTILITY GRADE METER TO MEASURE PV OUTPUT MAXIMUM AC VOLTAGE 240 Vac (6)GRID INTERCONNECTION BY 15A TWO POLE BREAKER . . . . MAXIMUM AC CURRENT 0.9 Aacfinverter (7)200A MAIN SERVICE PANEL WITH 200A MAIN BREAKER (1) (8)GROUNDING ELECTRODE CONDUCTOR CONNECTED TO EXISTING BUILDING GROUNDING ELECTRODE. AC CIRCUIT BREAKER(690.64) NOTES: WARNING:CIRCUIT BREAKER IS ENERGIZED FROM THE SUM OF THE RATINGS OF BREAKERS FEEDING ANY PANEL (2) TWO SOURCES-SOLAR SYSTEM AND UTILITY GRID. MUST NOT EXCEED 120%OF THE RATING OF THE PANEL BUS BARS (NEC)690.64) MAIN SERVICE PANEL 10 awg USE-2tRHW-2 AC POINT OF CONNECTION (3I Sunlight Resistant Wire plus SOLAR ELECTRIC SYSTEM One#6AWG Bare Copper Equipment Ground AC OUTPUT CURRENT:9.0A NOMINAL AC VOLTAGE:240V AC Voltage Droo Calculation 1.Intemal Voltage drop within cabling: 10 micro inverters=.29% WARNING 2.Voltage drop from branch circuit to dedicated OCPD:N/A INVERTER OUTPUT CONNECTION 3.Voltage drop from OCPD to Main Service Panel DO NOT RELOCATE THIS OVERCURRENT DEVICE %Vdrop=(0.9A*10)*(2`40ft) (4) Soladeck to transition wire =(720*(.00124ohms/ft))/240V THIS PANEL IS FED BY TWO SOURCES OF POWER =0.0037100 o 1-UTILITY 2-PV INVERTER 1.37%AC Voltage Drop Roof Top + TOTAL AC VOLTAGE DROP:0.29%+0.37%=0.66% Ground "$ METER if CUSTOMER OWNED SOLAR GENERATOR OUTPUT Approximate distance from ..... PROJECT:12523 SW 114th Terrace roof top array to Main Electric Panel is 40 t:. Tigard, OR 97223 2.55 KW SOLAR PV SYSTEM 3/4"EMT outdoors with H awg T34 EMT from AC Disco* 200A Main Panel Solar Contractor HWN-2 N-2 conductors #10awg, THWN-2 Neutral,and#6 awg 1 Meter Advanced Energy Services EquipmentGND conductor 15 Main Electric Panel. 120/240 Volt from array AC Disco to output meter istance less than 10'. three-wire,single-phase located next to main service panel. ® (7) PV • Output Meter t5OeakerAMain BrTITLE: Single Line Diagram,Grid Tied Solar PV System .,....‘. eI r 4 1 Utility (8) (6) / DATE: 1/30/13 DRAWN BY: Jordan Weisman (5, M o Grounding PROJECT/Customer Name: Drawing#:0001 Mohr Residence 15A Two Pole/ Backfeed Breaker ::--.-... Electrode REVISION HISTORY DATE NOTES Ar:" REVISION:00 1/30/13 #6 bare copper �J .K e ' f 1`'