Loading...
Permit (19) CITY OF TIGARD ELECTRICAL PERMIT COMMUNITY DEVELOPMENT l t Permit#: ELC2016-00625 TICJ ARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 tr`' Date Issued: 08/10/2016 �:/�3/ /67/3�/' Parcel: 2S112DD01600 Jurisdiction: Tigard Site address: 15575 SW SEQUOIA PKWY 100 Project: Inspired Results Subdivision: PACIFIC CORPORATE CENTER Lot: 4 Project Description: Low Voltage Data com cabling for SUITE 180 NOT SUITE 160. 8/31/16:REPRINTED permit to show change of address from suite 160 to suite 100. Contractor: PACIFIC NETWORKS INC Owner: PACIFIC REALTY ASSOCIATES 16869 SW 65TH AVE, STE 373 ATTN: N PIVEN LAKE OSWEGO, OR 97035 15350 SW SEQUOIA PKWY#300 PORTLAND, OR 97224 PHONE: 503-645-4000 PHONE: FAX: 503-352-0202 FEES Quantity Description Date Amount 1 ea Signal circuit or Limited 08/10/2016 $75.00 Specifics: Energy Panel 1 ea 12%State Surcharge- 08/10/2016 $9.00 Type of Use: COM Electrical Class of Work: ALT 45 Misc Administration Fee 08/31/2016 $45.00 Type of Const: Occupancy Grp: Total $129.00 Required Items and Reports(Conditions) This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a c•• s or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. �✓ Issued By: Permittee Signature: OWNER INSTALLATION ONLY The installation is being made on property I own which is not intended for sale,lease or rent. OWNER'S SIGNATURE Date: CONTRACTOR INSTALLATION ONLY SIGNATURE OF SUPR.ELEC' Date: LICENSE NO. Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection.