Loading...
Plans (7) BUP2004 - 00297 13 uplebu C�tir� z W a °' 6d, U cL U 2x6 stud wall DF no. 1 o o' 'an' 0 U Y RF 2 z Z C WL9 0 �maF- LLff 3 9 7 g 2 3 i Ln U a: -' typical) Simpson LS7749 strapsZ between first and second levels g/8�� gypsum board Over =s _ impermeable vapor barrier z Y _Z 2x6 stud wall, R18 insulation 3.5"x71-7/8" microllom W W 7/�6- OSB Z t5 y l 7–%8" T&G deck ? stucco 3 Z TJl L65 20" joists glue–nailed floor 1 _ W IL 1" rigid insulation to 20" joists 2x6 stud wall DF no. 1 I I W o zo _ 1—/4 Timberstrand rim 00 �- ? tO W RO h O y"' o v rn a w 2x6 top plates f D t\ f�� P 2x6 stud wall J� w „ f2)Scale: 1/8" = 1 '-0" SECTION (D Z 2x8 stud wall DF no. 1 SCALE: 3/4' = 1'0" � Q I LL I J is TJW series 20" joists with glue nailed floor W W J 5.25"x11.25" Parallam column _—,.11.875"x7" Parallam. 2x6 stud wall column DF no. 13.5"x11-7/8" microllom TJW series 20" joists withglue–nailed floor ' 1.75"x11-7/8" microllom O 2x6 stud wall DF no. 1 ba/cony 1 v enders over J these windows only 24F g/uloms 5 1/8"x12" Y 2x8 stud wall – 5/8" gypsum board over Q DF no. 1 (full–height area only) impermeable vapor barrier a 0 2x6 stud wall, R18 insulation V r� 7/6" �.L. OSB 1–%8" T&G deck stucco C) Q 1" rigid insulation h 20" joists 1–%4" Timberstrand rim Y v U = 2x6 top plates —/ 2x6 stud wall, R18 insulation o 6x6 DF no. 1 11.875"x7" Parallam column TJI/L65 20" joist glue–nailed floor � SECTION 6 � 2x8 stud wall DF no. 1 � 3 � F all second floor joists ore spaced @ 24" o.c. w w 2x4 stud wall and 2x6 ceiling rafters @ 24" o.c. for restrooms SCALE: %" = 1'�" ❑ a (� for stair balustrade details, refer to balcony balustrade details 4 provide 5 1/8" x 24" g/u/om beam supported by 6x6 DF no, 1 columns SECOND FLOOR FRAMING PLAN provide simpson HGLT5 at the 5 1/8" x 24" glu/am and 11.875" x 16" porallom column SCALE: %g' = 1'0" provide simpson HD6A at the floor connection o 0 0 z 01 1 PROJECT NO. 03-500.07 DRAWING FILE FRAMING-4.DWG SHEET 9 z z Z Q G _ _J r- 0- m v IEEE rn 6 bn ll Z x _ 0 ,0 � 3 L7 0 10 c 2 or _ W W � aI° d 3 227'-0' ow point at scupper 226'-8' In 2x6 wall stud reference: simpson PHD 2-SDS3 @ 48" o.c. a Z Y Z J 4" thick concrete slab W W with # 3 rebars @ 18"" oc each way W 3 Z t7 . o Z e < . ° o W O d _ 16 -. - .. 44 4 Lo _ 3"" 6" compacted structural backfills tib 0 Co 6" compacted structural backfill �� Z.s _ M I a z m 0 v; `oo 3@ # 5 bars 41 0 3 0 ,a Of o , _N N # 4 @ 16" o.c. EL EL W SECTION „ i 2 1 10 4 SCALE: 3/4" = 1 '0" C� Z_ TFF ont/nuity strap 2 Q 11.875 x7" Parallam column LL L1._ 0 12 O 1 227'-3' stud wall @ 24" o.c. — simpson PHD 2-SDS3 @ 48" o.c.12 i 2 � I 5.25x 11.25" Parallam column 4" thick concrete slab 1" 4'" concrete walkway 227.-5. ;; 2x6 stud wall DF no. 1 hear panels (typ.) with # 3 rebars @ 18" oc each way � � y d 4a _ - 4. . T✓l�ft90 11—�/B' Ia%St ,a'e °. . . ^ 6" compacted structural backfill 3, low point of per 226'-8' 4 a 3 @ # 5 continuous bars 6" compacted continuity brace--,,, 2275" # 4 @ 12 o.c. structural backfill 6 3/4" x 12" 24F glulam 2" polystyrene connect through main J beams with angle plates, 3 insulation (R-16) a 4 O 1" bolts each way Y Q 10 3 SECTION U SCALE: 3/4" = 1'0" U_ Q a. \,to x I Both endsp cut and bent to U h/yh point 228'-0' U 2 O O O O o � 2r-a- O O O O N 227'-7" 11.875'x7" Parallam columnall roof joists are T✓11165 except as noted F N 1225"x31.50' 24F-V4 DF 2x6 stud wall OF no. 1 all roof joists are spaced ® 24" o.c. s 3" spaces = 1'-6" u 16W"' Parallam column all roof sheathing is OSB w w 10 8d nails ® 4" o.c. at pane/ edges o 1 ROOF FRAMING PLAN 8d nails ® 12" a.c. in field SCALE: %8" = 1'0" Q N O a O O %z o 10 CONTINUITY STRAPS PROJECT NO. 03-500.07 4 6 ga A36 steel DRAWINGFILE Struct2-1.dwg SCALE: 1/4" = 1'o" SHEET 10 z z Z z Q N W tD in E Ei -J w mrnm E 0 w z 0 3: -6 /18 z a Q 0 119 W w a- F- LL -0 .7 w > Elf :3 ul (L z Jw W w z 120 7 6 z Fw IL Lo 0 Pf) 0 0 z in 0 0� A. V) w m w4% Z 0 0 f2O FI-FLFL----J------L----120' Scale: 1 /8" = 1 '-0" W Z 119 < Z 113- < 120 119 < 113- 2 w U) hear panels (typ-) 119 /19 f19 ,11 4— CITY u- r 0 Q /18 tio t;o lio /19 0 r 0: ww a a- FREWINC; STREET 1 SHEAR PANEL LOCATIONS SCALE: Y8 ff 1'0" 0 PROJECT NO. 03-500.07 DRAVIAWFILE Stmct2-1.dwg SHEET 17 z z VD z ', throes c E J m N ro CD v 0 rnv c d M n W a_ rna E c W ao � `o uY z Z c N (06) 3 _ m o. Z } o o W Y W W coaHtl 3 J N 7 u STC28 MSTC28 22•- " SHEAR WALL 17'-11 3/4" SHEAR WAL a TIE DOWN TIE DOWN Z [7 Y Z J W W xx x x xv zxmxx - W W Z W,, Z >1 0 `v o z� 6 ren a _z aD i 2 0 U O .), N to w 1 $ DETAIL aired HDUII aired HDU11 1shear wall shear wall SCALE: 1/811 = 1'0" tie-down tie-down SOUTHWEST EL E VA TION from ERE VVI N G S TREE T J � xZ D Q U ~ w U) W 21'-81/20 SHEARSTC2SWALL 18'-6' SHEARSWALL TIE DOWN TIE DOWN Q J X1a //Xx xlx\ x xxx Y U LL U XX 7[\ / xx xx x Q aired HDU11 1 " DETAIL aired HDU11 w shear wall 2 shear wall _ tie-down tie-down = _ SCALE: 3/4" = 1'0" U Y NOR TH WES T ELEVA TION from HIGH WA Y 99. ° SHEAR PANEL NAILING SCHEDULE F a U 7/16 " OSB 8d nail 3" o. c. at edges 12 o. c. in field 0 Q N o 0 O Z o PROJECT Na. 03-500.07 DRAW GFILE Structt-t.dwg SHEET 1 M z z t� z mem Z Q WNOWW 4a It � m aD b V 0 W a' •� T wm E c W a 0 °O U Y z Z tAcNo �a3 0 _ m � n Z } o o 0 m s W W w a LL 3 1 7 N U d Z [7 Y Z 35'-1 1/16" 35'-1 1/16" J W Wor 1W 226.67 z _ 226.67 226.67 -4& W Shear wall to tie down O Shear wall MS (typ.) wal 213.67 Stie down) tie down W O z��� C, M 0 2 MSTC28 (typ.) MSTC28 (typ.) 213.67 a 0 I y o 2� 0 v W --B 213.67 -® �/�� X Sheathing on W both sides of this panel Sheor wall N�/ U) tiedown LL z HDU4 (typ.) Q O W F- Achor bolts Achor bolts Q 48" O.C. (typ.) 48" O.C. (typ.) W W Ow � J 20 20 BUILDING SECTION 20 BUILDING SECTION ~ z BUILDING SECTION 2 3 z Q a 35'-1 1/16" 35-1 1/16" 226.67 226.67 226.67 J Shear wall Shear wall W Shear wall tie down tie down tie down MSTC28 (typ.)own MSTC28 (typ.) 213.67 Y MSTC28 (typ.) 213.67 213.67 Q U LL Sheathing on both sides U of this panel Q a I-R -16 perimeter insulation Shear wall tiedown Y HDU4 (typ.) Achor bolts = _ Achor bolts 48" O.C. (typ.) 48" O.C. (typ.) o = � 4 2020 BUILDING SECTION 20 4 BUILDING SECTION BUILDING SECTION 5 6 QM N K SHEAR PANEL NAILING SCHEDULE ° 7/16 OSB CD 01 1 8d nail 3" o. c. at edges o p 12 o. c. in field d z PROJECT NO. 03-500.07 DRWANG FILE Stmct2-1.dwg SHEET 20