Loading...
Plans (2) BUP2014- 00096 DATE LOG RECENED FEB 3 20 z 2 z CM OF T*AFO > 1 9/4/14 SUBMTLI 2 12/3/14 REV I LLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLL-LLLLLLLLLLLLLLLLLLLLLLLL-LLL LLLLL-L-L-LLLLLLLL-LLLLLLLLLLLLLLLLLLL-L- L L L CULVER L L L L I (n A 2 9 GLASS I . z 9 777= TVF & R STATION 51 ...... ...... ..... ....... .. ...... . ....I ... ....... ........ ............... ......... .... L-L-L-L-LL-L-L-L-L-L-L-L-L-L-L-L-L-L-L-L-L-L-L-L-L-L-L-L-L L-L-L-L-L-L-L-L-L-L-L-L-L-L-L-L.=L-L-L-I-L-L-L-L-L-L-L-L-L-L-L-L-L-L-L- -L-L-L-L-L-L-L-L-L-L-L-L LLLLLLW ...E. LLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLL L-L-L L LLLLLLLLLLLLLLLLL LLLLLLLLLLLLLLLLLLLLLLLLLL ..................... ......... ... ..... ..... ........ ............ ......... ............. ...... ....... ....... z 2 01 4 HENNEBERY EDDY ARCHITECTS , INC 921 SW WASHINGTON STREET, SUITE 250 PORTLAND OREGON 97205 0 PHONE : 503-227-4860 FAX: 503-227-4920 City of Tigard r: Plans _ V& EMERICK CONSTRUCTION CO OFFICE COPY EL%3 C T U QEDPRop lNe CULVER GLASS 7 514P v 2619 NW INDUSTRIAL BLDG "B" SUITE #3 4� Lo 08 44 �0z/ PORTLAND OREGON 97210 1 RENEWALDATE:DAUB w 12-31-26151 E- cccli PHONE : 503-226-2520 z MD STRUCTURAL HAS PROVIDED 0 STRUCTURAL DESIGN CALCULATIONS FOR OZ4 wo c� Lo FAX: 503-226-0972 THE MULLIONS, AND THEIR ATTACHMENT TO ow 06 ci zTHE BUILDING STRUCTURE. SHOP DRAWING w SHEETS THAT SPECIFY STRUCTURAL Z > co 0 MULLIONS, AND THEIR ATTACHMENT TO THE F- cm" p 0 STRUCTURE HAVE BEEN REVIEWED FOR a as THEIR CONFORMANCE WITH THE SHT* STRUCTURAL CALCULATIONS AND THESE SHEETS HAVE BEEN STAMPED. 1 .0 DATE LOG � Z INDEX: PRODUCT INFORMATION: GENERAL NOTES ABBREVIATIONS I GLASS SCHEDULE z W 0 1.0 COVER SHEET A) EXTERIOR FRAMING A.R. RCHITECTURAL REFERENCE No. TYPE 'Z. 1.1 INDEX GENERAL NOTES&SCHEDULES 1) ALL FRAMING VIEWED FROM EXTERIOR p T \ 1) FRAMING:ARCADIA OPG T500 7"CW DP DIMENSION POINT v 1.2 PARTS LIST ARCADIA OPG T500 SPANDREL 1 1"OA SOLARBAN 601 STARPHIRE ARCADIA T-200 VENTS D.L.O. DAY LIGHT OPENING 1/4"SB60#2 ANNL > D.O. DOOR OPENING I--I 2.0 FLOOR PLAN 2) GLAZING CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS&ROUGH OPENINGS O.A.F. OVER ALL FRAME 1/2" AIR SPACE 3.0 ELEVATIONS R.O. ROUGH OPENING 1/4" STARPHIREANNL 1 9/4/14 SUBMTL I 3.1 ELEVATIONS FINISH:TO MATCH ALUCOBOND COLOR-STATUARY BRONZE. 3) CULVER WILL ASSUME NO RESPONSIBILITY FOR ERRORS RESULTING T TEMPERED GLASS TEMPERED WHEN REQ. BY IBC 2 12/3/I4 REV 1 SP SPANDREL GLASS GLASS: SEE SCHEDULE FROM THE USE OF THESE DRAWINGS BY OTHER TRADES. W WIRE GLASS 4.0 DETAILS M MIRROR GLASS 4.1 DETAILS DOORS: SEE SCHEDULE 4 GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION TO THE 4.2 DETAILS JOINT SEALANT: DOW CORNING BUILDING SEALANT- BLACK ) B.O.M. BOTTOM OF MULLION 4.3 DETAILS LOCATION OF HVAC RISERS, PIPING&ANY POSSIBLE INTERFERENCE WITH WINDOW T.O.M. TOP OF MULLION ANCHORING SYSTEM. T.O.S. TOP OF STEEL C.L. CENTER LINE 5) A BITUMINOUS PAINT/ZINC CHROMATE OR AN EQUAL SEPARATION MATERIAL B.O. BY OTHERS IS REQUIRED WHEN ALUMINUM COMES IN CONTACT WITH STEEL OR ANY OTHER W.S. WINDLOAD CLIP WELDED TO STEEL DISSMILAR METALS. D.S. DEADLOAD CLIP WELDED TO STEEL T.S T-CLIP CONNECTING TO STEEL 6) ALL METAL TO METAL BUTT JOINTS, OVERLAPS AND INTERSECTIONS ARE TO BE T.C. T-CLIP CONNECTING TO CONCRETE m SEALED WITH APPROPRIATE CAULKING T.M. T-CLIP CONNECTING TO METAL FRAMING T-CLIP CONNECTING TO WOOD FRAMING - U s - 7) ALL PERIMETER FASTENERS INTO WOOD FRAMING ARE BASED ON A MINIMUM T.W. w Z OF 3"WOOD MEMBER. F.S. F-CLIP CONNECTING TO STEEL "s 3 F.C. F-CLIP CONNECTING TO CONCRETE - Q 8) ALL PERIMETER FASTENERS INTO BRICK OR CMU ARE BASED UPON SOLID AND/OR F.M. F-CLIP CONNECTING TO METAL FRAMING GROUT FILLED MASONARY UNITS. F.W. F-CLIP CONNECTING TO WOOD FRAMING 9) ALL DETAILS SHOWN WITH WORK FROM OTHER TRADES IS FOR REFERENCE ONLY. P.F. PERIMETER GLASS POCKET F-CLIP S.T. ADDED STEEL 10) EACH GLASS LITE SHALL BE SUPPORTED BY TWO SETTING BLOCKS LOCATED AT 1/8 POINTS FROM ENDS OF SUPPORTING O.C. ON CENTER OPP. OPPOSITE MEMBER TYPICAL UNLESS NOTED OTHERWISE. S.P. SPLICE POINT PNL PANEL O TEMPERED GLASS REQUIREMENTS CHAPTER , n CHA24 v L LI-i SECTION LEGEND ' PARAGRAPHPH 6 6&7 6. GLAZING IN AN INDIVIDUAL FIXED OR OPERABLE PANEL ADJACENT TO A DOOR WHERE THE NEAREST EXPOSED EDGE OF THE GLAZING IS WITHIN A 24-INCH w ARC OF EITHER VERTICAL EDGE OF THE DOOR IN A CLOSED POSITION AND WHERE THE --- ------ ELEVATION NUMBER ~J BOTTOM EXPOSED EDGE OF THE GLAZING IS LESS THAN 60 INCHES ABOVE THE F---� WALKING SURFACE. -- ------ SHEET NUMBER EXCEPTIONS: 1. PANELS WHERE THERE IS AN INTERVENING WALL OR OTHER PERMANENT BARRIER BETWEEN THE DOOR AND GLAZING. KEY PLAN ELEVATION BUBBLE 2.WHERE ACCESS THROUGH THE DOOR IS TO A CLOSET OR STORAGE AREA 3 FEET OR LESS IN DEPTH. GLAZING IN THIS APPLICATION SHALL COMPLY WITH 2406.4, ITEM 7. w 3. GLAZING IN WALLS PERPENDICULAR TO THE PLANE OF THE DOOR IN A CLOSEDDETAIL NUMBER POSITION, OTHER THAN THE WALL TOWARDS WHICH THE DOOR SWINGS WHEN OPENED, I IN ONE-AND TWO-FAMILY DWELLINGS OR WITHIN DWELLING UNITS IN GROUP R-2. --- ------ SHEET NUMBER 7. GLAZING IN AN INDIVIDUAL FIXED OR OPERABLE PANEL, OTHER THAN IN THOSE DETAIL BUBBLE LOCATIONS DESCRIBED IN PRECEDING ITEM 6,WHICH MEETS ALL OF THE FOLLOWING r , w CONDITIONS: W 7.1 EXPOSED AREA OF AN INDIVIDUAL PANE GREATER THAN 9 SQUARE FEET; 7.2 EXPOSED BOTTOM EDGE LESS THAN 18 INCHES ABOVE THE FLOOR; ,^ 7.3 EXPOSED TOP EDGE GREATER THAN 36 INCHES ABOVE THE FLOOR;AND v L 7.4 ONE OR MORE WALKING SURFACE(S)WITHIN 36 INCHES HORIZONTALLY OF THE PLANE OF THE GLAZING n EXCEPTION: SAFETY GLAZING FOR ITEM 7 IS NOT REQUIRED FOR THE FOLLOWING INSTALLATIONS: 1.A PROTECTIVE BAR 11/2 INCHES OR MORE IN HEIGHT, CAPABLE OF WITHSTANDING A HORIZONTAL LOAD OF 50 LB/FT WITHOUT CONTACTING THE GLASS, IS INSTALLED ON THE ACCESSIBLE SIDES OF THE GLAZING 34 INCHES TO 38 INCHES ABOVE. V l 2.THE OUTBOARD PANE IN INSULATING GLASS UNITS OR MULTIPLE GLAZING WHERE THE BOTTOM EXPOSED EDGE OF THE GLASS IS 25 FEET OR MORE ABOVE ANY GRADE, ROOF, WALKING SURFACE OR OTHER HORIZONTAL OR SLOPED (WITHIN 45 DEGREES OF HORIZONTAL)SURFACE ADJACENT TO THE GLASS EXTERIOR. /O I--6w DOOR SCHEDULE DOOR: # 130B DOOR: # 131A ELEVATION:A/3.0 ELEVATION: E/3.1 HDWR GRP # HDWR GRP # ELECTRIFIED HINGE VAN DUPRIN PANIC HARDWARE ;' T �`. T E-- O E-' N Q O v SIZE: 3-0 X 7-0 SIZE: 3-0 x 7-0 9 W v Remo /SWING-OUT SWING: LH/SWING-OUT ro 0 L z TYPE: MEDIUM STILE TYPE: MEDIUM STILE �" �; ¢ LA MANF: ARCADIA MANF: ARCADIA 0 m O a 00 F^ i SIIT' 1 . 1 DATE LOG a w O o 1 9/4/14 SUBMTL I 2 12/3/14 REV 1 6 OPG2900 01 10 7 OPG19 OPG291Tr OPG25600 3 OPG191 F;5 � ¢ OPG2979 -� p 2112 2 112 OPG1901 cc 21/2 OPG2979 OPG297 T450 _ OPG1999 z OPG291 OPGP 9868P O OPOG600 z 21/2 OPG2910 ® ® OP 910 UCH201 z OPG1901 OPG291 OPG25600 O OPG290 0 21/2 7 7 OPG1999 ® v 1 OPG2087 ' ^ O OPG291 OPG2900 OPG 19861P OPG600 V 1) F F 1 ll OPG290 . rn ® OPG19 (D O OPG291 OPG6001 OPG1901 OPG2902 ® OPG1999 ® rT, OPG2917 OPG 19861P W OPG2087 I OPG2087 OPG2979 OPG1901 OPG 19861P OPG25600 OPG291 0.5000�{ �.250f3-}-- �0.5000 0.8125 P-125 ® ® OPG-SPDRL OPG2087 OPG 19861P OPG2979 OPG2978 OPG2905 M459 DS45 21/2 7.2667 0 OPG2902 OPG2905 Lu OPG2902 O OPG 19861P a Opt. bottom rail OPG2087 weathering o o to m 0 N O 0 O T407 ® 6 OPG2910 51/16 OPG25716 OPG2917 OPG2902 21/2 _ DS4 M45 rn _ r m N 0 OPG2917 0 Lf� E-' zw �,o � -- E x � Q 0] cd Pa 0 E 06 Q z z" x Q 0. E C', F= & a SHT" 1 . 2 DATE LOG x Z m Om o a I—I 1 9/4/14 SUBMTL 1 2 12/3/14 REV l m $ 3 � a❑' rOr � rF 3.1 LLJ Z W i A ..� 3.0 r T 1 W Q 2-112x 6•CW W/STANDARD COVER CAP 131A � O a a U BE a U w 0 U -u X Z Q ¢ L6 X N 3 N SPANDREL CW 2-1/2 X 7 CW `" 3 W/5-1/16 SNAP CAP W/5-1/16 SNAP CAP C D 3.0 3.1 F- KEYP LAN 1 ST FLOOR w cc Q4� ZN N SCALE: 1 /8" = V-0" d a z E . x0 � zw rx w 0 an 06 z > E~ ° p a a 5-HT" 2 . 0 - - - - - - DATE LOG ol 00 114 1/2 RO VIF z 10 115 RO VIF m zz 114 OAF > Q z 114 OAF 1 9/4/14 sUBMTL t HORIZONTAL TO BE ONE PIECE. SHEAR 2 12/3/14 REV 1 BLOCK VERTICALS TO HORIZONTAL. 109 DLO PROVIDE GLASS SETTING BLOCKS AT 48 5/8 DLO 58 3/8 DLO EACH VERTICAL MULLION. qo 5A4.0 4 4.1 291/4 291/4 341/4 2- r V V d £ DLO DLO OAF z a 6 4 I 4.1 Fill 4.0 o [±42] ALLIGN MULLION I SQUARE PROFILE I SQUARE PROFILE 4.3 WITH HSS STEEL METAL PANEL BY METAL PANEL BY 7 g 501/2 1191/2 1201/2 POSTS OTHERS OTHERS 1201/2 0 4.2 4.2 DLO OAF RO RO VIF I VIF w 2 703/4 4.2 84 1 2 5 6 O DO 4.3 4.3 4.0 4.2 n . �/ 9 4.3 LIN : DLO 301/4 2 — — — 15 4.1 W I 36 DO 33 DLO 33 DLO ARCADIA T-500 SPANDREL CW NOTE: THIS SYSTEM IS A O 1PPG SB60/STAR HBYSTEEL POSTS LOAIRE BRONZE ISPPORTED r T 1 ARCADIA T-500 6" CW 1 THUS DESIGNED BY THE EOR. I� O1" PPG SB60/STARPHIRE J ARCADIA T-200 VENT ALUCOBOND-STATUARY BRONZE Q DOOR #130B Z 1 THUS V J C Ile 451 5/8 RO VIF AT ALL 117-3/4"x31-1/2" GLASS PANES, PROVIDE SETTING BLOCKS TIGHT TO VERTICAL MULLIONS. 451 1/8 OAF Ave 85 3/8 DLO 117 13/16 DLO 117 13/16 DLO 117 13/16 DLO 2 4.0 I I 6 I 291/4 341/4 5 I I I DLO OAF 4.1 4.1 4 OPP. OPP. 4.0 SQUARE PROFILE I SQUARE PROFILE I SQUARE PROFILE I SQUARE PROFILE I 1201/2 (�\3 0 T iR METAL PANEL BY METAL PANEL BY METAL PANEL BY METAL PANEL BY I VIOF ��ED PROFFS 9� OTHERS I OTHERS I OTHERS I OTHERS 703/4 SG I N Fc��ro 72 14P F- y9 � 08, E— N 4.1 4.2 4.2 4.2 4 2 I RENEWAL DATE: 12-31-2015 F . x 15 � W MD STRUCTURAL HAS PROVIDED < m O cc _ — — — — — STRUCTURAL DESIGN CALCULATIONS FOR E 3 cj z THE MULLIONS, AND THEIR ATTACHMENT z " � TO THE BUILDING STRUCTURE. THIS STAMP Sal OC ARCADIA T-500 SPANDREL CW NOTE: THIS SYSTEM IS A CERTIFIES THAT THIS SHOP DRAWING HAS a E " w E– ° 1" PPG SB60/STARPHIRE SKIN SYSTEM SUPPORTED BEEN REVIEWED FOR CONFORMANCE WITH ALUCOBOND-STATUARY BRONZE BY STEEL POSTS THE DESIGN CALCULATIONS PROVIDED IND - 0 1 THUS DESIGNED BY THE EOR. MD STRUCTURAL ENGINEERING JOB #1196. -- DATE LOG w m z W � U w z 1 9/4/14 SUBMTL 1 2 12/3/14 REV 1 w ' w m 0 �J 144 RO VIF w �Vn1 O 144 1/8 OAF �+ j 00 175 1/4 OAF VIF ANCHOR WITH HEAD ANCHOR WITH HEAD HORIZONTAL WITH HORIZONTAL WITH (2) CHANNEL CLIPS. (2) CHANNEL CLIPS. 263/4 261/2 26 1/2 211/2 26 1/2 22 11/16 29 DLO 30 15/16 30 15/16 38 DLO DLO DLO DLO DLO DLO DLO SEE DETAIL 8/4.4. SEE DETAIL 8/4.4. T F.� DLO DLO v W I 2 10 5A I 4 4 �4A M4O 4.3 4.1 4.2 4.2 291/4 291/4 DLO w DLO I 7 I I 481 D 4 U) U I U) U I U) U I DLO OAF 120 1/2 DLO 100 105 100 F4:.3 120 1201/2 w z I w ? I w ? I RO OAF RO o c 0 � I o C I VIF 70 3/4 VIF 70 3/4 O co m W i co W DLO 2 W4�3 840 -1 0 -1 0 4.3 DO a co cn (nI co U) I 3 4 I I 3 4.2 4.1 I I 4.1 5 4.3 15 15 OARCADIA T-500 7" CW ARCADIA T-500 6" CW 36 DO ARCADIA T-500 2-1/2 SPANDREL O 1" PPG SB60/STARPHIRE 1" PPG SB60/STARPHIRE ALUCOBOND-STATUARY BRONZE ALUCOBOND-STATUARY BRONZE DOOR # 131A 1 THUS 1 THUS 001, 49 RO VIF 48 OAF 43 112 OAF U C T U R ��yED PROP s'9! GIIVFFsr°2 ' 25 24 19112 72514P 9< RO VIF OAF DLO F- � l`tiaFN 08, 2° ��J O F N AU5 fir m RENEWAL DATE: 12-31-2015 Q Q Z ARCADIA T-200 x 0 O 1" PPG S1360/STARPHIRE b w w M ALUCOBOND-STATUARY BRONZE D STRUCTURAL HAS PROVIDED ¢ oe.� mw STRUCTURAL DESIGN CALCULATIONS FOR THE MULLIONS, AND THEIR ATTACHMENT E °� 1 THUS n z TO THE BUILDING STRUCTURE. THIS STAMP z m CERTIFIES THAT THIS SHOP DRAWING HAS [~ oho F- a BEEN REVIEWED FOR CONFORMANCE WITH THE DESIGN CALCULATIONS PROVIDED IN s11T# MD STRUCTURAL ENGINEERING JOB #1196. 3 . 1 DATE LOG 2 O m � rT, z 0 11/2 17/16 Q 1 1/2 7/16 1 9/4/14 SUBMTL 1 2 12/3/14 REV 1 Cc 0 DIM PT. 10 ' - 0 " OP 197 OPG199 T. O . MULLION 06 "F" OR "T" CLIP w oPcsool F.O. (E) BRICK WITH (4)-1/4"x3" /1 Lu SIMPSON SDS \— o O "F" OR "T" CLIP ~ 2 AR: 2/A801 WOOD SCREWS. 7 /1 1 AR: 1/A802 WITH (4)-1/4"x3" 4 0 AR: 11/A804 `J 1 Ll� 4.0 SIMPSON SDS WOOD SCREWS. z Z z cn o w LL r^Wy/7 5 9AR: NONE 4.0 Q I� Q 1 1/2 "F" OR "T" CLIP WITH (4)-1/4"x3" SIMPSON SDS O OPG25716 WOOD SCREWS. Q. OPG1901 AR: 2/A801 4.0 711 I OPG2979 SQUARE ® + PROFILE METAL PANEL AR: 5/A804 BY OTHERS 4.0 o I Z "F" OR "T" CLIP I 1 1/2 7/16 WITH (4)-1/4"x3" SIMPSON SDS WOOD SCREWS. C T U R O PROFFg�! �G 1 N FF sr°2 7 1 E v Lf� �' ✓ oO� �lll� W �tig9N 0811, DAUBENe O E cu � cn rn RENEWAL DATE: 12-31-2015 ' N daz E - x O MD STRUCTURAL HAS PROVIDED V1 zcc w STRUCTURAL DESIGN CALCULATIONS FOR p THE MULLIONS, AND THEIR ATTACHMENT E" 0,6 TO THE BUILDING STRUCTURE. THIS STAMP z Li. d CERTIFIES THAT THIS SHOP DRAWING HASo rn U 0 BEEN REVIEWED FOR CONFORMANCE WITH a F' THE DESIGN CALCULATIONS PROVIDED IN S1{T* MD STRUCTURAL ENGINEERING JOB #1196. 4 . 0 DATE LOG z W m O z z o 1 9/4/14 SUBMTL 1 2 12/3/14 REV I 8 AR: 8/A804 4.1 $ OPG19 U OPG1901 m p cn i z f t 1 AR: 3/A801 � 4.1 OPG1901 3 AR: 8/A804 p 4 d OPG60a01 AR: 2/A802 OPG1999 0®#12 SELF TAPPING SCREWS @ 8" OC d. TO STEEL ANGLE OPG2979 OPG2 OPG-5012 d 560 4 da. .d 3" MINd d ®d d 3" MIN ° d ° d® ®° 4 1 OWOrW_, M�1 C7 p d d 4 F d d I aa W 111 W W m STEEL ANGLE AND ANCHORSL) 1 DESIGNED AND SUPPLIED BY a o W "T" CLIP, "F" CLIP AT JAMBS 2-1/2" MIN I _ w 0 U) 2-1/2 MIN T CLIP, F CLIP AT JAMBS W OTHERS. HORIZONTAL WITH (2)-3/8" SIMPSON TITEN WITH (2)-3/8" SIMPSON TITEN REACTION OF 80 LB/FT. HD ANCHORS EMBEDDED 3" HD ANCHORS EMBEDDED 3" Q MINIMUM. SPECIAL MINIMUM. SPECIAL INSPECTION REQUIRED PER INSPECTION REQUIRED PER ESR-2713. (1)-ANCHOR IN "U" ESR-2713. (1)-ANCHOR IN "U" ¢ CLIP REQUIRED AT JAMB CLIP REQUIRED AT JAMB MULLIONS. MULLIONS. . V o C7 � ° ° STEEL POST BY OTHERS. STEEL POST BY OTHERS. O � a BREAK METAL BY CULER GLASS v 0 AR: 5/A801 4 46 AR: 6/A801 4..11 7 v AR: NONE 4.1 p #12 SELF #12 SELF 2 SHEAR BLOCK WITH (6)-#12x1/2" ov d TAPPING TAPPING P.P.H.S. SCREWS REQUIRED ATSCREW @ 8" SCREW @ 8" FRAMES B AND C ON 3.0. v OC OC. v AR: 5/A801 "F" OR "T" CLIP WITH (2)-#12 SELF 4.1 TAPPING SCREWS SO STEEL PLATE. 1/4" STEEL PLATE AND ANCHORAGE DESIGNED BY OTHERS. OPG25716 LOCATION OF REQUIRED OPG19 41 AR: 13/A804 NOTCH. J � OPG19 � Wh dd - O F^ c\ 4 C T R m a � U U STEEL PANEL BY OTHERS. I 5" � � Q z d ��RED PROFESS` 'o z O 4. d 6 G 1 N F r MD STRUCTURAL HAS PROVIDED I b cr d ° �Ll =1 �'~ �� lq �� �� STRUCTURAL DESIGN CALCULATIONS FOR 10 1-1/2"WIDEx1/8" ANGLE w m 0 � d THE MULLIONS, AND THEIR ATTACHMENT 1-1/2" SQ TUBE w/ L1/8"2"x1", I 4.1 STRAP WITH (3) #12 E C 3 p z ° 1" WIDE AL ANGLE CLIP SCREWS TO EACH z Li. Y) F- 0� THE BUILDING STRUCTURE. THIS STAMP n d u d WITH 2 -#12 TO POST, HORIZONTAL. NOTCH f>-' cn c7 ° d °y 9ti p0 CERTIFIES THAT THIS SHOP DRAWING HAS O 1000" o a .d 9E(� DAUB NO�� j/� BEEN REVIEWED FOR CONFORMANCE WITH (1)-#12 TO HORIZONTAL. HORIZONTAL TO INSTALL. d F THE DESIGN CALCULATIONS PROVIDED IN SHT' RENEWAL DATE: 12-31-2015 MD STRUCTURAL ENGINEERING JOB #1196. 4 . 1 DATE LOG m w Om z � r Q � r a 2 12/3/14 REV l 4' p . OPG2900 o . 4A AR: 9/A801 4.2 (PLAN VIEW) IA PG1999 ¢ OPG1901 CO Jill 4 z 0 rO►� `.J 1 AR: 8/A801 w 4.2 PLAN VIEW AR: 9/A801 #12 SELF TAPPING SCREW @ 8" OC.. 4 2 PLAN VIEW #12 SELF TAPPING SCREW @ 8" OC.. W AR: 9/A801 4 I � 4.2 (PLAN VIEW) w rTl �1 J r O p U -r w � W m m Z N m CL z� n 0 0 MQ� I� 1 1/2 .� O W W DIM POINT T. O . a" O - OPG25600 OPG25610 OPG25610 AW E I N G WINDOW R O E STEEL POST BY OTHERS. ° OPG199s O d p OPG600 4 2 AR: 1/A807 p ° p 4 2 AR: 6/A808 — Q p. rn a #12 SELF TAPPING SELF TAPPING b SCREW @ 8" OC. SCREW @ 8" 10 AR: 1/A807 OC. p ° AR: NONE 42 AR: NONE AR: 12/A804 4.2 12 A — #12 SELF TAPPING SCREW @ 8" OC. 1 AR: 2/A807 � ^;;�AR: NONE 01 .Lo OPG25600 �Oy✓,9N �0�� z IWO R E- j. DAUB //i O = ti OPG1999 ® ® RENEWAL DATE: 12-31-2015 ¢ ¢ Z OPG600 Z O MD STRUCTURAL HAS PROVIDED ¢ W m STRUCTURAL DESIGN CALCULATIONS FOR m O 2 t=W444= THE MULLIONS, AND THEIR ATTACHMENT E 06 z TO THE BUILDING STRUCTURE. THIS STAMP z5. u CERTIFIES THAT THIS SHOP DRAWING HAS 1070, "' BEEN REVIEWED FOR CONFORMANCE WITH ° THE DESIGN CALCULATIONS PROVIDED IN SHT* MD STRUCTURAL ENGINEERING JOB #1196. 4 .2 - - — - DATE LOG m O z o Q E- U 1 9/4/14 SUBMTL I 2 12/3/14 REV l I w m ` � f OPG2900 I m g I � � I � I ¢ ¢ OPG19 OPG191 OPG1901 T450 I O 1 I I OPG2910 W AR: 4/A802 UCH2O1 `} AR: NONE 459 4.3 — S45 N o o O 4 3 AR: NONE 4 3 AR: NONE Z w I w � Eli d OPG2910 O a I I 3 AR: NONE 4.3 AR: 7/A804 4.3 I 4 3 AR: 8/808 I I M459 DS45 DS4 M45 C7 a a O O OPG2917 Opt. bottom rail weathering T407 � ,a CTUR D PROPFS q� �,�y'� �GINFFSro2 72 4P 3 ✓ Qom c9� z [z] h N. AUB E O Dm RENEWAL DATE: 12-31-2015 Q ¢ Z E , x O Z MD STRUCTURAL HAS PROVIDED ¢ m STRUCTURAL DESIGN CALCULATIONS FOR m O THE MULLIONS, AND THEIR ATTACHMENT M L" TO THE BUILDING STRUCTURE. THIS STAMP , m CERTIFIES THAT THIS SHOP DRAWING HAS a � F- i BEEN REVIEWED FOR CONFORMANCE WITH THE DESIGN CALCULATIONS PROVIDED INsHTx MD STRUCTURAL ENGINEERING JOB #1196. 4 . 3 DATE LG oeLlm z w O a Q 1 9/4/14 SUBMTL 1 2 12/3/14 REV 1 (1)-1/2" HOLE FOR 3/8" ANCHOR. 1 "U" CLIP ANCHORED w/ (1 )-3/8" TITEN HD U a.a AT CONCRETE FOUNDATION b ¢ � 10 D 21/2 21/2 2 3 0 V1 � V 1 O 0 � Z C� (2)-1/2" HOLES FOR 3/8" (2)-1/2" HOLES FOR T ►.� ANCHORS. 3/8" ANCHORS. v w I 2 "T" CLIP ANCHORED w/ (2)-3/8" TITEN HD 3 "F" CLIP ANCHORED w/ (2)-3/8" TITEN HD 4.4 AT CONCRETE FOUNDATION 4.4 AT CONCRETE FOUNDATION w ^^I 21/2 2 1/2 1 3/4 4 JAMB MULLION 2 1 " 1 5 116 1 5 1 * F20VIDE (4)-HOLES AS SHOWN FOR( SIMPSON SDS WOOD ' \ SCREWS. 4 77/7- 77777 777— EQUAL 0 0 0 0 0 0 4, EQUAL 1/4" (2)-#12 SELF TAPPING (2)-#12 SELF TAPPING SCREWS TYP. SCREWS. 4 "T" CLIP ANCHORED w/ (2)-#12 SCREWS 5 "F" CLIP ANCHORED w/ (2)-#12 SCREWS ANCHOR(CENTERINS OTSASSHOWN) (SEE BELOW)TYSPORCHANNELLEGS TYPICAL ADJACENT TO EACH JAMB MULLION a.a AT STEEL PLATE 4.4 AT STEEL PLATE PLAN VIEW (4}1/4"x3"SIMPSON SDS WOOD SCREWS. WOOD FRAMING 1 5 1 5 1 5 3/16"ALUM.CHANNEL 16 16 16 2"WIDE X 2"VERT. LEGS X 0'-6- LONG 21/2 21/2 1 3/4 4 / - - �/ O O o O � (i� C T NR je-11-71 � 0 PROFESS! 1 1/2 1 1/2 2 HEAD EXTRUSION-CUT TOP � G I N FFA foy WALL(SMOOTH EDGES, NOTCH 72 14P ^, Q O I FREE) TO FORM SLOT FOR CHANNEL F, VARIES, 7/16" MIN ANCHOR AS SHOWN ALLOW CLEARANCE FOR SHEAR BLOCK _) N LL' N (4)-1/4"x3" SIMPSON SDSELEVATION VIEW (4)-1/4"x3" SIMPSON SDS RENEWAL DATE: 12 31 2015 Q ¢ z WOOD SCREWS. WOOD SCREWS. x O s "T" CLIP ANCHORED w/ (4)-SDS SCREWS 8 AR: NONE HEAD ANCHOR DETAIL z " O 7 F CLIP ANCHORED w/ (4)-SDS SCREWS 4.4 MD STRUCTURAL HAS PROVIDED ¢ � STRUCTURAL DESIGN CALCULATIONS FOR 00 4.4 AT WOOD FRAMING 4.4 AT WOOD FRAMING THE MULLIONS, AND THEIR ATTACHMENT z L" C F TO THE BUILDING STRUCTURE. THIS STAMP cn CERTIFIES THAT THIS SHOP DRAWING HAS 0 [~ F- c 0. BEEN REVIEWED FOR CONFORMANCE WITH THE DESIGN CALCULATIONS PROVIDED IN s11T= MD STRUCTURAL ENGINEERING JOB #1196. 4 . 4