Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Plans (5)
MEC2015 - 00856 GENERAL NOTES � � OW N ERaENANT: A. DO NOT RUN ANY PIPE OR DUCTS OVER ANY ELECTRICAL PANELS. A. PROVIDE MANUFACTURER'S RECOMMENDED AND CODE REQUIRED CLEARANCES AROUND ALL PIECES OF EQUIPMENT. PIPING AND CONDUIT SHALL NOT INTERFERE WITH REQUIRED ACCESS. 4 B. EQUIPMENT LAYOUT IS BASED ON EQUIPMENT LISTED IN EQUIPMENT SCHEDULES. ANY --........................... 1 l l 1 G O DIVA OTHER EQUIPMENT USED IS SUBJECT TO MEETING PERFORMANCE REQUIREMENTS OF 8'0 UP (� }�- }- {� (}} Clw dasier LISTED EQUIPMENT. CONTRACTOR SHALL MAKE ALL NECESSARY ADJUSTMENTS TO DEMO NOTE T T T T T GODIVACHOCOLATIER, INC. ASSURE OTHER EQUIPMENT WILL FIT IN AVAILABLE SPACE AND WILL NOT EXCEED WEIGHT REMOVE ALL PARTS OF THE EXISTING RECEIVul 333 WEST 34TH STREET AND ELECTRICAL REQUIREMENTS. MECHANICAL SYSTEM AND ALL NEW YORK, NY 10001 C. REFER TO STRUCTURAL DRAWINGS FOR ALLOWABLE METHODS/LOADS FOR HANGING RELATED EQUIPMENT. DO NOT DEC 2 8PROJECT PLANNER: PIPE/DUCTS FROM STRUCTURAL MEMBERS. OF WORK WITH THE LANDLORD PRI OR 6 EF-1 CITypF�/ D. PROVIDE BOWDEN DAMPER REGULATORS AND CABLE SYSTEM AT ALL LOCATIONS WHERE TO BID. 75 0 0 0 o I F0-01 0 0 0 0 0 0 ° ° BUILDIN ARU DAMPERS ARE LOCATED ABOVE HARD LID CEILINGSABANDON. COORDINATE DEMO SCOPE 2015 CEILINGS OR NOT ACCESSIBLE (SEE DETAIL). VD 1 9 CDIV/,SIO] ' E CONTRACTOR SHALL PROVIDE COMPLETE INSTALLATION OF ALL DETAILS ON DETAILqL 00, SHEET TO EQUIPMENT INDICATED. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING 530 5iZ1 4501 CONDITIONS PRIOR TO BID. ALL EQUIPMENT IS TO BE MARKED WITH T 12'0 9 535 9 F. AIR DUCTS FITTINGS, MECHANICAL EQUIPMENT AND PLENUM CHAMBERS SHALL BE THE STORE'S NAME AND SPACE NUMBER. L _ i MECHANICALLY ATTACHED, SEALED, INSULATED AND INSTALLED IN ACCORDANCE WITH ALL MARKING SHALL BE DONE ON A r fiRTU_7 I w w 12'0 12'* THE CRITERIA OF THE 2013 CALIFORNIA MECHANICAL CODE. STENCIL PLATE AND ATTACHED TO THE 38W }— G. DUCT SMOKE DETECTORS SHALL SHUT DOWN ALL HVAC EQUIPMENT UPON DETECTION OF UNIT OR AS SPECIFIED BY THE MALL 10'0 ( 1 2 I I ( ° �° $ '.' �o SMOKE BY ANY DUCT DETECTOR. ' WJCA INC. j 0 763 SUSQUEHANNA AVE. L H. NEW DUCTS USED TO CONVEY THE CONDITIONED AIR SUPPLY AND VENTILATION AIR ARE I k FRANKLIN LAKES, NJ 07417 TO BE MADE OF CONTINUOUS SHEET METAL (! ( I 48'x12' I 30'x12' I TEL: 201-848-9060 I. CONTRACTOR SHALL VERIFY ALL AS-BUILT SITE CONDITIONS PRIOR TO BID AND INCLUDE ALL DUCTWORK TO BE GALVANIZED METAL FAX: 201-848-9881 I IN BID ALL COSTS TO MAKE FIELD COORDINATION AND ADJUSTMENT TO DUCTWORK FOR NO FIBER DUCTWORK SHALL BE USED. I 12•* FIT INTO EXISTING STRUCTURE CONTRACTOR SHALL VERIFY AND FIELD COORDINATE 10 TYP•) ENGINEER: 7 FINAL LOCATION OF MECHANICAL EQUIPMENT. S-11 f I I I I ❑° J. GUIDE AND SMACNA MANUAL LATEST EDITIONS.ALL DUCTWORK SHALL BE SHEET METAL FABRICATED IN ACCORDANCE WITH ASHRAE - - I w w ETHERMOSTAT SCHEDULE — ENGINEER: K. IF INSTALLATION VARIES FROM THE CONTRACT DRAWINGS, THE GENERAL CONTRACTOR Dan R. Rhodes, PE WILL BE RESPONSIBLE FOR OBTAINING AS- BUILT DRAWINGS FROM THE SUBCONTRACTOR SYSTEM MODE HEATING COOLING RH 9 530 9 5lZt 9 �t AND SUBMITTING SAME TO OWNER. 425 535 7402 East Broad Street r<TU OCCUPIED 687 68F 60X Blacklick,Ohio 43004 L FURNISH ALL LABOR, MATERIALS, TOOLS INCIDENTALS AND DETAILS NECESSARY TO UNOCCUPIED 557 68F 60X 5(ZL ,11 8 ( Q VD = ❑ ❑ Phone: 614.204.2479 PROVIDE A COMPLETE HEATING, VENTILATING, AIR CONDITIONING SYSTEM. INCLUDE ANY 325 `-1 12'0 0 0 LABOR AND MATERIAL NOT SPECIFICALLY MENTIONED, BUT NECESSARY TO PROVIDE A OCCUPIED 66F 667 60X COMPLETE AND OPERATIONAL SYSTEM. ALL WORK SHALL BE INSTALLED IN A VAV-BOX 3 I — VAV-1 O 1Z•0 $ TYP.) MEP Building Consultant PROFESSIONAL MANNER AND SHALL MEET ALL THE REQUIREMENTS OF THE ALBERTA UNOCCUPIED SHUTDOWN SHUTDOWN - _ _ - 3 1300 BUILDING CODE, CITY BUILDING CODE, SAFETY AND HEALTH CODES, NFPA CODES AND n --��•�� O ALL OTHER APPLICABLE CODES AND REQUIREMENTS. ALL COSTS FOR SAID REQUIREMENTS SHALL BE INCLUDED IN THIS CONTRACTORS BID PRICE *NIGHT SETBACK NOT ALLOWED FOR COOLING M. THIS CONTRACTOR SHALL SECURE AND PAY FOR ALL REQUIRED PERMITS AND r 2Yx10' 0 INSPECTIONS AND PERFORM ALL TESTS CALLED FOR OR REQUIRED AS A PART OF HIS F0_0_1 FO-0-1 o 0 0 0 19WORK. CONTRACTOR SHALL FURNISH AN APPROVED CERTIFICATE OF FINAL INSPECTION, AND TURN OVER TO OWNER AT COMPLETION OF PROJECT. 8 18 x12 8 N. MECHANICAL PLANS ARE DIAGRAMMATIC, NOT SHOWING EVERY ITEM IN EXACT LOCATION 1000E3 C14 OR DETAIL MEASUREMENTS AND LOCATIONS MUST BE FIELD VERIFIED AND x COORDINATED WITH ARCHITECTURAL, HVAC, FIRE PROTECTION, STRUCTURAL, ELECTRICAL N ^ RG-2 12'0 AND OTHER BUILDING DRAWINGS. 8 4 _., V-1 .. y 1300 1200 G O D I VA 0. MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL TRADES - Chocolatier LANDLORD REQUIREMENTS, CEILING HEIGHTS AND EXISTING STRUCTURAL CONDITIONS i 4 T 'x1 16'0 DN PRIOR TO FABRICATION OF ANY DUCTWORK OR ORDERING OF ANY EQUIPMENT. _ STORE NO: R. ALL WORK SHALL BE IN STRICT ACCORDANCE WITH ALL FEDERAL, PROVINCIAL AND I �— I 200 g SD-1 w SD-1 52/' LOCAL CODES AND ORDINANCES AND LANDLORDS TENANT CRITERIA MANUAL i 5�L Y 24'0 DN w 535 535 i _T S. FLEXIBLE INSULATED DUCTS SHALL BE MAXIMUM 5'-0' LONG AND SHALL MEET — INSTALLATION AND MATERIAL REQUIREMENTS OF LOCAL CODES. 325 PROJECT LOCATION: 8 SB1 0 0 9 0 0 9 L T. MECHANICAL CONTRACTOR TO PROVIDE TENANT WITH AS-BUILT DRAWINGS, ALLVID I I 425 -" I EQUIPMENT SHOP DRAWINGS, INFORMATION ON THERMOSTATS, CONTROL WIRING i 4 4 WASHINGTON SQ. MALL DIAGRAMS AND OTHER PERTINENT INFORMATION AT COMPLETION OF PROJECT. __ S S I RTU-1 VAV-1 [ SPACE B04 U. ALL TEMPERATURE CONTROLS, FIRE ALARM COMPONENTS, EQUIPMENT NAMEPLATES, 9585 SW WASHINGTON LABELS, OR COLOR CODED COMPONENTS SHALL BE MASKED DURING PAINTING TO 8 Zx: 3 C SQUARE ROAD PREVENT DAMAGE FROM OVER-SPRAY OR OBSCURING INFORMATION. 14 0 DNI PORTLAND, OR 90703 V. MECHANICAL CONTRACTOR SHALL VERIFY WHETHER A ROOFING CONTRACT EXISTS ON I R7U_7 f VAV-1 D © O THE ROOF, PRIOR TO MAKING ANY ROOF PENETRATIONS. IF A ROOF CONTRACT EXISTS RG-3 J � I ON THIS BUILDING, ALL ROOFING WORK SHALL BE BY THE LANDLORD'S ROOFING CONTRACTOR TO AVOID INVALIDATING ANY ROOF WARRANTY THAT MAY EXIST ON THE 650 —� BUILDING. THE ROOFING CONTRACTOR'S COST SHALL BE INCLUDED IN THE MECHANICAL L- _ ISSUE DATE: - - - - - - ---- -- - - - - - - - - - - -- -- - - - - - - - - - - - - - - - - ------ - - - - -- - -- - - --- - - - - --- - - -- -CONTRACTOR'S - - BID PRICE DATE DESCRIPTION W. SIZE OF DUCTWORK SHOWN ON THE DRAWINGS IS FREE NET AREA, OUTSIDE DIMENSION NO. 12.11.16 ssuEDFOReID.RMIT AND LANDLORD OF DUCTS WILL NEED TO BE INCREASED IF LINED DUCT IS USED. X. VERIFY THAT NOTHING WILL HINDER THE HVAC DESIGN WHICH SHALL COOL/HEAT 24/7 MECHANICAL PLAN REMEW 3 8 =1 —0 THE LEASE SPACE TO 68F, 60X RH. THE STOCK ROOM SHALL COOL TO 60F. Y. FIRE STOP AND SEAL ALL NEW AND EXISTING ARCHITECTURAL OPENINGS AS REQUIRED. FIELD VERIFY ALL CONDITIONS Z. CLEAN AND BALANCE ALL EXISTING AIR DEVICES. QCODED NOTES DESIGN DRAWINGS ARE SCHEMATIC. THIS CONTRACTOR SHALL VISIT THE SITE PRIOR TO BIDDING OR AWARD OF CONTRACT TO INSPECT EXISTING FIELD CONDITIONS. THIS CONTRACT SHALL INCLUDE ALL 1. PROVIDE AND INSTALL NEW SINGLE PACKAGE ALL ELECTRIC ROOF TOP UNIT (RTU), PROVIDE NEW ROOF CURB WITH 90X VIBRATION ISOLATORS. ALL LABOR AND MATERIALS NECESSARY FOR FIELD MODIFICATIONS DUE DUCTS AND CONDUITS PENETRATING THE ROOF SHALL BE INSIDE THE CURB SUPPORT. SEE SCHEDULE ON SHEET M200 FOR MORE INFORMATION. TO EXISTING CONDITIONS. ALL ROOF CUTTING, FLASHING, ETC. REQUIRED SHALL BE DONE BY LANDLORD'S ROOFING CONTRACTOR AT THIS TENANT CONTRACTOR'S EXPENSE. GENERAL CONTRACTOR SHALL PROVIDE ANY ADDITIONAL STRUCTURAL SUPPORT REQUIRED FOR RTU, PER LANDLORD'S REQUIREMENTS. COORDINATE CONTACT THE ARCHITECT, ENGINEER OR OWNER PRIOR TO BIDDING WITH LANDLORD'S REPRESENTATIVE PRIOR TO STARTING WORK. UNIT SHALL BE FURNISHED WITH TWO SETS OF STANDARD FILTERS. CONTRACTOR TO FOR INTERPRETATIONS AND CLARIFICATIONS OF THE DESIGN AND REPLACE FILTERS PRIOR TO OPENING OF STORE PROVIDE FLEXIBLE CONNECTIONS TO DUCT DROPS. INCLUDE IN HIS BID ALL COSTS TO MEET THE DESIGN INTENT. CITY OF TIGARD CLARIFICATIONS MADE BY THE ARCHITECT, ENGINEER OR OWNER REVIEWED FOR CO COMPLIANCE AFTER BIDDING WILL BE FINAL AND SHALL BE IMPLEMENTED AT 2. INSTALL CONDENSATE PIPING FROM RTU. MINIMUM PIPING SIZE TO BE 3/4.' CONDENSATE DRAIN TO BE TRAPPED WITH A TRAP DEPTH OF 1.5 X CONTRACTORS COST. Approved: UNITS TOTAL STATIC PRESSURE (MINIMUM 4' DEEP). DRAIN SHALL EXTEND AT A SLOPE OF 1' PER 40'. CONDENSATE SHALL BE ROUTED TO ROOF Approved: DRAIN OR GUTTER PER LANDLORD REQUIREMENTS. INSTALL PIPING SUPPORTS, PREFABRICATED BLOCKING SET PER LANDLORD'S REQUIREMENTS, BIDDING CONTRACTORS SHALL HAVE A WORKING KNOWLEDGE OF OTC: [ ] SPACED A MAXIMUM OF EVERY 1OFT. FIELD COORDINATE EXACT ROUTING, SUPPORT TYPE, AND THE LOCATION OF THE ROOF DRAIN OR GUTTER. LOCAL CODES AND ORDINANCES AND SHALL INCLUDE IN THEIR BIDS permit#' l Zdl� -C O 3. SMOKE DETECTOR TO DE-ENERGIZE RTU SUPPLY FAN IF ACTIVATED. FIRE ALARM CONTRACTOR TO PROVIDE AND WIRE, HVAC CONTRACTOR SHALL THE COSTS FOR ALL WORK INSTALLED IN STRICT ACCORDANCE WITH G Address: Q�j ILLI!-S INSTALL SMOKE DETECTOR IN RETURN AIR DUCT. FIRE ALARM CONTRACTOR TO PROVIDE AND WIRE, HVAC CONTRACTOR SHALL INSTALL STROBE HORN GOVERNING CODES, THE PLANS AND SPECIFICATIONS NOT WITHSTANDING. THE CONTRACTOR SHALL ALERT ARCHITECT, Suite#: WITH MANUAL RESET FOR SMOKE DETECTOR. FIELD COORDINATE WITH CONSTRUCTION MANAGER AND LOCAL CODE OFFICIAL FOR EXACT MOUNTING ENGINEER OR OWNER OF ANY APPARENT DISCREPANCIES BETWEEN c , -� LOCATION OF STROBE HORN. A STROBE HORN SHALL BE PROVIDED FOR EACH UNIT. MOUNT MANUAL RESET SWITCH BELOW SENSOR FOR UNIT AT 4 GOVERNING CODES AND DESIGN INTENT. `S o By: Dates Z (� �^ I �/� FT. ABOVE FINISHED FLOOR. Jam. G.%JFK 59832 9 .r 4. HVAC CONTRACTOR SHALL FURNISH AND INSTALL 7 DAY PROGRAMMABLE THERMOSTAT WITH COOLING STAGES AND HEATING STAGES TO MATCH UNIT, AUTO CHANGEOVER, OCCUPIED AND UNOCCUPIED MODES AND TEMPERATURE OVERRIDE WHILE OCCUPIED. MOUNT AT 4 FT. ABOVE FINISHED FLOOR INJ/ OFFICE COPY LOCATION SHOWN ON PLANS. FURNISH AND INSTALL A REMOTE THERMOSTAT, 7 FT. ABOVE FINISH FLOOR IN LOCATION SHOWN ON PLANS AND LEGEND* CONNECT TO THERMOSTAT. COORDINATE EXACT LOCATIONS WITH TENANT. THERMOSTAT AND SENSOR MUST BE FULLY COMPATIBLE WITH HVAC UNIT USED FOR PROJECT. COORDINATE TYPE WITH UNIT MANUFACTURER. V .1 z� Nco r I V R. mi`CGV THE ACTIVATION OF A DUCT 5. PROVIDE AND INSTALL VARIABLE AIR VOLUME (VAV) BOX, WITH 4 KW ELECTRIC HEAT. MECHANICAL CONTRACTOR SHALL INSTALL WITH HANGERSte— SMOKE DETECTOR SMOKE DETECTOR SHALL SUPPORTS PER MANUFACTURES INSTRUCTIONS AND ATTACHED TO THE BUILDING STRUCTURE PER MALL CONSTRUCTION REGULATIONS. VAV-BOX IS NEW DUCTWORK EV RAT1OP1 DATE: �Z 3/ ACTIVATE A VISIBLE AND APPROX. 235 LBS. H❑4 HORN/STROBE AUDIBLE SUPERVISORY 6. EF-1 COOK MODEL /GC-148 EXISTING DUCTWORK TO REMAIN SIGNAL AT A CONSTANTLY HVAC CONTRACTOR TO PROVIDE AND INSTALL A CEILING MOUNTED EXHAUST FAN COMPLETE WITH INTEGRAL BACKDRAFT DAMPER, SPEED CONTROL (D@ THERMOSTAT/SENSOR ATTENDED LOCATION AND ALUMINUM GRILL EXHAUST CAPACITY SHALL BE 75 CFM AT A PRESSURE UP TO 0.2' S.P. FAN SHALL BE 120V., 1 PH., 60 HZ. TRANSITION DEMO DRAWING TITLE: GMSC 606.4.1 FROM FAN DISCHARGE TO DUCT SIZE SHOWN AND EXTEND UP THRU ROOF. TERMINATE WITH FLASHING, BIRD SCREEN AND RAIN CAP. EXHAUST TO ------ TERMINATE A MINIMUM OF 10'-0' FROM ANY FRESH AIR INTAKE. ALL ROOF CUTTING, FLASHING, ETC. TO BE DONE BY THE LANDLORD'S ROOFING XX-1 AIR DEVICE TYPE 0 CONTRACTOR AT THIS CONTRACTOR'S EXPENSE. THE EXHAUST FAN SHALL BE WIRED TO OPERATE WHENEVER THE TOILET ROOM LIGHT IS SWITCHED ® CEILING SUPPLY AIR DIFFUSER Y4? CFM AMOUNT MECHANICAL AL U — � SUPPLY AIRFLOW PLAN 7. GENERAL CONTRACTOR TO UNDERCUT DOOR 3/4' ABOVE THRESHOLD FOR TRANSFER AIR. 08. DUCTWORK TO BE ROUTED ABOVE CEILING STRUCTURE AND WRAPPED WITH R-5 INSULATION. FIELD VERIFY EXACT ROUTING. CEILING RETURN AIR GRILLE RETURN AIRFLOW i 9. PROVIDE AND INSTALL PLASTER FRAME WITH COLING SUPPLY DIFFUSERS AND RETURN GRILLES WHERE INSTALLED IN DRYWALL CEILING. ® CEILING EXHAUST AIR GRILLE OA OUTSIDE AIR 10. MECHANICAL CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION, SIZE, AND CONDITIONS OF DUCTWORK FOR SUPPLY AIR OF MALL VAV SYSTEM. ALL SUPPLY AND 1 o RETURN DUCTWORK USED FOR THIS TENANT SPACE SHALL BE ROUTED AROUND THE DUCTWORK OF MALL VAV SYSTEM. FIELD VERIFY EXACT CONDITIONS AND I TURNING VANE SA SUPPLY AIR PROJECT NO: ADJUST DUCTWORK AS NEEDED. THE AREA PER SQUARE INCH FOR ALL DUCTWORK MUST STAY THE SAME IF DUCTWORK IS TO BE MODIFIED. 0 11. CONNECT NEW DUCTWORK FROM MALL SYSTEM SUPPLY AIR DUCTWORK TO VAV-BOX. EXACT LOCATION AND TYPE OF CONNECTION TO BE FIELD VERIFIED.. c I BRANCH TAKE-OFF WITH RA RETURN AIR 15428 J BALANCING VOLUME DAMPER 11 PROVIDED AND INSTALL 48'x12' INDEECO FLANGED ELECTRIC DUCT HEATER. HEATER SHALL BE 208V-30, 3-STAGE 12 KW HEATER ELEMENT. PROVIDE ALL FD FIRE DAMPER DRAWING NO: NECESSARY HARING AND SENSORS NEEDED TO BE INTERLOCKED WITH THE RTU. HEATER AND RTU FAN SHALL ENERGIZE WHENEVER INDOOR AIR TEMPERATURE a ROUND DUCT RISE In DROPS BELOW 66' F. INSTALL HEATER UP STREAM OF SUPPLY AIR BRANCH DUCTWORK. ROUND DUCT DROP VD VOLUME DAMPER mi 00 a r • ALL SYMBOLS MAY NOT BE USED OWNER/TENANT: - EXISTING PLUMBING -- �- G O D I V VTR. FIELD VERIFY Cti01 COL DESIGN COOLING DESIGN HEATING I _ _ _ _ EXACT LOCATION. _ GO33 EST 34T ETRETIER, INC. COOLING DATA AT Jul 1500 HEATING DATA AT DES HTG ' -' 333 WEST 34TH STREET rAe 10 C NEW YORK, NY 10001 COOLING OA DB/WB 90.0°F!67.0 OF HEATING OA DB!WB 22.1)°F t 18.4°F FRESH AIR CLEARANCE Sensible Latent Sensible Latent I 6.0 UP I SEE CODED PROJECT PLANNER: ZONE LOADS Details (STU/hr) (BTU/hr) Details (BTU/hr) (BTU/hr) I I R� j I NOTES ON I I Window&Skylight Solar Loads D tt2 0 - 0 ft2 - - I Ii1 {� M1 QQ IE Wall Transmission 0112 0 - 0 n2 0 - Roof Transmission 1248 ft2 2818 1248 ft2 1655 - I �j Window Transmission 0fL2 0 - 0ft2 0 ( / Skylight Transmission o tt2 0 - 0 ft2 0 - ALL ROOF CUTTING, FLASHING, ETC. REQUIRED Door Loads om o - 0It2 o I I SHALL BE DONE BY LANDLORD'S ROOFING Floor Transmission 1248 112 0 1248 ft2 0 I I I CONTRACTOR AT THIS TENANT CONTRACTOR'S \ Partitions 0 tt2 0 0 tt2 a EXPENSE. \ Ceiling 0112 0 - 0 ft2 0 - / Overhead Lighting 1814W 6189 - 0 0 I 3850 Task Lighting ow 0 0 0 - I I _ _ 1 2 / I I� WJCA INC. Electric Equipment ow 0 - 0 0 - I 'l�\ People 11 3245 5005 0 0 0 I O �� /� / I 763 SUSQUEHANNA AVE. Infiltration - 0 0 - 0 0 I / I / FRANKLIN LAKES, 90 07417 Miscellaneous - 70399 10542 - 0 0 ( I / TEL: 201-848-9060 I I /\ FAX: 201-848-9881 Safety Factor 00/6/0% 0 0 0% o o 3-0 �/ �� 5-0 Total zone Loads - 82651 15547 - 1665 0 \ 7 10 ENGINEER: Zone Conditioning - 83271 15547 - 1656 0 Plenum Wall Load 0% 0 0 0 Plenum Roof Load 0°% _ 0 - 0 0 - I / / I Plenum Lighting Load 0% 0 - 0 0 - ENGINEER: I I MAINTENANCE CLEARANCE FOR Return Fan Load 3839 CFM 0 - 3839 CFM o - RTU T'YP, Dan R. Rhodes, PE Ventilation Load 281 CFM 6376 1667 281 CFM 13648 0 I I Fi- 7402 East Broad Street Supply Fan Load 3839 CFM 0 - 3839 CFM 0 L _ _ J Blacklick,Ohio 43004. Space Fan Coil Fans - 0 - 0 - II I Phone: 614.204.2479 Duct Heat Gain/Loss 0% 0 - 0% 0 - >>Total System Loads 648 89 ',. 17214 15304 0 I Central Cooling Coil - 89646 17219 0 0 I I I Central Heating Coil 0 - 15304 - MEP Building Consultant >>Total Conditioning - 89646 17219 15304 0 ( I I Key: Positive values are cIg foods Positive values are htg loads I I FRESH AIR Negative values are htg loads Negative values are cig roads I INTAKE I I I I I t I L �_ ....._ II GODIVA Chocolatier II I STORE NO: 524 I I 111 I PROJECT LOCATION: II I I WASHINGTON SQ. MALL I ISPACE B04 9585 SW WASHINGTON SQUARE ROAD IPORTLAND, OR 90703 FF I L._...... _ _- __.............. _s �_ e ISSUE DATE: i NO. DATE DESCRIPTION EDF MECHANICAL ROOF PLAN 12-11-15 SSUERMITA BID, AND LANDLORD REVIEW 3/8'=70' FAN POWERED VAV SCHEDULE ROOF TOP UNIT SCHEDULE 208V FLOW RATES COOLING ELECTRIC HEATING &P. TS MANUFACTURER/ O•A• NOM. TOTAL SENS. ENT. ENT. LEAV. LEAV. REFRIG. REFlZIG. INPUT MBH SEER/EER WEIGHT UNIT TAG MFG/ INLET SIZE HP VOLT PHASE PRIMARY CFM( HEATING COIL MARK MODEL CFM CFM E.S.P. TONS MBH MBH D.B. W.B. D.B. W.B. TYPE LBS. KW EQUIVALENT BHP PHASE MCA MOCP IEER/IPLV LBS REMARKS MODEL I FAN CFM MAX. MIN. KW VOLT PHASE RTU-1 DAIKIN 3850 300 .5' 9.6 106.7 93 70.5' 58.5' 48.3' 48' R-410A - SEE DE - 71.57 208 44.7 60 -/12'2/ 2450 RTU TO COME WITH 14• FACTORY VAV-1 CARRIER 12.4 1/4 208 3 1300 920 1300 4 208 3 DPS010A NOTE 12. 3O 19.1/- MOUNTED ROOF CURB VIBRATION ISOLATORS. NTH 90X 45N1011_41222 STASES A NEPTRONIC ELEC. DUCT HEATER SHALL BE SUPPLIED SEPARATELY FROM RTU TO PROVIDE HEATING, SEE tOffS CODED NOTE 12. 1. ALL COOLING CAPACITIES SHOWN ARE BASED ON AN AMBIENT OUTDOOR TEMPERATURE OF 954F. 2. CONTRACTOR SHALL INSTALL ALL NEW FILTERS PRIOR TO TEST AND BALANCE WORK. 3. PROVIDE LOW AMBIENT COOLING CAPABILITY DOWN TO OF. 4. ALL COMPRESSORS SHALL HAVE 5 YEAR WARRANTIES SERVICED BY INSTALLING CONTRACTOR, ALL HEAT EXCHANGERS TO HAVE A 10 YR WARRANTY. 5. ALL CAPACITIES LISTED ARE MINIMUM REQUIRED QUANTITIES. 6. ALL UNITS TO BE BELT DRIVEN. 7. PROVIDE 7 DAY DIGITAL PROGRAMMABLE THERMOSTAT WITH COOLING STAGES AND HEATING STAGES TO MATCH UNIT, AUTO CHANGEOVER, OCCUPIEDAMOCCUPIED MODE AND TEMPERATURE OVERRIDE WHILE OCCUPIED. sso �5 ��yGIN�E9 e 8. UNITS SHALL HAVE 10076 OUTSIDE AIR ECONOMIZER OPTION. r 598 2 r Ventilation Schedulec✓ co��`� AIR DEVICE SCHEDULE Godiva, Washington Square, Portland OR AEG# 15428 NOTES : 1. SYMBOL KEY - FIRST LETTER: S-SUPPLY R-RETURN E-EXHAUST 4. DAMPERS SHALL BE OPERABLE FROM FACE Occupant CFM Area Air Total space Zone Air Total SECOND LETTER: D-DIFFUSER R-REGISTER G-GRILLE 'A' OPPOSED BLADE EXPIRATION DATE:JqJ3 N SQ. FT. Load / 1000 No of /Person Total CFM Flow/SQ FT Total vent CFM Effectiveness Required 2. 1,2,3, AND 4-WAY AIR DEVICES ARE DETERMINED BY 'C' RADIAL OPPOSED BLADE q DIRECTIONAL ARROWS ON DRAWINGS. Rm No Room Name (Az) (Pz) People (Rp) People (Ra) Area AF (Vbz) (EZ) CFM (Voz) 3. FINISH- 5. BORDER STYLE- A' METALESCENT ALUM. BAKED ENAMEL A' SURFACE MOUNTED Service/Sales 802 15 12 7.5 90 0.12 96 186 0.8 233 'B' ETCHED FINISH NTH CLEAR FINISH OR ANODIZED 'B' LAY IN MOUNTING DRAWING TITLE: a 'C' BAKED OFF WHITE ENAMEL FINISH 'C' LAY-IN PANEL PROVIDE TITUS MODEL /TRM a Storage 396 0 0 0 0 0.12 48 48 0.8 60 1 'D' STANDARD OFF WHITE FINISH G.C. TO FIELD PAINT FRAME FOR PLASTER CEILING MOUNTING. TO MATCH CEILING OR WALLS SIZE MOUNTING MATERIAL ACCESSORIES FlREBORDER MECHANICAL Total Required 12 293 SYMBOL MANUFAC. CATALOG / MOD. NECK DUCT STEEL ALUM. FINISH DPR. E(;121D DPR. STYLE ROOF PLAN REMARKS • i • • D A B do C SEE CODE NOTE 9 FOR & SCHEDULES Total Air Provided 300 SD-1 TITUS TMS 24 X24 12 LOCATION OF PLASTER FRAME Ventilation and Exhaust Rates per SEE CODE NOTE 9 FOR Exhaust Total RG-1 TITUS 35ORL 38'x22' 36'X20' • • D A B dt C LOCATION OF PLASTER FRAME SEE CODE NOTE 9 FOR Total # Exhaust Rate Total# Rate per Required RG-2 TITUS 35ORL 26"x14' 24'X12' • • D A B dr C LOCATION OF PLASTER FRAME Rm No Room Name Toilets per Toilet Urinals Urinal CFM Section 403.3 of the 2014 Florida * • D A B & C PROJECT NO: O Restroom 1 70 70 70 Mechanical Code RG-3 MS 35ORL 24 x24 22 X22 Total Restroom Exhaust Required 70 Vbz = R x Pz + Ra x Az NOTES` 1 5428 � q ( p ) ( � 1. TRANSITION TO DUCT AS REQUIRED. Total Restroom Exhaust Provided 75 VOz = Vbz / EZ 2. SEE DETAIL THIS SHEET FOR INSTALLATION REQUIREMENTS. DRAWING NO: t,1 3. PROVIDE NTH PLENUM AS MFG BY DIFFUSER MANUFACTURER. Ln 4. PROVIDE OPTIONAL AIR SCOOP DAMPER. a M200 3 L=1/4W,4"MIN OWNER/TENANT: eC4 7 NSULATION QKEYED NOTES: L ROOFTOP CU UNIT YMAIN1. DUCT,COLLARAND K45- 4 RETURN/EXHAUST REGISTER ® SUPPLY 2. MANUAL VOLUME DAMPER 4 3. SECURE TO CEILING PER G O D I VA 1 1 '2E 1 / RECOMMENDATIONS AND PER T12" 3 3 e i CEILING FINISH. PROVIDE GRID GODIVA CHOCOLATIER, INC. CLIPS PER MFG'R REQUIREMENTS 333 WEST 34TH STREET . 4 MIN 4 4. HANGER,SECURE TO STRUCTURE NEW YORK, NY 10001 1 6 6 O 5 1 5. ATTAAND CH DUCTTOREGISTER PROJECT PLANNER: 7 6. BALANCING DAMPER FOR FINAL 4BALANCING 7. SHEET METAL DUCTWORK 2 8. MAIN RETURN/EXHAUST DUCT s O 9 REGISTEER NDROP OTO BOTTOM OFUST BRANCH 110. SPIN IN FITTING QKEYED NOTES: GENERAL NOTES: 11. HARD SHEET METAL ELBOW AT O 8 CONNECTION TO AIR DEVICE. 1. ANCHOR UNIT TO CURB ON PROJECTS WITH BUILT-UP ROOFS,ADD Q KEYED NOTES: 2. PRESSURE TREATED WOOD NAILER CANT ON EQUIPMENT SUPPORTS AND LAY-IN MOUNT 4O 3. VIBRATION ISOLATORS EFABRICATE PIPING CHASE 11 WJCA INC. 4. ROOF DECK B. P E EQUIPMENT ACROSS BAR JOIST OR 1. MAXIMUM LENGTH OF INSUL. FLEX DUCT 6. SECURE TO CEILING PER MANUFACTURER'S 763 SUSQUEHANNA AVE. 5. PREFABRICATED EQUIPMENTS PORT ADD DITIONAL STRUCTURAL STEEL AS EQUALS 5 FEET.FLEX NOT PERMITTED IN RECOMMENDATIONS AND PER CEILING FINISH. 6. SINGLE MEMBRANE ROOFIN LASH PER NIECES Y TO CARRY EQUIPMENT WEIGHT INACCESSIBLE CEILINGS PROVIDE GRID CLIPS PER MFR 2 10 © FRANKLIN LAKES, NJ 07417 MFG'R RECOMMENDATIO . FLASH UP AND C. LOCATE A INIMUM OF 10'-0"FROM EDGE OF 2. INSULATED DUCT,COLLAR AND DIFFUSER REQUIREMENTS. PROVIDE FRAMING FOR a TEL: 201-848-9060 OVER WOOD NAILOR ROOF BY HVAC CONTRACTOR DRYWALL FAX: 201-848-9881 7. PREFABRICATED DO OUSE 3. TAPERED HIGH EFFICIENT TAKE-OFF INSTALLATION. 3 8. SEAL AND FLASH NTNG 4. INSULATION 7. HANGER,SECURE TO STRUCTURE AND 5. MANUAL VOLUME DAMPER ABOVE DUCTWORK =932Z S ENGINEER: ACCESSIBLE CEILING OR PROVIDE ACCESS 8. PEEL BACK INSULATION AND PROVIDE dISURFACE MOUNT PANEL, INSTALL MAXIMUM 5'ABOVE CEILING. STRAPPING AND SHEET METAL SCREWS AT 5 1 PROVIDE 18"LONG ORANGE MARKER TAPE FLEX CONNECTION TO DUCT.THEN PROVIDE ENGINEER: ATTACHED TO DAMPER TO IDENTIFY STRAPPING AROUND INSULATION. LOCATION 9. HARD SHEET METAL ELBOW ON ROUND DUCT INSTALLATION Dan R. Rhodes, PE CONNECTION TO AIR DEVICE. 7402 East Broad Street Blacklick,Ohio 43004 EQUIPMENT SUPPORT DIFFUSER INSTALLATION (TYPICAL) RETURN/EXHAUST REGISTER INSTALLATION Phone: 614.204.2479 313.00-02 233713.00-05 233713.00-15 SCALE: NONE SCALE: NONE SCALE: NONE MEP Building Consultant i 2 USE FOR 5 TONS & LESS 2 , s MAINTAIN CLEARANCE \CONDEN R/ 1 10 FC LIQUID LINE 3 O 4 3 3 y 4 s t1 GODIVA s 5 O Chocnlatter 3 s © STORE NO: 524 )TYPE B 7 TYPE A PROJECT LOCATION: 4 7 1 e WASHINGTON SQ. MALL DIRECT EXPANSION O SPACE B04 Q KEYED NOTES: EVAPORATOR COIL Q KEYE O S: Q KEYED NOTES: 9585 SW WASHINGTON 1. FIELD SUPPLIED FILTER DRIER, UNLESS 1. INSULA SUPPLY DUCT 1. NEOPRENE ISOLATION PADS TYPE SQUARE ROAD PROVIDED INTERNALLY BY THE 2. FLEX E CONNECTION VIBRATION ISOLATORS),TYPICAL PORTLAND, OR 90703 EQUIPMENT MANUFACTURER. GENER NOTES: 3. G ANIZEOALL-THREAD ROD VIBRATION 2. EXPANSION ANCHOR,TYPICAL 2. SIGHT GLASS A. PIPE SIZES SH BE PER MANUFACTURERS LATOR(PYP.)ATTACHED TO S CTURE 3. CONCRETE STRUCTURE 3. EXPANSION VALVE RECOMMENDATI 4. ILTER RACK AND ACCESS DOOR 4. STEEL WASHER,TYPICAL GENERAL N ES: 4. SUCTION LINE W/FLEXIBLE CL D CELL B. PROVIDE 4"CONCR PAD FOR ALL EXTERIOR CONDENSATE LINE WITH TRAP 5. MOUNTING STUD ELASTOMER INSULATIONUNITS ON GRADE. REFRIGERANT LINES,SUCTION LINE INS TED 6. MOUNTING BRACKE A. TYPE AMOUNTING ARRA EMENT SHALL BE 5. EXPANSION VALVE THEIR BULB C. PIPING LAYOUT AND CO GURATION SHALL BE WITH 3/4"ARMAFLEX 7. ALL-THREAD ROD USED EXCEPT WHERE SPA ONSTRAINTS ISSUE DATE: 6. TRAP FOR LONG VERTI RUNS(PER INSTALLED PER MFGR'S R MMENDATIONS. 7. SERVICE ACCESS PANEL 8. 1"x1"x0.125"AN IRON OR 1"UNISTRUT REQUIRE TYPE B MOUNTING MFG. RECOMMEND IONS) D. REFRIGERANT SPECIALITIES SHOWN FOR 8. RETURN DUCT 1/2"ACOUSTIC LINING(MIN OF 10' 9. FAN COIL-U B. MOUNTING STUDS AND ALL-THR RODS NO. DATE DESCRIPTION 9. HIGH WATER ALARM IN CONDENSATE DRAIN PAN. 10. TYPE NH LATION HANGER 7. EXPANSION VALV UALIZER LINE SCHEMATIC PURPOSES ONLY A SHALL BE SHALL BE MINIMUM 0.25"DIAMETER 12_11-15 UED FOR BID. COORDINATED PER MFGR'S INSTA TION WIRE TO BREAK 24 VOLT CONTROL POWER IN 11. DOUB UT,TYPICAL RMIT AND LANDLORD INSTRUCTIONS. THE CASE OF A HIGH WATER EVENT. REVIEW REFRIGERANT PIPINGSPLIT SYSTEM DX UNIT FAN-COIL MOUNTING (VIB. ISOLATION) 313.00-03 SCALE: NONE 126.00-05 SCALE: NONE 2 219.00-05 SCALE: NONE CAP K=MINIMUM OF 112" GENERAL NOTES: M= 1/2"PLUS MAXIMUM TOTAL STATIC PRESSURE PIPE FULL SIZE A. LOCATE TRAPS SO AS TO BE ACCESSIBLE CAP OF AIR UNIT DRAIN FOR CLEANING O CONNECTION B. CONDENSATE PIPING SHALL GRADUALLY SLOPE DOWN FROM DRAIN TRAP C. Confirm trap requirements with equipment manufacturer. Ix D. Refer to specifications for material and FLOW ----,c insulation requirements Od SEE NOTE 2 O7 M VERIFY WITH AHU Z CAP 00 AIR UNIT CASING F1 FLPOSITIVE PRESSURE 4 1 ' 17 3 IPE FULL SIZE OF AIR UNIT DRAIN CONNECTION �_C 7 KEYED NOTES: H=(1"FOR EACH 11"OF MAXIMUM NEGATIVE CAP cj 2"x4"TREATED NAILER ---+I�- '(� 03 1 STATIC PRESSURE)+ 1" I J=HALFOFH ` ANCHOR TO DECK L R R. RHO 3. "LINED L=H+J+PIPE DIAMETER+INSULA TION I - 4. NING THRU ROOF.SIZE BASED ON PIPIN Flow I I =;.[ RATIU'�J DATE: 2 3/ �b INS LATION REQUIREMENTS -h 5. DOUB\ARE L 1/2"INSULATED CAP SEE NOTE 2 6. 20 NGAUGTLV.SHEET METAL 7. CANTD FOR BUILT-UP ROOFING. DELER ANY NON BUILT-UP DRAWING TITLE: ROOFTE ND FLASH TO BELOW CURB 8. SECUTO BAS /1 SCREW PER SIDE AIR UNIT CASING 9. 24 GALV.SHEET TAL THIMBLE FOR MECHANICAL PIPE E CAULK THI EATDOG NEGATIVE PRESSURE 9 HOUSIPE PENETRATI DETAILS NOTE:OUTDOOR UNITS AND UNITS LOCATED IN UNCONDITIONED SPACES WHICH PROVIDE COOLING IN THE WINTER MUST HAVE HEAT TRACE ON CONDENSATE PIPING. DOG HOUSE FOR REFRANT PIPING CONDENSATE DRAIN TRAP POSITIVE & NEGATIVE 2313.00-01 SCALE: NONE 232113.23-05 SCALE: NONE 0 PROJECT NO: n 15428 I m DRAWING NO: In I 0 M300 HVAC SPECIFICATION control panels. TCC shall connect to existing spars at elect" panel board Construction with a minim um of thickness of 24 gaups. In addition, ductwork General: Instal air trminds as Indicated. and h accordance with : At hander units @hail be completely factory a omblod Including OWNER TENANT: Quality Assurance and provide proper circuit brsdw pr NEC and label panel board accordingly. used h systems over 3' W.G. shall haw cold sealant applied Shop fabricate manufacturer's Installation Instructions. . condensate drain pan. fat motor. fltrs and controls h an insulated 23 05 01.00 - Common Requirements for HVAC Codes and Standards: TCC shall route all low voltage wiring to VAV boxes. centralism and ductwork of and rNnforcement cam with SMACNA 'HVAC Duet that cat be led h elther vertical or horizontal con ration. AABC: 'National Standards for Total S sm Balance. thermostats for coon ete operation. VAV box manufacturer Wdl famish flow WYh9 Location: Insert ork; unit level and acaratdy h pncedon in ormd In its slid[ be rated and tested h accordance with ARI standard 210. Un Gemara Yct a Canrtruetlon Standards . nkUon to other work and maInbIn suffiotant clearance for norma cervico General Provbbns of the Contract including General and Supplementary ASHRAE: ASHRAE Handbook, 2011 Applications. Chapter 3% Testing. ring, M round danpr Waft far dlsct mounthq of actuator, and control and maintonmos. but h no ease lea than that recommended by I be UL Wad, labeled. classified In accordance wtth UL 465 and 559 Conditions and Gened Requirements apply to work of this section. Adjusting, and Balancing. andwsure. Lined Duct manufacturer. h blown col unit. Ass units shad be CSA certified for Canadian Submittals Provide wall mounted tenprature senow(s) with dW W display of room Fabricator ductwork with duct liner In each action of duct whre Indicated. kation. Scope t re all setpoht (+/- 3 deg. F. ad stable from t Laminate Ther to Internal surfaces of duct In accordance with Instructs ns by Field Quality Central ¢ Unk cceIn shall be constructed of zine coated. heavy gauge, The base bM includes fumbhhyq dl materials, labor, tads, and equipment Crtified Reports: Submit testing, adjusting, and bdandnq reports bearing gats � '*�Oin morxufaatmers of IIning and ado" and fasten with mechanical fastens Upon completion of Installation and prior to initial operation, test and [zed stool. Extrior "lam ehdl be cleaned. phosphotlzed and G O D I VA and the prformance of dl work required to Install a complete heating and the sed and signature of the Tat and Balance Engineer. The report shall determined by BAS). override feature (2 hours, adjustable thru BAS). and Duct liner to be 3-!b density for acoustic requirements 1' thick or as noted demtonstrate that air trminds, and duct connections to air terminals. are with a weather-resistant baked enamel fhbh. CesIng is y Ckarolatter air conditioning systern ce outlined hereIn. be certified proof that the systems haw been tested. adjusted. and balanced communications jack for comectkn o palmtop compute Size of ductwork blown on the b free not aura, outside dimehsian look-tight Inwul with ilrretardant, Permanent. odoriees ass fbsr materia. h accordance with the reforwnced rtandads ave an accurate rprw mtakon Shale Duct VAV e GODIVA CHOCOLATIER, INC. Guarantee of how the systems haw boon Installed; are a true representation of how On a coil for heat VAV damper shall modulate down to minimum Si duet will need to be n the dr H I ed duct n used Repair n raploo at terminad and duct connections ce reaNlred to dimhcte Knock ts shd ba a scrod for unit aioctrkd power and ess paant p 9 333 WEST 34TH STREET The contractor Nndl provide a guarantee h written form stating that dl work the systems are opera at the completion of the testing, adju and setpolnt position. On a coil for coding, dampr Wall Saxe c will nee shown on the drawings b fres net area cutdde dimension leaks. and retest to demonrtrats compliants. Conn a Capt: screws shall bo standar on all occas panels under this section shall be free of d~lw work, materials. a for a balancin teilnngq ssttinIngq,, of duets will need to be herooad N IIned duct ls used Refr1p t System: The TWE duds shall haw a shale refrigeration e k NEW YORK, NY 10001 P� 9 pracedursr and aro an atxxurats record of d find quantltda modulate open te datlsfy room twnperatura Provide supply air Cleaning and the TiE units andl haw dud refrigoratlon eMeuib Each Duct Lor: Fbdh s yea of th ve as Ime sere. Ind density. All IInrs. priori of one year from tins date of owners final aocsptance and Wag meceurod. to ostablbh normal operotinq values of the systems. Follow tine tenprature sensor tled to BAS. dean eopossd factory-finished wrfaeea Rspat any marred a *crotched circuit b eontrollod b a installed thrmd expansion valva PROJECT PLANNER: repair. review or replace at no cast to the owner an such defects occurhg procedures and format specified below During un-oeeupled mode VAV boxes Nndl be capable of stroking and a s and develop d Wd haus t Vane spread index not mare than 25 surfaces with manufacturers touch-up paint Y factory within the guarantee period. Contractor Nndl also state h written form that Fhd Report Upon verification and approval prepare find reports. type fully domed far tenprature antra. and a snake d*vdaped index of not mon than 50 bcndo at Col Conrnally ed aluminum ie surface n d bo m y any Items a occurrences artehq during the quarantw psiod srN ba attended rritten and organized and formatted ce spedAod below. Submit 2 complete Contra all monitoring points shag hdude but not be limited to Duct [Jnr AdhesM 23 37 1300 - Diffudws. Regbten and Lcuvsn bonded to 3/8' Intendy enhanced capper tubing and factory and to In a timely manner and will In no ewes exceed four (4) workhq days from sets of find report to to owner. the followIn¢ Duet Liner Fasteners: Comply with SMACNA HVAC Duct Construction Coling At Diffusers look to ct ate dN9. Col o stranged for Brow astir; a n and shag date of notification by owner. Report Farm at Report forms Nndl be those standard forms prepared by the pan Standard. Dlffu*w Fooec provide sate dram Pan the un+cted of PVC plastic and extend Per DoNtion tonnectlans Nther Nolo of the unit Previa@ full cased aver Quality Assurance referenced standard for each respective Itrn and system to be tested. Zane tompendure Installation of Metol Ductwork Square: Square housing. core of square concentric louvers, square or evaporator for duct mounting. wdjusted, and balanced. Zone override shbutton round duct connection. E or F : Double Inlet, double width. forward curved, con d-t ProvMe a complete hatdlatlan h conformance with the following standards. �PantY W General: Aesrrnbls and Indtdl ductwork h accordance with recogn@ed v'aPorct 9 Xve ASHRAE. American Soret of Heatin R tIn and At Condklonin QudMoations Actual CFM Diffusw Mountings: fan s) with stable belt dr: shall be standard. Thermal sad Y fb efrigera 9 9 industry practices which veil achlevs air-tight (SX leakage for systema rated Engineers The contractor shd procure the seMces of an Independent Balance and Minimum CFM *stpoint 3' and under; 1X for eyeterne rated over 3') and nobdas (no objectionable Surface Mount Diffusw Wag haw rolled edge below fhlshed coling for protection sh be standard an motor. Fan and motor @hail be NEPA: National Flro Protection Association Testing Agency. approved by the Enginer, and a membr of Asso fated Air Ma imum CFM ssfpoint noise) systems. capable of prformhq each indicated service. hstag each surface mounting or diffuser Niall be furnished with accessory plaster frame. permanently lu Motors and bearings Nndl be reddian mounted SMACNA: Shoat Metol and Air Conditioning Contractors National Association. Balance Council (MBC) or NEBB, which pecializes h the balancing and Discharge at temperature rn with mininwm number of joints. Align ductwork accrately at Lay-In: Diffusr housing sized to fit between coking exposed suspension tee Oversized m0 Nnd be available w on option for high application. Stat*wld* Budding Cods eating of heath¢ vsnUatinq and at conditbnhq systems. to balance connections. within 1/8' mbdignment tolrance and wfth Internal surfaces bas and rest on top wrioce of tee bar. Cantrdr Yogrn ev*porotor fan oontacior, low vdtogs incl strip. cheek ocIII and tat dl at and watr system* and equipment ce harsh pacified. srmooth. Su ducts idl with suitable time, braces, hangers and anchors Diffuser Dampen valves. and singl point parer en shall be Included. NI controls IMC: International Meehanicol Code Al work b this enc shag be done undr direct w of a alified Controls ch wi Y pore tiple opposed blade dampers connected to shall be factory- stalled and wirod. Evaporator dsfroat ted sinal be WJCA INC. Y s.9 Y PeviNon gnu of type which veil had duct y Moor. nape and to prawnt budding. OPP Blade Dan Mul hduded to Nu in b In tin Permits. Fees. Inspections. Laws and Regulations hooting and venticthg Engineer smploy*d byy this agency. NI instruments Elsetrkd contractor veil pravlds power wlinq. HVAC contractor Wdl provide yti�t �� �� et .,,ry Ate• linikage adjustable from face of dffusr with key. �Pr� 99 9 Y teAPor'ar1Y P 9 763 SUSQUEHANNA AVE. Permits and fees of nature ired h connection with this work shall used by this agency shall be accurately calibrated and maintained h good all the low voltage wMng of HVAC units and controls. thermostats and Int Combination volume control and pattern ad stment for tinew eamproomw Opera when low evaporator col tempwatu aro encountered Y or cem Sed dl langkudhd soave, S's and ndNes and dl Joints with mastic egra: lu FRANKLIN LAKES, 90 07417 be obtaIned and paid far by this eantraetar who shall deo pay far d the waking ordw. controllan. Thannaatat shall be by the manufacturer of the HVAC unit a eemeut Inetdl axadhq to SMACNA standards. dfffu�• Fliers: One Inde. -gray flten WNI be standard. tars dvag ba TEL: 201-848-9060 Installation fees and similar laws and regulations. which bear upon ankh and Schodul (heat/cod/wto/off). Provide plastic protect: cover ford thermostats. Fire Damper. Combination adjustable apposed blade danpr and fu*ble link accessble ham the coil oomm panel. Fltr rack be field Sequ g Ing Balancing Dampers: The chest metal contractor shall be fully responsible for converted fr two h capability. FAX: 201-848-9881 or offeet the various branches o this work NwN be complied with by this fire damper with UL approved link and assembly designed to moot contractor and ore hereb mode a ort of this contract Ad work, which Tart. odjurt and balance tins air systems before hydronk atsan, and Low Vdtoga Thsrrncetwts Needling bdandnq dampers h the ductwork (whatnr @frown on tM drawing Electric Heaters - U and CSA ved electric heat edules Wag be Y D requYroments of tIFPA 90Ao such laws regain to ba inspected. shall M submktod te the propr public nfrlgerant sywtams Low voltope thermostats sinal be fumlWad hNdled and wind by the HVAC a not) h order to err: ct the Intruded air Aw. The bdandn9 available for 1: dlofctl an fan dbrh a Heaton sinal be official for inspection and a certificate of find approval must be famished Test adj st and balance at conditioning systems during dunmer woman and contractor• The Nachted contractor Wag provide 4` square x 1- 1/2 doop sub-cantroctor shag provide d4sction and assistance In detrmhhq locations DltNser Aeoustk Performance NC lea than a egad to 30 avagable h o wide of kx parties with oris w @toga control, ENGINEER: qq systems during wintr season, Including at least a period of wail cutlet bozos (with single-gang rings) fr dl thermostats/sensors. The whre dampen aro required. Additional damnpw% H required sinal be Inrubiled Diffusw Accessoriac Plaster Rin¢ Porineter ring designed to act as plastr single-point electric connection and terminal connections. Tests and Adjustments operation at out" conditions within 5 deg F wet bulb temperature of at no additional cat to the owner. stop and dffusw anchor. NeCtrlcd contractor shall provide ono 3/4 empty conduit from each Electric heater Neman Wdl be constructed of h duty nickel dnromwm No dudefixtures or equipment shall be conceded or covered until they have maximum summer design condition, and within 10 dog F dry bulb Wd! Penstratione: Sed and around d1 ducts and in sleeves which Titus TRM frame kit been Inspected and b the Architect and the h or who shall tem re of minimum winter n condition. Take find thermaatat/wn@or location, fumed cut above atces*ble coking* (In joint P pd. 9 dements Internally wys *don 480/800 volt roe Phase and delta ENGINEER: aAro Y > t � `o a space or against overhead Nab/dock). The HVAC/Trmpraturo Control Pcee through wails that suktand to bottom side of rtruehuro and noted walla Dlffuw Flnbhes Milnite Enamd: SemF glow whits enamel prune finish. co nnected on 208/240 t three phoss. Each /240 volt heater sinal be notlAod by the contractor when the work b ready for hspoeton. du►in9 �eand oPrat Contractor Wag provide dl othr neconeary conduit, raceway and wWg Field Fabrkotkn: Complete fdricatlon of work at project ce noeessay to Manufacturer. Subject to compliance with requirements. provide dlffusrs of haw plot duty with bodacp fuse links automatic reset an high Dan R. Rhodes, PE Work Wag be completely installed. tested and leek tight beton inpection b Chedc ag fltrs for dwnlineos, provide new es required. Chock dampers related wok. Conduit Nndl be Identified h coking cavity and Ntdl be match WA-fdxieated work and accommodate inatdlatkn requirements. one of the failowIn¢ limit controls. Each 480 volt heatr sinal ha automatic line break 7402 East Broad Street required. All tests Wd be repeated to the satisfaction of those making the (volume and flee) for correet and locked position, and temperature control provided with wweap bends. bushings and dragli e. Routh¢ Locate ductwork runs. except ss otherla Indicated, vertkolly and Hemostat Products DW., Dynamics Cory. of America. high Bait contrda Bladdick,Ohio 43004 inspection. for completeness of inatdation before starting fans. Place outlet dampers The HVAC/Temperature Control Contractor Wdl coordinate with the General hail= tally and avoid dkgmd ams wherever posabl. Rion ductwork In MetcI Discharge Plenums and Grit - Accessory planum@ shag be 23 05 03.00 - submittals for HVAC h full open position. luubricab ag motan all bearing. Chock fan belt Contractor to ensure thermal envelope b maintained at these locations. dhatat routs which does not ab.trhuct useable spores a block oecea for Titus Products Div., Philips Industries, Ina available for vertical front rear, free �plkation. Plenums shall Phone: 614.204.2479 tension. Check fan rotation. servicing building and ib equipment Hdd ducts doss to wags. overhead Tuttle and Batey. be constructed of heavy- zinc coated hod steel finished with Gonrd Air balance and testing shall not begin unU the **am has been completed Tenpraturo Sanear* tied to BAS (verity contra requirements with lanldard) construction, columns. and other structural and permanent enclowro PrieO baked enamel to mwtolh tins hander unit la sinal be satin fhlshed Where submittals are required by the Contract Documents. they shall be and b In fail working order. The Contractor shall put d heating, venUating �ws Wdi be furnished. Installed and wired by the Temperature Control elements of building. limit clearance to 1/Y where furring b shown for dumhum and haw four-way j stable lou MEP Building Consultant od and ied In accordance with the Contract Documents. In and air conditionin systems and equipment Into full operation and shd Y 9 e9 Mounting Subbase - Avdable vertical A mount conflgrationa prpar wPPI q Contractor. Ths dectrted contractor Nnd provide 4 equars x 1- 1/2 dap endows a conesdmant of ducts, but Blow for insulation thkkhe@s. If an . CaiIn and Wag R been � Grille addition to DMsion 01, the Contractor b advised to rovlsw and comply with continue the opration of some during each working day of testing and wall cutlet boxes ct 54 above finished floor (with dngirgang rings for dl Miners possible, locate Ins fated ductwork for 1' clearance outside of Sted Construction: Manufacture's standard stamped @hest steel frame and Subbase Nndl be constructed heavy you zinc coated galvanized steel the requirements atkvlated within each Division and within each action of bdandng. The contractor Wag submit within 30 days aftr retelpt of thernootate/sensor. Ths dectrlcd contractor Wdl inadlatlorn. Wherever s In }InlefnW and occu led canoed that DlvWw. cantraet 8 copies of submitted data for the tooting and balancing of the of provide one 3 4 empty Pce� P sPaca adjustable bides. with baud enamel finish to at han Link. condklanIn heath and ventlatin s g conduit from each thrmastat senor location, turned out above accessible duetwk from view. by locatha h mechanical Naafis, hallow wall construction Register Damper Vibration Isolators - Shag rsdu tranen of nobs and vibration to Some Dtvlskns may include a dMdon-pedfic Submittal Requirements for 4 9• 9 ystena Tho At Balance and TeWn / or above suspended c Do not encose horizontal runs In sdW section. Mhos this section caste k articulates additional requirements Agency Wag provide proof of havhq sucgpfully Completed at least f: coling@ ( �spoce a against overhead Hots/deck). Ths Temperature partitions. axept ce spa l Nowa. Opposed Blade: Adjrstable opposed-blade dampr assembly, key operated buldinq structures. equipment an adjacent Packages Nwil be for wbmfttds that to the work of that Division. projects of similar size and eaAa Control Con sinal provide dl other necessary conduk. racewa and Y from face of register. e In eithr neoprene-h- or ng-flex types In floor or celhq apply Coardlnob la t with w cokh and I tin la band similar 9 P tffy trade and the project The air balandn contractor sinal Include the additional cost to than every s4►Ing related work Conduit shad be Identified h ceiling cavity on Wag be mpom d 9 9 You Register and Grille Finisher mountings. The followin requkemento hal to Men keep 9 rovided with bends. bushIn and Ina finished work organized ford pestles Involved. They are ns�wy to one" a timely fan factory Needed sheave pulley and/a bat of h ardor to obtain the P @wasp qs dragl Rpbtr and Grille FIniWee Minks Enanal: Sens-glace winks enamel primo Contra Options tumaound and an appropriab tednnicd rwlw. Slubmktas thwt do not 9m /Te rpraturs E]setrkd Equipment Spaces Do not routs ductwork through transformer desl dr Aonrs. The HVAC Contra Controetor Wdl eoardInate with the Gemara finish. Standard Indoor Themcetats - T h and coding operations a conform to endo n apprrat: Inicalnre are ro all retuned vaults and their electrical equipment spaces and eclosurme ono heath and codh Wag available ion either manual requ+ �ok Prformin Testh Ad stIn and Brian Contractor to eusuro themd envelope b mantahed ct thea Iocationa Penetrations: Owe ducts throw Interior s and exterior walls. Ragbtr and Gargle jet to Performance Nr lea than a egad t i 30 stow 9 9 without technkok review. 9 9. jh n dn9 Pea qh Partition a automatic eh General Contra Wfr1n R Iromanb and Instillation Methods and ars Manutacturr: Sub to ce sxth larrnants. provide diffusers of an��• Perform tesUny and bdandnq procedures on sock dysten kdenttfled, h 9 equ eogbONd t0 view. caned space batrwn cerntruetion oDe^In9 and one Of tins fagwM� �� n>�u Programmable Eloetronk Night errrnostat - Shd provide hooting Requirements accordance with the detailed procedures outlined In the referenced standards. Except whre specifically Indicated otherwise above, the HVAC/Temprature duct or duct hwulation with We@t metal flanges of same gage as duet ¢ setdback and coolh with 7-da Ing capablity. Supply submittals for each section: Submittals Wdl be supplied on a Wt hwlation. ductwork, and piping for installation of tat probes to the Control Contractor shall provide dl electrical work as requlrod for dl 0�a opening on 4 sMes by at lent 1-1/2'. Fatten to duct and Menoatat Producte Div., Dynamice Carp. of Amrko t section-by-section and type-by-type basis. For example, independent mhlmum extent necessary to allow adequate prformance of procedures. temperature control related wMng (i.e. conduit raceway, outlet boxes Metol-Alro Outdoor Themcetat - Shall provide q canted of aioctrk heaters bared G O D I V A product data submittals shall be famished for each section that requires Patch insulation, ductwork, and housings using materials Mruticd to those Junction boxes. wilnq etc) N accordance with Eleatrlcal SpedAcatbn* Where ducts pass through fUrrated floors. wags. or partitions. Provide fire Titus Products Div.. Philips Industrles, Ina on a met outdoor tempratura dampen and f re@topping between duct and substrata In accordance with Tuttle and Bae Provide the Followh¢ product dote wbmlttda independent WA drawing wbmittab shall bs removed requirements. All conduit drag be 3/4 minimum. y. Motor with Indivlduai overload pro Chocolatier fumbhed for each section that requires shop drwwingo. Refer to the Sd ducts and piping, and test for and repair loan. Coordinate d1 thermostat/ssneor locations h fleid (case by case) with requirements of Division-7 Section 'Finetopping'. Price High and low refrigerant cutouts. psdfications for identlficetlan of which submittals an reghuiod for the Sd Insulation to re-establish Integrity of the vapor baric. Architect Ownr and Eleetrted Contractor to caws that the aro h Coordination: Coordinate duct Installations with Installation of accessorise, Discharge plenums sinal be provided with perforated Innr wall panel. STORE NO: 5 Y Pkv Fane onto and heat-offv cod project Separate PDF im pedkoga shag M applied for each section, for Yak equipment s@ttIngs. IndudInq damper contra positions. valve indlootors loeatlons that will not htrira rich fumituro equipment artwork rag-Hung damPre, coil hams equlpmunt eontrob all other aesodatsd work of each sutbmlttd les when electronic wbmktd@ are required Faeh PDF sinal ductwork en. Turn delay relay to prevent short Ing tan up@@d control levers, and similar controls and doviced, to show find spddties, roam fhMee, ata AY thrmcetct/sensor rail lotatlons hdkatW s� 23 81 26.00 - Split System At Conditbnrs represent o single standalone xbmmitt me Mak with paint or othr suitable, Permanent Identification on HVAC drawls s aro schematic onl and must be verified coa-b saw Mawr indoor changefo ver tin at Sapan•otdy bound orad klantiflsd submdttd* shall be adcop 9 y Y- In*tdlatbn of Duct LInr k S Heat Pum Units provMed rhro h les m s. prior to rod -h. eR1 P Two aor t heat/cod for dud k units PROJECT LOCATION: 9h Gemara: Inetdl duct IInr In wceordance with SMACNA HVAC Duct aro required. mrd: Pd cam factoryra nd roc . and tested and iv hfan a d. con Outdoor thermostat Ratost adjust, and bdonce systems subsequent to signlAcant system NI dectricd cork as ds*cribed h this spaeMcation Wall be per tins latest Con*truetlon Standards Size of duetwori blown on tM drowinga is free net o hwlcted eah finer and rack, fan, motor and drive, fan and limit Include a transmittal: Transmittals shall enumerate each submittal for each modifications. and resubmit tat results. edition of the National Electrical Code NEC and icable state and area, outside dimension of dicta will need to be Increased if lined duct Is g' Crankcase heater• section of each type and itration. ( ) Dr a trols. and control transfer..r. Provide full cased evaporator cog and local codes. used Eleetrk resistance heater. Include cover sheat / title page The cover sheet shall include the 23 07 13.00 ti Duet oil conce R heat pocuit: WASHINGTON 04 MALL Information Identitled h to Contract documents. k sinal be Included as She Provide hwlatbn an dl conceded w Wfnere 1Fw-dr indtdlctbn methods (dtw axpaeod above the ceginge, h Ston intenndly Ihsd ductwork up off of the floor. Protect htwnally Ihed R drcutt Provide t tharmd sign valve for Mote dr Indicator. pp+i, return duetrork. NI Ihen, nfrigran span SPACE B04 first page of each electronic and/or hardcopy document-based submittal. M Insulation and adhesives Wag haw a fla a spread Index not mon than 25 bride rings or In cable trays) ae permitted undr Electrical Sped ications ductwork from watr and dust 'Butter the leading edge of dl Intemd duct t control. Provide access valvae h suctlon and liquid IInes. Flter trier. editable and printable PDF farts Created with editable flsids and sped6eation and a smoke developed Index of not more than 50. above cokhgs, provide plenum-ratod cables whrevr plenum coking@ (it any) Ihhg with the manufacturers recommended odnedhhs. Provide welded Wail, hermetic co pressors. or servkecti! Refrig rant service valves. 9585 SW WASHINGTON exist and Install as defined under Electrical Specifications. Instal low voltage Inspect and repair d damaged link to Installation of ductwork hem mom 1750 RPM. Provide crankcase heaters. Pro S Manufacturer: Sub to lona with ants. provide AC unite of compliant appearance b awlabla from KW upon r*quo@L It b Clea RIgM Fbergaa Ductrortk Insulation: dace ibars bonded Wth a themoattinq 9 Pyr pre@sors. year lect Po requ SQUARE ROAD downloadable from the KLM website at wlML rain• Comply with ASTM C 612, Type !B, without facing and with vapor circuits, located h concrete Nabs and mceonry walls. h Inaccessible exten warranty on compressor• one of the following: Include an Index: The Index Nndl enumerate the contents of the wbmktd. barrier dl-service jacket manufactured from kraft paper, rehforeinq scrim, locations. or h occupied areas. In electrical conduit less of Installation of Flexible Ducts �er g PORTLAND, OR 90703 vol �� regard E Cok: Construct of tubh and aluminum Ms. nand Bryant Include cneddbte When chaeMbb as Indudod rich the specifications. aluminum fall, and vinyl flm. Insulation dndl have a minimum R ue as what wMng methods ore permitted under Electrical Spedfleations. Maximum Le.ngth: For any duct run using flexble ductwork, do not exceed leak t at 1.5 tines working pressure. Provide full eased en a Trans Co. complete and include then rl die the a nclud d submittal Supply complsb by Coda Where cable trays or bridle rings ae provided by the electrical contractor for 5' - � extended length. Installation shall haw smooth N11 radius turns down around or col for duct mounting. Gorier Flexible Ductwork Insulation: Glass fors bonded with a low voltage cables theme raceways may be uUized for control wiring by this to diffuser. Font direct double-inlet forward curved, centrifu fon with drive submlttdr Complob submktds of each typo aro required Partici moa gal submittals wM be rejected.Mero a section requires a product data wbmktd, thermosetting resin. Comply with ASTM C 553, Type d, without facing and contractor (provide spealal color coded jock te, label Cable Jackets per Instdlatlon rot permittW above Inaeees@bl@ ceilInga Provide aranty lubrlorrbd fou and motor bearings. and tin Inspeatkn dl product data for that section sinal be supplied together, at one time. ce with vapor barrier dl-service jacket manufactured from haft ppr. Electrical Specifcations and group control wiring cables together). Provide Access Panels overloods In tor• Examine areas and con one under which at Gond Ing units aro to bs one cam ete submittal. Do not sand half the ct data a one submittal reiniorcing scrim, aluminum fok, and vinyl flm. Insulation shot haw a conduit drops from cable tray/bride ring paths to wall outlet boxes and installed. Do not with work until unedlefoct conditions haw been SSUE DATE: pl prodtu therwhis Specifications. Fumlsh a occur panels ealed v for prapr mervkinq of equipment Provide In t gr Pro 1' tHea throwaway flten corrected h manner table to Installer. minInnum R slue a Ind b Coda eat unless dirseted o under Eleetriod NO. DnTE DESCRIPTION and the other half os a separate ono When rwubmktd ls requited (ag. � y °app^' accea panels for dl conceded valves. vents. controls and deancut door, Integra Alr� ed Haat Pumps: Provide condendr col can ctod of Review and Resubmit) the revised wbmktd shd be mare compteb, more Vapor Barrier Material for Ductwork Paper-backed aluminum-fok, except ce Regardless of permitted methods in Electrical Specifications. all cables/wIrling and sprIrI devices required by NFPA. Provide frame ce required for finish. capper tubes d oWminum Ana Instdlatlon ssuEOFOR&D. accurate and mora contract-compliant than its rejected predetae@or. The otherwise indicated; strength and prmeablity rating equivalent to installed concealed by gypsum board, masonry a othr Inaccessble mateerrlidals Finnish panels to General Contractor. Exact locations to be approved by the Factory leak- at 1.5 times working pressure. dehydrate d provids full Genera: Inetdl un in accordance with manufacturer stdlatlan 12-11-15 ERMIDFORBINDLORD wbmktd numbs (for earn section and type) shall increment for each factory-appgied vpw barriers an adjoining ductwork Insulation, where In rdle or above Cokings shd be Instded In conduit, 3/4 mInlmum. Architect Minimum size to be 12' x 12', units to be 16 gauge steel, charge of t Provide subcodr and ocwmulator. instructions. Install Ib plumb and level, firmly an In locations owlable; with fagowhq additlond eanstructlon charactrbtice All conduit bride racwa outlet boxes. eta n for loekin device shd be wwwdrlver can lacks an�sequant wbmktd (00 - Original submlsaian, Q1 - First Rasubmisslon, 02 rings. X Y e 9 Low Ambbnt Con Provide hood prss*cure control, to operate at indicated and manufacturers rocamnrnended ems. - Second Resubmission. etc . Resubmktas sinal include a of the High Puncture Resistance: law vapor tranrnbsion (for ducts In exposed operational Installation of control wiring @hall be provided (famished and cePY Centra At Termhds tamparaturme te 0 de¢ F (-18 dip. C). Support Instal units on 4' thick cornareb pad reviewers comments ied with the wbmktd ro and Wd1 be amok Mach. Rooms. ata) installed) by the temperatrs contra contractor In strict aeon lance with suPPt W bion General: Provide factory-fabricated and tested aF terminals ae Indicated, Controlr Provide cry-installed and wired controls. termhd strip. Elaetrical Wirth¢ Adl electrkol devices furril by man rr but not amended with a description of the specMc action taken to comply with tns Moderate Puncture Resistance Medium vapor tranenhsian (for ducts h Electrkd Spedf cations documents. Coordinated work with d other @elected with performance dnaroctwbtks which match or exceed those Provide eonnoetiono remote thermostat specified to be ary�mounted. Famish copy of manu s wMng reviewers comments. The absence of this on rewbmftW b cause for conceded areas). applicable trades Including the electrical contractor. Indicated an dcheduls. Provide the Fdiowln dlogran submltt to Electrical Installer. rejection. Provide dl required conduit work to and between equipment In a manner Motor with Individual sad protection. V 23 07 19.00 - HVAC Plphg Insulation Trandarmr h WHnq: ProvMs traneformen rith connection to Ihs vdtogs erky that d wtrinq installation b h accordance with onufactured Name electronic flee to match the submittal ID and cover Wast The compliant with that described above (i.e. between VAV boxes to boilers, junction box elbow coling provided by electried contractor h various High and low cutouts. wbmktd and stailation requirements of Divldon-16 section Do not electronic fie name of submittals shall match the wbmktd ID Included an Provide 3/4' ammallex an refrigerant piping. starters, condensing units, eta as applicable). locations. Extend and connect low �t49e wiring to dl terminal boxes Fan-auto and heat- nod switches. proceed with Ipment start-up until wiring installation b a table to the submittals cover For examplecTha d fIrst ct data Provide 1 fiberglass hwlation on concealed condensate drain piping. g @p1 points, cola-coded tnamxwtato and control el. Refer to electrical drawls for box pugs. origin / produ instal control rlrin without k« between tarmInd pan 9• ctkn Time delay relay to t short eyaInq squiprment 1r. submittal for Section 234116 would be labeled as 234118.00-PD-00'; the hwlation shall haw a minimum R value as required by Coda Install In neat workmanlike mannr. socurely fastened Install h accordance locatio nor Ductwaric set supply and return ducts to unit with flexible duct fist resubmittal of @ane Wd bs labeled 234118.00-PD-01 . The Ail insulation and adheelves andl haw a Rano spread Indo not mare than with National Electrical Code and pr Electrkd Spsdlbations. Codings: Construct of die-cwt aluminum or shoe metal. e/ o Connsetbna transitions to exactly matdn unit duct eon size orlghd/Ant shop drawings submittal file fa the owns section would be 25 and a endo developed index of not more than 50 Inetdl ckcukd over 25 vat with odor-coded Na 12 vete h dectrlcd metallic prime hanger brackets iw attachment of supporta Em�oncy � may. Provide 1' std duct IInhq on return at side a minimum of O' from fan. labeled 234116.00-SD the fist resubmitted of same shat be labeled u tubIn Electrical s. Instil dI undr 25 volt with UnInge Line Inside surface* of toeing* with IInIng material to provide Manua indoor change-over themoetat 234116.00-SD-01 . 23 09 93.00 - once of Operations for HVAC Centrad � Per t� Connect au ds at duct to unit with 6ezlble eonneetkn. Provide anud color-coded Na 18 win with 0.031' high temperature (105 dogs. F) plastic acoustic peiamance. thermal insulation. and to prevent condensation on Two stage heat/cool fur du circuit units. do mpw motorized damper. , Insulation an each conductor and plastic Nath over d. Instal electronic Outdoor thermostat Drain P Connect unit drain to nearest Indirect waste conn P h Uee of Electronic Drowings from the Ownes Deetgn Team cutdide surfaces of eosin¢ Provide mInimum thioknan of t/2'. iP 9 Plan drawings for the Project sero created with AutoCAD . Split System ACU (Heat Pump. without O.A.) circuits with color-ooded Na 22 win with 0.023' polyethylene hwlation on Secure lining to prevent delamination. sagging, or settling. Crankcase heater. to be t L capper. Provide trap at drain piping connection to u k sized 1. Startup each conductor with plwtic-j&etod copper shield ovr d. Low ambient control. per m e recommendatkna If expreesfy permitted by tins Ownw and tins tarmd of tins Contract, editable Provide the fdlowhq lJnw: deetronk wMond of standard-ead4 AutoCAD-boded plan drawh ma be The unit ehdl opwate on a 7 day/night pro¢amrnable thermostat Smoke D@teeter Electric resistance heater. Stat- AC units, In accordance with manufacturers start-up In ctions. fA Y Fan Contra Provide fiber fres IInr (enghersd pdymr foam insulation). made avalable far the creation of Wop and as-butt drawl ge. 2• Supply All duct smoke detectors will be famished by electrical contractor, Installed Aeeesc Provide removable pads In casings to permit occas to at Moisture Indicator. Test train and demonstrate compliance with requirements. R Due to the proprietary nature of Internal design systems. editable The supply fan speed Nudl be constant and set to the required CFM. by the HVAC contractor, and wired by the electrical contractor pr local dampers and other parts requiring sorvlee, adjustment or maintenanes. Filter drier• darns or mdfunetlonhg contra* and equipment native-doftworo versions of some drawings. Including but not limited to 3. Space Temperature Control codes. HVAC contractor will Intrlock RTU fan with *mace detector. Provide Control@ Enclosure to cover unit mounted controller. Refrigerant service valves• Train of Owners Personnel system diagrams and detoke will not be made avalable In an editable farm. Provide local wall mounted room temperature thermostat with digital display Motor quarter-tum latches. Manufacture Subject to comp! requirements. provide AC units of In these cases. electronic versions of the drawIn may be made available of room tem Open In Dampers Provide airtight rust c and P service@ of manufacdures tschnitd rapraentatlw for 1-half d to qqrr praturo and sotpolnt (+/- req. F. adJustablo) and override NI fresh at Intake and exhcust louvers Wdl have motor Aerated dampers Leakage Construct cesingt such that when subjected to QS-h w.q ono of tins followin¢ Owners personnel h tion and maintenance of units. Sch only in PDF, JPG a @Talar non-aditdbls dectronfc form, at the ds °�° discretion of the Design Professional. 4. C Dampen sinal pr bur leak rich blade and edge rods. Motes operated unite, t for low pressen unite, and 3.0-in pe procure for high p y with Bryant q rich Ower. Provide ct least 7-day notice to Contrxtor and 4. Coding Control dampen sinal provided, hrtdled and wired by the mechankd contractor units, total leakage does not exceed 4y. of spodfied air Aow capacity wltu Trane Ca of training data The Request Drwingo forth can be accessed, filled out and submitted at the Coding sinal be controlled to maintain space temperature setpolnt On a cd! unless othrwles noted Provide dl necessary transformers, contactors, outlets soled and Inlets wide open. Construct at dampos each that when Carrier. foilow n Internet address (scroll down to bottom of home page): fa coolin the heath Wdl be off. On a further cog for codIn the controls and wtln for htrloddn t to motor dam sub ed to 6.0-In w. inlet with doe@d, total I Pais Q 9 9 9 9 9 equipmen operated Pre ject 9 Prasxs darer sakags F hitn:iiwrw_kihrn9dSu7ra. mechanical 000lhg shag be staged on. Provider Lw Amblsnt Control* an does not exceed 10X of podAod at Ave capodty. hpaetlon rd: FumlW to Owner, rith roceht the fdlowInq spare Parts for AC SS, candensh unit for down to -20 F. 23 31 1300 - Meta Ducts Examine orae* and conditlond un win heat pump units ars to be est of mwtdnad fan belts fur each belt dr:n fan. �? - iiNFF �O' 23 05 29.00 - Hangars and Supports for HVAC Piping and Equipment 9 operation degrees Air Danprr Construct of materials that cannot corrode, do not require h*tdled Do not with w anti saU conditions haw bean 1 <1' 9 5. Heating Contra Ductwork Materials lubrication, nee require periodic servicing. Provide maximum volume dampers a°COok sfactory set fltw for each unit 59 2 v Heating s hall be controlled to maintain space temperature *etpolnt On a Expand Oudwark Materiae Mere ductwork Is indicated to be exposed to wits v'ai�y rings. both pressure dependent and pressure componeated. that corected In mannr acceptable Install Support dl piping, ductwork and equipment by hangers or brackets. Fumtah cd for heaUn¢ the mechankof cooling sinal be off. On a further call for view h xcupted epwcee provide materials which aro fres tram vhud aro edbrated in efin, foetory�adjusted. and marikd for speaFlled at Installation ] / structural wtest members where required to support Piping and equipment heating the haat pump Nur! be staged on. On a further col for heating the Imperfections IncludIn mean maria, roger make, stains and Capacities. Provide mechanism to vary at volume thru damper for minimum ! y pitUn¢ Greed: Inetdl unit* h ce with m foeturan hstdlaUon 0: / l No portion of piping a valva Wdl ba supported by *quipment electric hal sinal stags on. dbceloratkne, and other irp.rfactione, hdudin thaw which would te maximum. h responw from aignd from thrmortat t Ductwork - Support by means of h ce fagovre 9 mai hstructlons. Install unite plum and level, anehwed h loeotlons % c'3 angrd 6. Unoccupled Mode painting. Expos*d ductwork which Is to be panted shag haw point grip Sound Powr Levels: Provide sound power levels not exeesdIng the fagowh¢ y,��, and maintain man ■ clearances. O v ,^ y� 1c_+ �� Duct Width Hangar S e and Typo Max Spodnq During the unoccupied mode of Aeration, the ACU shall go Into night applied Rodioted 30 or less (/16 gags) 8 setback mods. Sheat Metal: Except ce othrwise Indicated, fabricate ductwork from 2nd octave: 78 Support• Install exterior d-mounted un on 4' thick rd it eh d "T`�.RNOr, . A h of ham shalt be located at tranewrw t and elsewhere 7. Humidit Control galvanized shoot *ted, lock forming quality, with G 90 zinc Coating and mill 3rd octave 74 concrete pod 4 larger on side than heat rap unit Unk Wdl be acco din to t�ta ble. Provide an In q tegral Neatric Wheat col for dahumMlflcatlon. Provide apace phophatizod fur oupomed locations MIninum gauge shall be 24. 4th xtaw: � anchored to tins concrete Concrete fa h Division 3. Coadinab hstdlatlon of abdng devices. E('iRAI iOfJ DATE:j� / P In humkdty sensor. When the space humidity rises above SOX (adjustable), Miscellaneous Ductwork Matrkis 5th octow 64 Support Install Interior t handing units on 2 trete pad 2 larger on provide furl cooling and modulate the hot gas reheat col to maintain apace Volume Dan Provide volume dam In d1 branch ducts or ce 6th octave 54 earn side of unit Unit be anchored to con pad. Concrete b Instal hanger supports. damp@ and duping f p to support f hors ontaeY P� P� tenpraturo dotPoint When tin* pores humidity reaches setpdnt resume with ked for bdandn to ted ole flow. 7th octave: 80 spadAsd h Dh4don 3. Instagatlon of oaring deviosa from baking etruetret Arrange for grouping of my-du runs of hori ager normal heating dr coding operation. � 9 pe plpIng supported togsthw on field-fabricated. hsavy�duty trapeze hah9rs Ftttinge Provide radius typo tkthq* fdbrlceted of multiple suctions with Contrdr Provide contras accurate t0 1.5 dip. F (0.8 req. C) and Eioctrkd Whin¢ Inert electrical devices fumbled b monufaehurar but not where pn I a. Where piping of various sizes b supported together by 8. Night Setbock/Shutdown maximum 15 deg. change of direction pr section. Unless specifledly detailed od)u*tobio from 55 dog. F (22 dog. C) to 85 deg. F (29 dog. C) of the Wodfied to bs mounted Finnish copy of fackurers wMng DRAWING TITLE: trpeze hangers, space hangers for smallest plpe size or hwtag Intermediate At night setback/shutdown the ACU shall go to fag safe portion. Fal safe otherwise, use 45 deg. lauds and 43 dog. dban for branch takeoff foll�ng toms. dkgram wbmlttd to actrlcd Installer. supports for smaller dia natr pipe as specified above for individual pipe position ls delIned by the follwin¢ The supply fan b off, the outdoor at connections. Whore 90 deg. branches aro Indkoted. provide conical type Electric powered controls. transformers a required, compatible with electric Verify that d wing hetdlatkn b In accordance ith manufacturers hangea Intek. damper b dosed. the heating b off. The supply fan aha cycle in ire.. temprature control system peopled In other actions. ebrmktal and h requiromants of Electrkd Spec tions mectlona MECHANICAL Individual pipe hangers to be Anvil International Clovis Hanger Fla. 250, Elcen, conjunction with after the heating or coding system to maintain a Duct Slant Non-hardening, non-migrating mastic or liquid dmUc @edant All VAV boxes Nur haw both t Do not proceed equipment stat-p unU wMng Inst lotion b acceptable w ved equal. minimum maximum t e din on the season. t a.dnarg. emprature and supply CFM SPECIFICATIONS appro / pace enperatur deepen g ype applicable for tabrieatlon/i,.tdlatlon deed. a eompohnded add to equipment h SRod aim to conform to the fagowh¢ 3/8' rods for 3/4'-V pipe; 1/2' Condensing Units recommended by monufwetunr npedAcdly for *edInq Joints and awns In IdentMeation: Provide label an each unit Inds ating Plant Number. CFM Ductwork Conn supply and return ducts to unit with fl le duct rods for 2-1/Y-3' Pips 5/8' for 4'-5' and 3 4' for 6' ductwork connections. transitions to exactly match unit duct nectkn size. pipe / Pips. AN safeties htrdocks associated with the condensing unit Wdl be hard range, CFM factory settlnq, and cribration curve (it required). Nan Wd! be sized to allow Insulation to unobstructed wired. Software Interlodu aro a Duct Cement Non-hardening migrating mastic or liquid noopnI based Provide 1' duct Ihhq on return at side a minimum of 10' from fon. gears Pae through xsptabla ce mecanday addklond saf�tlea Provide tins fdlawkhq type of cok: provMe modde for Ins lation at all h cement t applicable for fabrkation/Instdatlon dotal, as compounded and Connect cu at duct to unit with flexible connection, pro manual support anger• Unk anal haw self . wit hall safety by unit manufacturer. Manufacturer: SubJect to eamplionce with requiramant@ provide at tarmhals reeamman by monufaetunr pedficelly for cementing fitting eonvponests, damper and torizod damper. Hangar spadnq for steel plpInq urea otiverwies noted b to bs as fdlowe On a cal for coding with dl safety devkw satlsAed. tins fist stags or Ion itudinal roans In ductwork of ons of the fdlwIn¢ DraIn P n 9 iping: Connect unit drain to nearest Indiroot waste Conn . Provide zZ 1-1/4" or smaller to be 8' on center, 1-1/2'-2' to be 10' on center, compressor contactor and condenser fan centimeter energize causing the Menostat Products Div., Dynamics Corp. of America. 2-i/2' and larger to be 12' on center and at each change of direction. compressor and condenser fan motor to operate (the indoor fan contactor Ductwork Support z d steel Except s. otherwise de. stra provide Hangar paeN for copper pipe to be ce fdiowr 1' or smaller 6' an shat be wind to stat at the sand time as the cam ressor . A I kd line hot-doped of ducted @ted taatenan anehon rods. straps trim orad angles Cama Ca oSap�r Pon: construct at least 1 deer neon fan h Ineha P ) Iqu for support of ductwork EH. Parke Start-up units h accordance with manufacturers stat-up In cUona � canter; 1-1/4 a lager 8' on caner. drnoM valve ell Aon enfnen the first etoge compreaor stats. Envlro--Tse Piping shall be also supported at each change In direction, at valves. and at On a furthr call fur coding, the second stags compressor eontoetor and Flexible Duets Test con s and demonstrate compliance with requirements. Repo PROJECT NO: equipment condenser fan contactor energize causIn the second stage compressor and Either pial-wound spring steel with flameproof vinyl sheathing. a eger darn or malfunctioning controls and equipment o conde ser fan motor to e. A I IIne donold valve will when Como ated dumhum. Unless ll mentioned, the maximum len th of Titus Products Div.. Philips Industries, Ina o ° �^ s 5 fo a y 9 Carrier Corp.. Sub. of United Technd Trainin of Owners Personnel 15 4 2 8 a the second stage compressor @tarts Asx et on the supply egad@ 5 feet Fla b not allowed for return, relief a ° Pro services of manufactures technical representative for 1-half ay to M 23 05 93.00 - Testing, Adjusting and Balancing fur HVAC M coaling demand decreases. the second stage compresew contactor and exhaust applications. The As�le ducts Indicated for use In the H.V.A.C. Trans (The) Ca • rn Wal conform to the requirements of UL 181 for Cass 0 or Class 1 MetdAie h Ownes perso nel In opration and maintenance of units. e m Gerard condenser fan contactor de-eurgize causing the second stage compressor Yct with Owner, at least 7-da notice to Contractor and DRAWING NO: � flexble at ducts and Wal be ea IdentMsd. 9 Provide Y a Teen, adjust and balance the following mechanical systems: and condenser fan motor to shut down. A corresponding liquid line denoid Tune k Batey of training data n eta9 pear err prawn g Where installed h unconditioned paces othr than realm dr enume, duuct s star systems. oll pressure ranges Inducing variabls volume and double wive veil raw when the second a cam b o tIn PI Johnson Controls aduct *ystens rofrigsrant mtgratbn bade to the compeessor during tins off cyclo vapor b����1/2 Ib. conthucu* Aeutbls fbsrgaa Woath with vinyl Inspection Pats Return at systema VAV Boxy Installation b not itted above cel and Inocc@nU* cokIn s Examine areas and conditions undr which of trmhds aro to be Installed FumlW to Owner, rich ncslpt tine ldlorhq spas parts Tor AC it M400 Peurm drywall 9 met of matched fan belts for each bait driven fan. EudnwN ori syrtama Provlds Iva vdtags DDC eontrollw, traneformr, differential pressure Do not proceed with work anti un*otbfoctary eanditlans have bean cerreeted o Verify temperature control system Aeration. transmittr. actuator and wMng for VAV box. Temperature Contras Fabrication h manner acceptable to Instar. *at fltem for each unit. Test systems for proper sound and vibration novels Contractor Wdl field or factory mount controllr at their expense. TCC Wdl Shop fabricate ductwork h 4, 8, 10 or 12-ft length% unless otherwise Instdlotlon At Handere provided 120 powr wiIng es required for transformers and temperature Indicated or required to complete rune All ductwork Wdl be Pittsburgh OWNERrrENANT: FIRE PROTECTION SPECIFICATIONS 2 GENERAL_ THE GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS AND INSTRUCTIONS TO BIDDERS SHALL APPLY TO AND BE PART OF A THIS SPECIFICATION. GODIVA CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE CODES, RULES AND REGULATIONS. Chcdatter GODIVA CHOCOLATIER, INC. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, CERTIFICATES OF INSPECTION AND APPROVALS REQUIRED. 333 WEST 34TH STREET NEW YORK, NY 10001 SCOPE OF WORK FIRE PROTECTION DISTRIBUTION PIPING FROM EXISTING MAINS AND SPRINKLERS TO NEW SPRINKLER HEAD LOCATIONS. PROJECT PLANNER: SPRINKLER CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING OF WALLS AND REPLACING OF CEILINGS IN 0 0 F0-7o F0__01 0-o-1 0 0 F-31 F0__0_1 AREASS)WHERE NEW PIPING IS TO BE INSTALLED (UNLESS CEILING REMOVAL IS SPECIFIED TO BE REMOVED/REPLACED BY OTHER WHERE CONCEALING SPRINKLER PIPING IS NOT POSSIBLE, SPRINKLER CONTRACTOR SHALL BE RESPONSIBLE FOR PAINTING ALL I EXPOSED SPRINKLER PIPING IN FINISHED SPACES. COORDINATE COLOR WITH ARCHITECT. I ON ON ON ON NO WHERE EXISTING PIPING IS CURRENTLY INSTALLED BELOW THE ELEVATION OF NEW CEILINGS, ALL PIPING SHALL BE RAISED Ld ABOVE THE NEW CEILING. COORDINATE WITH ALL NEW U71UTIES AND REWORK ALL PIPING AS REOUIRED. VERIFY EXISTING FIELD CONDITIONS AND INCLUDE ALL REWORK IN BID. NO ADDITIONAL MONIES SHALL BE PAID FOR REWORKING EXISTING PIPING TO QN ACCOMMODATE NEW CEILINGS. I noLui D ❑D WJCA INC. WHEN SPRINKLING AN EXISTING BUILDING THAT HAS AN ELEVATOR IN IT, THE ELECTRICAL CONTRACTOR SHALL PROVIDE AI763 SUSQUEHANNA AVE. SHUNT TRIP AND CONNECT TO FIRE ALARM. FIELD VERIFY ALL CONDITIONS Q FRANKLIN LAKES, NJ 07417 GENERAL STANDARDS DESIGN DRAWINGS ARE SCHEMATIC. THIS CONTRACTOR SHALL TEL: 201-848-9060 VISIT THE SITE PRIOR TO BIDDING OR AWARD OF CONTRACT O FAX: 201-848-9881 THE APPLICABLE PROVISIONS OF THE FOLLOWING STANDARDS SHALL GOVERN: TO INSPECT EXISTING FIELD CONDITIONS. THIS CONTRACT ON SHALL INCLUDE ALL LABOR AND MATERIALS NECESSARY FOR i ENGINEER: AMERICAN SOCIETY FOR TEST MATERIALS (ASTM); FIELD MODIFICATIONS DUE TO EXISTING CONDITIONS 1 1§1 121 ❑ O ❑ AMERICAN STANDARDS ASSOCIATION (ASA); UNDERWRITERS LABORATORIES (UL); THE CONTRACTOR SHALL CONTACT THE ARCHITECT, ENGINEER ENGINEER: ............----...._. _..... ___...._— -. �o O ; OR OWNER PRIOR TO BIDDING FOR INTERPRETATIONS AND NATIONAL FIRE PROTECTION ASSOCIATION NFPA TEXAS BUILDING CODE (NFPA); CLARIFICATIONS OF THE DESIGN AND INCLUDE IN HIS BD ALL OWNER'S INSURANCE UNDERWRITER COSTS TO MEET THE DESIGN INTENT. CLARIFICATIONS MADE Dan R. Rhodes, PE LOCAL FIRE DEPARTMENT REGULATIONS BY THE ARCHITECT, ENGINEER OR OWNER AFTER BODING I - -- 7402 East Broad Street WILL BE FINAL AND SHALL BE IMPLEMENTED AT I N N N Blacididc,Ohio 43004 THE INSTALLATION OF ALL SPRINKLER WORK SHALL CONFORM TO THE APPLICABLE LOCAL CODES AND STATUES. CONTRACTORS COST. - Phone: 614.204.2479 QUALITY ASSURANCE BIDDING CONTRACTORS SHALL HAVE A WORKING KNOWLEDGE I © ❑O O EO OF LOCAL CODES AND ORDINANCES AND SHALL INCLUDE IN ---- f MEP Building Consultant I Qi ON o MANUFACTURERS FIRMS REGULARLY ENGAGED IN MANUFACTURE OF FIRE PROTECTION PIPING SYSTEMS PRODUCTS THEIR BIDS THE COSTS FOR ALL WORK INSTALLED IN STRICT N OF TYPES, ACCORDANCE WITH GOVERNING CODES, THE PLANS AND MATERIALS, AND SIZES REQUIRED, WHOSE PRODUCTS HAVE BEEN IN SATISFACTORY USE IN SIMILAR SERVICE FOR NOT LESS SPECIFICATIONS NOT WITHSTANDING. THE CONTRACTOR SHALL THAN 5 YEARS. ALERT ARCHITECT, ENGINEER OR OWNER OF ANY a APPARENT — — DISCREPANCIES BETWEEN GOVERNING CODES AND DESIGN INSTALLER. FIRM WITH AT LEAST 3 YEARS OF SUCCESSFUL INSTALLATION EXPERIENCE ON PROJECTS WITH FIRE PROTECTION INTENT. PIPING SYSTEMS WORK SIMILAR TO THAT REQUIRED FOR PROJECT. ODE 0 NFPA CCOMPLY WITH NEPA 13, -INSTALLATION OF SPRINKLER SYSTEMS-. I F0_01 0 0 0 0 F0__01 Q UL LABELS: PROVIDE FIRE SPRINKLER PIPING PRODUCTS WHICH HAVE BEEN APPROVED AND LABELED ED BY UNDERWRITERS 1 0 LABORATORIES. {�tI POCAIPIN�FIRE DEPARTMENT/MARSHALL REGULATIONS. COMPLY WITH GOVERNING REGULATIONS PERTAINING TO FIRE PROTECTION I __......_.. �T- GODIVA STATE BUILDING CODE COMPLY WITH GOVERNING REGULATIONS PERTAINING TO FIRE PROTECTION SYSTEMS I Ch"olatier SUBMITTALS a o o a O STORE NO: 524 PRODUCT DATA: SUBMIT MANUFACTURER'S DATA FOR FIRE PROTECTION SYSTEMS, MATERIALS AND PRODUCTS. 1 j �' SHOP DRAWINGS: SUBMIT SCALED LAYOUT DRAWINGS FOR FIRE PROTECTION PIPE AND FITTINGS INCLUDING, BUT NOT I N N I NN N PROJECT LOCATION: NECESSARILY LIMITED TO, PIPE AND TUBE SIZES, LOCATIONS, ELEVATIONS AND SLOPES OF HORIZONTAL RUNS, WALL AND ( O• —��- Q Q FLOOR PENETRATIONS, AND CONNECTIONS SHOW INTERFACE AND SPATIAL RELATIONSHIP BETWEEN PIPING AND PROXIMATE EQUIPMENT. i ® -y © 0 0 0 0 0 0 Q 0 0 0 0 ,/`L 1 WASHINGTON SQ. MALL SUBMIT SHOP DRAWINGS TO ENGINEER FOR REVIEW AND APPROVAL, PRIOR TO SUBMISSION TO APPROPRIATE AUTHORITY AND I 1 SPACE SQ PRIOR TO INSTALLATION OF ANY PORTION OF BOTH UNDERGROUND AND OVERHEAD SYSTEMS I 9585 SW WASHINGTON APPROVAL DRAWINGS: PREPARE APPROVAL DRAWINGS OF FIRE PROTECTION SYSTEMS INDICATING PIPE SIZES, PIPE LOCATIONS, ( — SQUARE ROAD FITTINGS, SHUTOFFS, EQUIPMENT, ETC. SUBMIT ONE COPY, BEARING THE STAMP AND SIGNATURE OF A LICENSED SPRINKLER © PORTLAND, OR 90703 CONTRACTOR, TO THE AGENCY HAVING JURISDICTION, BEFORE PROCEEDING WITH INSTALLATION. r��I APPROVAL CALCULATION: PREPARE HYDRAULIC CALCULATIONS OF FIRE PROTECTION SYSTEMS SUBMIT ONE COPY, BEARING i �� LJ F21 1§1 THE STAMP AND SIGNATURE OF A LICENSED SPRINKLER CONTRACTOR TO THE AGENCY HAVING JURISDICTION, BEFORE PROCEEDING WITH INSTALLATION. - i _ - ISSUE DATE: CERTIFICATE OF INSTALLATION: SUBMIT CERTIFICATE UPON COMPLETION OF FIRE PROTECTION PIPING WORK WHICH INDICATES LLLL����� _ _ _ _ _ _ _ _ _ _ �_...... _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ THAT WORK HAS BEEN TESTED IN ACCORDANCE WITH NFPA 13, AND ALSO THAT SYSTEM IS OPERATIONAL. COMPLETE. AND ............__.._..._._..............._....._....._---..._..........._..._...._.__�_ _..........____.._—_.,__.__._....._................................................................____........-___....-..........................._...._ ___.�_......__� _._........__ NO. DATE DESCRIPTION HAS NO DEFECTS FIRE PROTECTION PLAN 12.1.15SSUET FOR LAN FIRE PROTECTION PIPING MATERIALS AND PRODUCTS 3 8 =1 —0 RAIEW ANDLORD GENERAL, PROVIDE PIPING MATERIALS AND FACTORY-FABRICATE) PIPING PRODUCTS OF SIZES, TYPES, PRESSURE RATINGS, TEMPERATURE RATINGS, AND CAPACITIES AS INDICATED. WHERE NOT INDICATED, PROVIDE PROPER SELECTION AS DETERMINED BY INSTALLER TO COMPLY WITH INSTALLATION REQUIREMENTS PROVIDE SIZES AND TYPES MATCHING PIPING AND EQUIPMENT CONNECTIONS; PROVIDE FITTINGS OF MATERIALS WHICH MATCH PIPE MATERIALS USED IN FIRE PROTECTION PIPING SYSTEMS. MOKLM LEIGM WHERE MORE THAN ONE TWE OF MATERIAL OR PRODUCT IS INDICATED, SELECTION IS INSTALLER'S OPTION. FIRE PROTECTION SPECIFICATIONS CONTINUE D BASIC IDENTIFICATION $Y� SeEQ&_yALym WHERE INDICATED, IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS, AND GENERAL: PROVIDE IDENTIFICATION IN ACCORDANCE WITH THE FOLLOWING LISTING: IN ACCORDANCE WITH RECOGNIZED INDUSTRY PRACTICES TO ENSURE THAT FIRE @N NEW CONCEALED WHITE PLATE SPRINKLER GENERAL: PROVIDE VALVES, UL LISTED, IN ACCORDANCE WITH THE FOLLOWING LISTING. SPRINKLER PIPING COMPLIES WITH REOUIREMENTS AND SERVES INTENDED PURPOSES FIRE PROTECTION PIPING: PLASTIC PIPE MARKERS PROVIDE SIZES AND TYPES WHICH MATE AND MATCH PIPING AND EOUIPMENT EXPOSED BRASS UPRIGHT TYPE CONNECTIONS COORDINATE WITH OTHER WORK, INCLUDING PLUMBING PIPING, AS NECESSARY TO FIRE PROTECTION VALVES PLASTIC VALVE TAGS BASIC METERS AND GAGES INTERFACE COMPONENTS OF ARE SPRINKLER PIPING PROPERLY WITH OTHER WORK. BASIC. PIPE TUBE AND FITTINGS SPRINKLER CONTRACTOR SHALL COORDINATE THE INSTALLATION OF HEADS WITH HVAC GENERAL: PROVIDE METERS AND GAGES COMPLYING WITH BASIC MATERIALS AND DUCTWORK. INSTALL HEADS ABOVE AND BELOW DUCTWORK WHERE REOUIRED TO GENERAL- PROVIDE PIPE, TUBE, AND FITTINGS COMPLYING WITH BASIC MATERIALS AND METHODS SECTIONS, IN ACCORDANCE METHODS SECTIONS IN ACCORDANCE WITH THE FOLLOWING LISTING: PROVIDE COMPLETE COVERAGE, WITH THE FOLLOWING LISTING: PRESSURE GAGES, 0-250 PSI RANGE. INSTALL DRAIN PIPING AT LOW POINTS OF PIPING SYSTEMS. INTERIOR PIPING: BLACK STEEL PIPE INSTALL HOSE OUTLET VALVES IN PIPING WHERE HOSE OUTLETS ARE REOUIRED. FIRE PROTECTION SPECIALTIES INSTALL SECTIONAL VALVES IN INLET PIPING, AT BOTTOM OF EACH RISER, AND IN PIPE WEIGHT: SCHEDULE 40 FOR PIPING UP TO AND INCLUDING 2' LOOPS AS REQUIRED. FITTINGS: CLASS 125, CAST-IRON THREADED. GENERAL: PROVIDE FIRE PROTECTION SPECIALTIES, UL LISTED, IN ACCORDANCE WITH FIRE PROTECTION GENERAL NOTES THE FOLLOWING LISTING. PROVIDE SIZES AND TYPES WHICH MATE AND MATCH PIPING INSTALL WATER FLAW INDICATORS WHERE INDICATED AND REQUIRED. PIPE WEIGHT: SCHEDULE 10 FOR 2-1/2 AND LARGER AND EQUIPMENT CONNECTIONS RENOVATED AREAS SHALL BE 100![ SPRINKLERED. FITTINGS MECHANICAL GROOVED PIPE COUPLINGS AND FITTINGS; CUT GROOVE TYPE MOUNT SUPERVISORY SWITCHES ON ALL CONTROL VALVES AUTOMATIC SPRINKLERS: PROVIDE AUTOMATIC SPRINKLERS OF TYPE INDICATED ON ALL WORK SHALL BE DONE IN ACCORDANCE WITH ALL MUNICIPAL, STATE, AND FEDERAL CODES, LAWS, AND Zo. BASIC PIPING SPECIALTIES DRAWINGS, AND IN ACCORDANCE WITH THE FOLLOWING LISTING. PROVIDE FUSIB E LINKS INSTALL INSPECTOR'S TEST CONNECTION AS REQUIRED, OR AT MOST REMOTE PONT OF REGULATIONS 2FOR 165 DEG. F (74 DEG. C) UNLESS OTHERWISE INDICATED. RISER. PIPE ALL INSPECTOR TEST CONNECTIONS TO THE OUTSIDE IF PIPING TO THE CONTRACTOR SHALL VISIT SITE AND BE FULLY COGNIZANT OF ALL CONDITIONS PRIOR TO SUBMITTING PROPOSAL 2GENERAL• PROVIDE PIPING SPECIALTIES COMPLYING WITH BASIC MATERIALS AND METHODS SECTIONS IN ACCORDANCE WITH OUTSIDE IS NOT POSSIBLE, THEN PIPE T'O DRAIN LARGE ENOUGH TO HANDLE FLOW. r2 �/ //"r- THE FOLLOWING LISTING: UPRIGHT PROVIDE A VALVED DRAIN AT THE LOW POINT IN EACH PIPING SYSTEM. 0 . G 'fffJ PENDENT CLOSE TO CEILING - WHICH ALLOWS CEILING TILE REMOVAL WITHOUT FOR SIDEWALL SPRINKLERS, PROVIDE SUPPORT TO ADJACENT STUD WALL WITHIN 6 `� ( ) PIPE ESCUTCHEONS REMOVING HEAD. INCHES OF THE HEAD. ALL VALVES AND OTHER PIPING SPECIALTIES SHALL BE FULL UNE SIZE UNLESS OTHERWISE INDICATED. DIELECTRIC UNIONS DRY PENDANT SEAL AROUND ALL PIPES PENETRATING FIRE SEPARATIONS WITH APPROVED INCOMBUSTIBLE PACKING RETAINED BY 1 1 R. RkAc lJ DRIP PANS ALCOVE SPRINKLER HEADS INSTALLED AT THE BOTTOM OF ELEVATOR SHAFTS SHALL BE METAL COLLARS, SLEEVES INSTALLED LESS THAN 24 INCHES OF THE PIT FLOOR. COORDINATE SPECIFICS OF ALL SLEEVE SEALS FINISH: CONCEALED WHITE PLATE FOR AREAS WITH DROP-IN CEILINGS, CAST BRASS ELEVATOR RELATED INSTALLATIONS WITH THE ELEVATOR INSTALLER, AUTHORITY HAVING COORDINATE ALL CUTTING AND PATCHING WITH GENERAL CONTRACTOR. THE FIRE PROTECTION CONTRACTOR SHALL EXFRATIOIl DATE. 1A_//(4 FOR AREAS WITH NO CEILINGS JURISDICTION AND ALL OTHER AFFECTED TRADES BE RESPONSIBLE FOR ALL CUTTING AND PATCHING FOR HIS WORK. BASIC SUPPORTS ANCHORS AND SFALS WHERE SUSPENDED LAY-IN CEILINGS OCCUR LOCATE HEAD IN CENTER OF TILE IN AT ADJUST AND CLEAN AUTOMATIC SPRINKLER SYSTEM SHALL BE INSTALLED IN COMPLIANCE WITH NEPA 13 AND BUILDING CODE GENERALPROVIDE SUPPORTS, ANCHORS, AND SEALS IN ACCORDANCE WITH THE FOLLOWING LISTING: LEAST ONE DIRECTION. REQUIREMENTS DRAWING TITLE: SPRINKLER PIPING FLUSHING: PRIOR TO CONNECTING SPRINKLER RISERS FOR FLUSHING, REFER TO REFLECTED CEILING PLANS FOR EXACT LOCATIONS OF LIGHT FIXTURES AND CEILING TYPES COORDINATE ADJUSTABLE STEEL CLEVISES, ADJUSTABLE STEEL BAND HANGERS, ADJUSTABLE BAND HANGERS, FOR HORIZONTAL PIPING SPRINKLER CABINET AND WRENCH: FURNISH STEEL, BAKED RED ENAMELED, SPRINKLER FLUSH WATER FEED MAINS, LEAD-IN CONNECTIONS AND CONTROL PORTIONS OF EXACT LOCATION OF PIPING AND HEADS WITH MECHANICAL AND ELECTRICAL DRAWINGS w HANGERS AND SUPPORTS. BOX WITH CAPACITY TO STORE 10 SPRINKLERS AND WRENCH SIZED TO SPRINKLERS SPRINKLER PIPING. AFTER FIRE SPRINKLER PIPING INSTALLATION HAS BEEN COMPLETED FIRE $ AND BEFORE PIPING IS PLACED IN SERVICE, FLUSH ENTIRE SPRINKLER SYSTEM, AS ALL SPRINKLER DRAWINGS, RISERS, CODE REQUIREMENTS ETC. ARE THE RESPONSIBILITY OF AND SHALL BE PROVIDED o TWO-BOLT RISER CLAMPS FOR VERTICAL PIPING SUPPORTS AVAILABLE MANUFACTURERS. SUBJECT TO COMPLIANCE WITH REQUIRE)MENTS, REQUIRED TO REMOVE FOREIGN SUBSTANCES, UNDER PRESSURE AS SPECIFIED IN NFPA BY THE SPRINKLER DESIGN CONTRACTOR. v MANUFACTURERS OFFERING FIRE PROTECTION SPECIALTIES WHICH MAY BE 13. CONTINUE FLASHING UNTIL WATER IS CLEAR, AND CHECK TO ENSURE THAT DEBRISPROTECTION STEEL TURNBUCKLES AND MALLEABLE EAAI F IRON SOCKETS FOR HANGER-ROD ATTACHMENTS. INCORPORATED IN THE WORK INCLUDE HAS NOT CLOGGED SPRINKLERS THE TENANT'S FIRE PROTECTIONS SPRINKLER SYSTEM SHALL BE DESIGNED TO MEET ORDINARY HAZARD CLA59FlCA71ON REQUIREMENTS. PLAN o CONCRETE INSERTS, TOP-BEAM C-CLAMPS, SIDE BEAM OR CHANNEL CLAMPS, AND CENTER BEAM CLAMPS FOR BUILDING RELIABLE AUTOMATIC SPRINKLER CO., INC. FIELD QUALITY CONTROL IF NO CEILINGS OCCUR, IN MECHANICAL ROOMS, ETC., SPRINKLER HEADS AND PIPING TO BE EXPOSED BRASS ZZ ATTACHMENTS. VIKING CORP. UPRIGHT TYPE ALL OTHER AREAS OF BUILDING WHERE SUSPENDED CEILINGS OCCUR SHALL BE CONCEALED VICTAULIC HYDROSTATIC TESTING: AFTER FLASHING SYSTEM, TEST FIRE SPRINKLER PIPING WHITE PLATE HEADS COPPER FLASHINGS FOR PIPING PENETRATIONS GLOBE FIRE SPRINKLER CORPORATION HYDROSTATICALLY, FOR PERIOD OF 2 HOURS, AT NOT LESS THAN 200 PSI OR AT 50 MAKE PROVISIONS FOR DRAINING AND PROVIDE INSPECTOR TESTS AS REQUIRED. ALL DRAIN PIPING SHALL BE PIPED POTTER ELECTRIC SIGNAL COMPANY PSI IN EXCESS OF MAXIMUM STATIC PRESSURE WHEN MAXIMUM STATIC PRESSURE IS IN TO OUTSIDE OR INDIRECTLY TO SINK OR F.D. o FIRE BARRIER PENETRATION SEALS HONNEEYWELL�Y EXCESS YDROSTATICEDPRESSUREECK ATT LOWSWPPOINT OF EACH SYSTEM OR ZONFOR LEAKAGE OF JOINTS. MEASURE NG TESTED. ALL PIPE AND FITTINGS SHALL MATCH LOCAL FIRE DEPARTMENT THREADS BASIC VALVES TY00 FIRE PRODUCTS PROJECT NO: o REPAIR OR REPLACE PIPING SYSTEM AS INQUIRED TO EL IJMINATE LEAKAGE IN ALL FIRE SUPPRESSION WORK SHALL BE PERFORMED BY A STATE LICENSED FIRE PROTECTION CONTRACTOR. ALL GENERAL: PROVIDE VALVES COMPLYING WITH DIVISION-15 BASIC MATERIALS AND METHODS SECTIONS IN ACCORDANCE WITH INSTALLATION OF PIPE TUBE AND FITTINGS ACCORDANCE WITH ANSI/NFPA STANDARDS FOR 'UTTLE OR NO LEAKAGE, AND RETEST SPRINKLER MODIFICATIONS TO BE BY THE MALL'S REQUIRED SPRINKLER CONTRACTOR AT TENANT'S EXPENSE � 5428 d THE FOLLOWING LISTING: AS SPECIFIED TO DEMONSTRATE COMPLIANCE GENERAL: INSTALL PIPE AND PIPE FITTINGS IN ACCORDANCE WITH BASIC MATERIALS ALL SPRINKLER HEADS SHALL BE LOCATED IN CENTER OF CEILING TILE IN AT LEAST ONE DIRECTION. WHEN °D INTERIOR VALVES. AND METHODS SECTIONS EXTRA STOCK APPLICABLE) DRAWING NO: WHEN MODIFYING EXISTING SPRINKLER SYSTEMS, SPRINKLER CONTRACTOR SHALL MAINTAIN THE INTEGRITY OF THE SECTIONAL, GATE VALVES. FIRE SPRINKLER PIPING SYSTEMS GENERAL, FOR EACH STYLE AND TEMPERATURE RANGE REQUIRED, FURNISH EXISTING SPRINKLER ZONES COORDINATE WITH NEW FIRE RATING PLANS IF APPLICABLE ADDITIONAL SPRINKLER HEADS AMOUNTING TO 1 UNIT FOR EVERY 100 INSTALLS) F P 10 0 � CHECK: SWING CHECK VALVES. GENERAL: COMPLY NTH REQUIREMENTS OF NEPA 13 AND NEPA 14 FOR INSTALLATION UNITS, BUT NOT LESS THAN 6 UNITS OF EACH. NO PVC PIPE SHALL BE PERMITTED. OF FIRE SPRINKLER PIPING MATERIALS INSTALL FIRE SPRINKLER PIPING PRODUCTS THE FIRE PROTECTION CONTRACTOR SHALL VERIFY SPRINKLER PIPE LOCATIONS AND ELEVATIONS AND SHALL MODIFY PIPE ELEVATIONS AS REQUIRED, TO ACCOMMODATE ANY NEW CEILING ELEVATIONS 0 OW N E RlTENANT: 2 - - A M d M d -xi __.xM d M d CODINA G7eoenlatitr GODIVACHOlatter ER, INC. 333 WEST 34TH STREET % �� � � NEW YORK, NY 10001 F/G N w PROJECT PLANNER: a a a a a p O 6 M o0 00 00 00 00 00 00 B-7 d 55 B5 55 55 55 55 l I i o Oa Oa Oa Oa Oa 00 REFER TO ARCHITECTURAL REFLECTED ' Uj O0 B BI B3 B3 B3 BI WJCA INC. CEILING PLAN FOR LAYOUT OF DEVICES. I ® 0S 6 O FRAN763 KLIN LAKES, NJ 0741 Oj � FRANKLIN LAKES, NJ 07417 O TEL: 201-848-9060 }{ ( I FAX: 201-848-9881 FMD �Y ALL ��s SR2 O a O a O p O a O p O p ENGINEER: DESIGN DRAWINGS ARE SCHEMATIC. THIS CONTRACTOR SHALL VISIT THE SITE o BI BI BI Bl 51 BI ° PRIOR TO BIDDING OR AWARD OF CONTRACT TO INSPECT EXISTING FIELD ( O O O CONDITIONS. THIS CONTRACT SHALL INCLUDE ALL LABOR AND MATERIALS NECESSARY FOR FIELD MODIFICATIONS DUE TO EXISTING CONDITIONS. ENGINEER: i Dan R. Rhodes, PE THE CONTRACTOR SHALL CONTACT THE ARCHITECT, ENGINEER OR OWNER 7402 East Broad Street PRIOR TO BIDDING FOR INTERPRETATIONS AND CLARIFICATIONS OF THE DESIGN I Blacklldc,Ohio 43004 4 AND INCLUDE IN BID ALL COSTS TO MEET THE DESIGN INTENT. CLARIFICATIONS MADANDEBY THE SHALL BE IMPLEMENTED OAT CONTRACTORS COST. BIDDING WILL BE FINAL \ ®1 .O �O O O O O O O O a O a O O Phone: 614.204.2479 [ � B �� B BI BI B BI BIDDING CONTRACTORS SHALL HAVE A WORKING KNOWLEDGE OF LOCAL CODES 1 ; / O MEP Building Consultant AND ORDINANCES AND SHALL INCLUDE IN THEIR BIDS THE COSTS FOR ALL I O o a 6 OO O WORK INSTALLED IN STRICT ACCORDANCE WITH GOVERNING CODES, THE PLANS AND SPECIFICATIONS NOT WITHSTANDING. THE CONTRACTOR SHALL ALERT ARCHITECT, ENGINEER OR OWNER OF ANY APPARENT DISCREPANCIES BETWEEN I GEH X 6 GOVERNING CODES AND DESIGN INTENT. ---- • ' I I 6 O 000 o0 0 00a o0 Oa BI111 O I ( BI p B4 0 84 GEII B4 a B4 BI DEMOUnIMINM O M o B-3 _ o a (TIE) LJ 1 $ REQUIRED TO FACILITATE PERFORM ANY/AUL THE NEW INSTALLATIOY ELECTRICAL N. FIELD COORDINATE ION WORK THAT IS I d G I j TO BIDS. REMOVE AND/OR MODIFY EQUIPMENT, CONDUIT, WARE, ETC. AS G O D I VA REQUIRED FOR A COMPLETE INSTALLATION. DEVICES OR EQUIPMENT REMAINING SRR- b AFTER THE DEMOLITION IS COMPLETE SHALL BE RECONNECTED OR MAINTAINED 1 PE O O O O O O Chocalatus TO EXISTING OR NEW CIRCUITS AND LEFT IN GOOD WORKING ORDER. FEEDERS TO PANELS AND WRING TO EQUIPMENT SHALL BE ROUTED CONCEALED IN I 6 2 3 O EH BB b B3 b B b b B STORE NO: FINISHED AREAS COORDINATE ANY DISRUPTION OF ELECTRICAL OR I524 TELEPHONE SERVICES WITH THE LANDLORD AND CONSTRUCTION MANAGER TO TI '_.._....__ ._.........___ I AVOID ANY CONFLICTS. i ( b • PROJECT LOCATION: O boo boo boo boo boo BIO LIGHTING GENERAL NOTES ! Sm xG BI b 52 52 Bz 52 52 WASHINGTON SQ. MALL 0 0 0 0 I SPACE B04 A. VERIFY ALL EXISTING CONDITIONS IN FIELD PRIOR TO BID. - 9585 SW WASHINGTON O O SQUARE ROAD B. UNLESS SPECIFICALLY NOTED OTHERWISE ALL BRANCH CIRCUITS SHALL B3 $3 83 B3 BI b PORTLAND, OR 90703 BE PROVIDED WITH (2)fIZ (1)/12 GND IN 3/4- CONDUIT. O O 4O O C. WHERE DRYWALL CEILINGS ARE USED IN THE SALES AREA, ARRANGE I I I c a c c B-3 CIRCUITS TO AVOID THE USE OF JUNCTION BOXES IN INACCESSIBLE 0 0 0 0 I (TE) LOCATIONS THE USE OF JUNCTION BOXES ABOVE DRYWALL CEILINGS GENERAL COUNTER BACK BAR DISPLAY SHALL BE LIMITED TO LOCATIONS NEAR ACCESS FRAMES USED FOR UGHTS LIGHTS LIGHTS LIGHTS �_ _ -- ISSUE DATE: DIFFUSERS AND RETURN AIR GRILLES OR ACCESS PANELS AS LOCATED - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ON PLANS �° mob' 'c 'd' NO. DATE DESCRIPTION D. EMERGENCY FIXTURES, EMERGENCY BALLASTS, EXIT SIGNS SHALL BE 12.11-15 SSUED FOR BID. PERIT PROVIDED WITH AN UNSWITCHED ' TO PROVIDE CONTINUOUS POWER 0 0 0 0 0 RMAND AND ORD HOT' ELECTRICAL LIGHTING PLAN TO BALLAST/BATTERY EVEN WHEN FIXTURE IS OFF. NIGHT LIGHTS SHALL BE WIRED AHEAD OF ALL SWITCHING. INTERMATIC FF SERIES 2 HOUR C DEVIL NOTES E. CONDUITS SHALL BE KEPT AS HIGH AS POSSIBLE ABOVE FLOOR TO OVERRIDE TIMER SWATCH TO CONTROL 1. REFER TO CONTACTOR SCHEDULE LCI ON THIS SHEET PROVIDE ADEQUATE SPACE FOR CLEANING. CONDUIT AND SIMILAR ® TIMECLOCK POLE fI - LC1 FOR CIRCUITS TO BE CONNECTED TO CONTACTOR. CONSTRUCTION LOCATED OUTSIDE WALL MUST BE INSTALLED SO THAT THERE IS A MINIMUM OF 3/4- SPACE BETWEEN IT AND THE WALL 0 0 0 0 0 2. REFER TO CONTACTOR SCHEDULE LC2 ON THIS SHEET 0 CODED NOTES STOREFRONT STOREFRONT LIGHT STOCK ROOM 2-HOUR FOR CIRCUITS TO BE CONNECTED TO CONTACTOR F. SUPPLY LIGHTING LEVEL AT FOOD PREP AND UTENSIL WASHING AREAS LIg1TS RECEPTACLES BOX LIGHTS OVERRIDE EQUAL TO OR ABOVE 50 FOOT CANDLES 'e' �f �9 'h' LES SWITCH 3. REFER TO TIMECLOCK SCHEDULE ON THIS SHEET FOR 1. CONNECT SAFLOOR EXIT AND EMERGENCY EGRESS LIGHTING TO PANEL TO BE CONNECTED TO TIMECLOCK. LOCAL LIGHTING CIRCUIT AHEAD OF ALL SWITCHING. G. CONNECT LIGHTING CIRCUITS THROUGH UGHTING CONTACTORS CONTROLLED REFER TO BY BANK � LIGHTING CONTACTOR SCHEDULES, ANES INDICATED IN LIGHTING CONTACTOR DD TIMECLOCK LE. "TC" 2 FIELD VERRTER IFFYYTIouCTWLOCCACH TION BANK. RTH GODIEFER TVADPROJECT MANAETAIL 2 ON IGER PRIOR LIGHTING SWTCHBANK NOTES LIGHTING CONTROL DETAIL ON THIS SHEET FOR ADDITIONAL INFORMATION. PROVIDE LUIRON DIVA SERIES DVTV 0-10V DIMMER SWITCH FOR3O TO ROUGH-114. PROVIDE LABELS ON SNATCHES AS INDICATED ON DETAIL SWITCHES LABELED 'a, b, c, d,'. PROVIDE ALL POWER PACKS REQUIRED. POLE CIRCUIT DESCRIPTION H. COLING MOUNTED SPEAKERS, VERIFY EXACT LOCATION WITH PROJECT 3. PROVIDE 2-HOUR OVERRIDE SWATCH (IN117RMATIC FF SERIES OF MANAGER AND PROVIDE WRING AS REQUIRED. FINAL CONNECTIONS BY 1 A-28 LC1 EQUIVALENT) TO OVERRIDE TIMECLOCK AUTOMATIC SHUT-OFF. REFER TO G.C. PROVIDE 20A-1P TOGGLE SWATCH FOR SWITCHES LABELED "0. 1, q, ho. 2 A-36 ILC2 DETAIL 1 ON THIS SHEET FOR MORE INFORMATION. I. REFER TO POWER PLAN FOR DEVICES TO BE CONNECTED TO SWATCHES REFER TO PRODUCT DOCUMENTATION FOR MORE INFORMATION ON SWATCH 4. PROVIDE CEILING MOUNTED OCCUPANCY SENSOR SWITCH (WATTSTOPPER INDICATED. GANGING REQUIREMENTS PROVIDE SWITCHES IN BACK BOXES AS OO -0 lL7 DT-300 OR EQUIVALENT) FOR CONTROL OF STOCKROOM LIGHTING. RECOMMENDED FROM MANUFACTURER. CONTACTOR "LC1 " SWITCHES }.� 5. PROVIDE WALL MOUNTED OCCUPANCY SENSOR SWITCH (WATTSTOPPER CONTROL: TIMECLOCK ON/OFF WITH Q ��{ SALES LIGHTING PW-3Q1 OR EQUIVALENT) FOR CONTROL OF RESTROOM FANAJGHT LIGHTING MASTER SWITCH BANK SWITCHES COMBO. SENSOR SHALL CONTROL FAN/UGHT COMBO ON/OFF. �F�S 2 SCALE: NOTE 6. ROUTE CIRCUIT THROUGH LIGHTING CONTROL SYSTEM. SE: DETAILS 1 POLE CIRCUIT DESCRIPTION cs- `�9IN�E9 S/O' 1 B-3 STOREFRONT/SALES/BACKBAR LIGHTING SWITCHES C: AND 2 ON THIS SHEET FOR MORE INFORMATION. 59 32 2 B-7 BACK OF HOUSE2O-0 DISPLAY LIGHTING 7. PROVIDE JUNCTION BOX, DISCONNECT SWITCH AND BRANCH CIRCUITRY / FOR CONNECTION TO STOREFRONT SIGNAGE PROVIDE FLEXIBLE WHIP FOR LIGHT FIXTURE SCHEDULE 3 - SPARE I FINAL CONNECTION. COORDINATE EXACT LOCATION WITH SIGNAGE VENDOR \ O^ EGO AND CODINA PROJECT MANAGER BEFORE ROUGH-IN. 4 - SPARE -dot, CD TYPE SYMBOL MANUFACTURER CATALOG NUMBER DESCRIPTION WATTS FOR S. PROVIDE AND INSTALL J-BOX IN ACCESSIBLE LOCATION WITHIN COLING FOR FUTURE UGHTING. RUN 3/4- EMPTY CONDUIT WITH PULL STRING B1 ❑O SOLAIS LKaNTIPIG D4RI1-DQ"QO-25-30V-1480-WI-UAd I-NEAD FULLY-REGE68ED MJLTIPLE n (LED INTEGRATED) CONTACTOR "LC2" OCAATIOM O BOF TJ-°�ELECTRICAL EXACT REQUIREMENTS� WITH OWNER PROR To EztlwTlollJ TF: / l FLOOD BEAM SPREAD ROUGH-IN. 52 F0-0-1 BOLA18 LIGNTINCs -XM20-28-28-30V-1480-1LH-UH 2-EAD FULLY-FASCE D MULTIPLE, n (LED MTECsRgTEp) SWITCRHESTIMECLOCK ON/OFF WITH FLOOD AND FLOOD BEAM SPREAD - 4"120-18- 01/-1480-IA4- I-4EAD FULLY-RECES6ED MULTIPLE,SPOT POLE CIRCUIT DESCRIPTION DRAWING TITLE: B3 o SOLAI81KsNTMG )d"1D3I 4 n (LED INTEGRATED) LIGHTING CONTROL SCHEMATIC BEAM SPREAD 1 B-5 SIGNAGE ,CAM MM ELECTRICAL 54 O O SOLAIS LKaF4TING -)d 120-6-8-30V-4180-W4-W4 2-DEAD FULLY-RECESSED MULTIPLE, SPOT n (LED INTEGRATIED) 2 B-9 LIGHTBOX 1 A110 SPOT BEAM SPREAD LIGHTING CONTROL DESIGN INTENT LIGHTING B8 O O SOLAIS LIGI4TMG 3 B-1 ILLUMINATED MURAL EVENT: NORMAL BUSINESS HOURS (HOURS TO BE DETERMINED BY PROJECT MANAGER( M�I2-> "QO-28-5-30V-1480-LIA4-WF4 2-HEAD FULLY-RECE88ED IwLLTIPLE, n (LED INTEGRATED) FOOD AND SPOT BEAM SPREAD 4 - SPARE - LIGHT SWITCHES AT THE LIGHTING SWITCH BANK SHALL CONTROL THE LIGHT FIXTURES. PLAN 8 M O SOLAIS I-rol-(TING >M-ICD-)d1-40-30V-WS0-UA 4N 3' DIAMETER RECE66M FIXTURE n (LED INTEGRATED) 5 - SPARE EVENT: CONCLUSION OF BUSINESS DAY (TIME TO BE DETERMINED BY PROJECT MANAGER) S� FSC Lk'sNTMG (SRI) L88-48-I-28WT/4'-40K-SLO-OS (SRU 4' LED STRIP 25 (INCLUDED) s - SPARE - TIMECLOCK SHALL SWEEP 'OFF' ALL LIGHTS (EXCLUDING RESTROOM) RI R S -EM (SRI-EM) EI'IPK-LS8-46-I-2SUJT/4'-40K-SLO-08 (SRI-EM) 4' LED STRIP WET / 'ERGENGY BATTERY 7 - SPARE 8 - SPARE EVENT: AFTER BUSINESS HOURS 1 FSC LrW4TNG (SRR) 188-96-2-25WT/W-40K-61-0-OS (SRR) 8' LED STRIP 50 (IPyCLUDEp) - LIGHT FIXTURES SHALL REMAIN 'OFF'. PROJECT NO: g - (8R2-EM) EMPK_LeS_96_2_25WT/4'_40K_SLO_ (OW-01)S, LED STRIP LU/ EMERGENCY BATTER(, - IF AFTER HOURS CONTROL OF THE LIGHT FIXTURES IS DESIRED, THE OVERRIDE SWITCH 15428 SHALL SERVE AS AN OVERRIDE SIGNAL TO THE TIMECLOCK AND THE LIGHT SWATCHES SHALL �CE� ��Y LIGW tWT14 EMEWENCY BE CAPABLE OF CONTROLLING THE LIGHT FIXTURES AGAIN (2 HOUR OVERRIDE MAX). o XC ® EDGE LIGHTING REL�(TE BATTERY BACK UP 35 (INCLUDED) DRAWING NO: EVENT: BEGINNING OF BUSINESS HOURS v 0 - LIGHT SWITCHES AT THE LIGHTING SWITCH BANK SHALL CONTROL THE LIGHT FPC IXTURES. NUTONE HDBOLNT 7�ROOM FAN/LIG14T 1001E IPTG 1 RECESSED EMERGENCY &MI AL (NTH 90 E 1 0 0 L=14 O JLNO NR3gWw MNUTE EMERGENCY BATTERY BACICJP 35 (IPK:LUDED) Y 0 OWNER/TENANT: 2 � --- —---— GODIVA GAocdatier GODIVACHOCOLATIER, INC. / 333 WEST 34TH STREET NEW YORK, NY 10001 \\p PROJECT PLANNER: —c 13 B-2 GFCI ' 0 0 0 12 -B- 0 ° ° ° WJCA INC. C T 763 SUSQUEHANNA AVE. / ° ° FRANKLIN LAKES, NJ 07417 A-28,36 A-11/f G TEL: 201-848-9060 RTU-1 FAX: 201-848-9881 A-26 I 14 O --x/32/34 ENGINEER: GFCI/I /__ VP - � O O ENGINEER: DUCT HEA .... ...........}.. ...... A-24 I / ° O O 1 l Dan R. Rhodes, PE et Bla East Broad Street Bladdidc,Ohio 43004 A-37/39/41 0 i Phone: 614.204.2479 \\ ° ° ° I I ( MEP Building Consultant ._.. I 11 15 Q° VAV 1 �-- I 1..__ .A-12 I I ,6 TELE/DATA I A-19/21/23 L J A-4,6 I A-8 _. ` ❑❑❑❑❑❑❑❑❑ B A-14,16, GODIVA 01 Chacolatier A-18 ,/ ❑❑❑❑❑❑❑❑❑❑❑ 8 7 8 9 STORE NO: 524 ELECTRICAL EQUIPMENT SCHEDULE CW 9 `1 PROJECT LOCATION: C5 31/33/35 B-9/g 11 o n WASHINGTON SQ. MALL co < K' I LABEL RECEPTACLE AS �� o EQUIPMENT DESCRIPTION s I 5 I 2 'GFCI PROTECTED SPACE B04 EQ-01 3 CHOCOLATE TEMPERING X FLOOR NEMA 5-20P 7.0 120 1 O 9585 SW WASHINGTON SQUARE ROAD EQ-02 4 BLENDERS X SCO NEMA 5-20P ISO 120 1 Q N LQ ° PORTLAND, OR 90703 EQ-05 1 UNDERCAUNTER REFRIGERATOR X SCO NEMA 5-15P 2.5 120 1 I A ` A 9 A l EQ-06 1 SINGLE DOOR REFRIGERATOR X SCO NEMA 5-20P 8.9 120 1 ,C A- 1 f A 10 EQ-09 1 ICE MACHINE X SCO NEMA 5-20P 150 120 1 ` 1D o 0-09 1 UNDEKOUNTER ICE MACHINE (RELOCATED) X SCO NEMA 5-20P 15.0 120 1 - _ Y= GFd —..-__-�_. _........_.. NEMA 15-30R _ _.._.___........__.........._...._.._...._....- - ISSUE DATE E Q-281 1 SCALE X DCO NEMA 5-15P 1.5 120 1 11 t s ELECTRICAL POWER PLAN NO. DATE DESCRIPTION E 0-331 1 1 SOFT SERVE MACHINE 1 X SCO I NEMA 15-30P I 25.0 2Wr 2 = -0 12-11-15 ISSUEDFORBID. PERMIT AND LANDLORD SCO = 120V SINGLE RECEPTACLE REVIEW DCO - 120V DUPLEX RECEPTACLE GENERAL NOTES WP POWER DISCONNECT FIELD VERIFY ALL CONDITIONS Q CODED NOTES SWITCH A ALL CONDUITS SHALL BE CONCEALED IN WALLS AND OUTLET DESIGN DRAWINGS ARE SCHEMATIC. THIS CONTRACTOR SHALL VISIT THE SITE PRIOR 1. PROVIDE NEMA 5-20R RECEPTACLE FOR ICE MACHINE. RUN (2) /12 AND (1) ;12 GRD. IN 3/4- CONDUIT FROM 20A-1P BREAKER IN PANEL TO BOXES SHALL BE FLUSH WITH RECEPTACLE VERIFY EXACT REQUIREMENTS WITH EQUIPMENT VENDOR PRIOR TO STARTING WORK. VERIFY EXACT MOUNTING HEIGHT AND LOCATION IMTH TH FINISHED WALL UNLESS OTHERVASE TO BIDDING OR AWARD OF CONTRACT TO INSPECT EXISTING FIELD CONDITIONS. THIS NOTED. CONTRACT SHALL INCLUDE ALL LABOUR AND MATERIALS NECESSARY FOR FIELD EQUIPMENT VENDOR PRIOR TO STARTING WORK. B. CONDUITS SHALL BE KEPT AS HIGH AS POSSIBLE ABOVE FLOOR MODIFICATIONS DUE TO EXISTING CONDITIONS. 2. NEW 208 VOLT, 3 PHASE, 12 kW ELECTRIC WATER HEATER. PROVIDE AND INSTALL 60A-3P NON-FUSED DISCONNECT SWITCH IN ACCESSIBLE LOCATION NEXT TO PROVIDE ADEQUATE SPACE FOR CLEANING. CONDUIT AND THE CONTRACTOR SHALL CONTACT THE ARCHITECT, ENGINEER OR OWNER PRIOR TO TO WATER HEATER. CONNECT TO NEW BRANCH CIRCUIT AS SHOWN. RUN (3) /6 AND (1) /10 GRD. IN 1- CONDUIT FROM 45A-3P BREAKER IN PANEL TO SIMILAR CONSTRUCTION LOCATED OUTSIDE WALL MUST BE 60A NON-FUSED DISCONNECT SWITCH NEXT TO UNIT. COORDINATE WITH PLUMBING CONTRACTOR PRIOR TO STARTING WORK. VERIFY EXACT ELECTRICAL BIDDING FOR INTERPRETATIONS AND CLARIFICATIONS OF THE DESIGN AND INCLUDE REQUIREMENTS WITH EQUIPMENT NAMEPLATE INSTALLED SO THAT THEM IS A MINIMUM OF 3/4- SPACE RIGID CONDUIT-SIZE AS REQ'D IN HIS BID ALL COSTS TO MEET THE DESIGN INTENT. CLARIFICATIONS MADE BY THE BETWEEN IT AND THE WALL UQUIDTIGHT ARCHITECT, ENGINEER OR OWNER AFTER BIDDING MALL BE FINAL AND SHALL BE FLENIBLE CONDUIT 1-5/8- POWERSTRUT IMPLEMENTED AT CONTRACTORS COST. 3. PROVIDE (2) 1- CONDUITS FOR POWER AND (1) 1-1/4- CONDUIT FOR TELE/DATA. SAW CUT SLAB AND RUN CONDUITS IN ACCORDANCE WITH LANDLORD C. ALL WORK SHALL BE IN STRICT ACCORDANCE WITH NATIONAL (1'-O-MAX.LG.) REQUIREMENTS. COORDINATE ALL SLAB PENETRATION WORK (I.E. X-RAY, SONAR, ETC.) VITH LANDLORD PRIOR TO BID AND COMMENCEMENT OF WORK. ELECTRIC CODE AND ALL LOCAL CODES AND ORDINANCES HAVING BIDDING CONTRACTORS SHALL HAVE A WORKING KNOWLEDGE OF LOCAL CODES AND ROUTE CONDUITS TO JUNCTION BOXES IN MILLWORK BASE PROVIDE FLEXIBLE CONDUITS AND CIRCUIT CONNECTIONS AS SHOWN. THE POS RECEPTACLES JURISDICTION AND LANDLORD'S TENANT CRITERIA MANUAL RTU OR ORDINANCES AND SHALL INCLUDE IN THEIR BIDS THE COSTS FOR ALL WORK SHALL HAVE A 10 CONDUIT. THE SELF CONSUMPTION CONDENSER SHALL HAVE A 1- CONDUIT. ALL TELE/DATA WIRING IS BY OTHERS. CONDENSING UNIT INSTALLED IN STRICT ACCORDANCE WITH GOVERNING CODES, THE PLANS AND AND NOTES TO INSURE THAT ALL D. REVIEW ALL ARCHITECTURAL LL ELECTRICAL ELECTRICAL DRAWINGS WR,WP,GFI RECEPTACLE SPECIFICATIONS NOT MATHSTANDING. THE CONTRACTOR SHALL ALERT ARCHITECT, 4. PROVIDE DEVICES IN MILLWORK AS SHOWN. RUN CONDUIT AND WIRING THROUGH MILLWORK, BELOW SLAB TO NEAREST FULL HEIGHT WALL, UP WALL TO ECTRICAL REQUIRE)MENIS ARE ENGINEER OR OWNER OF ANY APPARENT DISCREPANCIES BETWEEN GOVERNING ABOVE ACCESSIBLE CEILING THEN TO TELEPHONE BOARD. TRENCH AND PATCH FLOOR AS REQUIRED. COORDINATE EXACT LOCATION AND QUANTITIES WITH Mme' POWER & CONTROL CONDUIT CODES AND DESIGN INTENT. PROJECT MANAGER AND MILLWORK MANUFACTURER. E PROVIDE AN UPDATED TYPED PANEL DIRECTORY MATH ALL ROOF TO BE ROUTED THRU 5. (4) PRE-MARE) RECEPTACLES AND JUNCTION BOX FOR BLENDERS IN FIXTURE BASE (JUNCTION BOX AND OUTLETS BY FIXTURE MANUFACTURER). PROVIDE CIRCUITS ACCURATELY LISTED PRIOR TO STORE OPENING. FULL PERIM ROOFTOP ROOFING ROOF IN APPROVED DEDICATED CIRCUITS FOR EACH BLENDER AND HOT POT WIRED TO JUNCTION BOX. RECEPTACLES SHALL BE GFCI AND MOUNTED AT 18-. EQUIPMENT CURB OR OPENEINGS IN RTU CURBS. S 4 F. REFER TO MECHANICAL PLAN FOR LOCATION OF MECHANICAL CONDENSING UNIT RAIL DEMOLITION NOTE: 6. PROVIDE NEMA 15-30R RECEPTACLE FOR SOFT SERVE MACHINE PROVIDE 60- LONG /10 CORD AND MATCHING NEMA 15-30P PLUG FOR FINAL CONNECTION si 5 c� EQUIPMENT. FIELD VERIFY EXACT LOCATIONS OF MACHINE RUN (3) /10 AND (1) /10 GRD. IN 3/4- CONDUIT FROM BREAKER IN PANEL TO RECEPTACLE. VERIFY REQUIREMENTS WITH VENDOR AND VERIFY �' _ F9 PERFORM ANY/ALL NECESSARY ELECTRICAL DEMOUTION WORK THAT IS REQUIRED WITH GODIVA CONSTRUCTION MANAGER EXACT LOCATION AND MOUNTING HEIGHTS PRIOR TO STARTING WORK. REFER TO PANEL SCHEDULE ON SHEET E300 = ( ��" G. PROVIDE JUNCTION BOX AND RACEWAY FOR THERMOSTATS. TO FACILITATE THE NEW INSTAL' ATION. FIELD COORDINATE PRIOR TO BIDS. FOR MORE INFORMATION. / �jj' 7 / THERMOSTATS AND TEMPERATURE SENSORS INSTALLED AND REMOVE AND/OR MODIFY EQUIPMENT, CONDUIT, WIRE, ETC. AS REQUIRED FOR A cWIRED BY MECHANICAL CONTRACTOR. COORDINATE EXACT IXISTING JOIST a OCOMPLETE INSTALLATION. DEVICES OR EQUIPMENT REMAINING AFTER THE 7. PROVIDE (1) 1/2- CONDUIT WITH PULL STRING FROM MANAGERS DESK TO CASHWRAP. PROVIDE J-BOX AT 80TH ENDS MATH BLANK COVERS ROUTE CONDUIT N LOCATIONS AND MOUNTING HEIGHTS WITH MECHANICAL ,_ Qe DEMOLITION IS COMPLETE SHALL BE RECONNECTED OR MAINTAINED TO EXISTING FROM MANAGERS DESK J-BOX TO NEAREST FULL HEIGHT WALL, DOWN WITHIN WALL AND OVER TO CASHWRAP. SAW CUT SLAB AND RUN CONDUIT IN CONTRACTOR' OR NEW CIRCUITS AND LEFT IN GOOD WORKING ORDER. FEEDERS TO PANELS AND ACCORDANCE WITH LANDLORD REQUIREMENTS. COORDINATE ALL SLAB PENETRATION WORK (I.E. X-RAY, SONAR, ETC.) WITH LANDLORD PRIOR TO BID AND S E R\ I C E RECEPTACLE DETAIL HARING TO EQUIPMENT SHALL BE ROUTED CONCEALED IN FINISHED AREAS. COMMENCEMENT OF WORK.. Y F OO H. E.C. SHALL SUBMIT COMPLETE PLANS AND SPECIFICATIONS FOR 1 SCALE NONE COORDINATE ANY DISRUPTION OF ELECTRICAL OR TELEPHONE SERVICES WITH THE FIRE ALARM SYSTEM A THE CITYPRO OF SAN DIEGO DEVELOPMENT LANDLORD AND CONSTRUCTION MANAGER TO AVOID ANY CONFLICTS. 8 PROVIDE J-BOX (WITH WHITE COVERPLATE) IN SALES AREA CEIUNG AND PROVIDE J-BOX WITH BLANK COVERPLATE IN CASHWRAP MILLWORK FOR TRAFFIC SERVICE FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION. ATTION DATE: 6 EYE PROVIDE (1) 1/2- CONDUIT YW1H PULL STRING BETWEEN CEILING J-BOX AND CASHWRAP MILLWORK. ROUTE CONDUIT FROM CEILING J-BOX TO NEAREST - FULL HEIGHT WALL, DOWN WITHIN WALL AND OVER TO CASHWRAP. SAW CUT SLAB AND RUN CONDUIT IN ACCORDANCE MATH LANDLORD REQUIREMENT'S COORDINATE ALL SLAB PENETRATION WORK (I.E. X-RAY, SONAR, ETC.) WITH LANDLORD PRIOR TO BID AND COMMENCEMENT OF WORK. HVAC ELECTRICAL C❑❑RDINATI❑N SCHEDULE (HECS) 9. PROVIDE FLUSH FLOOR BOX EQUAL TO HUBBELL (SIPFB) MATH QUAD SUSPLATE (S1SP) AND BLACK COVERPLATE (SITFCBL). PROVIDE WITH (2) DUPLEX DRAWING TITLE: ABBREVIATIONS CONTRACTOR TYPE MOTOR CONTROL TYPE CONTROL TYPE RECEPTACLES TRENCH AND PATCH FLOOR FOR (1) 1- CONDUIT TO NEAREST WALL COORDINATE ALL SLAB PENETRATION WORK (I.E. X-RAY, SONAR, ETC.) DC LOCAL DISCONNECT EC ELECTRICAL CONTRACTOR CS COMBINATION STARTER TO TIMECLOCC HATH LANDLORD PRIOR To COMMENCEMENT OF WORK. ELECTRICAL MC MOTOR CONTROL (POWER) EX IDOSTING MCC MOTOR CONTROL CENTER CPT CONTROL POWER TRANSFORMER 10. RECEPTACLE AND COVERPLATE AT THE STOREFRONT SHALL BE MOUNTED ON CEIUNG PARALLEL TO STOREFRONT VITHIN 18. OF TOP OF STOREFRONT POWER W SD DUCT SMOKE DETECTOR FC FIRE PROTECTION CONTRACTOR MG MAGNETIC STARTER OR CONTACT BAS BUILDING AUTOMATION SYSTEM GLAZING. CIRCUIT THROUGH SNATCH Y. SEE DETAIL 2 SHEET E100 FOR MORE INFORMATION. 4 CN CONTROLS GC GENERAL CONTRACTOR MS MANUAL STARTER LOW LOW VOLTAGE CONTROLS PLAN TS TOGGLE SWITCH HC HVAC CONTRACTOR VFD VARIABLE FREQUENCY DRIVE UNE UNE VOLTAGE CONTROLS 11. CIRCUIT THROUGH TIME CLOCK. SEE LIGHTING CONTROL SCHEMATIC SHEET E100 FOR ADDITIONAL INFORMATION. C/B H.A.C.R. CIRCUIT BREAKER AT SOURCE PANELBOARC MFR MANUFACTURER MSR MANUAL STARTER W/CONTROL RELAY RUNE REVERSE ACTING UNE VOLTAGE STAT c FUSE FUSE AT LOCAL DISCONNECT (VERIFY FIELD RATING PC PLUMBING CONTRACTOR OV OVERCURRENT PROTECTION MAN MANUAL 12. PROVIDE AND INSTALL NEW 120/208V, 30, 4W, 60A MLO ELECTRICAL PANEL -B-. R FLA OPERATING FULL LOAD AMPS OR OWNER OR OTHERS FA FIRE ALARM MCA MINIMUM CIRCUIT AMPACITY CO CARBON MONOXIDE SENSOR 13. EXISTING 120/206V, 30, 4W, 150A MOB ELECTRICAL PANEL wAo. CP CORD AND PLUG CONNECTION INT INTEGRAL TO EQUIPMENT 14. HVAC UNIT. PROVIDE IN BID ALL WORK REQUIRED FOR A COMPLETE SYSTEM. RUN (3) 06 THWN CU AND (1) /10 GRD. THAM CU IN 1-1/4- CONDUIT FROM NEMA 3R, 6OA-3P NON-FUSED DISCONNECT SWATCH AT UNIT TO 6OA-3P BREAKER IN PANEL COORDINATE WITH MECHANICAL CONTRACTOR PRIOR TO BID. NARK DESCRIPTION EXISTING VOLTS PHASE ENERG BHP HP HTG KV WATTS FLA NCA DCP DC FURN DC INST DC VIRE NC TYPE NC FURN NC INST NC WIRE CN TYPE CN FURN CN RE INST CN VISD DUAN PROJECT NO: RTU-1 ROOF TOP UT 208 3 44.6 60 EC EC EC EC EC EC EC EC EC EC EC 15. DUCT SMOKE DETECTOR PROVIDED AND INSTALLED BY FIRE ALARM CONTRACTOR. E.C. SHALL CONTRACT WITH LANDLORD APPROVED FIRE ALARM y 5428 o NICONTRACTOR FOR ALL FIRE ALARM RELATED WORK. INCLUDE ALL COSTS ASSOCIATED MATH FIRE ALARM WORK AS A SEPARATE LINE ITEM "THIN BID. w VAV-1 VARIABLE AIR VOLUME 208 3 11.1 20 EC EC EC EC EC EC EC EC EC EC EC COORDINATE WITH LANDLORD AND LOCAL FIRE MARSHAL PRIOR 10 BID. 00 16. EXISTING VAV TO REMAIN. REUSE EXISTING CONDUIT, WIRING. AND DISCONNECT SWITCH. PROVIDE AND INSTALL NEW BREAKER IN PANEL CIRCUIT AS DRAWING NO: N INDICATED. COORDINATE WITH MECHANICAL CONTRACTOR PRIOR TO STARTING WORK. 17. DUCT HEATER. 208 VOLT, 3 PHASE, 12 KW. PROVIDE AND INSTALL 60A-3P NON-FUSED DISCONNECT SWITCH IN ACCESSIBLE LOCATION NEXT TO UNIT. RUN C/�0 0 Y (3COORDINATE CLI AND MEC(1) CIAL CONTRACTOR PRIOR T04ST�NGTA FROM 8OA-3P DISCONNECT SWITCH AT UNIT TO 45A-3P BREAKER IN PANEL CG 0 OWNER/TENANT: OO RISER KEYED NOTES RISER GENERAL NOTES ELECTRIC LEGEND 1. EXISTING LANDLORD ELECTRICAL DISTRIBUTION. A. PARALLEL FEEDER CONDUCTORS SHALL BE CUT TO EXACTLY THE SAME LENGTHS AND SHALL BE FROM 2 EXISTING METER. THE SAME FACTORY RUN. ALL CONNECTIONS FOR SAME SHALL BE TORQUED TO IDENTICAL VALUES 4 8. EXTERIOR ELECTRICAL WORK SHALL NOT ONLY BE WEATHERPROOF AND WATER-TIGHT, BUT SHALL ALSO SYMBOL DESCRIPTION G O D I VA 3. EXISTING 20OA-3P SERVICE DISCONNECT SWITCH. E.C. SHALL PROVIDE AND BE RUST-RESISTANT. Ch"Outw INSTALL NEW 150A FUSES LIGHTING CONTROL/SWITCHING GODIVACHOCOLATIER, INC. LANDLORDS TENANTC. CONDUCTORS BELOW GRADE OR SUBJECT TO MOISTURE SHALL BE "XHHW-2'. 333 WEST 34TH STREET ELECTRICAL RML SPACE 4. EXISTING MINIMUM (4) #1/0 CU AND (1) #6 CU GRD. IN 2 CONDUIT. c,b.c SWITCHING DES '� NEW YORK, NY 10001 D. PROVIDE FACTORY SERIES COORDINATION FOR ALL CIRCUIT BREAKERS (INCLUDING ALL BRANCH TION 5. RUN 20 TELEPHONE AND DATA CONDUIT TO NEW TELEPHONE BOARD BREAKERS), RELATIVE TO -UPSTREAM- BREAKERS, SO THAT ONLY THE BREAKER CLOSEST IN THE UNSWITCHED NIGHT-LIGHT FERULE PROJECT PLANNER: ROOF LOCATION WITHIN TENANT SPACE FROM LANDLORDS TELEPHONE DISTRIBUTION CIRCUIT TO THE LOAD TRIPS UPON AN OVERLOAD OR FAULT CONDITION. NL rd POINT. PROVIDE ALL REQUIRED CABLING. COORDINATE LOCATION OF LANDLORD TELEPHONE DISTRIBUTION POINT PRIOR TO BID. COORDINATE WITH LANDLORD, E POWER DISTRIBUTION EQUIPMENT SUPPLIER SHALL PROVIDE EQUIPMENT APPROPRIATELY RATED AND SINGLE POLE SWITCH CEYUING OWNER, AND LOCAL UTILITY COMPANY TO ARRANGE FOR SERVICE IN OWNER'S BRACED TO ACCOMMODATE THE AVAILABLE FAULT CURRENT AT THE UTILITY COMPANY TRANSFORMER NAME SECONDARIES THIS SUPPLIER SHALL ACCORDINGLY PROVIDE ANY RELATED CALCULATIONS SO THAT �p DIMMER SWITCH THEIR EQUIPMENT IS PROPERLY COORDINATED FOR THE AVAILABLE FAULT CURRENT. THE ELECTRICAL ® i 6. PROVIDE NEW 24 HOUR, 7 DAY, ASTRONOMICAL TIMEC LOCK AND LIGHTING CONTRACTOR SHALL PROVIDE THIS SUPPLIER WITH COPIES OF THE ELECTRICAL DOCUMENTS AS REQUIRED CONTACTORS. SEE LIGHTING SWITCH BANK AND NOTES ON SHEET E100 FOR SO THAT PROPERLY RATED/BRACED EQUIPMENT IS PROVIDED UNDER BASE BID. LIGHTING CONTACTOR MORE INFORMATION. E.C. SHALL LABEL TTMECLOCK CIRCUITS TO INDICATE WHICH AREAS THEY CONTROL- F. GROUNDING ELECTRODE CONDUCTORS SHALL BE PROVIDED IN STRICT COMPLIANCE WITH N.E.C., _ INCLUDING N.E.C. ARTICLE 250 AND TABLE 250.66. THESE CONDUCTORS MAY NOT BE INDICATED ON RECEPTACLES/MISCELLANEOUS OUTLETS 7. RUN NEW (4) #4 CU AND (1) /10 GRD. IN 1-1/4" CONDUIT FROM EXISTING RISERS OR SINGLE-LINES, BUT SHALL BE PROVIDED UNDER BASE BID NEVERTHELESS PANEL EDA' TO NEW PANEL 08m. ® DUPLEX RECEPTACLE G. EQUIPMENT GROUNDING CONDUCTORS SHALL BE PROVIDED IN STRICT COMPLIANCE WAIN N.E.C., WJCA INC. 5PROVIDED& EXISTING GROUND PER N.E.C.N.EC. ARTICLE 250. INCLUDING N.E.C. ARTICLE 250 AND TABLE 250.122 THESE CONDUCTORS MAY NOT BE INDICATED ON DOUBLE DUPLEX RECEPTACLE ( O IAD )• • 763 SUSQUEHANNA AVE. RISERS OR SINGLE-LINES, BUT SHALL BE UNDER BASE BID NEVERTHELESS FRANKLIN LAKES, NJ 07417 H. WORKING CLEARANCES SHALL BE PROVIDED FOR ALL ELECTRICAL EQUIPMENT (SWITCHBOARDS SPECIAL PURPOSE OUTLET TEL: 201-848-9060 PANELBOARDS, TRANSFORMERS, STARTERS, DISCONNECTS, ETC. AS APPLICABLE) IN STRICT COMPLIANCE DETERMINE EXACT NEMA CONFIGURATION IN FIELD WHERE APPLICABLE FOR RECEPTACLES FAX: 201-848-9881 i I TC TELEPHONE WITH N.E.C. CHAPTER 1, PART B, SECTION 110.26(A). LOCATIONS SHOWN ON FLOOR PLANS ARE FLUSH CEILING DUPLEX RECEPTACLE NEW NEL 7 EXISTING EQUIPMENT SCHEMATIC AND DIAGRAMMATIC IN NATURE. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR 6 LCI PAPANEL BOARD ENSURING COMPUANCE WITH THE ABOVE N.E.C. REFERENCE THIS REQUIREMENT APPLIES TO EQUIPMENT ® ENGINEER: B I .A' I ON FLOOR PLANS AS WELL AS TO EQUIPMENT SHOWN ON RISER. FLOOR OUTLET HUBBELL SYSTEM ONE- BOX (S1PFB) OR POKE THROUGH (SIPTFTT) 1 120/208V I20/208V SUB PLATE (SISPDU) COVER PLATE (SITFCBR.S) 30, 4W 30. 4W I. HOLD ALL NEW OVERHEAD ELECTRICAL WORK AS TIGHT AS POSSIBLE TO THE BOTTOM OF THE OVERHEAD ENGINEER: STRUCTURE LOCATE ANY RELATED PULLBOXES SO THAT THEY WILL BE FULLY ACCESSIBLE AFTER ALL Dan R. Rhodes, PE MLO MCB J 80A 150A O CONSTRUCTION WORK IS COMPLETE. AS WITH ALL WORK, COORDINATE IN ADVANCE WITH ALL OTHER MISCELLANEOUS TRADES THERMOSTAT (LOW VOLTAGE) - FURNISHED, INSTALLED AND WIRED BY H.C. 7402 East Broad Street LMJ I L OT OUTLET BOX AND CONDUIT STUB-UP BY E.C. Blac Jick,Ohio 43004 L I J. ROUTE FEEDER CONDUITS BELOW GRADE WHEREVER POSSIBLE. VERY LIMITED SPACE EXISTS ABOVE J INDICATES A DIRECTCONNECTION TO EQUIPMENT Phone: 614.204.2479 ACOUSTICAL TILE CEILINGS AND MANY, IF NOT MOST, OF THE SPACE ABOVE THE GYPSUM BOARD ■ CELINGS IS NOT AVAILABLE FOR RUNNING CONDUIT. STUDY ALL ARCHITECTURAL, STRUCTURAL E T FIRST FLOOR MECHANICAL DRAWINGS VERY CAREFULLY BEFORE LAYING OUT FEEDER ROUTES ON 13 HEAVY DUTY DISCONNECT SWITCH (NON-FUSED) MEP Building Consultant K. ALL PANELS HAVE NEMA 1 ENCLOSURES UNLESS NOTED OTHERWISE HEAVY DUTY DISCONNECT SWITCH (FUSED) �- L E.C. SHALL BE RESPONSIBLE FOR BALANCING ALL PHASES LOADS TO WITHIN 1OX S �- MOTOR OPTED DAMPER (1201) - FURNISHED AND INSTALLED BY H.C., M. PROVIDE HACK CIRCUIT BREAKER FOR ALL HVAC AND MOTOR LOAD POWER AND INTERLOCK WIRING 13Y E.C. ® TIME CLOCK RECESSED OR SURFACE MOUNTED PANEU30ARD AS INDICATED ON PLANS PLYWOOD EQUIPMENT BOARD BY E.C. ❑8 ® CIRCUIT BREAKER (NEMA i ENCLOSURE UNLESS INDICATED OTHERWISE) G O D I VA Ch"olatier SCALE i _L INDICATES GROUNDING BY E.C. ELECTRIC RISER DIAGRAM NOT TO SCALE I ELECTRIC UTILITY COMPANY METER STORE NO: DATA/VOICE PROJECT LOCATION: . TELEPHONE OUTLET WASHINGTON SQ. MALL PANEL WIRING SCHEDULE (3-PHASE) PANEL WIRING SCHEDULE (3-PHASE) SPACE 804 � COMBINATION TELEPFIONE/DATA OUTLET 9585 SW WASHINGTON PANELBOARD 'B' VOLTAGE 120/206 PHASE 3 WORE 4 AIC RATING MATCH EXISTING PANEIBOARD 'A' VOLTAGE 120/208 PHASE 3 WIRE 4 AIC RATING RIESLING SQUARE ROAD PANEL TYPE NQ MAINS 60A MLO MAINS RATING 125A PANEL TYPE EXISTING MAINS 150A MCB MAINS RATING 225A DATA OUTLET NEMA TYPE ENCLOSURE 1 MOUNTING SURFACE OPTIONS --- NOTE NEMA TYPE ENCLOSURE 1 MOUNTING SURFACE OPTIONS --- NOTE PORTLAND, OR 90703 OCT. BRIM N.E.C. NEG N.E.C. NEC. NEG N.E.Q. BRIQR (UKT. TUR. ERKR N.E.C. N.E.C. N.E.D. NEG NEC HLE.c BIRKR � RACEWAY/WIRE/CABLE NOLREAD DESLYnP710N 9ff N01E KVA KVA KYA PHASE KVA KVA KVA NOTE Siff LOAD DESCRIPTION LOAD OESCRp110N S� NOTE KVA KVA KVA PHASE KVA KVA KVA NOTE 5� LOAD DETiPTION ROME RUN WITH CIRCUIT NUMBER(5) fA OB NIC M A 0C A � � . M IS 0C M 08 1C � 1,3) 1 LTS - ILLUMINATED MURAL TC 0.400 A 0.540 REC - STOCK R RESTROOM 2 1 BU]MDER GFCI ,.800 A 1.300 fTtl RITC - NSIYCERATOR 2 ISSUE DATE: 3 LTS - SALES R BAC BAR U).TC 1.365 B 0.360 REC - MANAGERS DESK 4 3 BlDJOER CFd 1.800 B 0.720 ITEC - P.O.S. 4 CABLING/RACEWAY - CEILING OR WALL - SEE SPECS. FOR APPL CONDUIT/RACEIMAY REA'T5. 5 LIS - SIGN 7C 1.200 C 0.360 REC - MANAGERS DESK 6 5 BLEW 02 GFCI 1.800 C 0.720 REC - P.O.S 6 (FULLY CONCEALED IN FINISHED AREAS, CONCEALED TO OVERHEAD STRUCTURE IN UNFlN. AREAS) NO. DATE DESCRIPTION 7 LTS - BAD( OF HOUSE lC 0.550 A - SPARE 8 7 BLENDER 0-02 GFT] 1.800 A 1.700 GFC1 REC - CHOCOLATE CASE 8 CABUNG/RACEWAY - BELOW FLOOR/GRADE - SEE SPECS. FOR APPL CONDUIT/RACEWAY RE:Q'TS. 12-11-15 SSUEDFOR&D. 9 LTS - LIGHIBOX TC 0.360 B - SPARE 10 9 ICE MACHINE EQ-OMA GFIU 1.800 B 0.050 cm REC - SCALE 28 10 PERMIT AND LANDLORD REVIEW 11 SPARE - C - SPARE 12 11 REC - STOREFRONT TC 0.180 C 0.190 FEC - STOREFRONT TRAFFIC EYE 12 JUNCTION BOX - ABOVE ACCESSIBLE COUNG OR AT STRUCTURE IN AREAS WITH NO COLING 13 SPARE - A - SPARE 14 13 1.267 A 0.500 REC - DOUBLE DIPPER 14 15 SPARE - B - SPARE 18 15 SOFT SERVE MACHINE 30 1.267 B 0.500 REC - DOUBLE DIPPER 16 JUNCTION BOX - WALL (FLUSH IN FINISHED AREAS) 17 SPACE C SPACE 18 17 1.267 C 0.360 REC - CONVENIENCE 18 ❑t 19 SPACE A SPACE 20 19 1.333 A 1.800 GFC KE MACHINE 20 21 SPACE B SPACE 22 21 VAV-1 20 HACK 1.333 B 1.058 REFRIGERATOR Q-06 22 ABBREVIATIONS AND NOTES 23 SPACE C SPACE 24 23 1.333 C 0.180 LO ITEC - ROOFTOP 24 25 SPACE A SPACE 26 25 1.490 A 0.360 LO REC - PHOIE BOARD 26 ELECTRICAL CONTRACTOR 27 SPATE 8 SPACE 28 27 PANEL 60 2085 B 0.100 CONTACTORS h 111E (UD(UX 28 E.C. 29 SPACE C SPACE 1 30 29 16 1 1.580 C 1 4.000 1 30 GENERAL X713 PANEL LOAD SUMMARY l �Tg 31 4.000 A 4.000 HACK 45 DUCT HEATER 32 G.C. CONTRACTOR 1. ALL CIRCUIT BREAKERS TO BE 2D-AMP. 1-POLE UNLESS OTHERWISE NOTED. LO - HANDLE LDIX-0FF DEME 33 WUIER HEATER 45 4.000 B 4.000 34 2. ALL PHASES TO BE BALANCED TO WITHIN 1OX USING ACTUAL LOAD TOTALS NEC. IXINNECIFD TOTALS ST - SHUNT TRP TYPE 35 4.000 C 0.100 CONTACTORS R TIME CLOCK 36 VIF VERIFY IN HELD M 1.490 KVA GFCI - CAROLED FAULT CIRCUIT INTERRUPTER 37 5.368 A 0.500 REC - DOUBLE DIPPER EQ-01 38 (PRIOR TO ROUGH-IN WHERE APPLICABLE AND PRIOR TO SUBMITTING A BID WHERE APPLICATION) 08 2.085 KVA HACR - HEATING, A/C A REFRIGERATION 39 RIU-1 60 HACK 5.368 8 0.300 GFC1 U.C. 40 ABOVE FINISHED FLOOR (OR GRADE/PAVEMENT WHERE APPLICABLE) TO CENTER OF OUTLET IC 1.560 KVA SF - SUB-FEED BAKER 41 5.368 C - SPAREC. RE42 AFF (UNLESS OTHERWISE NOTED) TOTAL x135 KVA 1C - RUN CIRCUIT THRXIGH TIME CLOCK mm PANEL LOAD SUMMARY W/P PROVIDE WEATHERPROOF EQuF►ffxr/FlxruRE/DEVICE 1. ALL CIRCUITBREAMM TO BE 2D-ALP, 1-POLE UNLESS OTHERWISE NOW. MD LO - HLE LOOK�F DEWDE 2 ALL PHASES TO BE BALANCED TO MTHIN IOX USING ACTUAL LOAD TOTALS NEC. C(NIEM TOTALS ST - SHUNT TRP TYPE #A 27.218 KVA GFCI - MOUND FAULT CIRCUIT INTERRUPTER 42" DISTANCE ABOVE FINISHED FLOOR (OR GRADE/PANDORA WHERE APPLIC.) TO CENTER OF OUTLET 24.391 KVA HAM - HEATING, A/C k fEFRIGER 70 COUNTER HEIGHT OR SPECIAL HEIGHT DEVICE IC 21.058 KVA m - RUN =117 THROUGH TIE am CH COORDINATE WITH EQUIPMENT E ARCHITECTURAL ELEVATIONS TOTAL 72667 KVA GROUND FAULT CIRCUIT INTERRUPTER DEVICE (UNLESS SPECIFICALLY NOTED OTHERWISE ON GFl / GFG DRAWINGS. DO NOT F® DOWNSTREAM OUTLETS FROM LOAD SIDE TERMINALS OF GFI RECEPTS.) IG INDICATES ISOLATED GND. DEVICE W/PARITY SIZED ISOLATED/INSULATED EQT. GND. CONDUCTOR IG FrJ/O LOAD SUMMARY 120/208 (GREEN W/YELLQIW TRACER). PROVIDE DEDICATEDDEDICATED #10 AWG NEUTRAL COND. FOR EA PHASE COND. F� 55 2 SYSTEM TTB TELEPHONE TERMINAL BOARD 38 ELE9 DESCRIPTION N.E.C. POWE=R N.E.C. N.E.C. EWH ELECTRIC WATER HEATER , 2 GO CONNECTED FACTOR DEMAND DEMAND FURNISHED E INSTALLED BY P.C., WIRED BY E.C. �`-,\,,.� 19g� KW KVA FACTOR KVA LIGHTING 3.875 ♦ 1.25 4.844 LINE TYPES '} . R,�oo 1.0 < I OKW - - ELECTRICAL WORK SHOWN BOLD-DASHED INDICATES SELECTIVE DEMOLITION WORK EXPIRATION DAT RECEPTACLES 4.170 1.0 0.5 REMAINING KW 4.170 INTENDED TO BE REMOVED AS SELECTNE DEMOLITION BY E.C. / ELECTRIC HEAT 16.000 1.0 1.0 - ELECTRICAL WORK SHOWN BOLD-CONTINUOUS INDICATES NEW WORK BY E.C. AIR CONDITIONING SYSTEM 16.104 1.0 1.0 16.104 ELECTRICAL WORK SHOWN FADED INDICATES EXISTING WORK TO REMAIN DRAWING TITLE: OR NEW WORK BY OTHERS AS APPLICABLE KITCHEN EQUIPMENT 20.519 1.0 0.65 13.337 ELECTRICAL WATER HEATER 12.000 1.0 1.0 12.000 SCHEDULES o TOTAL 72.668 50.455 AND DETAILS s U \ NOTES R • 125% OF THE LARGEST MOTOR OR COMPRESSOR IN SYSTEM. APPLIED ONLY ON ONE UNIT. USE GREATER VALUE OF TWO CATEGORIES N.E.C. ARTICLE #220.56: 65X FOR KITCHEN EQUIPMENT PROJECT 1NOF uA ^/R 00 A, POWER FACTOR IS ALREADY INCLUDED IN UGHTING LOAD. 1 V T L V 0 w = MINIMUM FEEDER AMPERAGE DRAWING NO: N N.E.C_ DEMAND KVA_x JQM SYSTEM VOLTAGE x 3 LOLO I 50.455 x 1000 = 1401 AMPS REUSE 200 AMP SERVICE E 3 0 0 < 208 x 1.73 W 0 DIVISION 26 — ELECTRICAL SPECIFICATION It shall be Included as the first page of each electronic and/or hardcopy document—based submittal. M editable where not located at counter areas, the height of boxes from finished floor to center of boxes shall be as follows, OWNER TENANT: 25 05 01.00 — COMMON REOUIREMENTS FOR ELECTRIC and printable PDF form created with editable fields and specification compliant appearance Is available from KLH It is recognized that there may be some conduit systems rendered Inactive by demolition, causing disconnection of unless otherwise noted on plans. In cases where using center of box for measurement would result M a General Requirements upon request It is also downloadable from the KLH webeke at www.klhengrs.00m. 'downaboamn' outlets, etc. Investigate these types of conditions (for all systems) prior to demolition. Provide switch—height device having an operable component higher than 48 inches above finished floor, Install boxes lower as The General Provisions of the Contract Including the General and Supplemental Conditions and General Requirements necessary corrective electrical work prior to demolition to ensure that such 'downstream' devices remain needed so that uppermost part of operable component is no higher than 48 Inches. apply to the work in this section. Before submitting a bid, examine documents of all other trades visit the sits and Include an Index: The index shall enumerate the contents of the submittal. permanently active throughout demolition, during new construction, and after project completion. Switches: 3'10' get acquainted with all conditions that may M any way affect the execution of this contract Take measurements Include cheddists: Where chaddlets aro Included with the specifications. complete and Include them within the Devices at special heights: As directed In field. and be responsible for exact size and locations of all openings required for the Installation of work. Figured appropriate submittal. Supply complete submittals: Complete submittals of each type aro required. Partial submittals Perform cutting and trtehM required far demolition. Receptacles 1'6' (unless counter height) G O D I VA 4 dimensions are reasonably accurate and should govern In setting out work Whore detailed method of Installation Is will be rejected Where a section requires a product data submittal, all product data for that section shall be 9 patching eqt+ not Indicated a whore variations exist between deserted work and approved practice, direction of the Owners supplied together, at one time, as one complete submittal. Man resubmittal is required (e.g. Revise and Resubmit) Telephone Outlets (desk phone): 1'8' CAAn/atier representative on job site shall be followed the revised submittal shall be more complete. more accurate and more contract—compliant than Its rejected Coordinate work carefully with owner prior to beginning slactrlcd demolition work. Telephone Outlets (Wall phone): 3'10' GODIVA CHOCOLATIER, INC. predecessor. The submittal number (for each section and type) shall Increment for each subsequent submittal (00 — Data Cable Outlets: 1'6' 333 WEST 34TH STREET Whenever the words 'controctar, 'this contractors. eta appear on drawings a in these specifications for the Original submission, 01 — First Resubmission, 02 — Second Resubmtsion, etc ). Resubmlttals shall Include a copy Maintain (or reconnect If applicable) remaining wiring. Control Stations: 3'10' Electrical Work, it shall refer to the Electrical Sub—Contractor. Whenever the word 'provide' appears in these of the reviewers comments supplied with the prior submittal rejection and shall be amended with a description of NEW YORK, NY 10001 documents. It shall be Interpreted to mean 'Furnish and Install'. the ecifle action tdaen to aarrn with the reviewers comments The absence of this an resubmittal h cause for 26 05 53.00 — IDENTIFICATION FOR ELECTRICAL SYSTEMS mD comply Remove and relocate wiring, devices, conduit, etc. that conflict with construction related work of other trades as Provide manufacturers standard self—adhesive vinyl tape not les than 3 mils thick by 1-1/2' wide Where applicable. PROJECT PLANNER: The exact mounting height of device shall be determined In the field with relation to architectural necessary to accommodate new work of respective trade. Install on all conceded raceways l details and yes at connection to all function boxes, pull boxes, equlPrnmt wall/floor/roof equipment being served. It shall be the responsibility of this contractor to coordinate outlet location with equipment Name electronic files to match the submittal ID and cover sheet: The electronic fie nome of submittals shall match penetrations, etc. Union otherwise Indicated or required by governing regulations, provide orange tape with black The Owners representative shall be permitted to relocate any outlet prior to Installation within a 15 foot limit at no the submittal ID Included on the submittals cover page For example: The ortgInd/flret product data submittal for Provide electrical disconnections. and reconnections where applicable. for equipment to be removed (or relocated) by letters Provide dreuit klentiflcation bonds for all cables and conductors. Provide manufacturers standard color coding additional charge in contract price. All fasteners, hangers and methods of hanging exposed work In finished areas Section 260519 would be labeled as 260519.00—PD-00; the first rewbmittd of same shall be labeled other trades for cable/conductor jacket and/or insulation for all cables and conductors of all systems Match identification with / shall be submitted to the Owners representative for approval before Installation. 260519.00—PD-01 . The orighd/fiat shop drawings submittal fie for the same section would be labeled marking system used In existing systems (where applicable), shop drawings. contract documents. and similar The contract includes all Items of material and labor required for the complete Installation and full operation of the 260519.00—SD-00; the fist resubmittal of some shall be labeled 260519.00—SD-01 Existing branch circuit and systems conduit, not conflicting with new construction and not conflicting with overhead previously established Identification for projects electrical work Provide on all conductors of all systems. Use of Electronic Drawings from the Owner's Design Team or eating cavity requirements, may be re—used at the discretlon of the electrical Installer after all abandoned electrical work as shown on the drawings and hereinafter specified. All oval of l and methods shall ri In accordance conductors and cables have been removed from them. Do not exceed NFPA 70 required conduit fill and do not The following Insulation color code shall be used for em and volts Identification. This shall apply to both Plan drawings for the Project were created with AutoCAD 9 system 9e DP Y with applicable codes, regulations and/or ordinances and meat the approval of local work. era authority having install wiring fed from different sourer In common conduit- feeder and branch circuit wiring. Interchange of colors andl not bepermitted. jurisdiction. The latest edition of NFPA 70 ehdl be the minimum requirement for all work Examine the drawings and If expressly permitted by the Owner and the terns of the Contract, editable electronic versions of standard—sella 9 9 specifications for compliance with the above codes, regulations and ordinance and bas bid and work accordingly. ro AutoCAD—based plan drawings may be mode available for the creation of shop and as—butt drawings. 208Y/120V System: Block. Red. Due to the proprietary nature of Internal design systems. editable native—software versions of some drawings. For all existing luminaires which aro scheduled for reuse, remove from existing callings during demolition; protect Blue and White (neutral) Obtain and pay for all permits and Inspections related to this work A certificate of approval for work from ( including but not limited to system diagrams and details veli not be made available M an editable form. In these during construction; dean, service (If required), rolamp (with lamps to match building standard a per this section Equipment Inspection authority shall be given to the Owner before final acceptance will be given by Owners representative �, electronic versions of the drawings may be mode available only M PDF, RG or similar non—editable electronic ) 9 Systemic t Grounding (Mean 9 Y Y as noted and reinstall at locations Indicated. For all sxbtirn luminaires which aro scheduled to be removed and Systems: To match WJCA INC. All work, materials, and equipment shall have a one year warranty after acceptance of the work by the Owner. Any form, at the We dbcration of the Design Professional. turned over to Owner, the luminaires shall be disconnected, carefully removed and turned over to Owner. Transfer existing where applicable — verify In fleld. 763 SUSQUEHANNA AVE. defective Items shall be removed and replaced at the electrical sub—contractors expense and to the satisfaction of The Request Drawings form can be accessed, filed out and submitted at the following Internet address (scroll down such luminaires to storage area as directed In field FRANKLIN LAKES, NJ 07417 the engineer and owners representative. to bottom of home page): http://www.ldhongr&com. 9 represen 26 O5 05.00 — EXISTING CONDITIONS The use of Scotch ods or coding tapfor phase Identification shall be permitted on feeder cables only. TEL: 201-848-9060 General Requirements Refer to owners representative for disposal Instructions for abandoned electrical material* removed during demolition FAX: 201-848-9881 Perform work under this contract In ds oharmony with other contractors so completed work shall present a neat eq and thereafter. Neatly store electrical materials that the Owner elects to retain at the site as designated by the Install engraved plastic—lominate s on ma units of electrical equipment Including Nboords. disconnects, and workmanlike Installation. finished materials and equipment shall be carefull cleaned and Perform a detailed pre—bid walk—through field Inspection to review the existing structures and premises, torepresentative. Legally dispose gr pl sign jar equlpm q Pan Exposed and le y ogres to owner's seantativa I di of materials that the Owner Nesta not to retain. remove 9reese• smudges. fingerprints. dust and other spots and left smooth and dean. During the progress of the determine existing conditions and to determine scope of required electrically related work Include applicable starters, control panels. etc. Except as otherwise Indicated, provide single IIne of text, 1/20 high lettering. an ENGINEER: work, the electrical sub—contractor shall carefully dean the job site and shall leave the promisee and all portions of accessible calling cavity areas In this Inspection. i-112' high sign (2' high where 2 lines aro required), white lettering M black field Unless determined otherwise In the building In which he is working free of debris and in a dean and safe condition. Disconnect and remove electrical materials deslinated for salvage (removal and reuses or for turning over to Owner) field, provide text matching terminology and numbering of the contract documents and shop drawings It is not the Intent of this section, or of drawings, that existing conditions be accurately shown. Existing electrical undamaged. Disconnect and remove wWg and whips from equipment termind points This contractor shall be r work is shownto a very limited extent on drawings and Is shown for general planning reference only. Locations and ENGINEER: saponeble for the training of ormers representatives of each system to the sothfaetion of information were derived from cuvisual observations or from Equipment to Be Labeled: (Project may not Mdude dl pieces of equipment) the Owners representativecursory portions of documents that were prepared for Clean components to be reused Inside and out and reinstall wham indicated an drawings Modify and extend related Pandboards also including typewritten direct of circuits In the location provided b ondboard Dan R. Rhodes, PE previously Installed work (not from record drawings or 'as—bulls'). existing wiring h conduit accordingly. ( 9 YPe directory Drs Y P manufacturer). 7402 East Broad Street The Electrical Contractor shall consult the Plumbing, HVAC and Structural plans (where applicable) M all Instances Blacldhok,Ohio 43004 Do not rause removed electrical materials unless specifically indicated in protect manual a on drawings. Existing Enclosures and electrical cabinets before Installing his work so that his work will not Interfere with those branches In the event of a conflict, this Carefully transport salvaged electrical materials to a protected on—site storage location as directed in field and wiring systems may be utilized only to the extent Indicated in project manual, a on drawings. a as directed by Access doors and panels tar conceded electrical Items contractor shall report to the Owners representative at once and do no further work to be installed until a neatly store them grouped by system type. Phone: 614.204.2479 satisfactory arrangement is decided upon. My work done. or equipment placed h position by this contractor, Owners representative In flefd. Switchgear (also Include descriptive labels for each section. swftch. overcurrent protection device. . cresting a conflict M 26 05 19.00 — LOW—VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES violation hereof, shall be readjusted to the satisfaction of the Owners representative at the etc• expense of the contractor. The decision of the Owners representative @half be find In regard to changes due to Determine which existing branch circuits must remain active. Reconnect (or maintain in operation where applicable) Furnish and Install dl necessary cable of the size and type Indicated on the drawings or specified hereinafter. All MEP Building Consultant and schedule them. Completely re—type pandboard directories for pondboarde affected by this project using wire shall be copper. All wking shall be new. No wire smaller than #12 AWG andl be Installed unless specifically Switchboards (also Include descriptive laicals for each section, twitch, overcurrent protection device theOwnconflicting conditions.i can b Contractor *hall complete his work a any part thereof at such rine s may be not be ted by etc.; the Owner, so that It can be used for temporary a permanent use and such use of the system shall not ices accthe ratecorn as—built conductors. More applicable, ensure that rt onnectedcolor—co ng redfor neutrals aro properly balanced with desigsizes unless Use of {14 calor coded wire will be allowed for control circuits only. Provide stranded conductors for dl additional) Include name of engineering firm, name of Installing contractor and of Installation for construed as an acceptance of some by Owner. the correct Phase conductor• Where applkabl0. provide correct odor—coding for Insulation of reconnected sizes unless indicated otherwise Y 9 9 9 Yacr conductors in a manner compliant with NFPA 70. service—entrance switchboards). RECORD DRAWINGS AND OPERATING INSTRUCTIONS and SERVICE MANUAL Provide THHN/THM Insulation for all conductors size 500 MCM (kcmll) and larger, and no. 8 AWG and smaller. For Transformers: Label that Includes tag designation shown an Drawings for the transformer, feeder, and If required ll accommodate kcal equipmruction related activities temporarily remove, store In protected located on site. di other sizes provide THW or THHN/THWN Insulation as appropriate for the locations where installed. Provide color ponsiboards or equipment supplied by the secondary. Two sets of mechanicaldsetrfcd drawings ehdl be vides as record drawings which shall be separate, dean, Ie, and reinstall conflicting electrical equipment, luminaires a device that aro to remain a to be relocated./ Pro gs seP 0. seep coded Insulation/jacket for phase idtntificotion. All wires shall be rated at 600 volts Provide type XHHW Insulation Substations (deo Include descriptive labels for each section, switch, overeurrent protection device reproducible copies reserved for the purpose of showing a complete picture of the work as actually Installed These The following applies to electrical materials that will remain or be reused under this project Protect during for dl wiring below grade or subject to moisture stc.). drawings shall also serve as work progress report sheets and the electrical sub—contractor shall mace any notatione, construction activities; Clean and re—lam luminaires Immediately occupancy neat and legible thereon daily as work proceeds. The drawings shall be available for Inspection at all times and shall P y prior to coxa nc of the finished construction Emergency system boos and endoaurss be kept at the job at a location designated by the Owners representative. At the completion of the work these area; Clean and service (H service Is required) equipment In the construction area Immediately prior to occupancy of Provide the fallowing minimum wire sizes based on distances from panel to first device of a 15 or 20 ampere Motor—control centers (also include descriptive labels for each section, switch, ovsrcurrent protection record drawings shall be signed by the electrical sub—contractor, dated and returned to the Owners representative. the orea general lighting a receptacle branch circuit In addition to upsizing conductors as required for voltage drop, provide device, minimum #10 AWG conductors to the last device for branch circuits more than 150 feet In length. Fled payment of contract will not be made until receipt and review of sold drawings. minimum service existing electrical secs and feeders to occupied areas and operational facilities, unless otherwise Inclo indicated, Enosed switches G O D I VA Provide two neat) bound with tabbed sections copies of maintenance books. instruction books and or when authorized otherwise In writing by owners representative Provide temporary service during Interruptions to Distance AWG Wire Sizes , y ( ) cop parts Iihtt Enclosed circuit breakers pertaining to all equipment furnished. Submit to the Owners representative fora approval. Find existing facilities Schedule momentary outages when necessary for replacing existing wiring systems with new wiring U to 60 feet 2 Enclosed controllers/starters. Chacolatier pp payment will not be P /1 mode until drawings for record, maintenance and Instruction manuals aro delivered to the Owners representative. systems.� an that cutting—over' has been successfully accomplished, remove related wiring that has been 61 to 90 feet #10 Variable—speed controllers. 26 05 02.00 — COMMON ELECTRICAL MATERIALS AND METHODS 91 to 150 feet # 8 STORE NO: All materials and equipment shall be new. All materials. apparatus and equipment shall bear the sod of Underwrites 151 to 240 feet # 6 • Push—button stations. 5 2 4 Laboratories Inc. (UL), or a similar ar credible testing agency, label where regularly supplied. Certain manufacturers of Carefully coordinate work and system shutdowns advance with owner's representative, and with affected trades so Power transfer eqent uipm material and equipment aro specified and plans aro detailed according to this material. This contractor shall base that normal building activities and other construction trades aro minimally affected. Perform electrically related Contoetors Provide the following minimum AWG conductor sizes for generd branch dreutting grounds that aro not Indicated on his bbl on famishing and Installing this mdse of malarial and equipment of project work which will affect an occupied area is representative those which aro located outside the Immediate area Remota—controlled switches. dimmer modules, and central devices, via engraved wall plates PROJECT LOCATION: of t work at ectal times as directed b owner's drawings. basad on using capper conductors. Where applicable increase as negated to accommodate voltage drop Miscellaneous Control Stations propc ) special y representative in field.Where more than one make of malarial or equipment Is specified, to accommodateed, the contractor shall state in his bid which mdse apsdd conditions Do not dente any grounded (neutral) conductors. Temperature ratings listed Batt Inveter units he proposes to furnish. Shop drawings shall be submitted on material and equipment to be furnished by the Provide work In a manner that ensures existing systems and components remain fully operational in occupied spaces mow pertain to both wire and terminations. e� contractor for Engineersapproval. This approval shall be obtained prix to shipment of equipment during occupied periods Battery racks WASHINGTON SQ. MALLPower— eraUn unite also Included descriptive labels for each output overcurent protection device, 60 Deq. C Rating 75 Deg. C Rating Equipment Grounding gem 9 ( e�DP SPACE B04 Hold routing of new raceways In existing buildings as tightly as possible to the structure above. Obtain approval of Provide and maintain temporary partitions and dust barriers adequate to prevent the spread of dust and dirt to Source Brooker/Fuse AWG Wire Size AWG Wire Size AWG Wire Size etc.). 9585 SW WASHINGTON owne's representative prior to Installation. adjacent finished areas and other system components Protect ad)ocent Installations during cutting and patching 15 Ampere #12 012 012 Frequency changers. SQUARE ROAD operations. Remove protection and barriers after demolition operations are complete 20 Ampere #12 #12 #12 Monitoring and control equipment Neatly dress all work Install all work parallel and perpendicular to surfaces or exposed structural members, and 25 Ampere #10 #10 #10 UPS equipment (dao include descriptive labels for each major component section. switch, overcurent PORTLAND, OR 90703 follow surface contours, where possible. Keep conductor splices to minimum. Install spike and top connectors which Inspect existing electrical work in areas accessed under this project and bring into compliance with current NFPA 70. protective posses equivalent or better mechanical strength and insulation rating than conductors being spliced. Use splice and This applies only to the extent that such work ie, uncovered In the Immediate project areas affected by construction 30 Amps #10 #10 #10 P tap connectors which are compatible with conductor material. NI wires shall be run continuous from outlet to activities, and only to the linked extent that It applies to pre—existing general Installation methods such as missing 35 Ampere # 8 # 8 #10 device, etm if not provided by factory). outiet/luminaire to luminaire Insulation value of joints shall be 10OX In excess of wire Provide adequate length of junction box plate. open junction box knockout, minor conduit re—anchoring and minor exposed wiring/connections If 40 Ampere # 8 # B #10 Other similar sauipment designated by owners representative, architect or engineer In field. conductors within electrical enclosures and train the conductors to terminal points with no excess. Bundle multiple more extensive code or safety violations are discovered, immediately bring then to the attention of the Owners 45 Ampere # 6 # 8 #10 Secure to substrate with fasteners, except use adhesive where fasteners should not or cannot conductors, with conductors no larger than 10 AWG cabled In Individual circuits. Melee terminations so there is no representative (detailed In writing) along with proposed cost for corrections and Impact (If any) on the construction 50 Ampere # 6 # 6 #10 penetrate ISSUE DATE: baro conductor at the terminal. schedule 60 Ampere # 4 # 6 #10 substrate Power Continuity Requirements 70 Ampere # 4 # 4 #6 NO. DATE DESCRIPTION Maintain a uniform elevation for all cable runs wherever possible. All cables shall be supported/anchored at maximum The following notes broody define some of the specialty base bid scope of work required to provide special 80 Ampere # 3 # 4 #6 All equipment and system Identification nomenclature shown on drawings or listed herein Is shown for general design 12_11-15 SSUEDFOR&D, 4 foot intervals and within 12' of box or outlet and shall not sog. Install cables In a manner that prevents temporary power for existing facilities to accommodate utility power Interruptions Field verify dl specifics and 90 Amparo # 2 # 2 #8 and Installation reference only. The actual nam PERMIT LANDLORD provide materials. normal time labor, remium time labor, services, eta for all work under base bid, Including but Y relate. etc nomenclature be an for this project shall be verified a electrical overheating. Cabin shall be fastened directly to the structure using factory damps/dips specifically designed for the P P 9 contractor h field prior to fabrication and where applkabl0. shall be an extension of existing nomenclature used on respective cable (Caddy or equal). not limited to the following. 100 Ampere # 1 # 2 08 the site an determined in field by electrical contractor. Minimize risks to individuals and property throughout the duration of the project Keep full electrical services online 26 05 84.00 — MECHANICAL EQUIPMENT Keep conductor splices to minimum. Pull conductorssimultaneouslywherecess where more than one la bel&gg installed o same during all ods of time that an affected facility Is occupied. Coordinate with and obtain approval from the owner raceway. Use UL listed pulling compound a lubricant where necessary. Increase wire size per NFYA 70 to offset 9 � Y YPP Type MC Cable shall be formed from continuous length of spirally wound, Interlocked zinc—coated or galvanized Common Requirements voltage drop as/If required and engineer for all materials. methods. steps. locations. Installations. eta prior to commencement of work (inside and outside) strip steel. All conductors shall be rated for 90 deg. C. minimum. Provide with full parity sized Determine and employ means and methods as required to safely and securely Implement all related work green Insulated equipment ground conductor. Provide compatible steel fittings with Integral red plastic Insulated Provide all necessary electrically related work as required to render all mechanical equipment (including plumbing, Branch subfeeder eircuitt shall be Installed as shown an the floor plans Where outlets aro Indicated by letters on throat bushings, compliant with NFPA 70, aretiele 330. Cables *hall be 90 dog. C. rated with all components and heating, ventilating and air conditioning equipment) fully operational and fully compliant with dl local and national plans, they shall be controlled by corresponding switches Do not Interrupt electrical utility service(s) to the facility union permitted under the following conditions and then fittings listed for grounding and compliant with the following. codes. This includes. prior to ordering materials or commencing with rough—In, reviewing equipment submittal data only after providing temporary electrical service(s). Notify owner and engineer no fewer than fourteen days In UL Std.4 and UL Std. 83. and coordinating with Metalling contractors to enure the correct sim rating and quantity of conductors are Outlets shall be located approximately as shown on the plans and shall be wired to provide control of outlets advance of proposed Interruption of an electrical service. ANSI E119 and E814. provided. Base bid @hail Includecost to provide fully rated neutral wire for all mechanical equipment branch circuits Indicated. All wits of any one ckcu30 it @hail be run In the same conduit Do not proceed with Interruption of an electrical service without owner's written permission. NFPA 70, Articles 250 and 3 . unless specifically noted otherwise or unless verified with equipment submittals that a neutral wire is not required. Do not energize any new service or distribution equipment without notification to and permission from the owner. Mechanical wire splicers shall be Scotchlodc Insulated type. TandB Stdkon or approved equal. The conductors During construction related electrical outages, switchovers, disconnections, reconnections, eta provide all temporary 26 05 26.00 — GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS Locations of equipment and devices are shown only for schematic Indication of wiring requirements terminating at each wired outlet shall be left not less than 8' long at their outlet flttin to foclkate installment insulated conductors. tape. jumpers, eta to and from existing and now or temporary electrical equipment. including All metallic conduit, surface wireways. supports. cabinet and equipment shall be grounded In accordance with the of devices or lumhalres Friction and rubber tape conform to Federal Specifications HH—T-11 and HH—T-111. Plastic but not limited to. conductors. splices, lug fittings. rework premium time, security and safety measures, ata latest issue of the NFPA 70, Schedule out In advance with owner, at da of week and times of da or night as directed b owner, as Refer to dl contract documents for additional electrical requirements and concerns. and for further representation of electrical tape shall be Scotch #33+ a approved equal. eget Ya Y i9h Y 26 05 29.00 — HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS this work necessary to accommodate all construction related electrical outages, ewitehovers and related connections and Do not share neutrals amongst multiple branch circuits or with multi—wire branch ckeults disconnections. Conduit shall be supported by approved straps, fasteners and hangers Hangers shall be suspended from rods Perforated straps will not be acceptable Fasteners @hall be lead expansion shields In block or concrete. toggle bolts Provide raceway, wiring, connections. and terminations for power and Interlocks for electrically operated equipment Provide grounding electrode conductors per NFPA 70 for service entrants and derived systems. Interim Ufa Safety Work in hollow walla machine screws on metal surfaces and wood screws on wood construction. All conduit shall be Provide Interim electrical firs darts and Iife safety protection in demolition and construction areas as Indicated supported Independently from all other building systems and shall be supported directly from structural components Provide disconnect switch ahead of all equipment, Including controls. unless the mechanical equipment comes with Provide dl feeders and branch circuits with insulated (green covering) equipment grounding conductors per NFPA 70. below. Contact engineer if further definition Is needed. At building expansion pints and where deflection Is expected, conduits shelf be provided with expansion fittings with integral NFPA 70 compliant diseonneot(s). Provide NEMA 3R enclosures where Installed outdoors and where installed Provide temporary plastic covers, obtained from smoke detector manufacturer or obtained from a third party and bonding jumpers. Conduits posing through structural members shall be provided with stub and coupling or sleeve M indoors In areas subject to moisture Ground metal frames of equipment by connecting frames to the grounded Only Install conduit exposed on rooftops when It Is impossible to do otherwise, or only H specifically indicated for specifically approved for such use by smoke detector manufacturer, over existing smoke detectors within project the member. Where moisture conditions aro encountered, a hole shall be drilled at the lowest point In the conduit metal raceway and to a full size green ground conductor or both. Provide the necessary electrical connections such Installation cose—by—case elsewhere In documents Installation convenience, financial consiobrations, loco of area. and In adjacent areas that aro exposed to construction—related dust or airborne particulates, during working run. Also provide sleeves for all fire wall and smoke partition penetrations (seded accordingly). between the specified equipment and the junction box now equipment with flexible metallic conduit (liquid—tight coordination with other trades and similar nationals aro not sufficient reasons for doing so. In cases where conduits Peds Remove covers after each shift 26 05 33 00 — RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS outdoors) and matched connectors (see Section 26 05 33). Where mechanical equipment lugs cannot accommodate must be installed an rooftops, de—rate conductors and modify conduit sizes per NFPA 70. Provide expansion fittings, Providetemporaryemergency egress lighting dong eges routes affected by this project Remove this work when no Raceways conductor sizes shown on drawings. provide IL.SCO CloarTop Insulated Multi—Tap Connectors F which are UL listed and labeled for the respective applications. at all building expansion pints and at maximum S distances of 100 feet Point all such conduits with at least two coats of UV—resistant weatherproof paint Provide Provide Bette emergency exit lighting along ogres routes affected by this project Remove this work when no d system power feeders and branch circuits shall be installed in separate raceways from emergency system E p Sizes. electrical ratings. eta of equipment and wiring shown on drawings aro based on the respective equipment �� ENGIN F9 � white paint on flat rooftops that have finishes white h color, and for otherwise—colored roof finishes that oro notlongerdesign base manufacturersIf different manufacturer(s) a model(s) aro actually supplied provide necessary c`; 55832 viable from the buildinginterior or from the ground outdoors Elsewhere select colors to match surrounding surfaces: Provide temporary fire dorm system pull station if required to accommodate an egress route 9rcc+ 9 coordination In field (prior to ordering materials and prix to rough—h) and provide the necessary size of related submit calors to Architect for review h advance of procuring int Provide temporary fire dam system audio/visual annunciation devices clang all affected egress routes All wiring for different power voltages shall be Installed M raceway systems separate from such other. / PfOcu 9 Pa electrical equipment eking, conduit. eta C Remove this work when no longer needed Maintain a uniform elevation for all cable runt wherever possible. Ali cables shall be supported/anchored at maximum All wiring for the various electrical systems shall be Installed In raceway systems separate from each other. Prior to furnishing submittals and Ha to rough—In.In, determine exact electrically related charocteristle% loads. O 4 foot Intervals and within 12' of box or cutlet and shall not sag Pterin Air Quality (IAO) Work 9 P 9h— Y O �'v21,199 Install cables In a manner that vents overheating. Cables shall be fastened directly to the structure using Prevent airborne dust and particulate matter resulting from electrical watt from entering occupied spaces, and from voltages. disconnect and starter requirements. Iocatiana mounting hsl¢nts connection points eta of mechanical aH 9�0 �e g y 9 fttetay entering air Intakes to operating HVAC systems cAllo conduit type s indoors shall be galvanized steel DMT (3/4' minimum); dl drawings shall of set—escrow t equipment R, RHO damps/cps specifically designed for the respective cable (Caddy a egad)• compression type steel, with Insulated throats. Unless indicated otherwise on drawings a h other parts of the Maker required electrical openings throe walls and floors immediately prior to Installation of work. electrical specifications. all wiring of all systems shall be installed in conduit Conduit fill Nndl not excood NFPA 70 HACR Breakers Only where Installed for normal utltty circuits; all wiring for emergency system feeders and receptacle branch circuits eq oP 9 9h Y P requirements. EXPIRATION DATE: / shall be In conduit (EMT). no exceptions. Coordinate in field with the respective trades and determine case by aria which equipment b factory listed for use ( T) Ctc Properly and permanentlytr seal elm ma openingsbut ca immediately after Installation of work. Provide temporary Bede for with Heath and Air Conditioning Rated HACK breakers. In an effort to minimize SuPDats. Inserts. Cutting and Patching applications wham 9 9 ( ) requirements for stocking of fuses ppl penetrations aro made but cannot be permanently seeded within four hours. Conduit shall be cleaned Inside before any ekes ars pulled. Conduit ends shall be capped and plugged with standard b the owner, utilize HACK breakers at the source onalboards as the NFPA 70 required overcurrent t This contractor shall do all cutting and patching required for the admission of his work My damage done by this Meet with HVAC Installer to determine IAO requirements related to slectrkal that may to this o Y P req protection contractor to the building during the progress of his work shall be made good at his own expense All patching shall special req Y cmc project accessories se as soon o conduit has been permanently installed Conduit Metalled without conductors shall be wherever possible (In lieu of fusing lord disconnect switches). Cooperate fully with HVAC IAQ requirements that offset electrical work and aro affected by electrical work provided with sweep bends and baling eke for pulling. DRAWING TITLE: be done by a Neilisd craftsman in that respective trade It shall be the responsibility of this contractor to supervise DEMOLITION Disconnect Switch and/or Starter Locations the any type lation ot permanentf. and pay tempall additional elmemboM wood or metal and apparatus employed h the execution nwhich thin be required eq ire this supportk. Mofe the tem demolition b used heroan in, Interpret it to medemolition or 'selective demolition where applicable All joints shall be made tight with watertight couplings matching conduit and all comes shall be made with long Locations shown an drawings are Indicated for schemata purposes only. Determine exact locations h field so that radius elbows The ends of dl conduits shall be cut sare m and reamed and all joints brought to a shoulder. Conduit they aro compliant with NFPA 70, Article 110.26. Refer to HVAC / Electrical Coordination Schedule (HECS) an ELECTRICAL Sed all new floor, coling, wall, slab, eta penetrations to match or exceed existing assembly fire ratings Provide Provide electrical demolition work as required to accommodate project demolition and s required to accommodate qu shall be continuous between outlets to mace a complete Installation and to provide a continuous ground. Suitable wings Provide disconnects, startes. accessories, wiring, connections. services, eta where defined as EC' In the Weave sods for dl Weaves, provide sleeves for al penetrations All penetrations of fire—rated or smoke—rated wall, new construction• supports and fastening shall be provided for conduit schedule. Information In this section supplements the Information In the HECS SPECIFICATIONS I floors ceilings. eta shall be sealed immediately after raceways aro Installed All new electrically related work shall be w supported directly from building structural members. Now electrically related work shall not be supported from Disconnect and remove work to be abandoned, and as required to accommodate work of other trade% In areas All raceways shall be entirely free of plaster, mortar, water and other foreign matter. Provide power wiring and connections for all equipment (Including motor dampers and accessories where applicable) S ductwork, ductwork hanger, coling supports, existing conduit support, eta affected by this project union specifically noted otherwise on plans or determined otherwise during pro—demolition as required to render equipment fully operational. Q 28 05 03.00 — SUBMITTALS FOR ELECTRICAL SYSTEMS survey. Outlet, Junction and Swftchboxes General Install local disconnects and starters at 48 Inches to top of outlet box or enclosure where applicable above finished Where submittals are required b the Contract Documents, the shall be prepared and supplied In accordance with c general, gong type outlet boxes are. not 11 used. The cutlet box locations Indicated on drawings shall be req Y Y P aP PPI Remove accessible abandoned, inactive and obsolete raceway systems Remove abandoned, inactive and obsolete considered approximate. and therefore, it shall be Incumbent upon this contractor to study the general construction floor/elab/groda Provide flush mounted units M finished areae Provide key operated manual starters where R the Contract Documents In addition to Division 01, the Contractor Is advised to review and comply with the wiring and controls Remove abandoned, Inactive and obsolete equipment, luminaires and devices. Abandoned with relation to spaces and equipment surrounding each outlet All outlet switch and junction boxes shall be mode accessible to unauthorized personnel. Inducing general public:. � requirements articulated within each Division and within each section of that Division. raceways embedded In floors. walls. and callings may remain if such materials do not Interfere with new Installations of code galvanized steel complete with rings and screw cover plates and located where shown and noted on Maintenance Receptacles for Rooftop Units Some Divisions may include a divisian—specific Submittal Requirements for section. Where this section exists, It Remove abandoned electrical materials above accessible callings. drawings. More conduit is concealed. boxes shall not be less than 4' square x 1-1 2' d All boxes shall be Provide Type WR duplex GFCI weatherproof tale at each rooftop mounted HVAC unit. I articulates additional requirements for submittals that apply to the work of that Division. twith sq / seP• PP op PROJECT NO: W The following requirements help to IdentlN trodo and keep the project organized for all parties Involved. They are equippedproper coven to bring flush with finished wall surface Maintenance Receptacles for Indoor Equipment 5428 o necessary to ensure a timely turnaround and an appropriate technical review. Submittals that do not conform to the Remove related abandoned unused raceway bade to the nearest respective 'upstream' junction box that remains Provide duplex receptacle within 25 fast of dl Indoor electrically operated equipment of any nature administrative requirements aro rejected and retumed, without technical review, active even if outside of the confines of the project area. Where outlet boxes occur In block, cinder, or concrete block, facing tie or other material wham such materials form that requires periodic testing or maintenance o Requirements the finished wall *urface, the opening for the box shall be cut neatly and of the size that the cover plate will cover a Supply submittals for each section: Submittals shall be supplied on a section—by—section and type—by—type basis Remove abandoned unused wiring back to its source even If sources aro outside the confines of the project area. all parts of the opening. Conduiets shall be used on exposed raceways In gonard, junction boxes shall be furnished Air Handing Units DRAWING NO: W For example. independent product data submittals shall be furnished for each section that requires product data and required by NEPA 70, of the proper sizes. and ehdl be constructed of #12 gauge steel with removable front Provide separate power feeds or single power food as directed M field by the HVAC Installer (flaid M submittals Independent shop drawing submittals shall be furnished for each section that requires shop drawings Extend raceway and wiring as fastened an with counter mink head screws or other approved means For special application, junction boxes shall be N Y 9 required to accommodate new a relocated electrical work verify prior to rough—In). Modify starter and disconnect requirements accordingly, If required. E400 a Separate PDF file packages s e khale supplied l be for each secsubmittal h tion, for each bmittal type a Each PDF ehdl represent noted, detailed and/a elzed on the drawinga or In the field as required u Provide additional dedicated 12OV, 20A branch circuit for each unit from nearest pandboard single standalone d. Locate. identify, and protect electrical services passing through demolition areas and serving other areas outside the (whether or not Indicated dearly on the electrical drawings) for intend factory-installed lighting Include a transmitttal:al: Transmittals shall enumerate each submittal for sock section of each type and iteration. demolition limits Maintain services to areas outside demolition limit& When services must be Interrupted, Install Height of Boxes and rseeptodes Provide conduit wiring, and ovarcurrent protection for this work and terminations Include cover sheet / title page The cover sheet shall Include the Information Identified M the contract documents temporary services for affected areas Prior to rough—in, verify all box/device mounting heights and locations In field with Owners representative. In general, to connections within the units for this lighting and convenience power. X 0 Split System Air Conditioning Systems Provide wall switches. that aro flush self—grounding with green ground screw and color coded cover, snap toggle at 15A/12OV). Provide fused control power transformer. Provide combination starters In finished areas that aro Size I OWNER/TENANT: Provide (1) 3/4 inch empty conduit (with drag line) from each air handing segment to each type, bade and side wired, specification grade. Provide wall switches rated 20A, 120/277 volts, 1 HP at 12OV. A.C. minimum, equal to Square D /8538 or Allen—Bradley Bul. 512 with NEMA 1 Type B enclosure for flush wail condensing unit Provide control conduit between par to follow refrigerant piping routing wherever quiet type. installation. Provide combination starters for exposed conduit installations that are Size I minimum, equal to Square practical D /8538 or Allen—Bradley Bul. 512 with NEMA 1 surface mount enclosure. Single pole switches shall be equal to Leviton /1221-2 aeries. 26 51 00.00 — LIGHTING Electric Duet Heating and Reheat Cols NI recessed luminaires shall be equipped with necessary plaster frames and surface trim. All recessed fluorescent Provide local disconnect switch at each unit Provide enclosed contactor for each unit Provide Double—pole switches shall be equal to Leviton /1222-2 series. lumhares shall be equipped and suitably constructed UL app to operate with P rated ballasts All recess mounted G O D I VA contactor low voltage control wiring as directed by HVAC installer. Provide key switches where boxes and and H.I.D. luminaires shall have he approved thermal protection per latest edition of NEPA All Junction accessible to the general public. Install local disconnect switch and contoctor compliant with NFPA 3—way switches shall be equal to Leviton /1223-2 series. 4—way switches shall be equal to Leviton /1224-2 series. boxes and serviceable components (ballasts thermal protection devices, fuses eta) for recessed luminaires shill be Churolusier 70, 110.26, and in locations approved by Architect. Engineer and Elecbioal Inspector. readily accessible for service or replacement from below the caging, without removing any calling components (other GODIVA CHOCOLATIER, INC. than floe). 333 WEST 34TH STREET Heating. Ventilating and Ar Conditioning (HVAC) Control Wiring Locking type switches shall be some as above except with •L• suffix. Provide six keys. NEW YORK, NY 10001 Fluorescent lam dimmer switches shall be specification ods modular, thin profile; compatible with dimmer All luminaires utilized for emergency and/or egress lighting shall be connected ahead of switching. All ballasts of the Unless specifically indicated as empty conduit an drawings or herein, provide electrical control and interlock work as ballasts: trim potentiometer to adjust low—send dimming;grade; combination capable of consistent dimming some type shall er of the some manufacturer and catalog number. NI lamps of the same type shall be of the PROJECT PLANNER: shown on drawings. Provide additional control work as specifically Indicated herein. with low and not greater than 20 percent of full brightness. Provide dimming ballasts and dimmer switches that are same manufacturer and catalog number. Coordinate HVAC thermostat and sensor locations In field (case by case) with Architect. Owners Representative and fully compatible with each other. Provide low energy adid state rapid start electronic fluorescent lamp ballasts specifically designed for operating lamp equipment installer to ensure that they aro placed in locations that will not interfere with fumiture, equipment, t Indicated. Fluorescent ballasts shall be d to Motorola a Advance equal (lees than a equal to 20X THD artwork, wall—hung specialties, room finishes, etc. Fleld—verify these wail locations case by coos, prior to rough—In. LED Dimmer Switches: Specification grade; modular; thin profile; compatible with dimming drivers; dimmer—driver typesAll iinares shown es drawings with multi—level u swkehog shall r provided with multiple ballasts to accommodate since locations shown on drawings are schematic only. combination cae of consistent full—ran a dlmmin Provide dimmin drivers and dimmer switches that are full Schematic Thermostat and Sensor Locations compatible with each other. 9 9• 9 y function e. lother and as I��t maycontain� ither construction schedule.e ballasts or multiple ballasts as required to fulfil required Refer to HVAC drawings and documents. Low Voltage Thermostats and Sensors Do not break off side heat—sink sections when ganging. Provide dimmer and wall plate colors that match other Provide 4 Inch square by 2-1/8 Inch do" wall outlet boxes at 48 Inches above finished floor to wiring devices In the respective room. Multiple wallbox dimmers may be used sporadically throughout the project an Incandescent lamps shall be G.E., Sylvania h Philips, long Ilfs type dalat hours). a Incandescent lamps shall be with single—gang rings for each unit Provide one 3/4 inch empty conduit from each location, common circuits; provide compatible dimmers accordingly. Install dimmers within terms of their Voting. Verify that t Inside frosted unless specifically directed otharrrtoa Provide socket adapters/extenders if required for accommodating turned out above accessible callings (in joist space or against overhead slob/deck In case of open dimmers used for fat speed control are listed for that application. Provide dedicated neutrals for circuits serving the specified lamp. caging) loads controlled by dlmmere. Provide unshaed neutral conductors on line and load side of dimmers according to WJCA INC. Plumbing Equipment manufocturers' device gating conditions In the written Instructions. Fluorescent lamp color temperature shall be as Indicated on drawings or as directed In Heid. 763 SUSQUEHANNA AVE. Refer to Plumbing / Electrical EC` Coordination Schedule (PEGS) on drawings Provide dieconneets, staters accessories, Provide grounded (neutral ) conductors In all wall switch, dimmer and other lighting control outlet boxes, even If not F32TB fluorescent lamps shall be rapid start, energy saving type, minimum 75 CRI, minimum 2850 Initial lumens and FRANKLIN LAKES, NJ 07417 wiring, etc. as defined as 'EC" In the schedule immediately utilized. minimum 20,000 hours rated. Lamps shall be G.E., Sylvania. Osram or Philips, equal to Sylvania #FO32/RS. TEL: 201-848-9060 FAX: 201-848-9881 Domestic Water Heaters (Electric) All surface and recessed Begin luminaires installed on or tie ceilings shall be Installed to agree with module of Provide local disconnect switch, and power wrIn and connections. Provide Interlock wiring with Provide Weather Resistant (WR) GFCI receptacles for all receptacles installed in damp or wet locations. Any 9 grid 9 9 9 9 receptacle shown on the drawings with WP/GFq next to it denoting exterior cover shall be installed with a WR GFCl coling either displacing a tgo, or unit on center of tie. or centered an grid lines. ENGINEER: circulating pumps flow switches and aquastat controls where applicable. receptacle. Provide duplex weather resistant receptacles equal to Levitan / W7899 series. For receptacle circuits 26 09 19.00 — ENCLOSED CONTACTORS protected with 15A breakers, provide NEMA 5-15R equivalents. Provide luminaires and/or luminaire outlet boxes with hangers to properly support luminalre weight All luminaires re Provide contoctoequipped with external plot lights In cover, and external HOA selector switches In cover. Were installed In or on suspended calling systems shall be anchored directly to the building structural system above contactors for lighting applications so that the AUTO• position Is the normal activated condition (Ls. photocell ENGINEER: controlled, photocell/time—dock controlled, remote switch controlled. BAS controlled, etc.); so that the •OFF• Provide duplex and single d poles Intion grade conceded t mount g yoke grounding, self—grounding, green grounding (anchored per NFPA level. Such anchoring shall be Independent r the caging support system. t luminaires shall be position Is manual override to tum lighting off; and so that the •HAND• position is manual override to tum lighting screw, ground terminals and pans Internally connected to nation yoke. color coded bass, 2 toamperes. Ito volts, installed plumb and level. Support surface mounted luminaires greater than 2 fest In length at a point In addition to Dan R. Rhodes, PE P � 9 Pon � 9 with metol plaster sar0. bade and olds wring, NEMA configuration 5-20R. Provide duplex receptacles equal to Lsviton the outlet box luminaire stud. 7402 East Broad Street on. Provide contactors with field convertible N.O./N.C. contacts and descriptive nameplates. /5362 series. For receptacle creults protected with 15A breakers, provide NEMA 5-15R equivalents. Provide Blacklick,Ohio 43004 receptacles equal to Levlton /5361 series for simplex (single) applications. Provide dock hanger todes equal to Where used for temporary lighting prior to time of Substantial Completion, replace all Incandescent Iuminare lamps, Phone: 614.204.2479 Electrically Held Contactors Leviton "1—CH. as well as any lamps that are defective, damaged or burned out Provide contactors equal to Square D pass 8903 (or Allen—Bradley Bul. 50OL—BM94 series) for tungsten lighting 28 31 13.00 — FIRE ALARM SYSTEM EXTENSION loads, ballast lighting loads, and small resistance heating loads. Provide contactors that are electrically operated and Provide self—grounding commercial specification grade, duplex receptacles, ground—fault circuit Interrupters; feed—thru Provide all materials, labor and services to provide fully operational modifications to and extensions of existing MEP Building Consultant electrically held (EOE)i). Provide contactors In factory NEMA 1 enclosures, with 120V cols (union indicated otherwise type, capable of protecting connected downstream receptacles an single crcuk, grounding type UL—rated 943, pass facility tiro alarm system(s). elsewhere or otherwise required to render controls fully operable). Provide 'dry' contacts rated at 30A, minimum A. Group 1, specification grade. 20—amperes rating (device and feed—thru), 125—volts, 60 Hz; with solid—state Provide submittals for equipment, materials and systems specified In this section. Include cuts, descriptive 250V (600V if required by application). Provide number of poles (minimum of three poles) and number of contactors ground—fault sensing and signaling (maximum threshold of 5mA at 0.025 seconds maximum); equip with 20—ampere Information, technical data, wiring diagrams, system battery calculations, plan—view layouts. legend, point—to—point as required for each application. Field verify cog voltage ratings. plug configuration, NEMA 5-20R. Provide ground fault circuit Interrupter duplex receptodes equal to Leviton #8898 wring, etc. Identify all Information that Is specific to this project 26 D9 23.00 — LIGHTING CONTROL DEVICES series. For receptacle circuits protected with 15A breakers, provide NEMA 5-15R equivalents. Where GFCI protected The fire alarm system supplier shall provide to the electrical contractor o complete set of floor plan drawings receptacles aro shown on drawings, provide a separate GFCI receptacle for each one shown. Do not feed downstream showing conduit sizes and number of conductors required to dl components plus detailed wiring connections required Multipurpose Time pock receptacles from load—side (GFCI—protected) terminals of upstream receptacles. Provide Weather—Reelotant at each type of device. Receptacles with UL WR making, compliant with NFPA 70, article 406.8. for all applications In wet or damp It shall be the responsibility of the Fire Alarm System Manufacturer to furnish submittals to the authority having locations. Jurisdiction for approval. This action shall be taken during the shop drawing procedure. The system must be approved Provide Irs. relays j etc. to ren (r control steles multi—purpose time dodo or equal. Provide required external y this authority and a copy submitted to the Engineer with the shop drawing submittal. All fire alarm system contoetors relays, ate to render control systems fully operational. Special purpose receptacles shall be of the size, type and manufacturer as Indicated an the pians or as determined waking drawings shall be provided by manufacturer. In field. Interruption of Existing Fre—Alarm Service: Do not Interrupt fire—alarm service to facilities occupied by Owner or Occupancy Sensors others unless permitted under the following conditions and then only after arranging to provide temporary guard Provide wall plates with engraved legends where Indicated on drawings and/or where required per 26 05 53.00 — servbe according to requirements Indicated G O D I VA Passive Infrared Wall Switch IDENTIFICATION FOR ELECTRICAL SYSTEMS Section. All device walipiates shall be standard size; •midway". •oversized' Notify Ownsr s Representative no fewer than two days In advance of proposed Interruption of fre—daines m se Provide Wattstopper PW-100 wall switch (or equivalent) and configure as manual on, auto off (vacancy sensor) ('Junri or 'extra deep' wdlplates @hail not be acceptable. Construct with metal saawa for securing plates to Do not proceed with Interruption of fire—dorm service without Owners Representatives written permission. Chocvlatitr unless otherwise spedfied an drawings. Provide with time delay as specified on drawings. If no time delay is devices; no.. heads colored to match finish of plates. Except whereAf indicated otherwise on drawings, wallplates in Maintain existing equipment fully operational until new equipment has been tested and accepted. As new equipment STORE NO: specified, program to 10 minute& finished areas shall be commercial edification grade, satin finish stainless steel, with beveled edge*. al to 524 eP 9rWu Is installed, label It NOT IN SERVICE• until k is accepted. Remove labels from new equipment when put Into sa►vics. Leviton Type 430 series. Wallplates In unfinished areas shall be galvanized steel unless otherwise noted. Refer to Connecting to Existing Equipment and System Dud Technology Caging Sensor architectural finish schedules and owner representative for additional Information. Verify that existing fire—darn system Is operational before making changes or conneetiona. Protide Wattstopper DT-300 caging mounted occupancy sensor (or equivalent). Provide with time delay as specified 26 28 13.00 — FUSES Connect new equipment to existing control panel In existing part of the building. PROJECT LOCATION: an drawings. If no time delay In specified, program to 10 minutes. Adjust sensitivity based on field conditions and All fuses shall be of the some manufacturer. Subject to compliance with requirements. provide fuses of one of the Connect new equipment to existing monitoring equipment at the supervising station. occupancy of room to provide 10OX coverage without nuisance tripping. Provide Wattstopper BZ-50 universal voltage following: Bussmc n, LktelFuse, Showmut (A480 series). padk(s) as required to properly power all occupancy sensor and provide switching per the design Intent In areas Expand, modify, and supplement existing control/mankoring equipment as necessary to extend existing where multiple occupancy sensors control a single zone together. Interlock occupancy sensors/power packs per Except as otherwise Indicated, provide fuses of es, sizes, ratings, and averse time—current and peak lot—through control/monitoring functions to the new points. New components shall be capable of merging with existing WASHINGTON SQ. MALL manufacturer Instructions to mot control Intent coP 9 9 P 9 configuration without degrading the performance of either system. SPACE B04 26 22 00.00 — LOW—VOLTAGE TRANSFORMERS accent characteristics Indicated which comply with manufacturers standard design, materials, and constructed In Perform reocceptance testing to verify the proper operation of added or replaced devices and appliances accordance with published product information, and with Industry standards and configurations. Fuses 1 ampere 9585 SW WASHINGTON through 600 amperes shall be rejection type. Fuses 601 amperes through 6000 amperes shall be HI—Cap, bait type. Initiating Device, Notification Appliance, and Signaling Line Circuits: NFPA 72, pass A. B, or A and B as required to SQUARE ROAD Specifications below are applicable to all distribution transformers rated 600V and lose, with capacities up to 1000 match existing conditions kVA. Subject to compliance with requirements, provide equipment of one of the following manufacturers provide UL goes L cunront—limiting tlma—delay, dud—element (with pure elver links) fuses equal to Sussman / Provide materials and labor as required to result in a fully operational extension and modification to the existing fire PORTLAND, OR 90703 slam system. KRP—C (low pock? rated 600 volt, 60 Hz with 200.000 RMS symmetrical Interrupting current rating for protecting Eaton Electrical Inc.; Cutler—Hammer Business Unit transformers, motors, dreult—breakers, service entrances and distribution feeders above 600 amperes. Wham Indicated se drawings remove existing fire dorm cess In affected areas and protect during demolition and General Electric Company, GE Consumer and Industrial — Electrical Distribution. construction phases goon and reinstall these existing devices as Indicated drawings. Relocate devices ian Indicated on drawings and extend conduit and wiring as required. Modify and/or extend related existing wiring using Siemens Energy and Automation. Inc. Provide UL pass RK1 time—delay, dual—element (with pure elver links) fuses equal to Busamon SPS—RK1 (500V) or code—compliant and landord—canpllont methods as required for a complete operational system. Square D; a brand of Schneider Electric. Sussman #LPN—RKt (2501) rated 60 Hz with 200,000 RMS symmetrical Interrupting current rating for protecting Provide fire dorm system devices (duct smoke detectors, pull stations, A/V dam Indicating devices, area smoke ISSUE DATE: Transformers shall be factory-assembled and —tested, air—coded units for 60—Hz service, grain—oriented, non—aging service entrances and distribution feeders 600 amperes and below. detectors,) of the sone manufacturer as, compatible with, and UL Listed and labeled far use on, the existing NO. DATE DESCRIPTION s, silicon steel coreand listed far a continuous operation at listed kVA. Provide terminal enclosure, with cover, to building fire dm system. accommodate primary and secondary cal wring connections, and to accommodate electrical supply raceway terminal provide UL goes iK5 firms—delay, dud—elamant (with pure silver links) fuses egad to Busaman SPS—RK5 (600V) or Provide auxiliary contacts if required for ectal applications. All strobe dorms shall be compliant with NFPA and 12-11-15 SUED FOR LAN connectors. Provide terminal leads with connectors Installed. Provide wiring connectors sultalble for copper or Sussman ss 4 2im rated 60 l— with t (with RMS symmetrical Interrupting current math far tectIn aPP PERMIT AND LANDLORD aluminum wiring. Cole shall be continuously wound capper windings without splices other than at the taps. Col " ( yr►n P 9 9 Pr° g ADA EMEw connections shall be brazed or pressure type. general duty motors. Install wall—mounted devices at the following heights above finished floor. Enclosures shall be NEMA 250 Type 1 for Indoor applications and Type 3R for mdollor applications. Transformer Fre Alarm Manual Pull Stations: 46" to top of operating hands. enclosures shall be gray In color. Provide factory fuse Identification labels, Installed on the Inside of the door of each switch Indicating type and size Fre Alarm A/V Annunciators: 80 to bottom of outlet bo)L Insulation shall be 220 degree C. UL—component—recognized Insulation system with a maximum of 150 degree C rise of fuses Installed. For types and ratings required, fumbh additional fuses, amounting to 10 percent of fuses above 40es C ambient tomerature. supplied, but not less than one set of 3 of each kind degr D All new wiring shall be Installed In strict accordance with manufacturer's requrnmanta Coordinate size and location of concrete bases with actual transformer provided. Cast anchor—bolt Inserts Into The Installation shall Include a complete system tot of the equipment by the load representative of the system bases. Concrete, reinforcement and formwork requirements are specified with concrete. Coordinate structure—hanging Each fuse shall be dearly factory marked with classification, characteristics, ampere ratings, voltage ratings, eta Installed. This test shall be performed In the presence of representatives of the Owner, and toed its department supports/wall—mounting supports with actual transformer that Is provided. Fuses shall not be shipped Installed In switches nor shall they be Installed In the equipment until the equipment until and other his tee If hallappbebls. Transformers shall have a minimum number oft a as follows: the equipment Is ready to be energized tape Provide all required modifications (cards, power supplies, hardware, frmwore, software, etc.) to the existing Fre Smaller than 3 kVA: One 5X tap above normal full capacity Nam system as required to render the entire extension fully operable. Between 7.5 and 24kVA: One 5X top above normal fullcit Prior to installing fuses for protection of spedfic equipment, motors, etc., verify recommended fuse size/type In field cops yfrom respective equipment manufacturer. If a conflict In fuse size/type results between manufacturer's Provide all required 20A/120VAC power as/if required to energize all new fire darts related components. This Above 24kVA Two 25X taps recommendations and above specifications, contact engineer. Provide all required fuses under base bid. Install fuses requirement applies whether or not such power work is shown on the drawings. Branch circuits serving fire alarm above and four ry X taps below full capacity. related equipment shall be dedicated to fire darts related equipment only. Maximum sound levels when fact tested according to IEEE C57.1291 shall be as follows 2 fused switches cry 9 26 28 16.00 — ENCLOSED SWITCHES AND CIRCUIT BREAKERS The audio/visual and visual—only alarm Indicating devices shall the rod ADA—compliant units (with minimum 75 Smaller than 9kVA 45d8 Subject to compliance with requirements, provide equipment of one of the following manufacturers: candela ADA—compliant strobes) wall mounted at 6'8' to bottom of outlet box as shown on plans. Strobe units shall 30 to 50kVA: 45dB be synchronized wherever required by any authority having jrrisdiction. Including ADAAG. Additionally, where required 51 to 150kVA: 5OdB General Electric Co by local authority, the strobes must most ANSI S3.41 temporal code. 26 24 16.00 — PANELBOARDS Slemons/ITE Provide Isolation modules as/if required to iodate wire to wire shorts on a data loop to limit the number of other Subject to compliance with requrements, provide panelboard products of one of the following (for each type and aro D Co modules or detectors that ars Incapacitated by the t circuit fault and/or grounds. Isolation modules shall be lb rating of paneoard and enclosure): Square D Company, General Electric Company, Siemens, Eaton/Cutler—Hammer. Mort of the smoke detector boss. The isolation modules shall permit the entre system to operate Independently of Westinghoues/Cutler—Hammer the area disconnected by the isolation module due to wring faults. Ponelboords shall bear UL labels for their specific applications. Ponelboords shall be suitable for service voltage with Provide monitor modules as/If required to interface anon—Intelligent• devices Into the system as shown on the number of branch circuits of capacity scheduled. Unless otherwise Indicated, panelboards and sections thereof, if any. Disconnect switches shall be equal to Square D Type HD. All Safety Swkches/Oieconnects ohdl be heavy duty, safety drawings. shall hove main—lugs—only of capacity equal to, or greater than, the rating or setting of the over the current type, quick make and quick break and externally operated. Unless noted otherwise on drawings or dreeted otherwise Provide control modules for all auxillary devices and dl supervised control functions such as or handler shutdowns. protective device next back on the line. All ercuit breaker panelboard bus assemblies shall be of the distributed In field, all disconnect switches shall be fused. Unless noted otherwise on drawings or directed otherwise In field, Provide ceiling mounted smoke detector located above each Fre Alam Control Unit (FACU), if not already existing. QF (sequence) bussing type throughout, so that any 2 adjacent single pole breakers and/or spaces shall be replaceable brace dl disconnect switches for 200,000 A.I.C. Provide heavy—duty switches, with fuses of classes and currant provide csilIn mounted smoke detector located above sock remote satellite canted and power units FSS by a 2 pole intend common trip breaker, and any 3 adjacent single pole breakers and/or spaces shall be ratings Indicated and UL listed for use as service equipment under UL Standard 98 or 869. See Section 26 28 13.00 9 remote/satellite ?Cezz �15,9 'I�i�F %, for fictions. Where current limiting fuses are Indicated, provide switches with non—interehan edible feature Provide all required 120VAC power as required to energize all new fire dam related components. This requirement q replaceable by a 3 ode Internal common trip breaker, 15 amp through 70 amp Inclusive, without disturbing any suitable only for current limiting type fquse& Install disconnecswitches within sight of controller position union applies whether or not such power work Is shown on the drowin s. Branch ereults serving fire dorm related 32other breaker. All panelboarde shall be UL listed and labeled for use as seMce entrance equipment where being used yotherwise Indicated equipment shall bs dedicated to fire alarm related equipment only. �/as such. 28 29 13 00 — ENCLOSED CONTROLLERS I v17�lPI equ P eq Pm g ( ype g): 0ON Subject to compliance with requirements. provide equipment of one of the following for each t and raters 208Y/120V panelbcards shall be equal to Square D NOOD with bolt—on branch breakers Allan—Bradley Co. O All bussing shall be copper. General Electric Co. Slemans/ITE All branch circuit breakers shall be full ambient compensated thermal magnetic molded owe with quick—make and mare D Co. I EXr"IRATION DATE:/ / /, quick—break action and positive handle trip Indication, both on manual and on automatic operation. Breakers shall be Westinghouse/Cutler—Hammer of the over—the—center toggle operating type with the hands going to a position between •on• and aofr to Indicate automatic tripping. All breakers shall be bolt—on type. Except as otherwise Indicated, provide motor starters and ancillary components; of types, sizes, ratings and electrical characteristics Indicated, which comply with manufacturer's standard materials, design and construction In accordance DRAWING TITLE: All circuit breakers shall be full size. •Tandem• or 'split' breakers shall not be permitted. All multi—pole breakers with published product information, and as required for complete Installations. All staters shall be equipped with shall have Intend common trip with all load side box lugs of one breaker In the some gutter. All arouit breakers plot lights. All starters shall be sized according to load being served or as noted on drawings, whichever shall have sealed cases to prevent tampering. All 15 and 20 ampere branch circuit breakers @hail be UL Llated as requirement Is lager. Manual and magnetic starters thermal overload elements shall be rated between 115X and = SWD (switching duty). All 15-70 ampere branch circuit breakers shall be HACR Type. All GFCI circuit breakers shall 125X full load current or as called for under NFPA 70. Install and connect capacitors furnished by HVAC Contractors ELECTRICAL be UL pass A with maximum threshold of 5 mA. All branch circuit breakers serving all ballasted (fluorescent/HID) ahead of overbods where applicable. x lighting loads shall be HID rated. SPECIFICATIONS o Provide single—phase AC fractional HP manual motor starters, of sizes and ratings required. Equip with manually < Provide all electrical distribution related equipment with appropriately braced bussing and properly rated breakers, operated quick—mace, quick—break toggle mechanisms; and with one—piece melting alloy type thermal units. Equip fusesetc. for the available fault currents. with thermal overload relay with field adjustment capability of plus or minus 1OX variation of nominal overload heater rating, for protection of fractional HP motors as shown on drawings. Stater shall became Inoperative when thermal 0 In existing buildings where fault current values are not Indicated an drawings, coordinate with existing upstream unit Is removed Provide starters with double brook silver alloy contacts visible vle from both sides of starter grow distribution equipment provide equipment AIC ratings to nest a exceed same plot lights, and switch capable of being pododced—OFF. Manual Starters shall be equal to the following. Manual Starter In Finished Areas: Square D /2510 or Allen—Bradley Bul. 600-70X109 flush mounted, 2—pole toggle Fill out panalboard's circuit directory card upon completion of Installation work. Directories shall be neatly typewritten. switch type with now plot and NEMA 1 Type B enclosure for flush wail Installation. PROJECT NO: All ponelboard directories shall Include the actual room nano/numbers that are selected for Interior Manual Starter for Exposed Conduit Installation: 15428signage/designation. Square D /8536 or Allen—Bradley Bul. 600—TAX109 surface mounted, 2—Pols toggle o switch type with neon plot and NEMA 1 Type FG-2P enclosure for surface wall All recessed panelboards shall be provided with a minimum of three 1-1/4' empty conduits terminated to a single installation. 120 X 12' X ' deep Junction box above accessible calling. Provide AC motor starters, of types, ratings and electrical characteristics required for specific applications. Provide DRAWING NO: 6 m 26 27 26.00 — WIRING DEVICES staters with thermal overload relays, with field adjustment capability of plus or minus 10 percent variation of Unless specifically Indicated otherwise, or directed otherwise in field, provide Ivory calor for normal utility wring nominal overload heater ratingfor protectkxn of motors as shown on drawings. Coordinate specific coil voltage devices. Union specifically indicated otherwise, or directed otherwise In field, provide gray color for standby utility requirements (case—by—case) In field with the respective installer who is providing the equipment to be served. E 5 0 0 wiring devices. Unless specifically Indicated otherwise, or directed otherwise In field, provide red color for emergency Provide extend quick—maks/quids—break non—fused disconnect switch In cover. Provide external 'HAND—OFF—AUTO" utility wring devices. (HOA) selector switch in cover (for local or remote control as required based on respective application). Provide g external pilot light In cover. Provide external reset button in cover. Provide Form 2 NC/NO auxiliary contacts (rated