Loading...
Report (10) q STREET TREE TIGARD CER TIFI CA TION I, Ax,,,2 c/-Aaa , owner/agent for 72 f.27), e /✓s 7,4v(f.---3 (PLEASE PRINT) (PERMIT HOLDER) do hereby cert that the following location meets City of Tigard land use and development standards for street tree installation and is consistent with the approved site plan. PERMIT NO.: "75.7Z2/' a2/55 SIl ADDRESS: /7/ ��f /7. 1' �/" SUBDIVISION: g"1 "1 LOT,/'�� � 5 LOT #. / SIGNATURE: DATE: 77/1//:/:.‘ye" -. (OWNER/AGENT) RECEIVED & f VERIFIED BY: DATE: (CITY OF TIGARD) Tree location verified per approved site plan. I:ABuilding\Dorms\StreefI'reeCertificate 05/30/2012 hNtY✓ 1ta.' .. _ 1ltt 2`i t CI f2 rt. S 11_ All Time Heating LLC Po Box 1341 Lake Oswego, OR 97035 503) 208-2276 rruleu Huuress: i 1-112Ve. S, It 1e7 .__ HVAC Permit #: Builder/Owner: s', �^ Contact Phone Number: Mechanical Summary: Duct Tightness Verification (DTV) Tool used to conduct the duct tightness test: duct blower C7 blower door subtraction method El flow hood Unless all ducts are located within conditioned space, one of the following must be verified (indicate one): Post-construction duct leakage to outdoors is 5_ 8 cfm per 100 ft2© 25 Pa 0 Post-construction total duct leakage is 5 12 cfm per 100 ft2© 25 Pa ❑ Rough-in total duct leakage with air handler installed is 5 6 cfm per 100 ft2© 25 Pa ❑ Rough-in total duct leakage without air handler installed is 5_ 4 cfm per 100 ft2 @ 25 Pa Square footage of conditioned floor area served by HVAC system: 3 C)4L ft2 Test leakage measurement at 25 Pa: [ cfm Formula: cfm25 x 100 / ft2 of conditioned floor area served = Duct Leakage Result cfm2S x 100 / , ` ft2 of conditioned floor area served = , cfm leakage/100 ft2 Test Conducted by: Date Test Conducted: HVAC Contractor: --�— HVAC Master # The master contractor must sign and date below, A duct leakage test has been performed on the HVAC system at the above location by me or someone employed by me. The duct system meets the minimum leakage requirements as outlined in the 2009 International Energy Conservation Code, I am responsible to submit accurate test results to the permitting authority before final HVAC inspection. HVAC Master Signature: _� ��_ Date: Oregon Residential Specialty Code R318.2 MOISTURE CONTENT ACKNOWLEDGEMENT FORM I d---.7:- 1-(211,/ (,,,/1( Tit(, , am the general contractor or the owner-builder at the following address: Site Address: /� �/� // City: n Permit #: Subdivision/Lot#: 14 ,,,,i7""77 /rlr„�� Z, It1 and/or �// Map and Tax Lot#: To conform with the 2008 Oregon Residential Specialty Code (ORSC), Section R318.2 and OAR 918-480-0140, I am notifying the building official that I am aware of the moisture content Requirement of ORSC Section R318.2 and have taken steps to meet this code requirement. [Section R318.2 is provided for reference]. R318.2 Moisture Content: Prior to the installation of interior finishes, the building official shall be notified in writing by the general contractor that all moisture-sensitive wood framing members used in construction have a moisture content of not more than 19 percent by dry weight of dry framing members. Signature: 1 Date: ) / .1 General Contract r caner-Builder z I:\Building\Form\RES-MoistureSensitiveWood.doc 09/25/08 i Oregon Residential Specialty Code N1107.2 HIGH-EFFICIENCY INTERIOR LIGHTING SYSTEMS Permit No.: A15-7- O i5. 00055 Jurisdiction: 7i Site Address: / ,/,;._6, 5-4/ 110 cif � Subdivision/Lot#: '1/7,44/ /r and/or Map and Tax Lot#: By my signature below, I certify that a minimum of fifty(50)percent of the permanently installed lighting fixtures in the above mentioned building have been installed with compact or linear fluorescent, or a lighting source that has a minimum efficacy of 40 lumens per input watt. (Oregon Residential Specialty Code N1107.2)1 Signature: ,,_„ 7--"-"/-72 Date: 7 /. 1 Owner/General c tractor/Authorized Agent Print Name: YY2 <D9 ORSC Section N1107.2.High-efficiency interior lighting systems. A minimum of fifty(50)percent o the permanently installed lighting fixtures shall be installed with compact or linear fluorescent,or a lighting source that has a minimum efficacy of 40 lumens per input watt. Screw-in compact fluorescent lamps comply with this requirement. The building official shall be notified in writing at the final inspection that a minimum of fifty percent of the permanently installed lighting fixtures are compact or linear fluorescent,or a minimum efficacy of 40 lumens per input watt. I:\Building\Forms\RES-HighEfficiencyLighting.doc 07/01/08