Plans 824 SE 12th Avenue
Portland,Oregon 97214 FIELD OBSERVATION REPORT pc.,ca- f NT"'
Tel(503)616-9425 f4C3i2Tiit T
www.gcnweb.com
PROJECT ID DATE REPORT NO.
1062 -Summit Ridge August 4, 2016 26
OWNER/CLIENT OWNER/CLIENT REPRESENTATIVE DAY OF WEEK PAGE
D R Horton (DRH) Don Durst Thursday 1 of 1
GENERAL CONTRACTOR GENERAL CONTRACTOR REPRESENTATIVE ARRIVAL TIME DEPARTURE TIME
DHI Todd Kurilo 0700 0800
GRADING CONTRACTOR GRADING CONTRACTOR REPRESENTATIVE WEATHER/TEMPERATURE PERMIT
G-Cam Excavation Sergey Sunny, 73° F Project# 1062
TYPE OF WORK SOURCE AND DESCRIPTION OF FILL MATERIAL GCN REPRESENTATIVE
Structural Subgrade NA Robert Pendell
LOCATION OF WORK CONTRACTORS EQUIPMENT OBSERVED IN USE
Lot 144
CONTRACTOR ACTIVITY,OBSERVATIONS,CONCLUSIONS,RECOMMENDATIONS:
I made this visit at the request of Don Durst to observe the excavated structural subgrade for lot 144. I used a 14 inch
diameter steel foundation rod to probe footing subgrade.
During the probe I observed the structural subgrades to be very stiff soil.
In our opinion the building pad has been prepared in general accordance with our recommendations and will support
expected foundation for a single family home.
A Preliminary report is provided solely as evidence that the field observation was performed. Observations,and/or conclusions,and/or recommendations
® FINAL 0 PRELIMINARY conveyed in the final report may vary from and shall take precedence over those indicated in a preliminary report. A final report is an instrument of
professional service. Any conclusions drawn from this report should be discussed with and evaluated by the professional involved.
ITEMS TO OBSERVE,CHECK,OR TEST DURING NEXT VISIT
FIELD REPRESENTATIVE SIGNATURE
J,, DATE
Ro r n eA� Aug 4, 2016
GCN's professionals are represented on site solely to observe operations of the contractor identified,to form opinions about the adequacy of those operations,and to report those opinions to our client.
The presence and activities of our field representative do not relieve any contractor from its obligation to meet contractual requirements. We rely on the contractor to comply with the plans and
specifications throughout the duration of the Project.irrespective of the Presence of our representative.The contractor retains sole responsibility for site safety and the methods.operations,and seauences.