Loading...
Permit (43) CITY OF TIGARD BUILDING PERMIT '' COMMUNITY DEVELOPMENT Permit#: BUP2016-00249 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 08/17/2016 Parcel: 1S136AA00400 Jurisdiction: Tigard Site address: 6909 SW OAK ST Project: Oak Street Estates No.2 Subdivision: 2007-031 PARTITION PLAT Lot: 2 Project Description: Demolition of 1,064 sq.ft.house,631 sq.ft.garage,and 256 sq.ft.shed.DEMO CREDITS FOR SDC FEES WILL APPLY UPON FINAL INSPECTION. Contractor: LANDIS&LANDIS CONSTRUCTION LLC Owner: MCGUIRE, SUSAN 0 PO BOX 50 6909 SW OAK ST MARYLHURST, OR 97036 TIGARD, OR 97223 PHONE: 503-320-9443 PHONE: FAX: 503-213-5964 Specifics: FEES Description Date Amount Type of Use: SF Class of Work: DEM Type of Const: Permit Fee-Additions,Alterations, 08/17/2016 $347.48 Demolition Occupancy Grp: Occupancy Load: Erosion Control w/Development 08/17/2016 $80.70 Dwelling Units: 0 Info Process/Archiving-Sm$0.50(up to 08/17/2016 $0.50 Stories: 0 Height: 0 ft 11x17) Bedrooms: 0 Bathrooms: 0 Value: $18,000 Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $428.68 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a cop • . . • direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: --rmitteeSignature: Th, Vi , / . .�I r" _ .�.-mss_ _ / • 39.4175 by 7:00 a.m.for the next availa. . _.2-i0TIrktel This permit card shall be kept in a conspicuous place on the job site until com. ion of the project. Approved plans are required on the job site at the time of each inspe tion. .111111111111, Building Permit Application . Residential M r ro` "a I ,� w��h{N2�OPII(`I C'ti[.011.1 ' Cityof Tigard � " ` " Receivedt ,` ►'' 71, i a A- ' . 13125g '; Date/13 : Permit No.: SW Hall Blvd.,Tigard,OR 97223 Plan Review Phone: 503.718.2439 Fax: 503.598.1460 l 1� Other Permit: _ _ --r/"a I I A RR DatelB : r i,;A k D Inspection Line: 503.639.4175 ` l 1- s lJ' Date Ready/By: RI See age for Internet: www.tigard-or.gov ��11 , atifted/Method: ,�j-. Supplemental Information i i i,� 44,', TYPE OF.WOR[ t - 4 1 iO REQUIRED DATA:I-AND 2-FAMILY DWELLING ❑New construction ®D � Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ❑Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑1-and 2-fami!Y dwellin Valuation: $18,000 g ❑Commercial/industrial 0 Accessory building 0 Multi-family Number of bedrooms: ❑Master builder ®Other:Demolition Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address:6909 SW Oak St. New dwelling area: square feet City/State/ZIP:Tigard,OR 97223 Garage/carport area: square feet Suite/bldg./apt.no.: Project name:Oak Street No.2 Covered porch area: square feet Cross street/directions to job site:SW Locust St.and SW 69th Ave. Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.:IS 136AC,Lot 400 Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Demolition of existing house,detached garage,and shed. Valuation: $ j ol )-Cir' Existing building area: square feet New building area: square feet i7-4 PROPERTY OWNER 0 TENANT Number of stories: w Name:Biggi Construction,LLC Type of construction: Address:11605 SW Normandy Ln Occupancy groups: Lis ity/State/ZIP:Wilsonville,OR 97070 Existing: Phone:(503)682-7292 Fax:(503)625-3510 New: ❑ APPLICANT ® CONTACT PERSON * BUILDING PERMIT FEES Business name:AKS Engineering and Foresty,LLC (Please refer to fie schedule) Structural plan review fee(or deposit): $225.87 Contact name:Paul Sellke;Shawn Markman Address:12965 SW Herman Rd ct) FLS plan review fee(if applicable): City/State/ZIP:Tualatin,OR 97062 Total fees due upon application: Phone:(503)563-6151 Fax::(503)563-6152 Amount received: I E-mail:pauls@aks-eng.com;markmans@aks-eng.com PHOTOVOLTAIC SOLAR PANEL SYSTEM EES* CONTRACTOR Commercial and residential prescriptive installation of roof-top mounted PhotoVoltaic Solar Panel System. Business name: / ,c/ 's.. i I/S, /;,s C-2._C_ Submit two(2)sets of roof plan with connection details C // and fire department access,along with the 2010 Oregon Address: /?e f)., S-e) Solar Installation Specialty Code checklist. City/State/ZIP: /,jkC--)ie Cj- ' / Permit Fee(includes plan review ✓�-j G t0 and administrative fees): Phone:(57.3) )[7 ._ei 4.1 Fax:( } 3 State surcharge(12%of permit fee): CCB lic.: Total fee due upon application: Authorized signature: y" a This permit application expires if a permit is not obtained j '`"""''� within 180 days after it has been accepted as complete. Print name: * f Date: *Fee methodology set by Tri-County Building Industry i 4 G: 4:&..- kJ L1\51 �1 i�f G� Service Board. I:\Building\Permits\BUP-RESPermitAppoc 02/24/2011 440-46131(1 1/02/COM/WEB) City of Tigard q COMMUNITY DEVELOPMENT DEPARTMENT ill I T I G A R D Building Permit Review — Residential Building Permit #: o Civ--- 00,21 Site Address: 6 9o9 ----a,0 C ��„eg- Project Name: c 2 d les ,4JJ, Lot #: (New dwelling=subdivision name;Addition or Alteration=last name of owner) Planning Review Proposal: __ G2 ®,11 e2.P -'X> 75 k,-e, ,f9e,„9,62jt a. ia,C sAec TA Verify site address/suite# exists and actio in permit system. 1 11 °''ver Terrace Neighborhood: Vti No ❑ Yes,See River Terrace Review Addendum Attached S'te Plan Elements: III I'd ree(3)copies of site plan xisting structures on site fl• •' e plan must be on 8-1/2"x 11"or 11 x 17"paper otprint of new structure(including decks)with finished yawn to scale(standard architect or engineer scale) oor elevationsrth arrow Utility locations(required for new,may apply for additions) 5tte address,project or subdivision name and lot number °,cation of wells/septic systems CApplicant information(name and phone number) 1A Existing trees to be retained with drip line,and tree In Lot dimensions and building setback dimensions protection measures 0 Lot area,building coverage area,percentage of coverage and et tree size,type and location " impervious area(applicable if R-7,R-12,R-25&R-40) Street names ❑Property corner elevations(2 foot contour lines if more than 4 foot differential) ❑ Clean Water S ces-Service Provider Letter (lot platted prior to 9/10/1995): quired: V Yes,applicant was notified ❑ No Received: j Public Facilitie mprovement(PFI)Permit: �Jl�`��' /' �jJ equired: Yes,applicant was notified ❑ No Applied For: yes ❑ No,stop intake rfilik and Use Case#: �( �/� —���� ICJ Zoning: P- 1/,5- Setbacks: Front Rear Side Street Side Garage Landscape Requirement: Lot Coverage Maximum: Building Height: Maximum Height Actual Height Visual Clearance /Easements ensitive Lands: Yes ❑ No Type Lao- 14.7/j /7h„.4/Re Urban Forestry Plan ❑ Conditions "Met"prior to issuance of building permit Notes: Approved By Planning: Imo' ,fi<... : Date: e3//s-h4„, Revisions (after Building Submittal only) Reviewer Date Revision 1: E Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved I:\Building\Forms\BldgPermitRvw_RES_0601 I 6.docx Building Permit Submittal Original Submittal Date: aIrr/i/ Site Plans: # ` Building Plans: # Al„a Building Permit#: nter building ppermitt## ove. Workflow Routing: [� �an—nen ing ® gineering ermit Coordinator Workflow Sign off: L,�:-.},0off for Planning(include notes from planning review) Route Application Documents: L5"Engineering: (1) copy of permit application, (1) site plan, (1) building plan and ,�, original plan review routing form. L Sutldtng: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. tt Notes: i/i ce ;c am— /e XAJ/”re- - e-LieA.7-per v` e , & e//s -A By Permit Technician: �_ Date: S !S �16, Ingineering Review Slope at building pad: Conditions "Met"prior to issuance of building permit Easements (encroachments)per engineering conditions of approval and plat Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes ❑ No Assess Water Quantity Fee in-lieu: ❑ Yes No LIDA Facility on lot: ❑ Yes No ❑ NOT Approved by Engineering: Date: Notes: i Approved by Engineering: i AI Date: ,+r .6.--fir,.., Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: ❑ SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes ❑ N/A Tigard Trans SDC: ❑ Yes ❑ N/A Parks SDC: ❑ Yes ❑ N/A K to Issue Permit Approved by Permit Coordinator: //�y�v;% "Ate: .8-//1116( I:\Building\Forms\BldgPermitRvw_RES_060116.docx ✓� / rig/ � 7s .lam