03/22/1995 - Packet ; rvirig Tigard, K`:: xy., Durham rrrad lnincar�orated'Area
AGENDA
Wednesday, March, 1995
" 530
1.
:Call to:Order
2. Roll Call and Iritroductions
3. Visitor Comments
4. Approve:March.08, 1995 Meeting Minutes
5. Well #2 and:#3 Maintenance Program
6. Baylor Intertie Project>
7. Draft:IGA with Tualatin Valley Water District
8. Non Agenda,Items
9. Adjournment
Executive:Session:. The..Intergovernmentaf.Water Board.may go.into Executive
Sesssion under. :the provisions: of ORS 192.660 (1) (e); to: discuss real property
transactions.
INTERGOVERNMENTAL WATER BOARD
MEETING MINUTES
March 8, 1995
BOARD MEMBERS PRESENT: Bill Scheiderich, Paul Hunt, Violet Yager, and Beverly
Froude
STAFF PRESENT: Ed Wegner, Randy Volk, Mike Miller, Mary Gruss, and
Kathy Kaatz
VISITORS PRESENT: Jack Polans
1. Call to Order
The meeting of the Intergovernmental Water Board was called to order at 5:30 p.m.
2. Roll Call and Introductions
Roll call was taken and all members were present with the exception of Peggy
Manning.
3. Visitor's Comments
Mr. Jack Polans quoted from the January 24, 1995 letter of intent from former
Commission Morgan and stated that he wanted to discuss the revenue analysis but
would wait until another time to discuss. Mr. Polans referred to the January 12, 1995
agenda item of the City of Tigard 3.2 (Water Rate Analysis) and stated that he was
concerned about the proper consultant being hired. Mr. Polans also discussed the
January 11, 1995 meeting agenda of the IWB and the issue of negotiations with Lake
Oswego.
Chair Scheiderich stated that Mr. Polans would need to address any further issues at
another time since visitor's comments are limited to five minutes. Mr. Polans stated
that he would write a letter to finish addressing these issues.
Mr. Polans questioned whether the IWB Board is an independent advisory board to the
City of Tigard? Mr. Polans questioned whether the board made its own observations
of the facts presented? Chair Scheiderich stated that observations and
recommendations was the appropriate term. Mr. Polans stated that he feels
uncomfortable with the amount of influence from the staff of the City of Tigard.
Chair Scheiderich stated that there is nothing inappropriate with the City of Tigard
being represented on this Board nor with it supplying the staff. He also stated that
Council President Hunt
does the Board a service by being on the Board and listening to the concerns of the
smaller cities who do not have control of the assets. Chair Scheiderich stated as to
updates on the status of negotiations there would be no reason to lack confidence.
Commissioner Froude stated that at both the meetings of the TWD and the IWB there
is always a Director's report which is stated as well as written in the minutes on the
interim and long term water supply.
Commissioner Yager stated that negotiations are going on in executive sessions with
Lake Oswego and Tigard and that is confidential. She also stated that there are
regularly scheduled meetings as well as a time line. She stated that reference has
been made to communications although the content has not been discussed. Ms.
Yager questioned whether there would be a progress report to be given at this time?
Chair Scheiderich stated that we are given verbal reports at every meeting. There may
be separate progress reports being given to the Tigard City Council but he doubts they
would be any different than is presented here.
Mr. Wegner stated that negotiations have been going on for approximately five
months and within this time period both cities have had major elections, which has
involved getting new members of councils brought up to date. Early in negotiations
it was decided that detailed information would be held in executive sessions between
the Tigard City Council and the Lake Oswego City Council. Mr. Monahan met with
the IWB back in December in executive session and brought the Board members up
to date on the status of negotiations. The new Mayor for the City of Tigard and the
City Manager have been meeting with the Mayor and the City Manager of Lake
Oswego in working out some of the concerns. As this progresses, the Board will be
kept up to date whether it be in an open meeting or an executive session.
Commissioner Hunt stated that in order to run meeting efficiently, he felt that visitors
comments need to be limited to a five minute presentation.
4. Approval of Minutes
Mr. Hunt made a motion to approve the minutes of the February 22, 1995 meeting
minutes as written. The motion was seconded by Commissioner Froude.
5. Rules, Rates and Regulations - Randy Volk
Mr. Volk stated that a draft was presented to the Board members on the Rules, Rates
and Regulations which were adopted by the 190 agreement last year, Exhibit A,
Chapter 12.10 (City Code). At the time of the IGA, the City of Tigard's attorney
looked over those Rules, Rates and Regulations and made some changes which were
adopted in the form that was presented tonight. The Accounting Department who
Intergovernmental Water Board, 3-8-95 Page 2
now takes care of the billing for the Water Department had made some changes and
also has made some slight changes in the operations which necessitates some
rewording. The old Rules, Rates and Regulations as they were adopted have been
crossed out and in bold print are the new recommendations. Exhibit B which was
approved but was not supplied tonight are the current rates.
Commissioner Hunt questioned item 12.10.070 - Credit for Water Leaks and whether
it should state that amounts over $165.00 can be appealed to the IWB? Randy Volk
stated that this may be covered in another section (Grievances, Power to Grant
Variances) but, if it is a concern it can be amended.
Mr. Hunt questioned (12.10.110 - Cross Connection Control Program) whether
irrigation backflows that are required to be inspected once per year, are being
enforced? Mr. Hunt concern is that we are requiring something that we are currently
not enforcing. Mr. Hunt also questioned whether the Water Department could make
a better deal on supplying backflow devices for the public?
Randy Volk stated that the Backflow Program which is currently in operation does deal
with commercial and fire lines, but the Water Department is beginning to make note
of the residential use of irrigation systems, so as to enforce these. Mr. Volk also
stated that there are only a few double check valves and RP's that are currently
approved by the State.
Mr. Hunt stated that the Rules, Rates and Regulations states that the meters are read
once every eight weeks. Mr. Hunt questioned whether this should state that the
meters are read at Department discretion?
Commissioner Froude stated that she felt that once every eight weeks is very specific.
Mr. Hunt stated that there
has been discussion to the reading time being changed and this would allow a little
more flexibility.
Mr. Wegner questioned whether this could be stated as meters will be read based
upon the policies set by the IWB and the Tigard City Council. This would allow the
flexibility if we were to change the reading times.
Commissioner Froude discussed who has access to these polices and the fact that
they are available to the general public, she felt they should be specific.
Mr. Wegner stated that these policies can be amended at any time by Resolution by
the IWB and/or the Tigard City Council.
Mr. Hunt questioned the Water Main Extensions (12.10.170) being in conflict with
City Reimbursements Districts. Mr. Wegner stated that he is checking with the City
Attorney's office and will let the Board know.
Intergovernmental Water Board, 3-8-95 Page 3
Mr. Hunt stated that the City of Tigard has a Reimbursement District policy which they
are in the process of re-writing. This policy states that any services that will service
others can form a District and collect back from them.
Randy Volk stated that in the memo from Ed Wegner it stated that the Board would
briefly look at this document and next month will discuss further. Randy Volk stated
that he would provide Exhibit B to the Board. Mr. Volk also thanked Mike Miller and
Mary Gruss for assisting with the updating on this document.
Mr. Wegner stated that if the Board members had any questions or concerns to let us
know and we will have those incorporated into draft number two for the next meeting.
6. 1995/96 Budget Review - Ed Wegner
With the Board's approval the Request For Proposal for Water Rate Study was
discussed next.
Mr. Wegner stated that he has already had some concerns voiced to him as follows:
a. #7 and #5 should be that they address the proposed Capital Improvement
Projects not identify them.
b. Page 11, #2 should read, the System Development Charges for the City of
Tigard by Economic Engineering Services.
C. Page 13, one typographical mistakes (structures).
d. Page 14, two typographical mistakes (payment will be in lump sum, and
authorized by.
We will be forwarding this draft with the above corrections and any others necessary
by the Board to the Tigard City Council for adoption. Mr. Wegner stated that the
consensus of the Water Department and the Finance Department was that this would
be completed by June 30, 1995, although it now appears it will be into July or
August.
Commissioner Froude questioned whether there is something in this document which
discusses overruns or the consultant not staying within their budget? Mr. Wegner
stated that the Contract will state that it will be for a lump sum.
Mr. Hunt questioned the time frame for preparation of bid and whether it allowed for
sufficient time. Mary Gruss stated that these dates can be adjusted.
Chair Scheiderich questioned whether this RFP would contain a scoring matrix or a list
of criteria on how they are to be evaluated? Mr. Scheiderich stated that this should
be placed in the RFP and state that these proposals will be evaluated on the basis of
following....
Intergovernmental Water Board, 3-8-95 Page 4
6. 1995/96 Budget Review - Ed Wegner
Mr. Wegner stated that he had presented to the Board a draft of the Water
Department budget overview requests. Mr. Wegner stated that at the April meeting
either Bill Monahan or himself will present to the Board a more detailed budget that
will be presented to the Budget Committee and the Tigard City Council. Last March
if referred back to the minutes of the IWB, it was discussed that the IWB has the right
to submit changes directly to the Budget Committee.
Mr. Wegner stated that we would be going through the line items and to discuss what
items are included in that line item and why the changes in percentages from the last
budget. Mr. Wegner stated that the r500 account lines items deal with staff and are
completed by the Finance Department with the exception of #505 and #520 and the
600 account line items deal with operations.
Mr. Hunt questioned why line item 551 .000 went down 74% (Workers
Compensation)? Mr. Wegner stated that this would need to be addressed by the
Finance Department.
Randy Volk discussed line item:
505.000. He stated that last year he had six part time help and four of those
worked directly with the Water Department and two were shifted to
work on the Grounds Crew which was to maintain the reservoir grounds.
520.000 Overtime covers both the call out and the on call person for the weekend
as well as any additional overtime necessary.
Mike Miller discussed line item:
600.000 Cost of Water. The reason for rising 27% are the increase in rates from
the City of Portland which increased 126% from last year. Mr. Miller
stated that Lake Oswego and Tualatin Valley Water prices are estimated.
Mr. Hunt questioned what else goes into the calculation of the 27% increase?
Mike Miller stated that he also calculated an increase in the Lake Oswego rates, these
rates have not been raised in the last two years and Tualatin Valley charges were
unsure so he calculated what they currently pay City of Portland and added some
overhead costs to that. Mr. Miller also stated that increased consumption is also
included in these calculations. Mr. Miller stated that we bought less than $62,000
water from Portland last year and then this year to jump to $142,000 is a big
increase.
Intergovernmental Water Board, 3-8-95 Page 5
Ed Wegner discussed line item:
601.000 Professional Services. This is where consultants are paid from. Last
November the City of Tigard entered into an Agreement with Murray
Smith and Associates (four year contract at $25,000 per year) has
increased this account as wells as a seismic and stress analysis on the
steel tanks.
Mr. Wegner stated that this week while cleaning the 10mg site, it was noticed that
there is a separation along the outside wall and there is a structural engineer coming
in Friday to determine the cause. This line item expense may be necessary.
602.000 Contractual Services.. This line item is up considerably since this year we
have combined budgets to better serve the City's accounting system.
This line items will include janitorial service, SCADA system
programming, heating and air conditioning service, answering service for
emergency calls. Mr. Wegner stated that if a responsibility is transferred
to another division, the money to provide for these services will continue
to come from that department budgets.
Commissioner Froude questioned the use of the building for night meetings, weekend
use, and the homeless shelter? Mr. Wegner stated that the Water budget has always
paid for that. He also stated that the Finance Department will be suppling a matrix
that outlines these charges which are divided among the different divisions within the
City.
Mr. Wegner also stated the 1 % of sales which also goes to King City, Durham and the
Tigard Water District comes out of the Contractual Services line item.
Bill Scheiderich questioned line item 704.000 - Office Furniture and Equipment. Mike
Miller stated that the Water Division is budgeting for a new software program from
Hansen Information and Technology. This program is currently being used for
maintenance purposes within Maintenance Services in Sanitary, Storm, and Streets.
This new software program will enable the Water Division to track maintenance of
valves, pumps and pumping facilities, timing of blowing off dead end lines, fire
hydrant repairs and maintenance. We are currently doing all these tasks manually
which is very time consuming. He also stated that this line items includes budgeting
for AutoCad software and workstation to bring the drafting capabilities of the Water
Division to the same level as the City's Engineering staff.
Mr. Hunt wanted to clarify whether this was an item that was used by various
departments or the Water Division? Mike Miller stated
that this was a large packet and this portion was strictly for the Water Division.
Intergovernmental Water Board, 3-8-95 Page 6
Mr. Scheiderich questioned line item 706.000 - Operation Equipment. Randy Volk
stated that this included the purchase of a $62,000 backhoe, but with trade-ins hope
to have down to $48,000. Another item included is a meter reading van for $17,500,
a 20 ton utility trailer, and shoring shield for $3,750. The trailer the Water Division
has currently is inoperable. This trailer,purchase will be shared by other divisions (2/5
Water, 2/5 Wastewater and Storm, 1/5 Street) as well as the shoring shield. The
Water Division is also sharing in the cost of a concrete cutter that the Wastewater
Division is purchasing. This line item includes a chlorination station which will add
chlorine to the water as needed prior to pumping up to Bull Mountain, sample stations
for water quality, SCADA upgrade to upgrade system and also a purchase of two way
radios which will replace existing incompatible radios.
Paul Hunt questioned if there were two meter reading vehicles? Randy Volk stated
that we currently have two meter reading vehicles that were purchased from TVWD
and were used before that by the postal Service.
Bill Scheiderich questioned the last time contracting out the meter reading services
was? Mr. Volk stated that this is discussed on a regular basis. Currently the meter
reading program is coming along fine, but when additional purchases are requested
the need to look at contracting those services out needs to be addressed.
Mr. Scheiderich questioned whether Tigard is a party to the sharing of equipment
within the area? Mr. Wegner stated that the City is involved in this, but a backhoe is
seldom available through other agencies.
Ms. Yager questioned the software purchase and how much projected savings there
will be? Mr. Wegner stated that all utilities within the infrastructure will be
computerized (all manholes, valves,, meters,fire hydrants). This software will have the
ability to generate workorders, monthly reports, accomplishments and will track
problem areas within the City limits. Hopefully within the first four months we will be
able to generate reports and within one year to eighteen months will have everything
City wide on this system.
Mr. Hunt questioned the vehicle purchases being contingent upon the meters being
read in house. Mr. Wegner stated that a determination will be made and will be
brought to the Board and the Tigard City Council by January 1, 1996 if this will be
done in house or contracted out, if contracted out the vehicle will not be purchased.
Mr. Wegner questioned whether the Board would like to have a individual copy of the
budget pages? The Board stated that they would prefer to have a written summary
as well as answers provided to the questions that were not answered at this meeting.
Mr. Scheiderich stated that if a written presentation is being made to the Budget
Committee he would like the Board to also receive a copy of that.
Intergovernmental Water Board, 3-8-95 Page 7
Mr. Polans questioned if this was the end of the budget discussion? Mr. Wegner
stated that he still had two more pages to discuss.
Mr. Wegner stated that another page submitted included all the Water Division
employees paid through the Water fund including all benefits. Also distributed is the
program summary which states last year goals, projected goals and objectives for
1995/96 and performance measures.
Mr. Polans again questioned if this ended the budget discussion? Chair Scheiderich
stated that this ended the preliminary review of the budget for this evening. Mr.
Polans asked if he could ask a question of'the Board. The Board declined answering
any .more questions at this point, but stated that Mr. Polans could direct those
questions to Mr. Wegner after the meeting, if time allowed.
7. Director's Report - Ed Wegner
Mr. Wegner requested the Board to hold a second meeting this month on March 22,
1995. Mr. Wegner stated that by the first of next week, we will have a draft
agreement of an IGA between City of Tigard and Tualatin Valley Water District to buy
surplus water from them for the interim supply. We will also have a cost estimate to
connect to Tualatin Valley at the Baylor Street location, and cost estimates for
improving to well #2 and #3. We would like to bring these to the Board on March
22nd and on March 28th take these to the Tigard City Council to begin the process
and have Baylor Street and the wells on line by July 1, 1995.
Mr. Hunt questioned if haven't reached an agreement with TVWD how can we set an
interim contract if we don't know what the interim will be (3 months to 13 years)?
Mr. Wegner stated that if long term contract with Lake Oswego is negotiated it will
take from 3-5 years. The interim IGA with TVWD states that we are looking for a long
term source and when that comes on board we will have the ability to remove from
the contract.
Chair Scheiderich pooled the Board in regards to a March 22nd meeting? The Board
was in agreement and the Chair questioned whether Mr. Wegner would notify Ms.
Manning?
Long Term Water. Mr. Wegner stated that the Mayors and City Mangers from City
of Tigard and Lake Oswego have met twice and they are both reporting back to their
respective City Councils Tuesday and hopefully will have the five major areas of
concern resolved. Mr. Wegner stated that at the
meeting on March 22, 1995 or the April 8, 1995 meeting he feels confident that Mr.
Monahan will address the Board and discuss the majority of the contract.
Chair Scheiderich stated that he would prefer that on one of those dates, he would
like to have something in writing or presented in person, what has been agreed upon.
Intergovernmental Water Board, 3-8-95 Page 8
Mr. Hunt stated that if Mr. Monahan does not feel comfortable discussing in a public
meeting than it should be addressed in executive session.
Mr. Wegner stated that even though the contract will be between the City of Tigard
and the City of Lake Oswego, the recitals state that the City of Tigard is representing
Durham, King City, and the unincorporated area.
Mr. Wegner stated that there is no new movement on the Willamette River Study. Mr.
Scheiderich questioned whether there would be any new movement until the State of
Oregon resolves Pacific Power and Lights claims to twenty times the volume going
over the Willamette Falls? Mr. Wegner stated that as soon as the regional study is
complete the lower part will move along according to Phil Smith (MSA) since this is
the area not affected by PGE claims. This study is tentatively due to be completed
by November. There should be a preliminary report completed in July and a final
report adoption by each entity in November. Mr. Wegner also provided the Board
with a copy of the last minutes from the Regional Water Supply Plan Participants
Meeting held February 21, 1995.
The City of Tigard has instructed the City Manager and the Director to make
application to the State of Oregon for water rights on the Willamette River. The
locations of these will be in the area that Tualatin Valley and Wilsonville have water
rights which is not in the area of the PGE claims.
Mr. Wegner discussed the results of the testing on the 10mg pumping sites which
stated that we would have the ability to draw down from about 16.5 feet to 6 feet
which could give us two million gallons of water more than last year.
Mr. Wegner stated that Lorry Christian who had been working in the Human Resource
Department has resigned and taken a position in the private sector. This will enable
the Water Division to utilize that position within the Water Division as a Utility Worker.
Mr. Wegner had also distributed a copy of the water conservation program through
Northwest Natural Gas and stated that the Water Division was very successful with
4,102 participants with a cost of a little over $6,000. Mr. Wegner also stated that
we are putting articles in the Cityscape this month which will be distributed to Durham
and King City. At the request of the TWD we will be checking into doing mail inserts
into all water bills or at the cost involved in doing a mailing to involve those occupants
to the unincorporated area.
Mr. Wegner stated that Murray Smith and Associates would be beginning the survey
of the land for the Menlor Reservoir site. This report should be provided within the
next six weeks.
Intergovernmental Water Board, 3-5-95 Page 9
Mr. Wegner also stated that as soon as the monthly report was available it would be
mailed out to the Board.
Chair Scheiderich questioned whether the City was pursuing any other water
conservation efforts? Mr. Wegner stated that the City has checked into the toilet bags
and double levers. We will be offering this Spring some seminars on irrigation
systems by the landscaping crew and the backflow crew.
Commissioner Froude questioned whether there would be any attempt to pursue
commercial customers lack of conservation measures. Mr. Wegner stated that we
have some brochures to encourage water conservation that we would like to send out
early this year.
Commissioner Yager stated that there was no mention in the Rules, Rates and
Regulations in regards to water conservation and penalties associated with. It was
discussed that we would prefer to educate on water conservation issues.
Commissioner Froude stated that there is a need for consequences. She referred to
U.S.A. rates being based upon usage. Ms. Froude stated that she felt the Board
should discuss this issue.
8. Non Agenda Items
No items were discussed.
Chair Scheiderich stated that comments on the Rules, Rates and Regulations needed
to be in by the March 22, 1995 meeting,. Mr. Scheiderich also stated that he would
defer until the meeting on the 22nd to set the April meeting.
9. Adjournment
Paul Hunt moved to adjourn which was seconded by Violet Yager. The meeting
adjourned at 7:00 p.m.
kathyliwbl3-8mtgAwb
Intergovernmental Water Board, 3-8-95 Page 10
t: w
InterOffice Memo
To: Ed Wegner
From: Michael Miller
Date: March 8, 1995
Subject: Bids for Pulling Wells 2 and 3
I had Richard Sattler contact several different companies regarding the pulling and
reinstallation of the well assemblies at well sites 2 and 3. He contacted a total of five
different companies, but only three provided a bid. None of the bids included replacement
parts for the wells.
Lane Pump Company of Pasco, Washington, indicated that they were too busy to do a site
inspection and submit a bid. However, they did provide a hourly estimate on the cost to
pull and reinstall the wells. Their cost estimate was for $200 per hour, plus the cost to
rent the crane or boom truck to pull and reinstall the wells. They would not provide a
projection on the time requirements to complete the work. Lane Pump Company, unlike
their well maintenance program in the mid-west, do not carry stock parts for our Peerless
pumps, nor are they willing to stock these parts just for our agency.
Ericksen Pump Company submitted a price quote of$6,500 to pull and reinstall the well
assembly at well 2 and $8,000 to pull and reinstall the well assembly at well 3. This price
includes the inspection of the well parts as the well is being pulled. As stated in the
beginningof this memo, these quotes do not include refitting or replacement of parts.
Mather and Sons Pump Incorporated, the same company that pulled well 1, submitted a
quote of $2,500 per site to pull and reinstall the wells. This price quote included the
pulling of the pump, inspection of the shaft and bearings, inspection of the bowl assembly,
tear down for inspection and reinstallation of the pump assembly.
Since none of the companies would submit a quote for replacement parts and labor, this is
because they do not know exactly what will need to be replaced, we have estimated that
the cost of the labor and replacement parts at $22.25 per foot of well shaft depth. This is
based on the actual costs incurred during the retrofit of well 1 to current industry
standards. For cost comparison purposes, I used the $22.25 per foot of well shaft depth
estimate for all three vendors.
Well 3 is also in need of chlorination equipment to chlorinate the water as it enters the
distribution system, and other additional work to comply with current well head protection
codes. The additional work at this site includes raising the well casing an additional T-0",
pouring of a concrete slab and a wood frame structure to protect the well and chlorination
equipment from the elements. Total cost for the chlorination equipment and well head
protection is estimated at $6,200.
In order to bring wells 1 and 2 into compliance with Oregon Health Division codes,
regarding the mixing of chlorinated and non-chlorinated water supplies, chlorination
Bids for Pulling Wells 2 and 3 03/08/95 Page 2
equipment was purchased and installed last year before they were operated. Therefore the
purchase of chlorination equipment for well 2 is not necessary this year.
Listed below are the quotes and cost estimates that we have received.
Mather& Sons Ericksen Pump Lane Pump
Well #2
Pull and reinstall $2,500 $6,500 $8,000
Repair/replace parts to bring well to $7,800 $7,800 $7,800
specification
Total for Well #2 $10,300 $14,300 $15,800
Well #3
Pull and reinstall $2,500 $8,000 $8,000
Repair/replace parts to bring well to $10,000 $10,000 $10,000
specification
Chlorination equipment $1,200 $1,200 $1,200
Improvements for well head $5,000, $5,000 $5,000
protection
Total for Well #3 $18,700 $24,200 $24,200
Grand Total $29,000 $38,500 $40,000
It is my recommendation that we accept the bid from Mather and Sons Pumps
Incorporated and begin the process for them to start pulling the wells as soon as possible,
so that we can have the wells on line before summer. As we have discussed on other
occasions, the usage of well water is an important part of our interium summer water
supply plan.
Although included in the overall cost, the chlorination equipment and most of the well
head protection work would not be supplied by Mather and Sons Pumps Incorporated.
However the estimates for the chlorination equipment and improvements for well head
protection are accurate.
CC: Randy Volk
Murra};Smi r&ARciw,Inc.
Enoeers/P niers 121 S.W.Salmon,Suite 1020 ■ Portland,Oregon 91204 PHONE 503-22x9010 ■ FAX 503.225-9022
94-0310.404
March 17, 1995
Mr. Mike Miller
Operations Manager
City of Tigard Water Department
13125 SW Hall Blvd.
Tigard, OR 97223
Re: City of Tigard Interim Water Supply - Proposed Baylor Street Intertie
Connection
Dear Mike:
In accordance with your request, we have prepared this letter that summarizes
preliminary engineering efforts for a proposed intertie between the City of Tigard's and
the Tualatin Valley Water District's (TVWD) water systems near Tigard's Baylor Street
Reservoirs. Included are proposed piping and valving at the intertie, a construction
cost estimate and scheduling considerations for the construction of the proposed
intertie.
Introduction
The September 1994 Water Supply Plan Update completed by the City of Tigard
presented recommendations for the development of a long term water supply to meet
the City's water needs to the year 2020. Included were recommendations for
providing interim water,supplies to the City as the long term water supply alternative
is developed. Among the recommended interim supply alternatives to be considered
were connections to the TVWD's water system.
A preliminary review of potential intertie locations has been completed by the City and
the District. This preliminary review found that a connection near the City's Baylor
Street Reservoirs.provided favorable hydraulic conditions for a potential intertie.
These favorable conditions include the close proximity of existing facilities and
pressure conditions suitable for gravity flow from the District to the City. A hydraulic
analysis of the proposed Baylor Street intertie and several other potential intertie
connections under consideration by Tigard and the TVWD has been completed by the
District. The analysis found that the flow rates available through the proposed Baylor
Street connection vary greatly depending on local TVWD demands. The analysis
determined that under estimated average day demand conditions approximately 0.7
million gallons per day (mgd) is available through the proposed connection. The
District is presently performing fire hydrant flow tests in vicinity of the proposed
connection to more accurately determine the actual hydraulic conditions near the
1
Mr. Mike Miller
March 17, 1995
Page 2
proposed intertie. The District is also reviewing potential piping modifications that
may increase flow rates available through the proposed connection.
Hydraulic Review
Tigard's two Baylor Street Reservoirs are located near the intersection of SW Baylor
Street and SW 66th Avenue. The reservoirs each have a capacity of 1.0 million
gallons, overflow elevations of approximately 416 feet and serve Tigard's 410-foot
service level by gravity. The reservoirs were originally provided with separate inlet and
outlet piping. The original inlet piping, presently not being used, was connected to an
abandoned 12-inch diameter main belonging to the old Capital Highway Water
District. This piping has since been connected to an existing TVWD 8-inch diameter
distribution main which included a 6-inch diameter flow meter that was removed,
rendering this connection inoperable.
A 12-inch diameter transmission main, originally used as the reservoir outlet piping,
now serves as both an inlet and outlet main to Tigard's 410-foot service level
distribution grid. The reservoirs are located approximately a mile from the
distribution grid. The water level in the reservoirs fluctuates only with change in the
hydraulic grade of the distribution system. The reservoirs have had occasional water
quality problems resulting from insufficient water circulation. A booster pump located
on the 12-inch diameter transmission main between the reservoirs and the
distribution system is available to pump water from the reservoirs into the
distribution system and to provide for increased water circulation in the reservoirs.
The TVWD presently provides water service to the area around the Baylor Reservoirs
through 8-inch and 12-inch diameter piping within the District's 498-foot service
level. The 498-foot service level is served from the District's SW Taylors Ferry
Reservoirs located near the intersection of SW 65th Avenue and SW Taylors Ferry
Road. These reservoirs receive supply by gravity through connections to the
Washington County Supply Line.
Proposed Intertie Connection
The proposed Baylor Street intertie would connect a 12-inch diameter distribution
main in TVWD's 498-foot service level to the original Baylor Reservoir inlet piping and
to the 12-inch diameter transmission main serving Tigard's 410-foot service level from
the reservoirs. Use of the original existing 8-inch diameter reservoir inlet connection
was considered, however, to maximize flows through the proposed intertie, connection
to TVWD's 12-inch diameter main in SW 68th Avenue was found preferable. The
proposed connection configuration also allows the use of a single water meter for both
connections to Tigard's piping.
Mr. Mike Miller
March 17, 1995
Page 3
This proposed connection configuration provides the opportunity for a direct water
supply into Tigard's 410-foot service level or into the original reservoir inlet piping
providing for improved water circulation in the Baylor Reservoirs. The existing
facilities and the proposed intertie connection are illustrated in Figure 1.
The proposed intertie connection includes piping, isolation valves, and a valve vault
containing a hydraulically controlled pressure sustaining valve with flow control
features and a flow meter. A schematic illustration of the proposed valve vault is also
shown on Figure 1.
Approximately 650 linear feet of proposed 12-inch diameter piping will connect the
TVWD distribution system at the intersection of SW 68th Avenue and SW Baylor
Street to the original inlet piping of the Baylor Reservoirs and to the 12-inch diameter
transmission main serving Tigard's 410-foot service level.
Three buried, manually operated isolation valves are included in the proposed piping
configuration. These valves will be used to direct the flow from the intertie into the
Baylor Reservoirs for eventual discharge into Tigard's 410-foot service level or to
bypass the reservoirs and provide a direct supply into the 410-foot service level.
The precast concrete valve vault is proposed downstream of the connection to TVWD's
system. The vault will contain an 8-inch diameter flow meter and an 8-inch diameter
hydraulic control valve.
The flow meter will serve as a meter for flow measurement and will include provisions
to electronically transmit flow rate information to the valve so that the flow limitations
of the intertie are not exceeded. The hydraulic control valve will be a pressure
sustaining type valve with settings and adjustments to allow flow through the intertie
without excessive pressure reductions to TVWD's distribution system in area of the
intertie. The valve will also include settings to limit the flow through the valve to the
predetermined amount. ,The flow meter will require electrical power for electronic flow
signal generation.
As part of this project Tigard should also examine the existing valving of the original
inlet piping at the Baylor Street Reservoirs to confirm that these valves and their
controls are in proper working order.
TVWD System Improvement
An additional system improvement will be required as part of this proposed intertie to
improve supply to the TVWD's Taylors Ferry Reservoirs. An existing 10-inch diameter
flow meter, referred to as the Florence Lane Meter, on the transmission main
connecting the reservoirs to the Washington County Supply Line will require
replacement with a new 16-inch diameter flow meter. Through discussions between
Mr. Mike Miller
March 17, 1995
Page 4
the City and District, Tigard has agreed to share up to $15,000 in the cost of this
meter replacement.
Construction Cost Estimate
The total estimated construction cost for completion of the proposed intertie and
Tigard's share of the Florence Lane Meter replacement is approximately $91,000. This
construction cost estimate for the intertie assumes construction by a private
contractor. Included in the construction cost estimate for the proposed 12-inch
diameter water main are connections, isolation valves, fittings, trench excavation,
backfill and surface restoration. Included in the valve vault estimated costs are the
pressure sustaining hydraulic control valve, flow meter and vault electrical supply.
Not included in the estimate are costs associated with improvements to Tigard's
existing telemetering system related to the intertie. An itemized breakdown of the
estimate is provided in Table 1.
Table 1
Construction Cost Estimate Summary
Item Estimated Cost
Water Main - 650 If of 12-inch diameter main $ 44,000
Valve Vault (Exclusive of telemetry improvements) 22.000
Subtotal $ 66,000
15% Contingency 9.900
Total Estimated Construction Cost $ 75,900
(Say $ 76,000)
Florence Lane Meter Replacement (Tigard's Share) $ 15,000
Project Schedule
Tigard and the TVWD are presently developing an intergovernmental agreement for
water service that provides the legal and institutional framework for the supply of
water from TVWD to Tigard. With the substantial development of the
intergovernmental agreement, further engineering efforts should be completed for the
proposed Baylor Street intertie. These include a design survey of the project site and
L v
Mr. Mike Miller
March 17, 1995
Page 5
the development of design drawings and contract documents for the construction of
the proposed intertie. Tigard may also consider purchasing the flow meter and the
pressure sustaining flow control valve in advance of project construction to minimize
acquisition lead times on these items.
Conclusion
The proposed Baylor Street intertie is one of several potential interim water supply
connections between the TVWD and the City of Tigard. The proposed intertie provides
for a gravity supply of water from TVWD's 498-foot service level into Tigard's 410-foot
service level. The estimated construction cost of the intertie and related system
improvements is approximately $76,000 plus an additional $15,000 for Tigard's share
of the Florence Lane Meter replacement.
We appreciate this opportunity to provide our services to the City of Tigard. Please
feel free to call me if you have any comments or questions related to this letter or the
proposed intertie connection.
Sincerely, PROF��,
MURRAY, SMITH & ASSOCIATES, INC. �S� G I H.LP
w 15039 9
U
Chris H. Uber, P.E. „ x o
Associate �y��sTOY 25.
MLH:cyh SHE
cc: Ed Wegner
I I
v LEGEND I 1r CI s" CI I
- - - - EXISTING MAINS - TVWD C1 - -I-- - --- - - - - - - ---- - - - - - - ---- - --- - - - ---------- - I
— — EXISTING MAINS - C17Y OF TIGARD I I — ` ' — — -`—— — — —�
PROPOSED MAINS I —_...............-_
D4 PROPOSED ISOLATION VALVES r !
EXISTING ALTITUDE VALVE
I EXISTING TVWD MAINSSERVING THE I j
A O S I SERVICE LEVEL 98
ABBR TYPICAL
EVI TI N / I I
DI DUCTILE IRON I
CI CAST IRON
�- FLOW DIRECTION I ' I w I
OMG F MILLION GALLONS
OVERFLOW ELEVATION I
TVWD TUALATIN VALLEY WATER DISTRICT
I I ORIGINAL EXISTING
zc f I 12-INCH DIAMETER I
w
I RESERVOIR INLET I
PIPING I
ark PRESSURE SUSTAININGI to
�I FLOW CONTROL VALVE
I
1 _
--^ ~_ — I CITY OF TIGARD BAYLOR
~I BURIED PRECAST ys. t0 I W' "�" ---- STREET RESERVOIRS I
I CONCRETE VAULT
I
1.OMG I
OF-416' PROPOSED
I M I RESERVOIR INLET I
I I I CONNECTION I
I SOI FLOW METER
SCALE: 1" 50' i N.T.S. I ABANDONED I
I 1.OMG METER VAULT I
OF=416' I
I I
PROPOSED INTERTIEf---Orr
I
——— —— — — — — CONNECTION I I SW B��.'LOR FT I PROPOSED TRANSMISSION
`� I
- -- - - - � - - - --------- 6" CI MAIN CONNECTION
_... I
I I - - - - —. •I ———
Icl
I - - -
PROPOSED VALVE
I & METER VAULT I I
I I I I EXISTING I
I ( POWER
I POLE Figure 1 MARCH 1995
I I I BAYLOR STREET INTERTIE CONNECTION
I EXISTING TIGARD CITY OF TIGARD - TUALATIN VALLEY
\ 12-INCH DIAMETER WATER DISTRICT INTERIM WATER SUPPLY
. I TRANSMISSION MAI
_... ._. ......................... 94-0310.104
MAR--15-95 WED 1E:05 MMAY, SMITH & ASSOC, FAX NO, 503 225 9022 P. 02
AGREEMENT V01t WATER SUPPLY
THIS AGREEMENT FOR WATER SUPPLY is made and entered into effective
1995, by and between the MY OF TIGARD. a municipal corporation [herein
called"City") and TUALATINf VALLEY WATER DISTRICT, a domestic water supply
district formed under ORS Ch. 264(herein called"District"),
RECITALS:
A. City is duly authorized and formed under statutes and ft's charter.
District is a domestic water supply district, organized and under the laws of
the State of Oregon_
H. City presently provides water servic i residents so pursuant
to separate intergovernmental cooperation is cervi to the citizens of
the Cities of Durham, King City and the Tigard Wat
C. IRS 190.003 to 190.110 units government to enter
into intergovernmental agreements for th or of their duties or for the
exercise of pou'lus aanfer them, agreements for the sale of surplus water
are expressly auth
D. Dthat it is in the best interests of its rate payers for
District to into tra or the sale of surplus water.
E. has agr that execution of a long-term agreement for the
purchase of water isWct will provide greater likelihood of reliable water supply
to city.
F. The service and aaoanodity provided by District are a special eontmet
service and are not provided by District as a common utility service.
THEREFORE, the parties agree as follows:
Page 1 -Agreement for Water Supply
3/15/95
DEAR-15-95 WED 16:05 MURRAY, SMITH & ASSOC. FAX N0. 503 225 9022 P. 03
f
1. SS p.Plv of SIUVIn Water @&d Term of AMmment
a. Subject to the other provisions of this Agreement. District will
furnish to City a Run supply of potable, surplus water for City's present water service
area for a ten(101 year period beginning July 1, 1995 through.lune$0, 2005, subject
to renewal,extension, or termination and on the terins and conditions as set forth in
this Agyreememt. The parties understand and agree that this Agreement is an interim
measure until City can secure a permanent source and that the City is presently
pursuing the development of a long-term water supply as ent source.
Therefore the City may, at its discretion, choose to pur urn water
purchase t<ivm District allowed under the terms ent a lesser
amount on a year round basis as on a seas ' t Ment basig. The
11� development of the long-term supply by the City a the City's actual meed
and use of water from the District wlti at the � of executing this
agreement be determined.
b. City the to purchase up to six (6)million gallons
per day of its water
2. W_JK other Ch of Or ti
Sho . the rmtire 'ce of City be merged, consolidated, or otherwise
joined with , or an lily created pursuant to ORS Ch. 460,then this
Agreement shall and void at the time of such transfer, and District or the
new entity shall beanie responsible for that portion of City's costs as set Earth in
Section 10 and 11.
3. Other Sources.
City will also obtain venter from other state-approved sources.
Page 2 -Agreement for Water Supply
3J15/95
MAR-15-95 WED 16:06 MURRAY, SMITH & ASSOC. FAX NO, 503 225 9022 P. 04
4. Connectiona. Metexs. and Storm
City will provide and maintain meters, valves. axed controls, as approved by
District, in proper order for water transmission line conneeff ons points. City will
arrange to have its meters tested and calibrated by an independent terser qualified to
do such work not less than annually. A copy of the test report shall be forwarded to
District. City shall own and maintain the transmission line necessary to furnish
water to City from the point of connection, as hereinabove set forth, to the existing
distribution system of City. Unless otherwise agreed, City ees to furnish at its
expense any District-approved pumping stations, e s ing valves, and
�jlj other equipment. located within or without the b of Dls 'ch my be
Mdq
e
necessary to convey, eorctrol, and meter the old ity by Di trill!
Notwithstanding the foregoing,Ustrict shall main ch valves and devices to
control flows from its reservoirs and s
It is intended that the District will- u 6 million gallons of water per
day to the District. The points y include, but shall not be Eazited to the
foi,lQwing locations: ..01
a. or � air �
Cas Av e D4
Green g Road "
District that additional connection points may be added by
written consent both entities.
5. Continuity of S Edees,
a. By execution of this.Agreement, City agrees that District wdl
provide"firm" service of six(6)million gallons per day (MGD) for peak day usage.
Page 3 -Agreement for Nater Supply
3/15/415
MAR-15-95 WED 16:07 HURRAY, SMITH & ASSOC. FAX NO. 503 225 9022 P. 05
Peak day demand shall mean the highest total peak day's now at any time during the
Year. 'Flan°gervioe means that continuity shall be maintained by District to the
extent feasible in the same manner as service to Djstrict's own irdmbitants, and other
direct service customers. If a general emergency or watea sha tage requires
` restrictioms on the delivery of crater, then general restricUons placed upon deliveries to
(y the firm purchasers shall be determined by a similar method to that used for
restricting deliveries to District by the City of Portland and Distriers direct service
customers, to-wit: pro-rata reduction. if localized cxiierg problems occur,
temporary am-Ace interruptions may result. 0.
b. It is recognized by both parsi Ca emergcn 'on
,measure xray have to be implemented by D' orqohp meet an emergency
condition. City shall implement such emergency ea" ; atian measures as well. City
shall be included in discussions lea on plement the measures.
C, District wM provide if Diattict determines that
�J such interruption or.zed eoessar reasonable for systeitt emergencies or
to install equipment,a i ents,investigations,and inspections or
d� perform other ce in District's system,or other parts of the system
supplying Except a nergeney and in order that City's operations will
not be u ly in with,District also shall give City ten (10) days written
notice of any such/. ption ar reduction, the reason therefore,and the probable
duration thereof.) triCt agrees to exercise reasonable diligence and foresight to
repair, replace,andmaintainmaintain its facilities w as to provide a normal flaw and pressure
of water to the point of City's connections during the life of this Agreement.
Page 4 -Agreement for Water Supply
3/15/95
W-15-95 WED 16:07 HMAY, SMITH & ASSOC. FAX N0. 503 225 9022 .. P. 06
6. Contract PaMMA.
The present peak day demand for the first year of this Agreement is six(61
million_gallons per day. .Each year thereafter, City will notify District of the forecasted
W peak dad's demand and the average annual amount of water needed for the neat
I~ current year and the next ten(10)years,LMtrict will conduct a study every four(4)
t years in conjunction with a rate shady to forecast total District deman� This will
incorporate the annual forecast of demand by City and other users. The amount of
the quadret nW forecast demand determined by the Dis establish the City's
firm allowable future annual peak days demand. - "
7. Water Quality. auk. '
The quality of water delivered to City'")"; o f this Agr'O.ement shall.
'�►' comply with all applicable provisions of stage and f` law,rules and regulations.
Both parties agree this provision will n ' ding on 'ct where an emergency
exists and best efforts and reasonable p t d h exercised.
8� Are Su
The City pr the residents within the boundaries of the
City, to the City, City, City of Durham and to the Tigard Water District.
X
G. on- a T I mitgtLons.
City that it not, without obtaining written approval of District,sell or
"wheel"water to entity outside its corporate boundaries other than exi bng
commitments.prey. sly described in Section 8, No rights may be assigned under this
Agreement without the written consent of District.
10. Hates.
City will pay monthly to District for all water passing meters described above at
Page 5 -Agreement for Water Supply
3J]b/95
MR-15-95 WED 16:06 MURRAY, SMITH & ASSOC. FAX NO. 503 225 9022 P. 07
a rate of seventy eight and one one hundredth cents (78.10) per 100 cubic feet (c4,
effecative through June 30, 1996. Effective on each successive July 1 during the term
of this Agreement,or any renewal thereof, the rate shall be retained, raised, or
lowered in accordance with the criteria set forth in Section 1_l and adopted by
resolution of the District.
11, Rate Setting C "tea.
a. Rate-Making Principles and Policies.
Water rates shall be established under this Agreem 'using the cost of debt
service for traiumussiort pipeline facilities jointly used, water purchased by
the District from the City of Portland, the cost of , alterna f from the
Hillsboro, Forest Grove, Beaverton,Tualatan, Wa "c:t, J int water
Commission,the total flow metered annually thra a transmission pipelines, the
annual allocation ofadministrative an n and tenance costs by the City
of Portland an the tra mmisssion plpelin a administrative charge by the
J3istrict.
The initial watt by the following components (assets and
water volumes),q. es will be revised annually to reflect the current water
use expeari and for of
�{ 1. a Dail ater Volume of District through transnAssion pipelines
was 20.33 million per day or 9,920,751-100 of
V"
n�J, 2. water ge for City of Portland
U' Area 5 Rate $0.495 per 100 cf
3. Gravity Lane Debt Service Paid to
Portland for Washington County Supply
Page 6 -Agreement for Water Supply
3/15195
MAR-15-95 WED 16:09 tit1RRAY, SMITH & ASSOC. FAX N0. 503 225 9022 P. 08
Line- $1,329,380.63 $0.184 per 100 cf
4. Gravity Line Debt Service for
Coats of Metzger Pipeline
$790,429.08 $0.080 per 100 of
5. All bine CTw ration& Maintenance
and City of Portland Allocation
of Administration$23,480.00 $0.002 per 100 of
6. Cast of Acquiring Alternate Supply
fromthe Joint Water Cotninission per 100 cf
7. Wheeling Administrative Charge ,100 of
0
TOTAL COST OF WATER PER 1 $0.781
In the event of the addition, modification, or titution by District of assets
that are used by District to supply City ' ve d on of facilities shall be
miodif4ed accordingly. These new faeiliti me sided in any computation
notwithstanding the fact a time ueh inoiusion they have not been
formally included
b. n Facilities Cost[Jointly FYnanced Facilities].
New fa 'es . if required, will be allocated between City and
District ser ' tomers the iasis of their ultimate shares of the design
capacities of these The allocation of the costs of such facilities will be based
on the projections de or reviewed by an independent consultant at the time of each
rate study.
C. Provision for Emergency Surcharge.
I, hi the event of a severe drought, major catastrophe,or other
Page 7 -Agreement for Water Supply
3/15/95
MAR-15-95 UED 16:09 MMY, 5M I TH & ASSOC, FAX NO. 503 225 9022 P. 09
U
extraordinary conditions that require emergency expenditures to maintain a sufficient
water supply, it may be necessary for District to impose, by resolution, an mlergeney
surcharge on City in order to pay for such expenditures. An,equitable portion of these
costs will be allocated to City in accordance with the principles set forth in Section 11,
and may be recovered through an emergency surcharge.
2. An emergency surcharge based on water usage may be implemented
l' h"Medlately upon passage of the authorizing resolution and1y to all regular
they fter tr
b illit e8 ansutitted and may continue as long ecessary to pay for
v
emerg+emey expenditures.
12. how.
Meters installed to measure the volume ter by District to City shall be
read perioducaRy by representatives of District at ed by mutual agreement of
District and City. Representatives of prese t meter readb gs. Dish ict
shall compute and render wills and sta to by the 15th day of each month_
r4
Yf the meters.at any time_ urately ensure the water passage through said
meters, the charge fo time said meters are out of order shall
be based upon a consumption as shown by said meters when in
proper o condi ti ua comparable period of service. District shall
d
invoice City onth f :crater usage in the preceding month.
13.
During the to of this Agreement. City shall, by the 30th day of each month,
pay to Dlstriet the sums due based on the rates and charges provided in iSeedon 10
and 11 of this Agreement.
Pie 8 -Agreement for Water Supply
3/15/95
MAR-15-95 WED 16:10 MURRAY, SMITH & ASSOC. FAX NO. 503 225 9022 P. 10
14. Iftutes ttarlLc3M�
Dispute shall be settled by proceedings in the Washiritan County circuit
Court unless the parties mutually agree otherwise. If suit or action is commenc5ed,
the prevailing party shall be entitled to its reasonable attcmeys'fees,including any
appeal therefrom.
15. unI tnum of Ljawft.
City recognfzes and agrees that no liability for damages shall attach to District
hereunder on account of any failure to accurately anticipa availability of water, or
0'
because of actual failure of supply due to any damage source, equipulent,
pipelines, or facilities caused by vandalism, war, t, invasion, ental
restrictions, strikes,inability to procure su ct ,or oth causes beyond
its control.
16. caadftalLm and d
�j District shall notify City not less days prior to the date any
V '
pmposed changes to rat gen Wo d become effective and provide copies of
any supporting data ange. District and City agree to menet as
bo necessary to b; d matters of mutual concern,including the rates
#
chUged h lex and ca s to this Agreement,should such be dem. it is
Weed that hav a right to receive information t rom and to provide input
to District on ma ing the water system. Such matters include, but are not
limited to, u rrmoMeatlons to the system,anticipated costs, annual budget,
rate at#justments,costs of service rates studies and operating constraints.
17. Lim!tation of Supply.
District is not a public utility district and 1s not subject to the jurisdiction of
Page 9 -A,greetneiit for Water Supply
3/15/95
11AR-15-95 WED 16:11 T'tMY, SMITH & ASSOC. FAX MQ 503 225 9022 P. 11
O v
the Public'Utility Commfssion. It is not engaged in the water business and was not
created to sell water outside the corpmated limits of Districts exoept surplus water not
needed by District and its izitlabitants.and that the citizens and inhabitants of
NsWct have the prior tight to use of the water distributed by the District water
system. District herewith expresses confidence in its desire and ability to furnish
,( sufficient surplus water to meet the needs of City, but in the event there should ever
arise in the future an inabilky on the part of District to furnish sutfic ent surplus
water to City, it is understood that District shall not be lia on account of any such
liability. '
18. Planning_
1
City agrees to report to District its am d day total system demand
for each year following the term hereof ending D $1. City shall also forecast
its water requirements to be supplied in ce .Yeah SeWon 6. Such
forecast shall reflect the best judgment o S usformation shall be furnished
to]District no later than April of each year.
G1 City also a o data relating to water supplies as may
d 9 r be required by ; per, provided that auppbing such
U data shall reasvnab in .means of City. Records relevant to water supply
and consump within possession of District or City will be provided to the other
upon reasonable
19.
This Agreement is conditioned upon the faithful performance by both parties of
all terms and provisions hereof which on its part are to be kept and performed. If City
withdraws areas within the District's boundaries, then this Agreement shall terminate
Page 10 - Agreement for Water Supply
3/15/95
MAR-15-95 WED 16:11 MMAY, SMITH & ASSOC. FAX NO. 503 225 9022 P. 12
on the next succeeding June 30 from the effective date of withdrawal. Either party
may tez�te this Agreement on account of breach of its material terms by the other
party upon 365 days written notice.
20. ]EtenewA,..
This Agreement may be renewed upon mutual agreement if City wlstm to
renew, it shall give notice, in writing, to District no later than twelve (12) =Wombs prior
to expiration of the oabpW term of this Agreement. The Parties shall then ineet to
negotiate an extension which shall not exceed,then(10)y
21. otice.
a. Any notice under this Agre Mall be in shall be
effective when actually delivered or when de in mail, addfessed to the
parties at such addresses as tither party may d by written notice to each
4 Y
other. t
District: Administrator
TU Watex trict
1 1
regon 97005
f
City' City tnx
City d
SW Hall Blvd.
ard, Oregon 97223
b_ Communications related water system operations or supply shall
be performed by the District Operations Manager or Engineer. Communications with
the City shall be through the City Maintenance Services Director or the Director's
Page 11 -Agreement for Water Supply
3/15/95
MAR-15-95 WED 16:13 MURRAY, SMITH & ASSOC. FAX N0, 503 225 9022 P. 13
designee.
22. Effective Ewe_
This Agreement shall be effective as of_„day of , 1995,and continue
until terminated as hers provided.
IN WITNESS WHEREOF,Tualatin valley water District, pursuant to a proper
Resolution dated the_day of_ , 1995, duly authorizing the President and
Secretary of its Board of Commissioners to execute this instrument on its behalf, and
the said City of T *X d, pursuant to a Resolution dated the day of
1995, duly authorizing the Mayor and Recorder to exe th t on its
behalf,have caused this Agreement to be signed, du 'Cate, as y day and year
first hereinabove written_
CITY OF TIGARD UALAT ALLEX WATER DISTRICT,
a municipal corporation c vrater supply district
3 "
by:
Mayor President
:Illi
3
by-- ''` by:
Recorder s . . Secretary
Page 12 Agreement for Water Supply
3115195
MAR-21-95 TUE 11:56 HURRAY, SMITH & ASSOC. FAX NO. 503 225 9022 P. 02
121 S,�,Sd�oa ld . hdad,kp 91it14 ■ Pi;Q F SQI '�10 Sa3 S9U�
94-0310.407
March 21, 1995
Mr. F4 Wegner
Maintenance Services Director
City of Tigard
13125 SW Hall Blvd.
Tigard, Oregon 97223
Re: Water Right Application on Willamette River'
Dear Ed:
per your request of yesterday, we have prepared this summary of our discussiions
relative to the selected location of the water right application on the Willamette River
at Wilsonville.
At our meeting on February 8, 1995,with yourself and Bill Monalanh we haon deswide-
ranging discussion as to the- desired location of a water right appy
Willamette River. A key topic of discussion was whether to locate the point of
diversion in the application above or below Willamette Falls at Oregon Citi'. As a
result of these discussions,the decision was made to proceed with the application at
the WiWonville location.
The following is a summary of the discussions items that led to that decision:
o The Wilsonville site is the location of one of the regional sources being
considered in the rcgomil water supply planning studies presently ongping_
Substantial water supply studies of this location have boon conducted. A site
on the Willamette River below Willamette Fails is not presently being
considered Zor such a regional source.
0 While Tigard could proceed on its own vvith a water supply system if it were
to obtain water rights at any location, the Wilsonville site presents the best
opportunity to develop a joint crater supply system with other participants to
achieve the,greatest economics of scale for such a system. The G�ty Of
Wilsonville and the Tualatin valley Water District bath hold substantial water
rights at the Wilsonville location. The City's application would be for a point of
diversion at the same location. The potential to develop a joint supply below
Willamette Falls with others such as the City of lake Oswego is far less cert0in.
A supply system at this location would be far less likely to be developed with
others and would therefore likely not present opportunities for economies of
scale.
W-21-95 TUE 11:56 I'WAY, SK I TH & ASSOC. FAX NO. 503 225 9022 P. 03
Mr. Ed Wegner
Page 2
Mauch 21, 1995
t
o The siting of an intake and treatment facility below Willamette Falls would
present significantly greater physical c omstruction obstacles than would the
Wilsonville site. The west bank of the Willamette River in the West Linn and
Lake Oswego area is now substantially developed. SWffiicant siting difficulties
for a large intake and treatment works would be anticipated at such a site.
o The pre-1909 claims at Willamette Falls by Portland General Electric Co.for
hydroelectric power generation present an obstacle to he considered at the
Wilsonville site. These claims are senior to most other upstream rights on the
entire Willamette River system including those of others at the WIL-A nviRe site.
It was determined that this obstacle, while potentially serious,could eventually
be.favorably resolved such that a water supply system at WflsonvilLe could be
developed with confidence that a firm raw water supply is available.
P.a--&A upon the present understanding of the water rights and other related issues
concerning development of a water supply for the City, it was determined that
application for a right on the Willamette River at Wilsonville offers the City the best
opportunity to develop a new water supply.
If you have any questions or need any further information, please do not hesitate to
can.
sincerely,
MURRAY, SMITH&ASSOCIATES, INC.
p H. Smith,P.E.
Executive Vice President
PHS:Cyh
MurraS Sddi Ussodates,Inc.
Enoeeglamers 11.1 SAI.Sabon,Suite 1020 PoMud,Oregon 97,204 PHONE 503-225-9010 ■ FAX 503-225-9022
---- ------- -------
94-0310.407
February 22, 1995
Mr. Ed Wegner
Maintenance Services Director
City of Tigard
13125 SW Hall Blvd.
Tigard, OR 97223
Re: Application to State of Oregon Water Resources Department for Water Right on
Willamette River at Wilsonville
Dear Ed:
Enclosed is the completed application for a surface water right on the Willamette
River at Wilsonville. We have completed this work in accordance with your direction
at our meeting on February 9, 1995.
The application includes several items which we would like to bring to your attention:
1. The point of diversion on the Willamette River will be at Wilsonville west of 1-5 on
the north bank of the river. We have described the diversion point at the same point
as that described in the existing rights of the Tualatin Valley Water District.
2. Land use information forms will need to be submitted to the following:
Washington and Clackamas Counties, Cities of Wilsonville, Tualatin, Tigard, Durham
and King City. We will obtain a receipt for the information form from each of these
entities after approval of the application by the Council. The receipts will be then be
forwarded with the application to OWRD. Each entity has 30 days within which to
respond and forward the land use information form to the OWRD.
3. We have developed the estimated ultimate water demands based upon the ultimate
service area (9,732 acres) shown on the enclosed service area map, the assumption of
6.5 persons per acre ultimate population density, and the assumption of 400 gallons
per capita per day maximum daily demand for that population. These assumptions
thereby result in an ultimate maximum daily water demand of 40 cubic feet per
second or 25.9 million gallons per day. This methodology to develop ultimate
maximum daily demands was used because ultimate demands have not been
identified in the City's current water system master plan update which developed year
2020 demands or the Phase 2 regional study which is developing year 2050 demands.
Mr. Ed Wegner
February 22, 1995
Page 2
Please review this information at your earliest convenience and if you have any
questions or desire any changes to the application or supporting documents, please
call. Upon Council approval, please have the application signed by the appropriate
City official and return the original documents to us. We will then obtain the land
use form receipts and file the application with the State on your behalf. At the time of
filing, a $200.00 check payable to the Oregon Water Resources Department will be
required.
We appreciate the opportunity to assist you with this work and please call if you have
any questions.
Sincerely,
MURRAY, SMITH & ASSOCIATES, INC.
P p H. Smith, P.E.
Executive Vice President
PHS:cyh
Enclosures
VISITORS
PLEASE REGISTER
Date: 9 6
Meeting: /��
Name (please print) Do you wish to speak?
es or no
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.