Loading...
03/12/1997 - Packet Public a y ti:4 Servtn K i and Kan AL WAB'ER BOAR MEETII�TG INTERGO�lE1�N1VIEN- 1, ti "`g T g ty, Durham and Unancor orated Area' ` { g F. P GEY NA y. S W ednesday, March 12, 1997 r p ff s X � .1: Call to Order ;• Y f r 't 2 Roll Call/Introductions a Introduction of New Members , Patrick C, it b "Elecfon..of;orffieers 3 Visitor. Comments - �.. d I 3: ': 9 - 11 C 4 3Appro.�e Meeting.Mmutes 'January 48, 1997 5 Request for Facility Use Bili;Monahan <k 6 Consortium :Update Paul Hurit 7 1vlenloT Reservoir4. Update Ed Wegner 8=: ;ADA;Facihty Compliance Memo.• u 9 �`�Duector's Report a 1 y 10 Non Agenda Items: 11 Adjournment FA'/fight O nner w ,be seared at Executive Session The 'Yntergovernmenta/ Water Board may go into` ' Exeduff ' Session under ttie provisions of ORS 192 660 (7J (dJ, (eJ, & (hJ to discuss: labor.; �eNations real property ransacdons,' and=cur'rent an pending /itigationh issues: . Al/. discussions within;' this sessionl are confialentia/, therefore nothinghis. meeting may be'disc%sed by those present Representatives of the news media`a to;,attend„ this session, but`>nust'nof'.drsc%se any`",informaion'.a!iscussed during Phis: ketfiyliwbl3 I2'egn 1 • . /.:Y:ii .... f+�1.Ciit...... OA :� eSiVJ ::v:.... Members Present: Beverly Froude, Paul Hunt, and Jan Dransholt Members Absent: Bill Scheiderich Staff Present: Ed Wegner, Kathy Kaatz, Loreen Mills, Mike Miller Visitors Present: Jack Polans, Michael Denton 1. Call to Order The regular meeting of the Intergovernmental Water Board was called to order at 5 : 35 p.m. • 2 . Roll Call and Introductions Roll call was taken with all members present including the new representative from the City of King City, Jan Dransholt. Commissioner Scheiderich was absent. 3 . Visitor Comments Mr. Polans was present and discussed the executive session portion of the meeting Mr. Polans continued by saying that he would like the following added to, the Agenda: The IWB cannot discuss public information and if they do the representative of the news media can write that information in their newspaper without notifying the IWB members . Mr. . Polans then discussed the meeting minutes draft of November 13 , 1996 and discussed the article from the Oregonian regarding Bull Run water and getting the lead out. Mr. Polans questioned what percentage was the lead content? He continued by discussing from the November 13 , 1996 minutes page 2 , #6 the Regional Water Supply and Consortium Update. Mr. Wegner clarified that the items discussed under the above referenced minutes have nothing to do with Washington County or Senate Bill 122 , but have to do with the Portland Metropolitan Water Providers Meeting (27 water purveyors) that have been held. Mr. Polans questioned whether the firm of Cochran, Overton and Cochran are doing consulting work? Mr. Wegner stated not on the RWS P . Mr. Polans then stated that the firm of Cochran, Overton and Cochran, consultants for Washington County and working on Senate Bill 122 claim that the City of Tigard has many water problems in King City, City of Durham and the unincorporated area. Mr. Polans questioned. how we know that the IGA between Tigard, Wilsonville, Tualatin, Sherwood, Tualatin Valley Water District will not end up the same way the IGA with Tigard and Lake Oswego? Mr. Polans continued by discussing information on page 4 of the same minutes, item number 8 and question the address of the tax lot #600? Mr. Wegner stated he did not know the physical address of the tax lot since at this time it is a vacant piece of property. Mr. Polans then questioned on page 5 of the same minutes (water supply) #2 whether there was public hearing held on this matter? Mr. Wegner stated that this was brought before this Board approximately two years ago and there was a recommendation to the Tigard City Council in which a presentation was made and they voted to approve the contract . Mr. Polans questioned whether there was a written report on this public hearing? Mr. Wegner stated that he has a contract with TVWD. Mr. Wegner stated that Mr. Polans could obtain this information through the City Recorder vis the minutes of that meeting. Mr. Polans stated that according to the minutes Tigard is interested in building on the Willamette River for drinking water and questioned whether Mr. Wegner had a report on this matter? Mr. Wegner responded by stating he was unclear on what Mr. Polans was wanting. Mr. Polans questioned whether Mr. Wegner had addressed these questions? Mr. Wegner stated that the executive session notation on the agenda is in accordance with ORS 192 . 660 (1) (d) , (e) , & (h) . Mr. Hunt concurred that this information is in compliance with the Oregon State Statue. Mr. Michael Denton, 15673 SW Barrington Terrace, off Beef Bend Road was present to discuss a concern on water pressure at the above listed address. Mr. Denton' s concern is that he resides at the top of the hill in the Barrington Heights (Division 2) area built approximately five years ago and at that time had very good water pressure. Mr. Denton continued by saying that at the best time of the day they only have 40-50 psi . Mr. Denton questioned what can be done to increase water pressure in this area? He continued by saying that a couple of times employees from the City have come out and checked the water pressure and he was told there was nothing that could be done . Mr. Denton is concerned about the additional building in that area and how this will effect the already low water pressure? He also stated that they have multiple occasions where they have experienced brown water. IWB Meeting Minutes - January 8, 1997 Page 2 Mr. Wegner, stated that he and Mr. Denton had spoke before the meeting and informed him that he could answer his questions in general terms although he would need to speak with Mike Miller in., regards to :the 'hydraulics . Mr. Wegner continued to -state that it is our -intent- to place a new pump station on Beef Bend Road which should help the low pressure. This will be :designed and - constructed in May/June of 1997. This will be at 137th and Beef Bend Road. Commissioner Hunt questioned whether this project has, been budgeted? Mr. Wegner stated it is already budgeted. Mr. Wegner response to the brown water is that there is not a .lot that can be done since there is a lot of construction in that. area. Mr. Wegner stated that DEQ requires -a special permit to discharge hydrant water. At this time no one has a permit to do this . Mr. Wegner stated that there is a task force in the Metropolitan .area that is attempting to get a permit with DEQ to flush these systems. Mr. Wegner stated that we can pull the meter and run a line and flush that system. Commissioner Hunt questioned how we can flush a line in that manner"when we cannot, flush a � hydrant? Mr. Wegner stated that we can flush this into 'a sanitary sewer through his house. Commissioner Froude questioned this being a result of new ' construction? Mr. Wegner stated that when lines are tapped into it stirs up the water due to the force. Commissioner Froude also questioned whether we notify these residents that we will be tapping into their line? Mr. Wegner stated that in the past we have not - but will in the future. Commissioner Hunt- stated that the Water Department looks bad when the customers are unaware: of what we are doing. Commissioner Froude questioned the possibility of notifying, when we anticipate a change in water color. Commissioner Hunt questioned the value of sending out information with 'billings, and information ' regarding the issue with DEQ not -allowing flushing.. Mr. Wegner stated that we- have done news releases with the Oregonian, Tigard Times .and the Courier.. Commissioner Froude questioned who should be speaking with DEQ? Mr. Wegner stated that since' the fire districts are involved this will be resolved quicker. 4 . Approval ,of Minutes A motion to approve the minutes of the November 13 , 1996 meeting was made by Commissioner Hunt and seconded by Commissioner Froude. A voice vote was taken which passed unanimously. IWB Meeting Minutes - January 8, 1997 Page 3 S. Compliance Review of Water Facilities - Loreen Mills Loreen Mills was in attendance to bring a request to the Board to authorize staff to have a consultant do an ADA review of Water facilities. Commissioner Hunt questioned whether Ms . Mills was requesting authorization to receive quotes or to hire a consultant? Ms. Mills stated that we would get quotes and then come back to the Board for approval to hire a consultant. Ms. Mills continued by saying that the Purchasing Rules authorizes staff, if funds are available and budgeted to obtain three quotes and go with the lowest quote from the firm that is able to complete the work. Ms. Mills stated that the decision is the Boards on whether to authorize her to obtain quotes and come back for further authorization or to get quotes and proceed with the contract. This issue needs to be addressed in the 1997/98 budget with this proposal due to Finance in the next six weeks . Ms. Mills stated that ADA was passed in 1990 (Federal Legislature) which mandated local government to review their services, programs, policies and procedures as well as reviewing or evaluating.all buildings and facilities to ensure that they are accessible to the disabled community. When the City of Tigard did their evaluation in 1992 (published 1993) prior to the Water District merger, a consultant was hired to complete this work. While reviewing the ADA Plan for the City, Ms . Mills continued by saying it was noted that the Water facilities had not been included. The deadline for compliance with the ADA Act was in 1991, 1992 , and 1993 . Since these facilities had not been included a written plan must be completed to be in compliance. Ms. Mills stated that compliance with the ADA on hiring procedures has been completed by the Human Resource Department under the umbrella of the City of Tigard. This plan would include all Water facilities which include the Water Building and Canterbury facility. According to Ms . Mills there have been recent changes to the ADA and she is unsure how these apply to reservoir sites and pump stations . Commissioner Hunt stated that the Water Department is charged a percentage of the overhead of the City (each department) and as long as this would be an effort that Ms . Mills would spend a lot of time on, would there be an additional charge for your time? Ms . Mills stated that this will be reviewed during the budget process, although currently a percentage of her time is charged to the Water fund for risk management issues. After the process begins, if it is noted that more time is being spent than initially anticipated it will be adjusted internally. Commissioner clarified his question by asking if Ms . Mills is wanting authorization to hire a consultant only or for her time as well? Ms . Mills stated at this time, funds are being requested to hire consultant services . IWB Meeting Minutes - January 8, 1997 Page 4 Commissioner Drd_ ngs,holt questioned the- amount of funds we will be looking at?' Ms. Mills stated that since it is unknown what effect the changes to the ADA will have, it is anticipated that -the' costs will probably be $3, 000. This -work will cover a walk through of all•-facilities;. interview staff to determine if there are. problems ' with services provided, or programs provided in the .water delivery area. A final report should be completed before the December meeting of the IWB. Commissioner Drangsholt questioned how long this survey would take without the use of a consultant? Ms. Mills stated up to three years with current staffing and we would still have to hire someone to give expert advice. Commissioner Hunt questioned whether the Board could authorize the maximum amount of. funds to hire consultant and complete the , study without coming back to Board for additional approval? Ms . Mills stated that this would help speed up the process . Commissioner Froude questioned whether we do not include a dollar figure since pit is unclear at this time what the costs will be? Mr. Wegner stated that if the Board, approves the plan to receive quotes on consultants, he could approve up to ri1 $7, 5,00 and report back to the Board. In the future the Board will see ADA compliance in future budgets. The Board c4r;t_ concurred to allow Ms . Mills to receive quotes on hiring of xt: - consultant. Ms . Mills stated that she would be happy to file f.x.:• periodic progress reports on this process. 6 . Director' s Report a. . Menlor Site - the tree survey has been completed. The test -boring has .been completed. Mr. Wegner has met with ,the engineers "and .they have approximately 700 of the design phase complete. Hopefully 'by the March meeting they will `have a good rendering to show the Board. An appraiser has been hired to appraise tax lot 600 (right of way access'). The property- owner has also hired an appraiser and we .can begin negotiation for purchase. If the easement is resolved within the next ,30 days we will be on target with the design plan. Mr. Wegner stated that the property owner will have to determine whether they will sell all 2 . 7 acres or just .7 acres needed for the easement. b. Regional Consortium - City of Tigard after reviewing documents distributed to the Board we have . agreed to become a member of the Regional Water Consortium. A draft set of by laws is being reviewed at this time . There will be three different groups working to begin with different groups being added later. The first group will be the Consortium Board made up of elected officials from member agencies (23) with Commissioner Hunt • representing the City of Tigard and City Councilman Rolhf as the alternate with their first meeting February 6 . There will be a Technical Committee made up of 26 IWB Meeting Minutes - January 8 1997 individuals represented by ths with Mr. Wegner representing City of Tigard. The Technical Committee ill meet monthly. There will also be a ten member teering Committee with three members from Washington ounty, three from Clackamas County, three from Multnomah County and a representative from Metro. The three Washington County representatives will be Jesse Lowman (TVWD) ., Dave Winship (Beaverton) , and Ed Wegner (City of Tigard) . There are twenty-three members that have joined / V4 4 and have adopted the RWSP for the Metropolitan area. The Q difference in the number of participants and voting members is that City of Troutdale has said they won' t join the consortium and the remaining three members have not met. C. Regional projects - Continue to work with the Willamette River application. The committee will be meeting next week on how to handle our individual rights and collective rights requested. With all applications we were asking for two to three times the amount the RWSP indicated the need for. Mr. Wegner stated the group is looking at revising the current requests. The City of Tigard may reduce our request and use some of TVWD and Wilsonville 150 mgd and they will allocate 40 mgd to Tigard with an ownership right. Commissioner Hunt stated that the assumption that this project of building on the Willamette will go through, what if down the road this project falls apart and we have reduced our request for water rights? Mr. Wegner stated that the balance that we don' t take from TVWD and will leave those to be approved at a later date. Mr. Wegner continued by saying that if we combine with anyone it will be a joint partnership divided upon by the amount of water taken by the group. Mr. Wegner stated we will have a partnership and some ownership. Commissioner Hunt questioned the approval timeline on this application? Mr. Wegner stated that the Water Resources Board' s big question is why are the numbers so high when the Regional Plan states a lower need. We will need to get these numbers adjusted to proceed. d. Hydraulic Study - Mr. Wegner stated we are currently working on a hydraulic study of a line that goes through eastern side of Tigard called the Washington County Supply Line along with Portland, Tigard, Tualatin, Sherwood and Wilsonville to study the amount of water that can be pulled down from Florence Lane in Tualatin Valley to add additional water through that system to feed Tigard and Wilsonville. e . Water purchasing - Mr. Wegner stated we are within pennies of a new pricing with Portland which will allow us to buy a lot more water at a reasonable price. IWB Meeting Minutes - January 8, 1997 Page 6 .., .. .-.. .. :. •.:..-.`. .... ' ' :...N - HoPefully within the next month we will have a new, ,pur.chasing scenario which will probably ' become a. permanent scenario. f . Water Conservation - The Coalition is providing .another water wise landscaping seminar on March 15 at `PCC Rock Creek. We will be cost sharing with them as part: of Coalition expenses . 7 . Non Agenda Items Mr. Polans questioned that according to memo from Water Director we have to wait 3-4 years or 2-3 years for planning from the minutes on page 5? ' Commissioner Froude questioned whether this could be addressed after the .meeting with Mr. Wegner? Mr. Polans questioned what the cost of waiting 'for 3°-4 year or 2-3 years for planning and construction to the consumer, in King City, Durham and the unincorporated area? Comm1.ssioter Hunt stated that' what this. is, -really saying is that: we are delaying 3-4 years to study the issue. Mr. Wegner f stated that, these costs are unknown at this time,, ,since we do - not know what we will be doing. Mr., Wegner continued by telling Mr. Polans that if he wanted to' see him he could make an appointment -for them to discuss . Adjournment Commissioner Hunt made a motion to adjourned ..the meeting at IWB, Meeting Minutes - January 8, 199'7 Page .7 , TIN • y Murrq Sraiih&Associates,Inc. Enoeeglanners 121 S.W.Salmon,Suite 1020 m Portland,Oregon 97204 a MONT 503-225-9010 FAX 503-225-9022 96-0341.201 February 4, 1997 Mr. Ed Wegner Public Works Director City of Tigard .131,25 SW Hall Blvd Tigard, Oregon 97223 Re: Menlor Reservoir Dear Ed: Transmitted herewith for your review and comments are the 50 percent level construction drawings for the above referenced project. The main emphasis of review at this stage should • be related to general concepts, locations of facilities, and connections to existing infrastructure. Also enclosed is a copy of the "front end" contract documents, including instructions to bidders, proposal form, bond forms, general conditions and supplementary general conditions. It is important that these be reviewed by the City attorney, as they,are the basis of.the legal conditions between the City and the;contractor. Based on the estimated construction,cost of this project, we recommend that the insurance coverage amounts listed in the supplementary general conditions be reviewed and increased as appropriate. We have also prepared and enclosed an updated preliminary estimate of construction cost for this project, dated February 3, 1997, along with a copy of the estimate from our preliminary engineering report of November 17, 1995. This new preliminary estimate is based on our understanding of the final project scope, the geotechnical investigation findings, and our final design calculations. The major differences between this estimate and our previous estimate are as follows: • Solid rock was discovered at a relatively shallow depth during the geotechnical investigation. The previous estimate assumed that solid rock was at a greater depth, and that no rock excavation would be required. We have made a preliminary estimate of the • solid rock quantity in the excavation for the reservoir. It is also possible that solid rock will.be encountered in a portion of the access road and trench excavations. Due to uncertainties in the solid rock quantities and in the cost to excavate solid rock, we have presented a rangeof the potential cost that may be,associated with this item. • Mr. Ed Wegner, February 4, 1997 Page 2 • Due to concerns by USA regarding discharge of chlorinated water from potential overflows and draining of the reservoir, we are proposing that the reservoir overflow/drain and'all on-site drainage be discharged into the existing storm sewer system at the intersection of Scholls Ferry Road and 154th. This arrangement will bypass existing man-made wetlands and water quality ponds associated with the residential developments north and west of the reservoir site. The length of the.new storm drain before it enters Summer Creek and the installation of hydraulic jumps in the manholes will provide aeration'to minimize the chlorine residual from an unanticipated discharge. The current construction cost estimate, excluding solid rock excavation, is approximately 3 percent higher than the previous estimate. However, the presence of solid rock causes the new estimate to be approximately 25 to 4.6 percent higher than the previous estimate. We anticipate refining the estimated cost of solid rock excavation as we develop the final estimate of quantities for the bidding document. Please do not hesitate to call if you have questions regarding any of the above items. In order to.stay on schedule for completion of the drawings and specifications, we would appreciate receiving your comments on the construction drawings and "front end" contract documents by February 15. Sincerely, MURRAY, SMITH & ASSOCIATES, INC. /7� James L. Helton, P.E. Senior Engineer Enclosures ® CITY OF TIGARD 3.5 MG MENLOR RESERVOIR PRELIMINARY ESTIMATE OF CONSTRUCTION COST' February 3, 1997 Item Cost 1. Mobilization, Bonds and Insurance $ 50,000 2. Construction Staking 8,000 3. Tree Removal 46,000 4. Clearing and Grubbing 23,000 5. Erosion Control 25,000 6. Earth Excavation 1551000 7. Solid.Rock Excavation 475,000 to 950,000 8. Reservoir Foundation Preparation 75,000 9. Underdrain System for Reservoir 25,000 W. 3.5 MG Prestressed Concrete Reservoir 1,270,000 11. Access Road 43,000 12. . 18" Storm Drain to Scholls.Ferry Road on 154th 105,0.00 13. Water Quality Facility 25,000 • 14. 16" and 12" Waterlines to Distribution System 178,000 15. Yard Piping, Valve Vaults and Connections to Reservoir 90,000 . 16. Telemetry/Control-Building 101000 17. Instrumentation, including C12 and pH Analyzers 20,000 18. Electrical Work, including service, lighting, wiring field devices 30,000 19: Fence 35,000 20. Landscaping 50,000 Subtotal $ 2,738,000 to 3,213,000 15% Construction Contingencies 411,000.to 482,000 Total Estimated Construction Cost $ 3,149,000 to 3,695,000 • Footnotes: 1. This cost estimate is an opinion of cost based on information available at the time of the estimate. Final costs will depend on actual field conditions, actual material and labor costs, final project scope, method of implementation, schedule and other variables. FR--M MENLo2 flESEZvb/2 /REL/M/N.4R� DF51(;AJ /3FPo2T o>= No��►�be2 17/ lq''57 Exhibit"C" PROPOSED 3.5 MILLION GALLON MENLORRESERVOIR PROJECT COST ESTIMATE SUMMARYt The estimated reservoir costs are based on the following assumptions: _ No rock excavation included. _ No telemetry.-system costs included. _ Reservoir is assumed to be a presstressed.concrete reservoir. A 35% contingency, administration and engineering allowance included. Construction bye contractors. An Engineering (ENR') construction cost°index of 5506 (8/95). Item Cost 1. Site Work $ 183,000 2. Reservoir Structure $ 1,700,000 3. System.Connection and Yard Piping 259,000 4. Landscaping and Fencing 50;000 Estimated Construction Cost $2,192,000 35% Contingency, Administration & Engineering 767,200 Total $2:959.20 SAY $2.960:000 1 The cost estimates presented are opinions of cost based on the assumptions stated and developed from information available at the time of the�es tima ie: Final costs for all projects will depend on actual field conditions,on actual material and labor costs,final project scope, project implementation and other variables. MEMORANDUM CITY OF TIGARD TO;: Intergovernmental Water Board FROM: Loreen Mills, Risk Manager DATE: February 8, 1997 SUBJECT: ADA Review of Water Faciliti s f would like. to respond to a question raised at the last Tigard Water District meeting regarding the planned ADA review of water facilities., Mr. Ed Wegner reported to me that there was concern by TWD that the water.facilities should not be reviewed for ADA compliance with water funds. I suggested the use of water funds to pay for the review of facilities because the facilities were not in'.compliance-with the American's:VVith Disabilities.Acton January 1,, 1994 when the operations were assumed by,City of Tigard. Since all,four jurisdictions represented. by the IWB are now responsible for the water facilities, I believed the best way to finance the work was through water funds . There is another way to finance this review. Each jurisdiction represented by the IWB could pay their share of the .cost for review from their own budgeted funds.. I believe this process to be more costly administratively'for billing/collection time. Direction Needed From 1WB: Which method of financing the water facilities ADA review do you,wish to use? I am proceeding with the ADA review of water facilities as directed by the IWB at your 1/8/97 meeting. If you wish to change the method of 'financing this review, please advise as soon as you can and I will followup with our Finance Director. Thank you for your review of this issue. • Im/h/adawater.doc 9pH Adjustment,-., .Questions and Answers This month the Water Bureau began treating Bull Can I remove the sodium hydroxide from my Run water with small amounts of sodium hydroxide drinking-water? to adjust the pH level of the water. This treatment is Again,there is no sodium hydroxide in our drinking the first step in the Lead Hazard Reduction Program water. While we don't believe it is necessary, a to control corrosion. A few customers called with customer can remove the trace amounts of dissolved' questions about this treatment: sodium and bicarbonate that result from the addition Isn't sodium hydroxide lye? Does this mean of sodium hydroxide by usingrelatively there is lye in my drinking water? sophisticated water treatmentsystems. Generally, Sodium hydroxide is commonly known as caustic most home treatment systems(including most soda or soda lye. However, this does not mean that particulate ���ters ar�d carbon filters) will not remove dissolved minerals such as'sodium and bicarbonate. there is lye present in our drinking water. When Reverse osmosis units and filter.cartridges certified sodium hydroxide is added to our water, it for mineral removal may be capable of reducing,the immediately changes chemical composition; the odium and bicarbonate levels of the treated Bull molecules'of sodium hydroxide combine with the Run water. Any in-home treatment unit needs naturally,occurring carbon dioxide (CO2) in Bull regular maintenance or it can degrade water quality Run water to form a very low level of sodium by introducing',bacteria and other contaminants. bicarbonate (baking soda) which remains dissolved in the water. Why didn't the Water Bureau use lime (calcium. 10here are about,l to 2 milligrams per liter.(parts per oxide),soda ash (sodium carbonate), or baking million or ppm) of naturally occurring sodium in soda (sodium bicarbonate) for corrosion control Bull Run water. After adding 1 to 2 ppm of sodium treatment? hydroxide, the sodium level.is increased by.about .5 The Water_Bureau conducted,an extensive.study to. 1 ppm, resulting in a sodium level of to`l.5 to.3 looking at options.for-corrosion_,control treatment. ppm. This sodium level is extremely low compared- We conducted treatment testing and met with to other drinking waters in:the US. industrial, commercial,,institutional and residential increase1 elp evaluate treatment alternatives. The hydroxide that comes from sodium hydroxide Lime s the calcium content,resulting'in a is a natural component of water. Water is HO (two hydrogen molecules and one oxygen molecule). slight increase in the hardness and alkalinity of the Hydroxide is OH (one hydrogen molecule and one water. Although this change would not-'have been oxygen molecule). The hydroxide molecule is what noticeable to most customers, it would have adverse helps raise the pH of the water. impacts on some industrial users. The Portland Water Bureau uses only food-grade The advantage of sodium-based chemicals such as sodium-hydroxide that conforms to national soda ash,baking soda and sodium.hydroxide is that standards established by the American°Water Works they neither increase the hardness of the water nor contribute scale-forming minerals. The Water Association for drinking water treatment:The Bureau selected sodium hydroxide because of its National Sanitation Foundation has certified this lower overall cost, considering both chemical cost sodium hydroxide,as an;approved drinking water additive. This sodium hydroxide is one of the and treatment facility requirements, and because its hest purity grades available. It is produced in use results in minimal changes in overall water quality. Portland using Bull Run water. MEMORANDUM CITY OF TIGARD, OREGON TO: IWB Board Members FROM: Mikemiller, Operations Manager DATE: March 6, 1997 SUBJECT: Issues raised by Michael Denton At the last IWB meeting; Mr. Michael Denton commented to the Board his concems regarding the water color-problems in November 1996 and also the amount of water pressure to his residence on SW Barrington.Terrace. . Water Color The water color problem was a result of some construction work being performed by a private contractor during the week of.Thanksgiving. Instead of terminating water service to approximately 250 residents for 8 hours, we delivered water from a different direction, which caused a disturbance • in the water system. The disturbance did result in some minor coloration of the water. In addition to changing the direction of the water flow, after the private contractor completed the connection to the 1.6-inch water distribution.main on SW Beef Bend Road, we flushed that section of waterline. This resulted in high velocity water flows and a darker- coloration of the water in the Woodhue, Barrington Heights and Fox Glove subdivisions. The high water flows1rom the flushing of the water system,; stirred up some sedimentation,in the water lines. Sedimentation is a natural occurrence in water mains due to the relatively low,flows of the, local water system. Although the system was flushed for several hours, .a residual coloration continued. The residual,coloration ran its course and settled out within the next 24 to 36 hours. At no time was there, any foreign material introduced into the system and in no way did the disturbance indicate that the quality of our drinking water failed to meet Safe Drinking Water Act standards. All microbial'analysis indicated that the water was safe to drink. Since the incident,in November, we have recently completed an extensive flushing program of the water mains feeding the Barrington Heights, Fox Glove, Orcas Estates and Woodhue subdivisions, The flushing of the water mains in this area was very successful, and we hope that with routine flushing we will avoid a similar situation in the future. Water Pressure Also at the IWB meeting that night, Mr. Denton expressed his concern that the water pressure to his residence was inadequate. Mr. Denton has indicated that he had call the office requesting that field personnel check' the water pressure at his house. Our field personnel would' check the water pressure and reply that there was nothing that could be done to increase the water pressure'due to • the elevation of the subdivision. Mr. Denton lives on SW Barrington Terrace, which is located at the top 'of the zone, and his water pressure would not be any greater than the water pressure at the r outlet side of the pressure reducing station.: If we increased the outlet pressure to increase the water pressure for Mr. Denton, then the water pressure at the bottom of the 550.foot zone in Barrington Heights would be so great that they 'would create other problems for the distribution system. Upon my interview with Mr. Denton, he mentioned that at times there was adequate pressure, however, the pressure seem to be less in the mornings and the evenings. He did mention that there was plenty of pressure on Sundays for showers. At this time it was apparent to me that we may have'a pressure reducing valve in one of our vaults malfunctioning. This was confirmed after we placed a pressure recorder device at the pressure reducing valve station. The outlet side of the pressure reducing station was set for 50 psi to correspond with the 550 foot zone. However, when the water demands increased during the morning and evening hours, the pressure dropped to 35 psi during these high demand periods. We contacted GC Systems in Seattle, Washington, and requested that they send one of their technicians down to help troubleshoot the malfunctioning Cla-Val pressure reducing valve. GC Systems is the authorized service provider for Cla-Val. With the.growth that has occurred in this area overthe last couple of years; the pressure reducing valves speed control(this controls the rate and speed at which the valve opens and closes) was out of calibration. Basically the valves were opening too slowly and not allowing enough flow to maintain;the pressure as the water'demands increased. • After GC Systems finished recalibrating the pressure reducing valves, we continued to monitor the pressure on the outlet side of the valves. With the adjustments made, the valves were once again functioning correctly with a constant discharge of 50 psi. We followed-up with Mr. Denton, notifying flim of the corrections that had been made to the valves. Mr. Denton indicated that he .was very pleased with the "increased" water pressure and our responsiveness to his concern. J 9 Date Lake 0. in Bull Run TVWD in Well#1 in Well#2 in Well#3 in Total MG MG in Demand ® MGD in MGD MGD MGD MGD MGD Pur./Prod. Storage in MG 1/1/97 1.55 2.05 1.04 4.64 19:06 4.27' 1/2/97 0.859 2.06 1.04 3.959 18.58 4.439 1/3/97 0.1392' 2.06 1.04 3.492 17.74 4.332 1/4/97' 1.7 2.06 1.04 4.8 1:8'.06 4.48 1/5/97- 2.25 2.05 1.04 5.34 18.94 4.46 1/6/97 0.089 2.05 1.04 3.179 17.75 4.369 1/7/97 2.21 2.05 . 1.04 5.3 18.84 4.21 1/8/97' 1.29 2.05 1.04 4.38 18.94 4.28 1/9/97 0.098 2.05 1.04 3.188 17.83 4.298 1✓10/97 0:844 2.05 1.04 3.934 17.61 4:154. 1/11/97 1.93 2.05 1.04 5.02 18.24 4.39 1/12/97 0.863 2.05 1.04 3.953 17.77 4.423 1/13/97 1.64 2.06 1.04 4.74 18.18 4.33 1/14/97 1.09 2.07 1.04 4.2 18.21 4.17 1/15/97 0.901 2.07 1.04 4.011 1801 4.211 1/16/97 -2.14 2.07_ 1.04 5.25 19.04 4.22 1/17/97 0.022 2.06 1.04 3:122 18.07 4.092 1,/18/97 1.59' 2.04 1.04 4.67 18.44 4.3 1/19/97 1.33 2.04 1.04 4.41 18.53 4.32 1/20/97 1.3 2.05 1.04. 4.39 1,8.45 4.47 1/21/97, 0.836 2.05 1.04 3.926 18.23 4.146 1M/97 0.965 2:05 1.04 4.055 18.16 4.125 1/23/97 1..87 2.04 1.04' 4.95 19.05 4.06 1/24/07 0 2104 1.04 3.08 17.93 4.2 1/25/97 1.66 2.03 1.04 4.73 18.39 4':27 1/26/97 0.446 2.02 1.04 3.506 17.71 4.186 1/27/97 1.72 2.02' 1.04 4.78 18:27 4.22 1/28/07 1.15 2.03 1.04 4.22 18.4 4.09 1/29/97 0.899 2.02 1.04 3.959 18:15 4.209 1730/97 1.77 2-.01 1.04 4:82 18.79 4..18 1/31/97 0.102 2 1.04 3.142 17._93 4.002 Averages 1 1.145355: 2.045161 1_.04 #DIV/0!• #DIV%0! 4..270864 -1.8.3 4:294955 Page 1 I � Feb97 MGD MGD MGD MGD Date Lake O. in B Well #2 in Well #3 in Total MG MG in Demand Bull Run TVWD in Well#1 in MGD MGD Pur./Prod. Storage in MG 2/1/97 1.14, 2 1..04 4.1.8 17.86 4.25 2/2/97. 2.845 2 1.04. 5.885 19.02 4.725 2/3/97 0.495 2.02 1.04 3.555 18.27 4.305 2/4/97 . 1.59 2.02 1.04 4.65 18.82 4.1 2/5/97 1.55 2.03 1.04 4.62 19.3 4.1.4 2/6/97' 1.0.2 2;03 1.04 4.09 19.26 4.13 ' 2/7/9.7 0 2.03 1.04 3.07 18.34 3.99 2/8/97 1.44 2.03 1_:04 4.51 18.56 4.29 2/9/97 0.334 2:02 1.04 3.394 17.63 4.324 2/10/97 1.67 2.03 1.04 4.74 18.13 4.24 2/11/97 1.31 2.02 1.04 4.37 18:41 4.09 2/12/97 1.21 2.01 1.04 4.26 18.58 4.`09 2/13/97 1.52 2.01 1.04 4.57 19.1 4.05 2/14/97 0 2:02 1.04 3.06 18.11 4:05 ,2/1.5/97 0.301 2.02 1.04 3.361 17.16 4.311 2%1.6/97 2.19 2 1.03 5.22 18.2 4.18 ,2/1,7/97 2:33 2.02 1.04 5:39 1,9:26 4.33 2/18/97 0.075 2.02 1..04 3.135 18.18 4.215 2/1,9/97 2.01 _Z 02 _ 1.04 5.07 1.9.44 3.81 2/20/97 0` -2:02 1.04 3.06 18.62 3.88 2/21/07 0.939 2.01 1.03 3.979 18.14 4.459 2/22/97 0.485 2.02 1..04 3:545 1.7.34 4.345 2/23/97 2.73 2 1.03 5.76 18.65 4.45 2/24/97:. 1.74 2.02 1.04 4.8 19.14 4.31 2/25/97 0.489 2.02 1.04 3.549 18.57 4.1.19 2/26/97 1.79 2.02 1.0.4 4.85 19.34 4.08, 2/27/97 0.631 2.03 1.04 3.701 18.94 4.101 2/28/97 0.686 2.02 1.04 3.746 18.64 4.046 Averages 1.161429 _2.018214 1.038929 #DIV/0! #DIV/0! 4.218571 18:5360.7 4.193214 Page 1 Narrative Performance Measurements 1994/95 1995/96 1996/97 1997/98. Miles of water mains 203 207 210 214 Reservoirs 12 12 12 13. Fire Hydrants 1;504 1,580 1,620 1,660 Pump Stations 6 6 6 6 Meters and Services 12,846 13,325 13;9,00 14,400 Pressure Reducing Stations 12 14 14 1:5 Wells 4 4 4 4 Full Time_EquivalentPositions 1994/95 1995/96 1996/97 1997/98 Utility Manager 1.00 1.00 0.50 0.50 Operations.Manager 1.00 1.001:00 1.00 Water Operations Supervisor 1.00 1.00 1.00 1.00 • Sr Utility Worker 3.00 3.00 .3.00 3.00 Water Works Inspector 1.00 1.00 1.00 1.00 Water Quality Program Coordinator 1.00 1.00 1.00 1.00 Utility Worker II 6:00 6..00 6.100 7.00 PW Tech 1.00 1.00 1.00 1.00 Admin. Specialist 0.50 Total.Position 1 15.50 15.00 14.50 15.50 Service Level Standards Emergency situations (i.e. water main break, wind/winter storm, storm water incident, sewer surcharge, etc.) that occur within normal working hours, will be responded to by City staff within fifteen minutes of notification..Emergency situations that occur after normal working hours will be responded to within forty-five minutes after notification. Respond to citizens inquires within twenty-four hours. Read one half of the meters within the Water Service Area monthly. Water meters will be installed within seven working days of purchase. Water, sanitary sewer.and storm sewer lines to be located within forty-eight hours of notification. • Assist in designed community events in a manner that promotes good will between the City and the Community. Page 2 Narrative ' .> .: ... ....... ......,vvv:::w::::::.,•.�::nvv.�nv:•nw.vw:::::.�:.,•::::::•::.�:::•:::w::w:.�::::::.:::..:w::::::::::::::.:�::.:w:::.v:•.::::w:::•..v.�.w::x:.:•nv:..w::::::...:v:::••:::;:..4 "... iii��>.:i\::>.uttiiiLti:tii•'.:iii:>.L::i>.iii::iiitii?ry::'{''iiiiivti;:.;,.i:::•}:yiy:::aib'^:•i::•%:n};:.y}}v;xw:p:•i::;.v}:::.}::{.:�v}vvvvv}•y}vvi:^isii::•.uux..::::;.:y.;:y}•.v:}•.:y;}:.v:... ....i..v...,...,..vxn...n.,..x.:..:.v.vvvx.,.nv....:... •'��ti;iiii/•:i jiiv't`tivtiivti`iai;tivit{+vititi::tiiviii>.ti'iL::titiivtiii'vv$vv::i:ii2tivi�tiii+4v`:`viiiv iii`:i i~ii<M1::i[ii•`.::Lv'�vv>.ti>.v:4iiititiii?::isiit>.?i::i`i`iiiii•`.::tiiiiiv�`���Y::i": :.:: .... ...: :� Program Summary: 1997/98 Goals,and Objectives: The Water Division is responsible to the Public. Continue,to develop cooperative'agreements for our' Works Director. The Water Division has the long term water supply needs. responsibility to maintain,repair and expand,the: water:system;while at the same time providing.a Construction of a 3.5 million gallon reservoir at the dependable,watersupply at the highest quality to Menlor property. its customers. The'Tig'ard'WaterService,Area,is comprised of the cities of Durham, King City, two Implement and utilize the Hansen computer thirds of Tigard and the unincorporated areas of software"program for developing a preventive the Walnut Island and Bull Mountain (Tigard maintenance program, record keeping and the Water District).. replacement of the.existing:inventory system. Provide efficient and effective maintenance of the water system. Start a valve maintenance and,line flushing, program. Develop a'cooperative working relationship with Engineering, so as to have better coordination with projects.. 1996/97 Accomplishments: Program Highlights: Completed construction of a 8-inch water main Addition of 1 FTE to replace four part time located on SW 130th Avenue, from SW Hawks temporary positions and enhance the abilityto start s„ Beard to Scholls Ferry Rd. the valve maintenance-and water main flushing programs. Completed construction of 12-inch water main within the_ 130th Avenue bridge project. Reservoir cleaning program utilizing divers to.clean the reservoirs while they remain in operation. Completed relocationof water meters and services on SW Durham Road, due to Meter replacement program consisting of replacing Washington County Street.Improvement project. all meters 1 1/2"and larger with meters capable of capturing additional revenues. Completed,relocation of water services, meters, fire hydrants and replacment of 200 feet of&-inch water main on SW Hall Blvd, due to Oregon Department of Transportation improvement project. 'Secured 4.0 million gallons of water per day from City of Portland at,a.reduced rate._ Rate is.based on increased purchases and this years peaking factor. Page 1 Murray S.md&Associates,Inc. Enoeeglanners 121 S.W.Salmon,Suite 1020 Portland,Oregon 91204. • PHONT 503.225.9010 FAX 503.225.9022 ------------------------ Washington County Supply Line Hydraulic Capacity Analysis Project Startup Meeting March 7, 1997 Chris Uber, Murray, Smith &Associates, Inc. Meeting Agenda: 1.. Project Scope and Purpose 2. Water Demand Estimates and Existing Delivery Capacities 3.. Review Map, Model and Calibration. 4. Project Schedule and Next Meeting Estimated Water Demands Estimated water demands have been developed and are presented in Table 1. These estimates were developed from water demand estimates presented in the Phase.2 Regional Water.Supply Plan. Table 1 Water Demand Estimate Summary fiaEshmated Avera a Da and'Max�mumDa' WaterDemands m d � ' Yeair� ;Cryo Ti and ��, Co Tualatin [gall r Ci o 3C' oRaler h Water .:M �a IMMMYSonvrlle, Ave Max f Ave' Max ° AveIviax; Ave Iy1ax Ave Max Ave ` Max r1995 4.7 12.2 2.1 6.7 15.2 39.4 y�1.8 5:0 0.5 1.7 0.7 1.2 � 4.7 12.3 2.1 6.8 15.4 39.9 1.8 5.0 0.5 1.8 0.7 1.2 4.7 12.5 2.1 6.9 15.5 40.5 1.9 5.1' 0.5 1.9 0.7 1.2 4.7 12.6 2.2 7.0 15.7 41.1 1.9 5.2 0.5 1.9 0.7 1.2 4.8 12.7 2.2 7.1 15.9, 41.7 1.9 5.2 0.5 2.0 0.7 1.2 2000 4.8 12.9 2.2 7.3 16.0 42.3 1.9 5.3 0.5 2.7 0.7 1.2 2001 4.8 13.0 2.3 7.4 16.1 43.7 1.9 5.4 0.5 2.2 0.7 1.2 2002 4.8 13.2 2.3 7.5 16.3 1 45.1 2.0 5.4 0.6 2.3 1 0.7 1.2 '2003 4.9 13'.3„ 2.3 7.6 1.6.5 46.5 2.0 5.5 0.6 2.3 0.7 L:2 2004: 4.9 115 2.3 7.8 16-.7 48.0 2.0 5.6 0.6 2.4 0:7 1..2 2005 4.9 13.6 2.4 7.9 16.9 49.4 2.0 5.6 0.6 2.5 0.7 1..2 2010 5.1 14.4. 2.5 8.6 17.9 49.4 2.1 6.0 0.7 3.0 0.7 1.2 Washington.County Supply Line Hydraulic Capacity Analysis 'Project Startup Meeting, March 7, 1997 • Page 2 The estimates presented in Table 1 include average.day and maximum day demands to the year 2010,-of for the next 13years. The Regional Water Supply Plan presented water demand estimates in five year increments beginning in 1995. For this analysis a straight line interpolation is assumed for the year between the five year estimates. For the purposes of this analysis it is assumed that the Metzger area of the Tualatin Valley Water District comprises approximately 15 percent of the District's average daily and maximum daily demands. Please review the estimated water demands and let me know if they accurately reflect estimates for average day and maximum day demands for your agency. Existing Delivery Capacities, Portions of the Supply Line's service area can also be supplied by other existing facilities. Northerly portions of the.Tualatin Valley Water District can be supplied:through the Washington,'Park Pump Station Complexes. The Metzger Area of the Tualatin Valley Water. District and the City of Tigard can be supplied through ithe Fulton and Carolina Pump " Stations',the Burlingame system, located in'southwest Portland. Discussions with Bureau of • Water Works operations staff indicate the Washington Park Supply system can provide approximately 12.0 mgd.to the Tualatin Valley Water District at the Arlington Heights Reservoirs and approximately 8:.6 mgd through connection points in the Metzger area, including the connection,at Bradley Corner' The Tualatin Valley Water-,District is presently supplied through the Joint Water Commission supply system as well. For the purposes of"this analysis it is assumed that this system will supply the District approximately 6:0 mgd through 1998 and approximately 11.0 mgd there after. Hydraulic Model Development The City of Portland developed a basic model of the Washington County Supply Line using;; Stoner Hydraulic Analysis Software. This model of the Supply Line ends near:the intersection of SW Beaverton-Hillsdale Hwy. and SW Oleson Road. The existing model was expanded using Cybernet hydraulic modeling software to include the Tualatin Valley Water District's 5.4-inch diameter supply main, the 48-inch diameter Metzger Area and City, of Tualatin supply main and the City of Tualatin's 36=inch diameter..supply main. The model includes the end of the Tualatin Valley Water District supply main at the • Power Generation Station and the City of Tualatin supply main to the end of the 36-inch diameter main in the City.of Tualatin. A digital representation of the model has been Washington County Supply Line Hydraulic Capacity Analysis Project Startup Meeting March 7, 1997 •, Page 3 ,prepared. The model includes.nodes representing existing and potential.points of supply to the following entities: 1 Raleigh Water District 2. Tualatin Valley Water District (at two locations) 3. City of Tualatin 4. City of Tigard As illustrated Sherwood and Wilsonville will be supplied through the same demand node as the City of Tualatin. `Model Calibration Calibration,of the hydraulic model is presently underway using data from a number of agencies. Project Schedule It:is,anticipated that the review of the estimated water demands will be completed no later than March, 15, 1997: Following the completion of final model calibration and the receipt of review comments concerning estimated water demands and supply capacity assumptions a technical,memorandum summarizing the following work tasks.will be prepared: Task 1,- Data.Gathering and Establish Existing�Conditions Task 2 Model Development Task 3 Model Calibration Task 4 - Develop Base Case Scenario It is anticipated that a draft of this first technical memorandum,will be completed by March 28, 1997. Please do not hesitate to call me at 225-9010 should you have any questions concerning the demand estimates, model development or project schedule.