Loading...
09/11/1996 - Packet . ............ .... .... • ...... ...Pn ... -... ,_....__ .'>..��.�.«..��-��c:d-lay..r_ams. - �_.L._'..f�r..c.._�...��_..,.�..._.z-.�....r.�e......a.�_...'c✓:.•.=:r..L,.M; ...t,�.. PUBLIC BOOK IN'rERGOVERNM ENTAL WAFER:BOARD MEETING Serving Tigard;'King City; DiirM' and Unincorporated-Area AGE �'. Wednesday, September 11;.1996 1: Call to Order . Roll;CIntroductions . 3: Visitor Comments:, 4: Approve.Md 15; 1996>and:July 10 1996 Meetu g Minutes • 5: Letter for Adjustment Roald Lund 6: `Diieetor's ;Report - a•. Menlor;Reservoir.Update b. Regional'Vater'.Supply Plan Update and Consortium 7. Water leak.policy proposal - Wayne:Lowry 8. .-Non Agenda Items 9. - 'Adjournment Executive Session: The Intergovernmental Water Board may go into Executive Session under the provisions of ORS 192.660 (1) (d), (e), & (h) to discuss labor relations, real property transactions, and current and pending litigation issues. All discussions within this session are confidential; therefore nothing from this meeting may be disclosed by those,present. Representatives of the news media are allowed to attend this session, but must not disclose any information discussed during this session. kamy\fwb\9-.1 Lagn INTERGOVERNMENTAL WATER BOARD MEETING MINUTES MAY 15, 1996 Members Present: Chair Scheiderich, Beverly Froude, John Budihas, and Bob Rolhf Staff Present: Bill Monahan, Ed Wegner, Mike Miller, Wayne Lowry and Kathy Kaatz Visitors Present: Carolyn Houghton, Jack Polans, Bob Tomlinson, John Haunsperger 1. Call to Order The regular meeting of the Intergovernmental Water Board was called to order at 5 :40 p.m. 2 . Roll Call and Introductions Roll was taken with all members present with the exception of Paul Hunt and Bob Tydeman. The alternate representative from the City of Tigard, Mr. Bob Rohlf was present. There was no representative present from the City of Durham. Mr. Monahan stated that the new alternate for the City of Durham is Mr. Chris Hatfield. 3 . Visitor Comments Jack Polans stated that he was present at the meeting to find out what the citizens will be paging for water services and also is interested in knowing the measurement and consideration of the minimum amount. 4 . Approve April 10, 1996 Meeting Minutes A motion was made by Bob Rohlf to approve the minutes of the April 10 , 1996 IWB meeting which was seconded by Commissioner Budihas and voted upon unanimously. 5 . Letter for Adjustment Ms . Carolyn Houghton was in attendance at the meeting to request additional credit on a substantial water bill she received for $633 as a result of a water leak that occurred from the main to the residence. Accompanying Ms. Houghton was her tenant, Mr. Nick George. Mr. George stated that during some landscape work the leak was discovered. Mr. George stated as soon as the leak was discovered they contacted the City who came out and assisted him in determining where the leak was located and turned the service off . The leak was then repaired immediately. Mr. George stated that the leak was approximately 4 feet underground. Mr. Scheiderich questioned what the typical monthly billing for this residence was? Mr. George stated that the bill generally runs approximately $61-71 dollars per month. Commissioner Froude stated that policy allows for $165 . 00 credit to be applied which would leave a balance of $468 . 00 . Mr. Wegner stated that the policy does allow a credit amount $165 . 00 or to follow the appeal process by coming to the Board. Mr. Rohlf questioned the basis for the $165 credit allowance? Mr. Lowry stated that this is an existing policy that the Water District has always had with a slight increase. Ms . Houghton stated that she owns five properties in Tigard and has experienced three additional leaks this year with substantial repair bills . Mr. Rohlf questioned the purpose served by this policy? Mr. Wegner stated that it allows staff some latitude in applying this credit without bringing all issues less than this amount to the Board. Mr Rohlf questioned calculating the actual cost of the water loss? A motion was made by Commissioner Budihas that the Board examine the billing for this address and make a decision at the next meeting. Mr. Rohlf stated that the City only needs to recoup the actual costs of the water. Chair Scheiderich motioned that the Board delegate to staff to allow credit for the bill minus the City' s direct cost of the water or $165 . 00 whichever is greater. This motion passed unanimously. Mr. Lowry stated that the staff would be in contact with the property owner. 6 . Prater Rate Study - CH2M Hill Mr. Lowry stated that Bob Tomlinson was in attendance from CH2M Hill to discuss the proposed rate study. Mr. Lowry stated that Mr. Tomlinson was present at this meeting to make a brief overview of the report and the conclusion of the report as well as CH2M Hill ' s recommendations . Mr. Tomlinson distributed a short handout that outlined the rate study, recommendations and the rate design options . Mr. Tomlinson discussed the following briefly: • SDC Recommendation. (Table LS-5 , page FS-8) Recommendation to adopt the revised SDC charges . These charges were _calculated to adopt a reimbursement fee SDC. These fees as based upon the systems current fixed assets and will allow reimbursement of existing users for the investment in the Intergovernmental Water Board Meeting - May 15 , 1996 Page 2 current system. Also calculated was an improvement fee SDC. This is a calculation based upon the capital improvement plan for the next five year. Oregon State statue allows these fees to be added together to get a combined System Development Charge (maximum charge) . This fee calculated out to the figures outlined in table ES-5, page ES-8 . This recommendation is based upon current investment as well as planned investment for future users . Chair Scheiderich questioned whether the planned investment have any contingencies amount built into the projected costs? Mr. Tomlinson stated that they have inflated the capital improvement by 426 a year. Chair Scheiderich also questioned the construction costs estimates and contingencies? Mr. Tomlinson stated that he believed that those figures were also inflated. Mr. Scheiderich questioned the concern during year four or five of an annual revenue shortfall made up by excess revenue the first few years. Mr. Tomlinson stated that they calculated five year average rates . Mr. Tomlinson continued by stating that the organization needs to have some fiscal restrains so during the years of excess revenue that these funds are placed in a rate stabilization fund to allow for shortfall . Mr. Tomlinson continued to say that their recommendation is to continue the buyers service connection charge which is currently $1, 250 . 00 . • Rate Design Options . (Table ES-2 , page ES-5) Mr. Tomlinson stated that in examining the current revenue requirements, the current rate design is sufficient to allow for planned costs and expenditures for the next five years . Based upon the assumptions of this study, these rates should be sufficient for the next five years. CH2M Hill does recommend to go with cost of service rates which are more equitable and more defendable. These proposed costs of service rates are outlined in Table ES-2, page ES-5 . This table outlines two scenarios for both a based bi-monthly and a volume charge. The first scenario outlines a volume rate plus minimum customer charge. The minimum charge only includes the customer costs (fixed costs associated with billing and meter reading) . This second scenario includes 800 cf of initial demand in the base charge, with the same volume rates applying for usage c over 800 cf . Mr. Scheiderich questioned whether there would be a revenue loss while assessing all residential users a minimum of 800 cf . Mr. Tomlinson stated there might be a slight loss but are actually looking for revenue stability while adding an additional amount of demand into the base charge_. Mr. Scheiderich questioned the percentage of the demand by the various classes and the correlation between this and the 100ccf charge? Mr. Tomlinson stated the percentages are used to allocate the cost to the customer classes and these costs are divided by the estimated demand over the five years . The percentages are applied to the costs . Intergovernmental Water Board Meeting - May 15 , 1996 Page 3 Mr. Tomlinson stated that they also looked at the seasonal conservation surcharge which is summarized on Table ES-3 on page ES-6 . The breaking point on these figures was 50 cf so in the summer months someone in the residential class that uses more than 50 ccf would be charged an additional amount. The revenues collected from this charge are in addition to the cost of service revenues . It is the recommendation of CH2M Hill that these revenues are used to fund a comprehensive conservation education program. Mr. Scheiderich questioned the minimum annual amount of revenue to fund an adequate conservation program for this size service area? Mr. Tomlinson stated that $100, 000 minimum would be sufficient (table reflects $61, 000 minimum) . Mr. Scheiderich questioned whether an inverted block rate was considered? Mr. Tomlinson stated that it was considered although they had problems gathering the data which made it difficult to make this recommendation. Mr. Scheiderich asked if we know what Tualatin Valley Water District is increasing their SDC to? Commissioner Froude stated that they are increasing their charges from the current charge of $1, 860 to $2, 160 . Commissioner Froude stated that the residents on Bull Mountain are not happy with the additional booster charge and feel that it should be lowered. Mr. Tomlinson stated that this charge reflects the additional costs of pumping water to the higher elevations. Commissioner Budihas stated that the residents of King City are happy that their rates will be lowered. Mr. Wegner stated that it is important to understand that the rate only decreases if you change the way that you bill . Residents will pay for what they use, there is not a reduction in rates . Chair Scheiderich questioned whether there are any consumer price index factors that are figured into any future rate increases? Mr. Tomlinson stated that they have inflated costs for the next five years . He continued by saying that the inflation rate is based upon current inflation rates and if something would happen to increase the inflation rate, these rates would need to be re-visited. Mr. Scheiderich stated he thought it would be appropriate for the Board to state a consensus on the preference on a rate that begins with 100 cf. Mr. Scheiderich questioned how the 800 cf minimum was arrived at? Mr. Lowry stated that he believed this figure to be derived from a system average. Mr. Scheiderich requested clarification on the USA rates as they apply to water consumption. Mr. Lowry stated that these charges are based upon a winter average on water usage which becomes the users average for the next year and they apply a base charge plus a volume charge. Intergovernmental Water Board Meeting - May 15 , 1996 Page 4 Mr. Lowry stated that currently our minimum charges is $14 . 30 for 8 ccf on a bi-monthly basis . This is approximately $1. 78/ccf plus volume charge of $1. 32 . On the assumption that the first 8ccf were sold at $1.32/ccf then we would be charging $3 . 74 more for the 8ccf. This is the same logic as the proposed charges with the difference in charging only for what the user uses . Mr. Lowry referred to Table ES-2 , page ES-5 that lists the two scenarios a) base charge, no minimum water and users pay $3 . 89/bi-monthly (cost of billing) plus every unit used, b) same as currently using with minimum charge. Mr. Lowry stated that the staff prefers the no minimum charge since lower use customers are penalized for water not being used and have no incentive to conserve. Mr. Lowry stated if we choose the option with no minimum there is the potential for cash flow concerns although since the system is so large this will not be an issue. The staff prefers the no minimum charge since it promotes conservation without a complicated rate structure. Mr. Lowry referred to Table ES-1, page ES-2 which outlines the current rate structure, and its complexity. On Table ES-2 on page ES-5 this captures the simplicity of the no minimum charge and reflects a cost of service rate. Mr. Lowry emphasized that this a revenue neutral rate proposal . There is no increase or decrease in rates, just a change in rate structure based upon cost of service. On Table ES-4 Mr. Lowry pointed out the significant impact on certain users, although residential users will see virtually no change, higher volume users will see a significant change. Mr. Lowry stated that their are 526 commercial accounts and 8 industrial users . Commissioner Froude questioned the irrigation notation on the table? Mr. Lowry stated that certain customers have irrigation meters (Pac Trust) which are used for irrigation purposes . These irrigation charges will encourage conservation from these users . Mr. Lowry discussed the computer system that the Finance Department is utilizing for billing which was purchased prior to the merger of the District with the City and it is set up to deal with more complex billing practices . To incorporate changes to the current billing system will however take some time to transition. Mr. Lowry stated that if the Board decides to change the rate structure, it would be his recommendation to look at some other billing issues such as monthly billing versus bi-monthly, meter reading, even pay plans, automatic withdrawal, etc . Mr. Lowry felt that this should be able to be accomplished by January 1 . Intergovernmental Water Board Meeting - May 15 , 1996 Page 5 Mr. Haunsperger stated that on the issue of irrigation and conservation, this may place some incentive for the irrigation users to make use of gray water (effluent water) from USA. Chair Scheiderich stated that he thought this issue should be broke up in to a couple of topic issues for decision: • Whether to adopt the rate structure that charges only for amount used as opposed to minimum amount used (volume rate plus minimum customer charge) . • Proposed SDC charges . • Summer surcharge for excess consumption. What should it be? Mr. Polans asked the Chairperson if there would be a public hearing on this? Chair Schederich stated that not at this Board. Mr. Polans questioned whether a public hearing would be held at the Tigard City Council level, with Mr. Scheiderich response being that he assumed so. Chair Scheiderich questioned whether there was a consensus on the adoption of the volume rate plus minimum customer charge? Mr. Haunsperger stated that the Tigard Water Board recommendation was to initiate the charge only per use. Commissioner Froude stated that her concern in doing that is that there is enough time to get information out to the customers especially if users go over the 50ccf during the summer months . Ms. Froude is concerned about having a program in place prior to enacting a new rate structure. While polling the Board, it appeared that there was a consensus on the adoption of the volume plus minimum charge. Mr. Scheiderich questioned whether there was a consensus on the proposed System Development Charges including the high elevation? Mr. Wegner stated that Mr. Lowry is assuming the implementation to be January 1 therefore, the changes will not be seen during the summer months . On the SDC charges, Mr. Rohlf questioned whether these amounts were too low in comparison with surrounding communities . Mr. Tomlinson stated that the SDC need to be based upon actual system wide needs . Mr. Lowry stated the only way to charge a higher SDC would be to have more capital projects and this plan does reflect realistic needs . Chair Scheiderich stated that the Board reached a consensus on the SDC issue. On the issue of a summer surcharge, Mr. Rohlf stated he was opposed to that and he spoke with Commissioner Hunt and he was also opposed to that . Commissioner Froude stated she would be more comfortable to have this summer surcharge in effect this year and re-visit if users are not conserving. Mr. Rohlf stated that if charges are based upon usage, there is no need for punitive measures . Mr. Lowry stated that maybe it would Intergovernmental Water Board Meeting - May 15 , 1996 Page 6 be appropriate to hold the conservation thought until this time next year or wait until the proposed rate structure is in place. Mr. Wegner stated that the new budget has $17, 000 budgeted for a conservation program which is about all the staff can handle. Chair Scheiderich stated that the Board agreed to proceed with the program and then determine a rate. 7 . Director' s Report Mr. Wegner stated that we have entered into an agreement with City of Portland to take 1 mgd which will lower the rate by .50 . This new scheme of buying will reduce winter consumption buying with Lake Oswego. This proposal will go to Portland City Council this week. Mr. Wegner stated that we are currently in the process of negotiating a contract with Murray Smith and Associates on the Menlor Reservoir site and should be going to City Council within the next couple of weeks . Work is continuing on the Regional Water Supply Plan and incorporation of comments with a new draft out in 3-4 weeks . Mr. Wegner stated that we will have wellhouse #3 completed by June 1 which will allow an additional 1/2 mgd to the system. Murray Smith and Associates is working with TVWD on improvements to bring in another 4 mgd over the next year. Mr. Wegner stated that he and Mr. Monahan are continuing to ~-- work with the Willamette River Subregional group. This group is not only looking at the Willamette but also at new transmission systems . Mr. Scheiderich questioned the status of the Damasch site? Mr. Wegner stated that will not be a future water site. Mr. Wegner also stated that John Acker, Property Manager has resigned effective June 14 and Rusty Thomas unofficially announced his plans for retirement effective July 1. Mr. Monahan stated that an analysis was done on the lease rate for the monopole with Sprint and it was determined that $800 a month was appropriate however, other issues have raised the rate to $900 per month if the City will agree to a longer term before being able to terminate the lease. The corporate office for Sprint also wanted an additional five years before being able to terminate the lease for a lease rate of $950 . The lease that was signed today states that we can terminate the lease after twenty years which will allow revenue in the amount of $421, 000 . Intergovernmental Water Board Meeting - May 15 , 1996 Page 7 8. Non Agenda Items Chair Scheiderich stated that the major parties to the Regional Provider Plan are getting together next week to draft an actual intergovernmental agreement for shared projects . Commissioner Froude questioned whether the Board had completed discussion on the Rules, Rates and Regulations? Mr. Wegner stated that we had decided to wait until the rate study was in place and get information together on backflow before proceeding with this discussion. 9 . Adjournment The regular meeting of the Intergovernmental Water Board adjourned at 6 :50 p.m. Intergovernmental Water Board Meeting - May 15 , 1996 Page 8 INTERGOVERNMENTAL WATER BOARD July 1.0, , 1996 MEMBERS PRESENT: Bill Scheiderich, Beverly Froude, John Budihas , Paul Hunt, Robert Tydeman STAFF PRESENT: Ed Wegner, Mike Miller, Kathy Kaatz, Cynd'i Turner, Trish Toedtemier VISITORS PRESENT: Todd Harris 1. Call to Order The meeting of the Intergovernmental Water Board was called to order at 5: 3,2, .p.m. 2 . Roll Call and Introductions Roll -:call was taken with all Board Members present with the exception of Robert Tydeman from the City of Durham who arrived momentarily. • 3 . - Visitors Comments The' Boardrecognized Mr. Todd Harris who was present at the meeting to discuss an adjustment to his billing (Agenda item #54) and was allowed to proceed at this time. Mr. Harris began his discussion by noting hisilette'r that had been submitted to the Board. He continued by stating that he was initially contacted by the City staff noting that. there was an apparent water leak at his property. City staff contacted him and stated that the meter had been checked twice and . there was a problem. The staff made. contact with Mr. Harris at his work and after checking found a -broken pipe underneath his garage . Mr. Harris stated that his water bill had climber to over $600 . 00 and when he contacted City staff was told they could allow him a $165 . 00 credit and if he was not satisfied he could appeal that to this Board. Mr. Harris continued by saying that he did not feel that the $165 .00 credit was adequate for a billing of this size and questioned whether the adjustment should be based upon a percentage basis with this high of a dollar amount? Mr. Harris continued by saying that his repair bill on this break was over $2 , 000 . 00 . Commissioner Budihas questioned whether Mr. Harris received the $600 . 00 billing on one bill or two? Mr. Harris stated it. • was all on one bill . Mr. Harris stated that when " he was contacted at his work, he `was to meet someone from the- Water Division at the property address . Mr. Wegner stated that the process was that the meter readers read monthly for a every other month billing and when the read came in notably higher, someone was sent back out to re-read the meter which still indicated higher usage and that was when Mr. Harris was notified there was a problem on his side of the line. Mr. Harris would then have received the original bill for the $600 . 00 amount and after that receiving that he can apply for the credit . Mr. Harris stated that it was their assumption that the break was indeed on his side and he called a plumber who found it to be under the garage. Commissioner Hunt questioned the time frame between the two meter readings? Trish Toedtemeier stated that she thought it was about a day an a half between readings . Commissioner Budihas stated that as a homeowner, the area after the meter and to the residence it is the homeowners responsibility and that the Water Division had done what they could. Chair Scheiderich questioned where the amount of the $165 . 00 credit came from. Ms. Toedtemeier noted that it was her understanding that was a historical figure that was determined earlier and is generally increased with rate increases . Mr. Wegner stated that this figure was raised about one year ago when the revisions to the Rules, Rates and Regulations was updated. Commissioner Froude stated that in the previous minutes it was discussed and the Board decided that the Board would delegate to staff to allow credit for the bill minus the City' s direct cost of the water or $165 . 00 whichever is greater. The previous bill that was discussed was issued $165 . 00 credit plus the $204 . 89 which was the credit above the actual water costs . Commissioner Hunt motioned that the Board should be consistent and do the exact same for Mr. Harris. This motion was seconded by Commissioner Budihas. Commissioner Froude stated she would save her discussion until later. Mr. Wegner asked for clarification on this issue. He questioned whether the Board gave the staff approval on crediting Mr. Harris' s bill the same criteria as the last credit (Houghton) ? The Board stated that was correct . Ms . Toedtemeier stated that they had already calculated that out to see the outcome which was he would receive an additional credit of $158 .45 plus $165 . 00 which would leave Mr. Harris a balance of $265 . 00 . The Board voted on this motion, which passed unanimously. Mr. Wegner questioned if this formula would be the standard for billing adjustments and should this information be prepared prior to the meeting to see what the total adjustment would be? Chair Scheiderich questioned what percentage of IWB Meeting Minutes - July 10 , 1996 Page 2 • a .dollar-_ is charged . per 100 cf is actual water costs (year around average): ? Mike Miller- stated that 'it is approximat.ely 70 cents... Ms . Toedtemeier stated that we currently charge $1 . 32 per' .100 cf . Commissioner Tydeman questioned the formula as reflected in .the previous minutes (May 15 page 2 , item #5) ... Commissioner Froude read from the minutes as follows : "Mr.. Rolf stated that the City only needs to recoup the actual costs. of the water" with the following motion, "the Board delegate to staff to allow credit for the bill minus the City' s direct cost of the water or $165 .00 whichever is greater" . The Board continued discussion with Commissioner Froude stating that since the policy of the $165 dollar allowance was determined, the Board has always . changed the policy and- allowed a larger credit . Commissioner Hunt requested- that .Mr. Wegner come up with a policy proposal to discuss at the next meeting. Mr. Wegner stated that Mr. Lowry will be involved in development of this policy. 6 . Director' s Report Mr. Wegner stated that he would like--to bring the Board up to date on three or four projects that- are continuing: Lake Oswego - We have been negotiating to purchase into the Lake Oswego treatment plant with the idea that they. would • expand their capacity from 16 mgd to 30-32 mgd. The Lake Oswego plant is located in the City of West Linn which is not allowing plant expansion since this plant is located within a residential neighb-orhood.. The West Linn Planning Commission did grant approval to capital improvements necessary to the existing treatment plant, but did.not give permission for an expansion. In the Metro 2.040 Plan, Lake Oswego has been designated as the water provider for the Stafford Road area. Both of these issues have stopped negotiations with Lake Oswego on any. degree of partnering. By the end of this week, we will be receiving a contract to purchase water from Lake Oswego. Two years ago we had a letter of agreement extending the -old. Tigard Water district Contract for a period of one year. They are currently writing a contract for -.the City of Tigard to purchase excess water. .Tualatin Valley Water District - Gene Sibel has retired, and Jesse Lowman, the previous Assistant General Manager has assumed the position of General Manager. Mr. Lowman has spoken to Mr.. Wegner and hopefully the relationship with them will remain intact . We are currently purchasing water from them this summer as well as the Baylor Street connection. We are working with TVWD in buying water in the future which will involve some transmission improvements . TVWD will have between 8-13 mgd in excess water to sell . Murray, Smith and Associates and the TVWD Engineers are currently working on the ® conceptual design to see how this will work. IWB Meeting Minutes - July 10 , 1-996 Page 3 Consortium - Mr. Monahan and Mr. Wegner are both involved with a consortium that consists of the Citys of Wilsonville, Sherwood, Tigard, Tualatin, Canby, Clackamas Water District, Tualatin Valley Water District to look at the Willamette River as a potential water source. There have been a couple of engineering studies completed at this time and are looking at the feasibility costs of the treatment plant and transmission mains . A decision will probably be made in the near future in regards to Wilsonville since they are in need of an immediate water source. Tigard may go with the Consortium in purchasing land and build a small plant within the city limits of Wilsonville or an area down toward the river. Commissioner Tydeman questioned how much land would be necessary? Mr. Wegner continued by stating that if land was purchased within an industrial area they would look at approximately 40 acres and if they found land outside the industrial area they would probably look at a 100 acre site . The actual need would be for approximately 60 acres . Mr. Wegner stated that we are currently purchasing water from TVWD, Portland, Lake Oswego and utilizing two of our own wells . Mr. Wegner stated that he spoke with Portland Water Bureau today and they are currently producing 168 mgd to sell with Tigard taking approximately 4 mgd. July 1 we began taking 1 mgd from Portland to reduce costs . Regional Water Supply Plan - The revisions have been made and the final plan will be sent for review to this Board and the City Council in September. The Steering Committee of the Water Providers have embarked upon a group of attorneys to begin working on a IGA which we will have a draft of in the near future. Rate Study - We are proceeding with raising the SDC' s and Mr. Miller is following the same procedure as we did with the Park SDC' s . This will involve an Open House held at the Water Building and then a formal public hearing before the Tigard City Council and then bring back a resolution to this Board. The target date is to implement these new charges by January. The resolution will hopefully be brought back to this Board by September. Menlor Reservoir site - A conditional Use permit will be submitted in approximately one month to allow some further investigation with the neighborhood. We will be holding a neighborhood meeting at the Water Building inviting residents from Bull Mountain Meadows and surrounding areas as well as Board Members . Meeting Schedule - Recently we have not had a lot of Board action items, so do we want to consider changing our meeting schedule? Chair Scheiderich stated since he was the member at IWB Meeting Minutes - July 10 , 1996 Page 4 • large and not representing a specific group of people, he would leave discussion to the rest of the members . Commissioner Hunt stated that we do not need to meet just for the sake of meeting and stated that the Board could meet every other month or call meetings as needed: Mr. Wegner . stated that he felt a lot of the future meetings will be informational meetings versus action type meetings . Mr. Wegner stated that we could meet and have a meeting monthly or every other month or look at the possibility of sending out monthly updates . Commissioner Budihas suggested that we try meeting every other month and call a meeting if necessary. Commissioner Froude questioned whether the discussion on billing credits would be on the agenda in September? This item will be on the agenda in September. The Board decided to begin meeting every other month beginning in September. Discussion was held on what to do in the meantime with a water leak issue.. These will be placed on the agenda of, the next scheduled meeting, at times which could be two months . Commissioner Hunt questioned whether we would want to address the issue of "reasonable time" in having repairs completed. Chair Scheiderich questioned whether the meter readers have the previous reading when they read a meter? Mike Miller stated that they have hand held reader that displays the • previous reading. Discussion was held on whether there should be a door hanger that would flag the property owner to a high reading. Commissioner Tydeman questioned the term of the contract with Lake Oswego? Mr. Wegner stated that the existing contract with TVWD is ten years and we do not know at this time the length that Lake Oswego is considering, only that our rate will increase from 57 .cents to 63cents . Chair Scheiderich questioned the amount of TVWD output do we currently purchase? Mr. Wegner stated that we purchase 2 mgd out of their average 13 mgd output.. Chair Scheiderich stated that since we are currently purchasing one third of their total output, we could consider annexing into TVWD or beginning a water authority. Commissioner Hunt questioned the length of the contract signed with Portland? Mr. Wegner stated that we did not sign a new contract with Portland, although we are operating under the Tigard Water District Contract which is effective through 2007 . We have modified the . contract and increased our purchase amount at a reduced rate . During the winter months this will have a significant impact on Lake Oswego since our first purchase of 1 mgd will come from Portland. We could have increased this amount to 2 mgd although we did not want to have that sudden of an impact with Lake Oswego at this time . IWB Meeting Minutes - July 10 , 1996 Page 5 Commissioner Froude discussed an article in the paper as well as radio time on conservation and questioned what we are doing in regards to conservation? Mr. Wegner stated that we have the last two months have placed articles in the Cityscape and the Columbia/Willamette Conservation group is doing public announcements beginning yesterday and PGE is also doing some water conservation announcements. Commissioner Froude questioned the possibility of including something in with water bills? Mike Miller stated that we have seen a reduction in water usage lately. In 1992 prior to the drought, average gallon usage per capita per day was 150 gallons which is currently down to 130 gallons per day. This is a drop of 130 overall . Discussion was held on separating the billing to split water from sewer. Currently County residents are not billed for sewer usage and City of King City and Durham receive a separate bill from USA. The Finance Department began combining sewer and water billing with the City of Tigard and will combine the other cities at some point. These costs are itemized although you do receive one billing. 8. Adjournment The meeting was adjourned at 6 :25 p.m. The next scheduled meeting is September 11, 1996. kathy\iw b\iw b 7-10.mtg „%Owl IWB Meeting Minutes - July 10, 1996 Page 6 n.... .. :.-:•:.tom w. ::�%vl.:}. _, ... > > .,.moo..._...,..�...._ ,,,C?*ti-__... o -.-�:u. _- -.... ._..c._._ _ _. ..,.._... 1 • ROA,LD G. LUND 1'531.5 S.W. Bull Mountain Road Tigard, OR 97224, USA Phone (503) 590-5808 July 25, 1996 City of Tigard Utility Department P O Box 230000 Tigard, OR 97281-1999 Dear Friends: Your inspector Mike White came to my home during the week of July 15th and advised me I had a,very large leak somewhere in my system. We checked the meter and'it was going around though no water was turned on in the house or outside: We turned off the main valvecontrolling both the west side garden sprinkler system and garden faucet system. The meter stopped. This located the leak somewhere:within the west side garden system. Mike suggested l put in as many valves as necessary to define where the leak was. • We,walked the entire system but found no,damp earth, and Mike suggested the leak water was probably going down gopher runs (my property slants downward toward the north from the house). Mike was extremely helpful. Regarding pocket gophers, I have neighbor properties to the east and west where there is no effort to catch moles and pocket gophers;i I have been hiring Redi National Pest Eliminators for many months at $35 per month and they are trapping moles and poisoning pocket gophers which continue to plague-.me:, Because of my poor health(1 am under the care of doctors),. I could not work on the,project until the weekend of the 20th, at which time, with a helper, w&dug up the main piping area between the lawn and vegetable garden so that we could put in a valve cutting off the garden faucet system. This we did, and with all other systems open (but not running) we then checked the meter. That proved the leak existed somewhere in the roughly 150 foot vegetable garden faucet system. It was not practical to dig the whole system up, so that system has now been abandoned and 'is no longer connected to any water supply- -A new direct 45 foot line will be dug. and installed from the new valve to a single faucet at the north end of the garden as soon as my health permits. In the • meanwhile, any hose used in the garden runs directly from the one faucet on i...-......v _ ...+i.!' ':.•�•-'a.' ..ti.•�.� h^:- .:-1.•r:..-,rte.-..... -..• .:.. -.,..... .. ._ - .:.::\�.. - ..-_ -.`�...: _ _ r i • _ 1 • the positive side of the cutoff valve. The garden sprinkler system is apparently , ok with no leaks. attach invoices from A-Boy to the amount of $38.05'for valves and incidental supplies purchased to handle any eventuality I might have run into. The labor assistance in the plumbing work was done without charge by the maintenance. man who cleans my house once a week. When I do install a new single faucet garden line I will have to purchase about 50 feet of 1" plastic piping. I acquired this 3 acre property in 1964 and had a home built here which we moved into the following spring. I have been a water customer of the Tigard Utility Department and its predecessor since that time and always paid my bills promptly. Lam now a widower, 84 years of age, and I retired formally in the fall of 1984. Many years ago (possibly 20 or more) the contrcactor-instal led' main Fine from the meter to the house went out. The major leak was immediately seen and 1. called Modern Plumbing which ran a new copper Fine under the blacktop to the house. I paid the water bill without question. hope you can approve a significant reduction in the current bill of $1,206.02. •�' That is very tough for a retired 84 year old widower who is trying his best to keep up his home and property and pay high Bull Mountain taxes. Please let me know promptly so that I can send you a check. Very sincerely yours, ROald G•.Lund r REQUEST FOR ADJUSTMENT DUE TO A LEAK The City of Tigard Utility Department has a policy of issuing partial credits for le:,' that are repaired in a timely manner. G�rc iiy we expect leaks to be repaired within one b1 111() c,, ; , t��o months. Credits are based on your average usage for the same period in previous years. This average amount is then deducted from the billed consumption, divided in half(we pay half, you pay half), converted into dollars and a credit is issued to the account. Credits are limited to a maximum of$165. Please describe the specific circumstances of your request: See IPtter attached Date leak found: Wk of 7/i 5 Date leak repaired: stopped immediately. Leaking line abandoned. Cutoff valve installedcco . ACCOunt#' unt No. 3607500 Location of Service: 15315 SW Bull Mtn. Road Customer Name: R. G. Lund Mailing Address: 15315 S W Bull Mtn. Road, Tigard 97224 590-5808 Street address City State Zip Phone DOCUMENTATION PLEASE SUBMIT COPIES OF PLUMBER'S BILLS AND/OR RECEIPTS FOR PARTS, REQUIRED TO FIX THE 1- ------------------------------------------------------------------------------------ FOR OFFICE USE ONLY Previous years usage: �2_7 & i �� &3-7 - �� �G npe iod�.used — = x sl = 553. P < Avera2c Leak Period Loss Total Credit:$�'� Date Issued: 7 ssued By: L` 61'/ MSL Mqtster Record Dump Printed: Tuesday, July 30, 1996 12: 26pm Page: 1 Account Info Meter & Financial Info Ac #: 3607500 Ftg: Mtr #: 1305 # Dials: 4 NoBl : _ Grp: 05 Rte: 0036 Seq: 5490 Sze: 1 1/2 Mon: - # Mts: 01 G/C: C Area: TW Type: RES Prm: Sew: Swm: Win: 15 XRef: Ten: _ Spec: _ Rates NB Codes Step 1 Desc Legl : Op: Water: - B1.5- 14.300 BOOSTER 1 . Billable Address Sewer : X No charge Last : LUND Swm: X No charge Frst : R G Acct Flags Readings Addr : 15315 SW BULL MOUNTAIN RD Nt: Yes Ow: No Cur : 4929 07/16 Ms: No Mc: No Prv: 4035 05/21 City: TIGARD Use: 894 St : OR Zip: 97224 Cr : Balance Information Phn: (503) 590-5808 Water Sewer Swm Service For Address Bal : 1041 . 92 .00 . 00 Na: Pen: . 00 . 00 . 00 St: 15315 SW BULL MOUNTAIN RD Ot : Ap: C:: Total : 1041 . 92 St : ____ Zip: , ' Isactions history ^nted: Tuesday, July 30, 1996 12: 26pm Page: 2 For acct 3607500 Jate Ty Water Sewer Swm Total Open Reference 10/11/93 SB 0. 00 0. 00 0. 00 0. 00 Auto Conv 11/19/93 BL 84.24 84. 24 84. 24 Billing 1994/ 12/01/93 PY -84. 24 0. 00 0. 00 -84. 24 0. 00 01/20/94 BL 62.35 62. 35 62. 35 Billing 1994/ 02/02/94 PY -62.35 0. 00 0. 00 -62. 35 0. 00 03/18/94 BL 55.88 55. 88 55. 88 Billing 1994/ 04/06/94 PY -55. 88 0. 00 0. 00 -55. 88 0. 00 05/18/94 BL 52.53 52. 53 52. 53 Billing 1994/ 05/25/94 PY -52. 53 0. 00 0. 00 -52. 53 0. 00 07/20/94 BL 111.87 111 . 87 111 . 87 Billing 1995/ 08/03/94 PY -111 .87 0. 00 0. 00 -111 . 87 0. 00 09/14/94 BL 84.92 84.92 84. 92 Billing 1995/ 09/21/94 PY -84.92 0.00 0. 00 -84. 92 0. 00 11/09/94 BL 45.32 45. 32 45. 32 Billing 1995/ 11/15/94 PY -45. 32 0.00 0. 00 -45~ 32 0.00 01/04/95 8L 42.00 42. 00 42.00 Billing 1995/ 01/10/95 PY -42.00 0. 00 0. 00 -42.00 0.00 03/01/95 BL 38.07 38.07 38.07 Billing 1995/ 03/07/95 PY -38.07 0. 00 0. 00 -38. 07 0.00 04/26/95 BL 40.04 40.04 40. 04 Billing 1995/ 05/30/95 PY -40. 04 0. 00 0. 00 -40. 04 0.00 06/21/95 BL 53.88 53.88 53. 88 Billing 1995/ 06/28/95 PY -53.88 0.00 0. 00 -53.88 0. 00 08/16/95 BL 114.63 114.63 114.63 Billing 1996/ 08/22/95 PY -114.63 0.00 0. 00 -114. 63 0. 00 10/11/95 BL 85.56 85. 56 85.56 Billing 1996/ 10/23/95 PY -85.56 0. 00 0. 00 -85.56 0.00 12/06/95 BL 57.84 57.84 57.84 Billing 1996/ 12/13/95 PY -57.84 0.00 0. 00 -57. 84 0.00 01/31/96 BL 42.03 42.03 42.03 Billing 1996/ 03/12/96 PY -42.03 0. 00 0.00 -42. 03 0. 00 03/27/96 BL 46.64 46.64 46. 64 Billing 1996/ 04/02/96 PY -46.64 0. 00 0. 00 -46. 64 0. 00 05/22/96 BL 42.68 42. 68 42.68 Billing 1996/ 05/30/96 PY -42. 68 0.00 0.00 -42. 68 0. 00 07/17/96 BL 1 ,206.92 1 ,206.92 1 , 206.92 Billing 1997/ 07/30/96 BC -165.00 0.00 0.00 -165. 00 1 ,041 .92 Cr Leak � 'er ^ I' formation July 30 1996 12:26pm Page: 3 For acct 3607500 inted: Tuesday, , ' C/8: Cubic feet 1 Active: Yes Service: Both How: Add Make: B Read Type: ster Num: Size: 1 1/2 Dials: 4 [ ] Remote: [ ] Walkin [ ] Back [ ] Front [ ] Side [ ] Remote Flags: Dog Adjust Cmt Prev Usage Ty Yr/Cyc ted read te Curr Date 4 035 894 A 199701 Imported read 4,929 05/21/96 , A 199606 Imported /16/96 4' 035 03/26/96 4, 023 12 A 199605 Imported read �/21/96 4' 023 01/30/96 4, 008 15 A 199604 Imported read )/26/96 4' 008 12/06/95 3, 996 12 A 199603 Imported read L/30/96 3' gg6 10/10/95 3,973 23 199602 Imported read l/O6/95 3' g73 08/14/95 3, 929 44 1gg601 Imported read }/10/95 3' g2g 06/20/g5 3,862 67�H 1gg507 Imported read 3/14/95 3' 862 04/24/95 3, 842 20 A 1gg506 Imported read 6/20/95 3' 842 02/27/95 3, 832 10 A 1gg505 Imported read 4/24/95 3' 832 01/03/95 3, 823 9 H 1gg504 Imported read 2/27/95 3' 823 11/07/94 3,812 11 H 1gg503 Imported read 1/03/95 3' 812 0g/12/94 3,798 14 H 1gg502 Imported read 1/07/94 3' 7g8 07/18/94 3,754 44 1gg501 Imported read )9/12/94 3' 754 05/16/g4 3,692 62/A 1gg406 Imported read )7/18/94 3' 6g2 03/18/94 3,673 19 �� 1gg405 )5/16/94 3' 673 01/21/94 3,651 22 n 199404 }3/18/94 3' 651 11/18/93 3,627 24 n 1gg403 }1/21/94 3' 627 0g/22/g3 3,584 43 r\ 1gg4O2 Cnvt Reads 11/18/93 3' 584 O7/21/93 3,514 70 1gg401 Cnvt Reads 09/22/93 3' 514 05/18/93 3,457 5�� � 1gg306 Cnvt Reads 07/21/93 3' 457 03/1g/g3 3,425 32 H 1gg305 Cnvt Reads 05/18/93 3' 425 01/26/93 3,402 23 H 1gg304 Cnvt Reads 03/19/93 3' 402 11/20/92 3,378 24 H 1gg303 Cnvt Reads 01/26/93 3' 378 09/21/92 3'342 36 A 199302 Cnvt Reads 11/20/92 3' 342 07/21/92 3,304 3�� 1gg301 Cnvt Reads 09/21/92 3' 304 05/20/92 3,238 6�� � 1gg206 Cnvt Reads 07/21/92 3' 238 03/19/92 3' 197 41 H 199205 Cnvt Reads 05/20/92 3' 1g7 01/21/92 3, 172 3��� A 1gg204 Cnvt Reads 03/19/92 3' 172 11/20/91 3, 145 ��/ * 199203 Cnvt Reads 01/21/92 3' 145 09/19/91 3, 118 ��/ * 199202 Cnvt Reads 11/20/91 3' 118 07/19/91 3,054 b^f 1gg201 Cnvt Reads 09/19/91 3' 054 05/22/91 3,022 3�� ! 1gg106 Cnvt Reads 07/19/91 3' 022 03/1g/91 2,984 3lj p� 199105 Cnvt Reads 05/22/91 2' g84 01/18/91 2'963 2z � 199104 Cnvt Reads 03/19/91 2' g63 11/20/90 2,933 �]V * 199103 Cnvt Reads 01/18/91 ' �� � 11/20/90 2,933 aAl 6--� I ' RS WHOLESALE bing Supplies at Moksale Prices TlgaIl Northwest 12520 W.Main" 2012 N.W.Vahn �. 639.4321 226-1170ugAloha tv I. 17305 S.W.N Hwy. #o— 649-9412 _ Charge Credit Cust.Order No. Quantity Description Unit Amount 1 + D C 2 . 3 i 4 5 I { 8 7 8 9 10 11 12 13 i 14 i 15 No Returns or Exchanges without our consent.Cut Lengths,Special Orders,Sale Merchandise and Closeouts not subject to return. Returned material may be TAX subjected to a restocking charge.No Returns after 30 days. i Received By TOTAL so From: Self <FINANCE/KATHYK> To: FINANCE/ED Subject: Concerned citizen - Water treatment Date sent: Tue, 22 Oct 1996 14:41:27 Wayne called and said that he had a call from Mike Penick 579-1925 who was questioning our water treatment (or the lack of it) . Wayne informed him when our next IWB meeting is and he is thinking that Mr. Penick is planning on attending. He is concerned about the water not being floridated. Thanks! • MEMORANDUM CITY OF TIGARD, OREGON TO: Intergovernmental Water Board FROM: Wayne Lowry, Director of Finance DATE: September 3, 1996 SUBJECT: Water Leak Policy From time to time, water customers develop leaks in their water system on their side of the City meter. As a result,, great amounts of water can.be lost and the customers bill will be much greater than normal. Recognizing that water leaks will happen and create a hardship on some customers, the Intergovernmental Water Board(IWB) and the Tigard City Council adopted Tigard Municipal Code(TMC) section 12.10.070. This code section.allows customers to apply to the IWB for a.credit on their water bill equal to one ,half of the cost;of the, leak to a maximum credit of $1.65. Any applications for credit greater than $165 are considered, by the Intergovernmental Water Board on a case by case basis. The $165 credit was an arbitrary figure established by the Board and:'subsequently increased with the cost of,water over the years. The IWB has reviewed the application of three customers for credits greater than the $1;,65 in the last six months. :During the discussion of,the first of these three, it was suggested by a board .member that the customer should only have to,pay for the wholesale cost of the water lost through the leak. The City charges the, customer $1.32 per unit of water and Rays on the average $.70 per unit. Calculating the credit this way-, the.customer would get a forty seven percent credit against the billed amount of the leak. Since that time, all leak credits heard by the Boardhave been calculated in this way. Tigard water customers experience an estimated one hundred fifty to two hundred leaks per year. Most,are satisfied with the one half credit up to $165 that is granted by the staff. About ten to fifteen leaks per year are much more severe and costly to the customer. Only three to five:of those customers apply to the Board for greater relief each year. We would .like to clarify with the Board what the credit for leak policy should be. 'Does the Board wish to continue the current policy which gives staff the authority to grant a credit of • one half of the leak up to $165 and allow customers:to apply to the Board for anything greater, or does. the Board wish to change the policy to give a greater credit without application to the Board. This would result in larger credits being granted by staff and fewer being referred to the Board for consideration. Any change in the Board approved policy should be reflected,in the,Tigard Municipal Code. . We would like to discuss this issue at the September 11, 1996 IWB ,meeting. If you have any question's or would like more information prior.to the meeting, please call me at 639- 41'71 ext. 345. P • `TIGARD MUNICIPAL CODE through. customers' service connection in which 12.10.070 Credit.for Water Leaks. event such customer will be charged an additional monthly minimum for each additional customer When a water leak occurs on the customer's supplied. Such. .permit may be revoked and side of the water meter. resulting in an unusually separate:service:connections required at any,time. high water bill,customers can apply for a credit to (Ord.93-34,) their water bill equal to 1/2 of the cost of the leak (above the normal bill), up to a maximum of$165. 12.10.050 Furnishing Water. Customemi ust apply for credit'in writing, to the City, and forward proof `-of the le k being_fixed in The City shall not be obligated to furnish and a timely manner. L "� - /U �j �t-.NLS install, at its expense, system facilities for all 0 property within the City.. The City shall', so far as An applications for.credits,over$165 will be reasonable and practicable and within its financial considered by the Intergovernmental Water means, however, provide' adequate source of Board. (Ord; 96-02;Ord. 93-34) supply, necessary primary feeder mains, storage facilities .and other improvements necessary to 12.10.080 jurisdiction. makewater service generally available to all areas within the City. Extensions to furnish water to All service. Connections, meters, mains and areas not now served by the City willbe made at parts of the system through which water is served, the expense 'of those persons requesting service. except `thepipes beyond the ._meter, are the Such. extensions will be made by the City or by property of the City, and under its exclusive hose: expressly authorized by the City. All control. No person other than the Public Works plications for line extensions to provide new Director or authorized person shall install any service are subject to review by the City Council. seivice, make any extension, tum the water on or Consideration will be given to the City's ability to off, or otherwise tamper or interfere with the serve and to eligibility for annexation to the City water or the system. (.Ord.93-34) of the property to be served. The City may contract with other governmental,entices for the 12.10,090 Waste-Plumbing-Inspection. .provision of water. The. terms of service will be defined by agreement and 'consistent with the Water will not be furnished to premises terms of this Chapter. (Ord. 93-34) where it is allowed to run or waste to prevent freezing,. or through defective plumbing, or 12.10.060 Private Service Pipes. otherwise. Plumbing should be of high test and first class, and in conformance with the All pipes from the meter to the premises appropriate codes of the jurisdiction issuing the must' be installed in accordance: with gccd building permit, and where pressures may engineering practice, and maintained in good become high, on 5/8" x 3'/4" and 1" meters, a order by the customer. Pipes must be laid 24 pressure regulator may be installed at the meter inches deep provided with a stop and waste valve by the City to control varying pressures. (On for drainage, and all standpipes or fittings of any meters 1 1/2" and larger, customer is responsible kind must be so located, anchored and installed as for installing a pressure regulator.) The City w11 not to interfere with or endanger the meter. All not be responsible for damage from varying pipes must be well protected from freezing. (Ord. pressures. The Public Works Director or 93-34) authorized person may inspect pipes and plumbing at proper times. (Ord. 93-34) 12-10-2 Rev. 1/23/96