Loading...
Plans �I C- L M M SCOPE OF WORK Replace (2) Lennox Pulse furnaces with (2)Carrier 0 0 90+%gas furnaces.Connect flues to existing 2" PVC pipes. Re-connect existing electrical and controls. Connect condensate to existing drain lines. F_ F' Re-connect existing ducts. 004, - C ( Equipment Schedule , � s TAG F-1 F-2 Manfacture Carrier Carrier tc. s Model 59SC2A06017-14 59SC2A06017-14 MBTUH . 60 60 AFUE 92% 92% SEER Voltage 115, 1ph. 115, 1ph. Max MOP 15 15 Weight 144 lbs 144 Location Mech Rm. Lower floor Mech Rm. Lower floor Notes HALL BLVD. BAPTIST CHURCH Location: 14145 SW Hall Blvd.,Tigard,Or. 97224 Mechanical Room, 2 furnaces Scale: 1/8" = 1'0" Plan Sheet Drawn By: Date: 8-8-16 Rev. M-1