Loading...
09/08/2004 - Packet Interg' ove"rnmental Water Board Serving Tigard, King City, Durham and Unincorporated Area • Wednesday, September 8, 2004 5:3 City of'Tigard Water Auditorium 8777 SW Burnham Street Tigard, Oregon' 97223 t , FILE COPY Intergovernmental.Water Board Meeting Serving Tigard, King City, Durham and Unincorporated Area �#" `,,,,..,,S�AV 4.'fid' d t*%b•'�,"� a�'�bcr sTM '� �F�,C a r =ej r F� r 4 xa. 3AB, s� �€' s xrr^ �rlr' ' �,�3 a+i�`z '. ` "'f a �''�, . INS ., . �. �5'�r"., Wednesday, September 8, 2004 5:30 p.m. 1. Call to Order,Roll Call and Introductions Motion to call meeting to order, staff to take roll call. 2. Approval of Minutes—June 9, 2004 Motion fromBoard for minute approval. 3. Credit for Leak Request for Brighton Hill,Apartments—Tom Imdieke(10 minutes) 4. Clute Property•Update.—Dennis Koellermeier(10 minutes) S. Long Term Water Supply Update Dennis Koellermeier(20 minutes) 6. Informational Items—Dennis Koellermeier Items will be discussed briefly if time allows—otherwise printed info will be distributed. 7. Public.Comments; Call for,any comments from public. 8. Non Agenda Items Call for non-agenda items from Board. 9. Next Meeting: Wednesday, October 13, 2004, 5:30 p.m. — Water Auditorium 10. Adjournment;—Approximate Time 7:00 p.m. Motion for adjournment. A light dinner will be provided. Executive Session: The Intergovernmental Water Board may go into Executive Session under the provisions of ORS 192.660(1) (d), (e), (t) &(h)to discuss labor relations, realproperty transactions,current and pending litigation issues and to consider records that are exempt by law from public inspection. All discussions within this session are confidential;therefore nothing from this meeting may be disclosed by those.present. Representatives of the news media are allowed to attend this session, but must not disclose any information discussed during this session. Intergovernmental Water Board Meeting Minutes June 9,;2004 Members Present., Patrick-Carroll;.Dick Winn, Brian Moore, Bill Scheiderich, and BeverlyFroude Members Absent: Norm Penner—excused Staff Present Dennis Koellermeier and Twila Willson g hel'and Sandy Henschel Visitors: Roland Si nett, Ken Hensc a. 1. Call to Order Commissioner Bill 8cheiderich called the meeting to order at 5':30 pm. Staff calledroll and Commissioner Norm Penner was excused,and'being-represented by Commissioner Beverly Froude. 2. Approveal'of Minutes-;May 12, 2004 Commissioner Brian Moore motioned to approve the minutes, Commissioner Dick Winn seconded the motion, the vote was unanimous to accept the,minutes as presented. 3. Filtration of Fluoride Discussion — Dennis Koellermeier Board members received'a packet of information containing a memo prepared by Brian Rager responding to the issue from last month's;meeting regarding fluoride. In summary, thorough research with other agencies and'the city,attorney,was performed and it was concluded that,Tigard does not have a legal obligation to provide fluoride free water, but we do have an,obligation to meet Federal and Oregon Health Division water quality requirement standards. The other.agencies that were part of staff,research . interviews indicated they d_id not provide reimbursement, machinery, or filters, etc., to benefit people with a fluoride issue. The board discussed legal and liability issues as;well as;that fluoride is a controversial issue that was not voted'on by the Tigard service area water users. Tigard does not have control over what was,in the water purchased from other providers. Commissioner Brian Moore motioned to accept staff recommendation obtained from the city attorney and other water purveyors and deny the request from Mr. and Mrs. Henschel, Commissioner Patrick Carroll seconded the motion, and board members voted to deny the-request, with Commissioner Froude abstaining from the vote. 4. Discussion of Portland Wholesale Contract— Dennis Koellermeier Dennis Koellermeier recommended skipping that item until later. 5. Informational Items Intergovernmental Water Board 1 June 9,2004 DRAFT COPY Packets of recent articles were distributed to the board for them to read at a later time in their entirety. The invitation to the public meeting in Wilsonville on June 30th regarding the Willamette River water quality was brought to their attention and they were encouraged to attend. Mr. Koellermeier continued with an update on other water related items: ASR Well #3 - test well on 150th - targeted depth has been reached with no positive results; further drilling there will be discontinued. FYI - Dr. Mary Beeson, expert in northwest geology, passed away unexpectedly last week. He was a consultant on this_project. Dennis will pursue the possibility of naming a well after him and bring those results before the board ata later time. ASR Well 42 - long term testing will begin next Week and all indications look better than were expected. 4. Discussion of Portland Wholesale'Contract— Dennis Koellermeier Item #4 was reopened, Dennis Koellermeier stated that this issue was discussed in an Executive Session of Council last night-and details would be disclosed in Executive Session if the board desired. •Commissioner Winn motioned to go into Executive Session to discuss "current pending litigation issues", Commissioner Moore seconded the motion which was unanimously accepted by-'a' 11 board members. The regular meeting temporarily adjourned at 5:46 p.m. for Executive Session., The regular meeting reconvened 4t'6:31 pm:,following Executive Session. The -Chairman asked if there•was a consensus'from the NVB to advise the City of Tigard City Council to take any direction other than what.they decided on at their meeting on June , 8th Commissioner Moore removed himself from the discussion and the remaining board members concluded they did not dispute the Council's.direction. 6. Public Comments,-,None 7. Non Agenda Items - None 8. Next:meeting date— Joint Meeting With .City Council- Tuesday, July 20, 2004; at 5:30 p.m..— Town .Hall There.may not be enough to present in a joint Meeting'.on that date and it was decided. that would be scheduled as a tentative meeting only. 9; Adjournment The.meeting concluded at 6:35 p.m. Intergovernmental Water Board 2 June•91,2604 DRAFT COPY i MEMORANDUM TO: Intergovernmental Water Board FROM: Tom Imdieke, Financial Operations Manager RE: Brighton Hill Apartments DATE: July 26, 2004 The attached credit for leak.request is being forwarded to you for your approval at the next scheduled meeting on September 18, 2004. The method used in calculating the amount of the credit is based on existing'policy and there are no extenuating circumstances to this particular request. Public Works staff did.visit the site and .verified that it was indeed a leak and not a problem with the meter. The leak appears to have taken place within one billing period. The amount of the credit as calculated would be $879.30 and requires your Board approval before processing. If you have any questions regarding this item, please feel free to call me at 503-718- 2488. (0- 'REQUEST FOR ADJUSTMENT DUE TO A LEAK The Cityof Tigard has a policy of issuing partial credits for leaks that are repaired in a timely manner. The city expects leaks to be repaired within ten days of discovery. Credits are based on your average usage for the same period in;previous years. This average is deducted from the total consumption used during the time of the leak. The excess usage is charged at the wholesale rate of water, with the difference between wholesale and resale cost deducted from the utility account as the Credit for Leak I ' Please describe the specific circumstances of your request: P.� or\ :LL_.ASE SENO LETT C?x Date leak found: Q alrd� Date leak repaired: 5 Account#: n 9 y oao Location of Service: Customer Name: Mailing Address: I-k)oo 3-.�aD-WD Street address City State Zip Phone DOCUMENTATION YOU MUST SURNUT COPIES OF PLUMBER'S ]BILLS AND/OR RECEIPTS FOR PARTS, REQUIRED TO FIC TIM LEAK. FOR OFFICE USE ONLY $1.81 51.7.9 52.11 $1.75 52.25 - 1.09¢ RES MUR, COM� IND "I jJ�-y� VP Markup V��� n �' - #Pc Previous years.usage: 'J1L p -�-� ���ts�r-`-- '--`;'�' - ods used Average Leak Period Leak ccf Markup Credit Adjustnx Total Credit:$ K9- Date Issued: Issued By: J,,Utj-,v08-2004 09 :3.9 AM THE MAY APARTMENTS 5032242437 P. 01 M®u 26 04 04r 32p Sky M,at P•rOpgPth 603-222-9002 P. 2 REQUEST FOR ADJUSTMENT D 1E TO A LEAK The City of Tigard hma a policy of•issuing parttialeoedits for leaks'that ate repaired in•a timely mannetr. The°city expects leaks to be repaired within ten days of discovery. Credits'are based on yoer average usage for the same periad•in previous years• This average is deducted from,the.toW consumption used during,the:time of the leak. The excess usage'is charged at the wholesale rate of water,with the difference between wholesale and-resale cost deducted Ecom the utility account as the Credit for Leak ?lease describe the specific eircountanees *(your request; • 1-1;1! ��eca o T a.a.� �rz � ���.'A I� �,.�,�n ��e�►�;___o��n�-���_ EQ 8 l 2 jL a1Qt2U a j9Z ) AdT- M}w ia -Z .Frame as d lk a T y TZ oL L.".As a t �Ile& :., WMe4 &f Lig= AL slu'''r jaA► _ PdA7 a F a Z^ AaAlie jAi.4!'jzW o - MAL'.�'t' u�4wdBio Date leak toupd �gj /•D' y Date leak repaired: AccoosW: Location of Semite Customer Nave: NalUng Address; Sheet taddasa Cir Stow Zip phone DOCUMENTATION YOUs�S[.BM T`COPIES OF PLUMBER'S B LLS.AND/OR RECEIPTS FOR PARTS, REQUIRXV TO FIX THE'LIEAIC.. ..»----••.erre eeew-eew+o_+�-----.-.«.----- ..-.-.._..�.�✓.......».».� �•.•r.eeew.we.w......w-....e...... F0. t1 OMCE'USE ONLY Si.11 $1.79 52.11 $1.73 $2.23 1.098 a a RES MM COM tNM IRR Markup Previous years unse: 4 ttperiods used X e Avenge Leah Period Leak cef Markup Credit Adjustment Total Credit-.S Date Issued: Issued By.. T 6 August 20, 2004 - Mort Anoushiravani, Director Portland Water Bureau 1120 SW Fifth Avenue, Room 60.1 Portland, OR 97204 Re: Minimum Purchase Calculation Dear Mort, Please be'advised as follows regarding the-minimum purchase invoice you sent me dated July 21, 2004. ry The'Tigard City Council and the Lntergovemmental Water Board met jointly on Tuesday, August 17, 2004, at which time I presented them with.the information that Portland:had -elected.to invoice us for a minimum purchase violation. The Board Members and.City Councilors were not happy with the position'you have taken on this issue. I have been instructed to seek resolution in this matter: To that end, please provide me the following information: 1. Provide a.list- Capital Improvements Portland has constructed in the last fire years.that would allow Portland to meet Tigard's�maximum daily demands at the- Bradley Comer meter. As`you:recall, Portlandpromised Tigard that it could meet its water needs when Tigard was considering the Willamette Treatment,Plant, Qur records.indicate your supply to our meter`has:continued to decline, not imprcive. 2. Provide an.accounting ofminimum purchase penalty payments and rate increases. I continue to be.convinced that Portland`is collecting twice, once in the form of a minimum purchase penalty and'secondiy'when you raise.rates to all the next-year due to decreased use. Other wholesalers agree with me on this and it's your responsibility to provide an answer to all of us. 3. Provide me with any alternatives Tigard may have to avoid paying this. Since ely, Dennis Koellermeier Public Works Director 13126SW Hall Blvd.,Tigard, OR 97223(503)639,4171 TDD(503)684-2772 Q°RTL"moo Dan Saltzman,Commissioner CITY OF Morteza Anoushiravani,_P.E.,Administrator 1'120 SW 5'h Avenue u - x PO , MAND, Portland;Oregon 97204 Information(503)823-7404 Fax(503)823-6133 a s, BUREAU OF WATER WORKS TDD(503)823-6868 July 21, 2004 Bennis Koellermeier City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Dear Dennis: As provided for in Section 7 of the 25-year Water Sales Agreement between the.City of Tigard as Purchaser and the City of Portland, In consideration of the agreement of the City to provide a firm supply of surplus water, P,urchase.r agrees to maintain its level of purchases for the term of this agreement soas not: to diminish the ratio of City water used to the total water used by Purchaser, Your purchase ratio,(comparison of Portland water purchases to total water-purchases) for the fiscal year-ending June 30,2004 was 53.5%. This,is.lower than the minimum purchase requirement of 62% that Was set in the March 7,1997 letter of agreement. Because the 2003-04 purchase'ratio was lower than the requirement, payment of $304,522 is due before,07%01/05. :Please send payment to the,attention of Jerri VVidner.Accounting Supervisor. The,guaranteed purchase ratio for City of`Tigard will continue at 62% for FY 2004-05. If'you. have any questions concerning these computations, please contact Anne Conway at 503-823-7468. - Sincerely, Morteza Anous iravani Administrator Attachments C: Anne Conway Jerri Widner Sign-in Sheet.for Intergoverninental Water Board Meeting September 8, 2004 Name 'Please Print) Would you like to sp�)eak to the Board? V77 A JJ-41 lwfo 42TYV1°�vv r 4� gra _M MEMO ANDM .70: WOOD FROM: WIN W051 WPW(R(MVE DIRECTOR AMANRA NO,WRW(51AkT DATE: SEPTEM6ER 7,2009' RE: WiIIAN•EnE RIVER iNfORMATiON PROSECT At the July 28,2004 meeting, the WRWC Boarddiscussed the possibility of undertaking an effort1provide area citizens with accurate information on Willamette River water.. The majority of the board expressed interest in pursuing such a project.and set a.special meeting for Wednesday, September 29th to further discuss the idea. In preparation for the meeting, staff was asked to develop a memo outlining the possible components of a public information project and the steps involved in getting the project started. Next Steps for September 29, 2004 —WRWC Board Meeting 1. Board'review, edit and approve the attached draft.outline for the project. 2. Identify fundi:ng.forthe project. (WRWC currently has approximately $1.00,000 in reserves. A portion of that amount should be sufficient for the first phase of-the project. Staff recommends that the board designate an amount of those funds that they are willing_ ,to expend on the initial phase of this effort.) 3. Board vote,to allow WRWC Executive Director to seek proposals from and contract with a survey firm and/or public relations firm to begin the process. 4. Board appoint a subcommittee to work with WRWC staff to monitor the project. If you,have any questions.about this memo or the upcoming WRWC Board Meeting on'September 29th, 2004, please contact Burton Weast at 503-650- TIB1 or Amanda Rich at 503-378-0595. pq l aY ��r a r r: 9 c x wk £axa a E gam' @6 h;Y I/A°�V ,/ '; �1/,Yl����^w:::t4.�id�.c a➢istr Yx ,k DRAFT Willamette River Information Proiect Objective: Provide the public with accurate and objective information about the Willamette River. Project Components: 1. Baseline survey- We will begin the project by assessing the public's knowledge and/or opinion on subjects, including but not limited'to, the following: a. Facts about the Willamette River including current water.quality, flow direction and flow volume. b. The use of Willamette River water for drinking water supply. c. Drinking Water Standards and.Technology d. Where they get'their information about the Willamette River and drinking water,supply. , e. What information sources they trust most. 2. Development and Distribution of. Information: We will develop a plan to provide the public with factual and objective information regarding the Willamette. The information pieces will be developed with WRWC Board input and will be focused according to what we learn from the baseline survey. The plan could ,include the following elements: a. Direct mail b. Creation of WRWC Website where citizens can access information and reports on.the Willamette River Water Coalition, the river, drinking water quality-, etc. c. Public forums; d. Press Releases and/or Editorial Pieces 3. Monitoring: We will monitor the success of the information project with periodic tracking surveys. If necessary, we will alter the project to respond to information we learn from the tracking surveys. Project Logistics: 1. WRWC will solicit proposals from appropriate firms to develop and conduct the baseline survey, develop and implement the information plan and develop and conduct the tracking surveys. We may find one firm to carry out all three components of the projector we may break the work up among two or more"firms depending on expertise. 2. WRWC Board and Staff will manage and monitor the"progress of the information project through regular consultation with the firm(s) carrying out the project and regular updates at WRWC Board meetings. 6, Summer Supply Update September 3, 2004 Attached is a drawdown curve updated to reflect the latest weather forecast and the actual supply/demand conditions experienced since the mid-August forecast. Also provided.is an updated graph comparing 2004 water demand to 2003 and the 1994-2003.time period. The following are highlights related to key components of the 2.004-supply strategy. Weather Forecasts: The unusually cool and wet weather experienced during the last week of August is expected to continue into the first few days of September. The remainder of the month is expected to be mostly dry with.normal'temperatures for the. first three weeks, then becoming wetter and cooler. ' The Cool-Wet and Median scenarios forecast that drawdown will'resume for sh;ortAime, Nit will not draw the reservoirs below the level they;reached just prior to the late August storm: The Cool-Wet forecast indicates that the reservoirs will finish refilling ori° September 21, while-the Median forecast projects that this will happen on October 14. The Warm-Dry,forecast predicts that drawdown will continue through its time frame, which extends through the end:of November.. Even under this scenario, there would be 2.8 billion gallons left in storage at the end of�the forecast period: Bull Run Status: Drawdown of the Bull'Run reservoirs began on June 21, about a week or'two earlier than usual. Over the next two months, about 5.3 billion gallons (or'54 percent of usable storage)were drawn from the reservoirs. On August 22, an unseasonalily large storm moved into the area, dropping over 5 inches.of rain at Headworks over the course of six days. Streamflow into the reservoirs increased by more than 30 times the pre-scorn 'levels. As a result;the reservoirs gained about eight billion gallons,bringing them within 1.5 billion gallons of.being full. Total demand in August 2004 was about'12%o less than the August average for the previous 1,0 years.: Most of this decrease was'due to the c661;wet weather'during the last week of the month -demand for the first three weeks of August was about 2%below the previous ten years' August average. Groundwater Status: As a result of predicted waterr deficits under the median and warm-dry modeling scenarios in early-mid July, groundwater was activated-on July 27, 2004. Groundwater operated until August 24, 2004 at a daily rate of 35`MGD. Approximately 1 billion gallons of groundwater was blended with the Bull Run Supply. No ASR,water was recovered during this.groundwater ran. At this time it appears unlikely that additional groundwater augmentation will be needed in 2004. Decisions on whether to reactivate the groundwater system to augment supply be made in the next several weeks and will be based on next month's modeling of reservoir drawdown, water demand, forecasted weather, and anticipated reservoir-refill date. 1 Conservation Activities: Portland continues to send out its annual outdoor conservation bill stuffer. Radio ads, in partnership with the Portland Area Radio Council and the Regional Water Providers Consortium, ran on many radio stations in the metro area in August. Work on another demo garden in partnership with Parks Bureau at Kellogg Middle School is underway.. In 2000 Mt. Saint Joseph (MSJ) assisted care facility began an effort to reduce water consumption. High:•use toilets were the first items targeted. Early in 2003 MSJ began working with the.BIG'program. BIG staff has identified a number of water'saving opportunities in their commercial kitchen and refrigeration. Since 2003, MSJ has reduced water use by 22% overall and this summer BIG has been helping monitor the estimated 1 million gallons used annually.for,refrigeration, Demand for refrigeration water increases substantially in the summer months: This effort will help determine.the cost effectiveness of replacing the water using refrigeration equipment with air-cooled units. The Regional Water Providers Consortium continues its summer campaign—Be Water Smart. TV ads featuring.a"Water Bee" format ran in August along with the radio ad-in partriership with Portland and the.Portland Area Radio Council. Conservation staff from around the region have appeared on numerous TV and radio shows, talking about the. benefits.of efficient watering,proper plant selection and placement, an&the importance of organic amendments to soil. Media:messages continue to drive people to the Consortium's web site www.conserveh2o.org. Fish.Releases/Downstream Flows; The flow target in the lower Bull Run River has varied depending on the weather forecasts. When the air temperature increased, we have slightly increased flows to maintain the water.temperature in the.lower river for juvenile salmon and steelhead rearing conditions. .Our water temperature goal was to keep the7- day average of the daily maximum water temperatures at the hottest point on the Bull Run River to below 21 degrees Celsius (approxirimately 7.0 degrees Fahrenheit). So far this summer, we have met that goal..:Even when the air temperature reached 100 degrees Fahrenheit in the Bull Run:in July,we were able.to meet:our water emperature.;goal. During this drawdown season,.the 7-day average water temperature'l as gotten to a . maximum of approximately 20 degrees Celsius, and often has been-less than that. Generally, flows will continue to be 25-45 cubic feet.per second(CFS measured at the USGS gauge on the lower Bull Run,River)to maintain water temperature and fisheries habitat goals. Once refill begins in the fall,.flows will probably be increased to provide additional habitat for spawning salmon. :2 2004 Dravudown Wth No Additional,Supply Augmerta ion Usable Storage in Bull Run 2 Reservoirs(BGal). As of Seo&bff 10- 8 - Actual 08 Actual Storage{boll) Cool Wet`Scenario. - Additional,Supply Used to Date: initial drmdawn ended 227Aug 6 (+4.6 BG) Gmu i&N er(1.0 BG) Secondary drawdown ends 18-Sep 27-JU to 24- u @ 36`NM (+7.8 BG) 4 Median Scenario Initial drawl ni ended 22-Aug (+4.6 BG) ,2 Secaidary dm low ends 7-W (+6.6 BG) p Bull Run Reservoir Storage Depletion Line. Warrr�Dry Scenario .2 initial dr-dw�ended 22-Aug (46 BG) Secondary drawdown ends 28-Nov (+2.813G) -4 - -6 1Jan 1-Feb 1-Mar 1-Apr 1-May 1-Jun 1-Jul 1-Aug 1-Sep 1-W 1-Nov 1-Dec 1-Jan Current Denm Cwpared.to Previous Decade 7-day R/W g Avg lvm 90 80 70 50 50 40 30 10 00 90 SD �. 70 1-Nbr 1-Apr 1-may 1-An 1,1u1 1-ALU 1-Sep 1-od 1-Nov 1-Dec 1994-2003 K/bw , 2003 ®2004 Summer Supply Update September 3, 2004 Attached is a drawdown curve updated-to reflect the latest weather forecast and the.actual supply/demand conditions experienced since the mid-August forecast. Also provided,is an-updated graph comparing-2004 water demand to 2003 and the 1-994-2003-time period. The-following are highlights related to key components of the 2004 supply strategy. 'Weather Forecasts: The unusually cool and wet weather experienced during the last w'eekof August is expected to continue into the first few days of September. The remainder of the month is expected to be mostly dry with normalttemperatures for the first three weeks, then becoming wetter and cooler.. ' The•Cool-Wet and Median scenarios forecast that drawdown•will resume for a short time, but,will not'draw the reservoirs below the level they reached just prior to the'.late August storm.-The Cool-Wetforecas't�indicates that the reservoirs will finish refilling on September 21, while the Medianforecast°projects that this will happen on October.14: The Warm-Dry forecast predicts that drawdown will continue,through its`fime frame, which extends,through the end of November. Even under'this scenario,'there would be 2.8 billion gallons left n storage at,the end of the forecast period. Bull stun Status: Drawdown of the-Bull Run reservoirs began on June 21, about a week or two earlier,than,usual: Over the next two months, about 5.3 billion.gallons (6r'54,' percent of usable storage)were drawn from the reservoirs. On August 22, an unseasonably large storm moved into the area,,dropping over 5 inches,of rain at Headwofks over the course of six days. Streamflow into the reservoirs increased by more.than 301imes the pre-storm levels. As a.result, the reservoirs gained about eight billion gallons,.bringing them within,1.5 billion gallons of being full; Total demand in -August 2004;was about 12% less than the.August average for the previous 10 years.: Most:of'this decrease,was due to the'cool,wet weather during the last-week of the month —demand for the,first three weeks of August Was about 2%below,the previous ten years' August average. Groundwater Status: Asa result of predicted water.deficits under the median and warm-dry. modeling scenarios in early-mid July, groundwater wasactivated on July 27, 2004. Groundwater operated until August 24,.2004 at a daily rate of 35 MGD:. Approximately 1 billion gallons of groundwater was blended with the Bull Run Supply. No ASR water was recovered during this groundwater run. At this time it appears unlikely that additional groundwater augmentation will be needed in 2004. Decisions on whether to reactivate,the groundwater system to augment.supply be made in the next several weeks and will be based on next month's modeling of reservoir drawdown, water demand,forecasted weather, and anticipated reservoir refill date. 1 • Conservation Activities: Portland continues to send out its annual outdoor conservation bill stuffer. Radio ads, in partnership with the Portland Area Radio Council and the Regional Water Providers Consortium, ran on many radio stations in the metro area in August. Work on another,demo garden in partnership with Parks Bureau at Kellogg Middle School is underway. In 2000 Mt. Sairit,Joseph(MSJ) assisted care facility began an effort-to reduce water consumption. High use:toilets were the first items targeted. Early in 2003 MSJ began working with,the,BIG.program. BIG staff has identified a number of water saving opportunities in their commercial kitchen and refrigeration. Since 2003,.MSJ has. reduced water use by 226/o overall and this summer BIG has been helping monitor the estimated 1 million gallons=used annually for refrigeration. Demand for refrigeration water increases substantially in.the summer months. This effort will help determine.the cost effectiveness of replacing the water'using refrigeration equipment with air-cooled. units. The Regional Water Providers Consortium continues its summer campaign—Be Water Smart..TV ads featuring a"Water Bee".format ran in August along with the.-radio ad.in partnership with Portland and the Portland.Area Radio Council. Conservation staff from around the region have appeared on numerous TV and,radio shows,'talking-about the. benefits of efficient watering,proper plant selection and placement, andthe importance of organic amendments to soil: Media messages continue to.drive.people to,the Consortium's web site.—www.conserveh2o.or-._ Fish Releases/Downstream Flows:.-The flow target.in the lower Bull Run.River has varied dependirig,onthe'.weather forecasts. When the air temperature increased, we have slightly increased flows to maintain the water.temperature in the,lower river for juvenile salmon and steelhead re.aring,conditions. ,Our water temperature goal was to keep the7- day average of the daily-maximum water temperatures at the hottest point on the,Bull Run River to below 21 degrees Celsius(approximately.7.0 degrees Fahrenheit). So far, this summer,we have met that goal. Even when the air temperature.reached.100 degrees Fahrenheit in the Bull Run in July,we were able to meet,our water temperature°goal.. During this drawdown season, the T-day average"water temperature has gotten.to a maximum of approximately 20 degrees Celsius, and often has been less than that. Generally, flowswill continue to be 25-45 cubic feet per second (CFS measured at the USGS gauge on thel lower Bull Run River)to maintain water°temperature<and fisheries habitat goals. Once refill begins in the fall, flows will probably by increased.to provide additional habitat for spawning salmon. . 2 2004 Drawdown With No Additional Supply Augmentation Usable Storage in Bull Run As of September 2 Reservoirs(BGal). 10- 8 - Actual Storage(bold) Cool-Mt Scenario Additional.'SupplyUsed,to Date: Initial drawc bvm ended 22 Aug (-+4.6 BG) 6 Qou xMdu(10 BG) Secondary dmvvdown ends 18-Sep 27-Jul-to 24Aug @36'lVM 0-7:8 BG) 4 Ndian Scenario Initial drawdown ended 22 Aug (+4.6 BG) - i 4.2 Secondary dra,�ands 7-W ! (+6.6 BG) p - Bull Run Reservoir Storage.Depletion Line . V%m}Dry Scenario _2 Initial&&&down aided 22=Aug (+446 BG) Secondary drawdawn ends 28-Nov = (+2.8 BG) -4 -6 1-Jan 1-Feb 1-Mar 1-Apr 1-May 1-Jun 1-Jul 1 Aug 1-Sep 1-Oct 1-Nov 1-Dec 1-Jan F A F CIOmIt Demmnd COtTpdeid to Previous Decade 7-day Maung Awages lvm 90 80 70 eon I . 50 10 00 90 so - . 1-mal 1-Apr 1-W 1-Jun 1-j� 1-Aug 1-sep 1-od 1-Nov .1-Dae 1994-2003 New 2003 ®2004