Loading...
Plans (59) e intcr20/6,---cor t° 824 SE 12th Avenue Portland,Oregon 97214 € ul TA T Tel(503)616 9425 FIELD OBSERVATION REPORT i f�- Z>ur www.gcnweb.com PROJECT ID DATE REPORT NO. 1062 -Summit Ridge July 22, 2016 25 OWNER/CLIENT OWNER/CLIENT REPRESENTATIVE DAY OF WEEK PAGE D R Horton (DRH) Don Durst Friday 1 of 1 GENERAL CONTRACTOR GENERAL CONTRACTOR REPRESENTATIVE ARRIVAL TIME DEPARTURE TIME DHI Todd Kurilo 0900 1000 GRADING CONTRACTOR GRADING CONTRACTOR REPRESENTATIVE WEATHER/TEMPERATURE PERMIT G-Cam Excavation Sergey Rain, 68° F Project# 1062 TYPE OF WORK SOURCE AND DESCRIPTION OF FILL MATERIAL GCN REPRESENTATIVE Structural Subgrade NA Robert Pendell LOCATION OF WORK CONTRACTORS EQUIPMENT OBSERVED IN USE Lot 150 CONTRACTOR ACTIVITY,OBSERVATIONS,CONCLUSIONS,RECOMMENDATIONS: I made this visit at the request of Don Durst to observe the excavated structural subgrade for lot 150. I used a Y2 inch diameter steel foundation rod to probe footing subgrade. During the probe I observed the structural subgrades to be stiff soil and dense rock. In our opinion the building pad has been prepared in general accordance with our recommendations and will support expected foundation for a single family home. ® A Preliminary report is provided solely as evidence that the field observation was performed. Observations,and/or conclusions,and/or recommendations FINAL 0 PRELIMINARY conveyed in the final report may vary from and shall take precedence over those indicated in a preliminary report. A final report is an instrument of professional service. My conclusions drawn from this report should be discussed with and evaluated by the professional involved. ITEMS TO OBSERVE,CHECK,OR TEST DURING NEXT VISIT FIELD REPRESENTATIVE SIGNATURE DATE Ro-12-e rt- Pe,ktotel . July 22, 2016 GCN's professionals are represented on site solely to observe operations of the contractor identified,to form opinions about the adequacy of those operations,and to report those opinions to our client. The presence and activities of our field representative do not relieve any contractor from its obligation to meet contractual requirements.We rely on the contractor to comply with the plans and specifications throughout the duration of the project,irrespective of the presence of our representative.The contractor retains sole responsibility for site safety and the methods.operations.and sequences.