March 15,2016
T1605922A
Permit No: MST2015-00314
P.O.No:
FIELD INSPECTION REPORT
DATES COVERED: March 10,2016
PROJECT: Polygon—NW River Terrace—Area 2—Lot 38—13715 GPR
ADDRESS: 13715 SW 1715`Ave Tigard OR
INSPECTOR: G.Fleming—ICC#5318962,O8OA#814
03/10/16-Ground Penetrating Radar(GPR)
As requested, a CTI representative onsite with Mike Waddell with Polygon Northwest Co. Ground Penetrating Radar (GPR)
scans are requested to determine reinforcing placement and frequency in newly poured stem walls.
Results: Scanned exterior concrete stemwalls at (4) sides for vertical and horizontal reinforcing. Found vertical reflections
approximately 18" on center, and (1) horizontal reflection, continuous at approximately 2"to 4"from top of wall. Stemwall
footing was not accessible for radar scans.
Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in
full, without prior authorization from this office. Under all circumstances,the information contained in this report is provided
subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared.No party other than
those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
CARISON TESTING,INC.
Keith Gauvin
Project Manager
G F/sc
cc: Polygon Northwest Co—Chris Walther CHRIS.WALTHER@POLYGONHOMES.coM
Polygon Northwest Co—Michael(Mike)Waddell MICHAEL.WAODELL@POLYGONHOMES.COM
8430 SW Hunziicer St.,Tigard,OR 97223
PO Box 230997,Tigard,OR 97281
03-10-16 fr 744(gf)
410 62691S-'0431$ Bend Office (541)330-9155
Geotechnical Office (503)601-8250
Carlson Testing, IEugene Office (541)345-0289
nc. Salem Office (503)589-1252
Tigard Office (503)684-3460
Special Inspection Page of
DAILY FIELD REPORT
��c�c�►�,s '> ►,aw 2tvet. a.t.4 ._ -�'`l /1..7
Project:-.A a«4 Z. L9''Tc 52 - 131',12Date: Z3/2014,
(//
Job Address: ?77' ' ;1.1 1"i' '`� Alt '`1" pr fry CTI Job No. Ti O 5 9 22, f3
Permit No.: Type of Inspection: 6-PR.
Field I i or Fab Shop 1 i Weather:
Inspection Notes(Include location,testing date,substitutions/deviations,materials and methods of construction,non-conforming items,acceptance criteria,
corrected non-conforming items,etc.):
A f''• �. j fu .E ' r iSITt wlTr{ MtKti WADLA: L..
• GT t "It.) . ,.1. A rr _
• __447" UF E2 DEgCO-N12e Pow�,1
L: wJ t 'rt CO 41~ tJ 1L i t'4 0 127-N , CAST;
, T o._ nd. Oat_ 4..oGAT(G/...1
�' ,..>�. .S t.:s :.'? i tit '71 C• S r. ` ,��" ( t f i S z '-1 6?r; ,.�..,, ._ _ A-_
0-1 Qt. 6.A(,. a `-t iL$.i346,-e, 1 i.t7.G:.:
W+4in((..L AS 1-t14_ UFe2. 2►a0/14 u,.14S vS+19 T7:1 (Z.4C. Tt-ttt Pat`N cel! 1-140
•
SCA EC vtpnc,.�-t'. o511.;7 : ,S4i t-tIN1 0rZ A.a 1 ELct3Md.TlfeaoTtavatrt. 120
t f.l-A t.-S 7 .t 2.6/ $ Co.
•
***CHECK BOX ONLY*** YES N_Q
1. This is a preliminary inspection only. -OR-
2. The work inspected conforms to acceptance criteria listed above.If"No,"the portions of the work that are non-conforming items are
clearly stated above and will be added to the NCL.Remaining portions of the work,which are not preliminary in nature,are to be
considered as conforming.
Inspector: Certification No.: OR OA # 8 1 y
Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced,except in full,without prior authorization from
this office. Under all circumstances,the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in
effect at the time this report is prepared.No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information
contained in this document.