Loading...
Report The Layton Residence Addition Permit#MST2016-00233 Inspection Report Response Page 2 of 2 ITEM#4: Provide hold down anchors per approved plans. Response: Contractor is to provide hold down anchors per contract documents and manufacturer recommendations. All anchors that are not installed at time of concrete pour will require post installed special inspection and may also require foundation repairs to produce calculated tension capacity. WDY, INC. 0 PROF pe AN"14% 04 Scott Walker, P.E., — o. c•'t Principal WDY inc. -0 �`r 09 2°°~ 'FA. WP"‘' Enclosure: SK-03 foundation extension t 5XPIRES: 06/30/ Special Inspection Memo Inspection Reports City of Tigard G'WEt./5 DA/k �. PGJ�C�c f Effigy �a(a PI ee•3 2110,0 'S' tR $e>` tti> 13>AR twro !QE) 'g'rxx'1 w4) , 5:0111461 E x krstoi " zou i ' t!Fs Esitpxy w/ (1) tt 4 -B AR, c, 4 Sicvs-r kt ---NN oarT1074 j� Nt FrreA4 To'P gpv xt 6-n IA kir W MA. ac‘ rverg- •4 Aer 4 ij 111 = 8A '3 _ _ Exp fl eon `t oolz WE,- — s K,tsi- To exits-rtx/67 Coy' sot L. V- ttie, DETAIL: Aj Revision \"ixyT 4 Exp w o Job Name: THE LAYTON HOUSE-FND REVISION Date: 8/03/2016 Imp .' J`<. Job No.: 16090 ✓� * Drawn: 09' saVv 'O' ,A. W Client: LAYTON Sheet: w D y SK-3 Structural •Cvil Engineers `/ FWD Y Structural • Civil Engineers bald August 03, 2016 Ron Layton 7978 SW Kelso Court Tigard OR 97224 RE: Layton Residence Addition 45630 SW 79th Avenue,Tigard OR 97224 Permit#MST2016-00233 Special Inspection Requirements Our office has been asked to waive the special inspection requirements called for on the approved permit documents. WDY recommends special inspections be provided as standard construction practice for the protection of the owner. Inspections that are not specifically required by code can be waived at the owner's direction, however, the owner therefore accepts full responsibility for any non- compliant issues that may arise. item #1: The minimum soil pressure used for design was 1500 psf. This is a code minimum allowed without verification. Therefore, Geotechnical special inspections called for on the permit documents can be waived with owner approval. Item #2: Per OSSC code section, single story residential construction can be exempt from inspections. Therefore, Concrete testing and inspections called for on the permit documents can be waived with owner approval. Item #3: Al post installed anchors require periodic special inspections and cannot be waived. The contractor is to provide these inspections during the installation process per the manufacturer recommendations WDY,INC. E4 PROp4S AZ leIN44% grif4846PE • Scott Walker, P.E., t► ORE • Principal WDY inc. 0D ✓`� 09 �°� Op,.A Ww CRIE=S: /30 t 9l 6443 SW Beaverton-Hillsdale Hwy,suite 210•Portland,OR 97221•ph:503.203.8111•fx:503.203.8122•www.wdyi.com City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel:503.718.2439 Location: Inspection Date: 15630 SW 79TH AVE, TIGARD, OR, 97224 Record Type: Record ID: Residential- Master Permit MST2016-00233 Inspection Type: Inspector: 205 Footing David Young Result: FAIL Comments: Provide Simpson shearwall hold down requirements and design for shearwall at garage. Provide engineers stamped letter not requiring special inspection as noted on stamped approved plans. Provide engineers approval or fix for undermined existing house and fireplace footing at new rear addition. Provide holdown anchors per approved plans. Violation Summary: Inspector Contractor City of Tigard 13125 SW Hall Blvd. Tigard,OR 97223 Tel: 503.718.2439 Location: Inspection Date: 15630 SW 79TH AVE,TIGARD, OR, 97224 Record Type: Record ID: Residential- Master Permit MST2016-00233 Inspection Type: Inspector: 205 Footing 0 David Young Result: FAIL Comments: Provide Simpson shearwall hold down requirements and design for shearwall at garage. Provide engineers stamped letter not requiring special inspection as noted on stamped approved plans. Provide engineers approval or fix for undermined existing house and fireplace footing at new rear addition. Violation Summary: Inspector Contractor