Specifications (13) 1% co s'(A)
JUL. 2 (; 2010
-4141I ' ; 7
��_ Delson Engineering, Inc. i',041E';46` ��� -H Av
VANCOUVER, WA. 98684
PHONE: (360)944-7094
john@delsonengineering.com
Structural Calculations
For
PATINO-CANOPY-FRONT
10660 SW PARK ST
TIGARD OR 97223
(JOB#: B15-11-146) REVISED 5/4/16
DESIGN CRITERIA: IRC 2012
SNOW 25 PSF
Table of Contents:
CALCULATIONS R-L-1 to R-L-7
CALCULATIONS F-1 to F-8
PLANS COPY CP-1 to CP-3
DETAILS D--1 to D-2
E. Fs` A �s,'
d ' ' �� o
R
•RECON
, km....'...AS
1 , .1 4,0z9 .09q
4 M� �N ,J. DE-.k-
r.
EXCLUSION OF LIABILITIES EXPIRES: 12/30/ MI
I. DISCLAIMER AND RELEASE,
BUYER HEREBY WAIVES,RELEASES AND RENOUNCES ALL WARRANTIES(EXPRESSED OR IMPLIED),
OBLIGATIONS,AND
LIABILITIES OF DELSON DESIGN&ENGINEERING,INC.AND ALL OTHER RIGHTS,CLAIMS AND REMEDIES AGAINST
DELSON DESIGN&ENGINEERING,INC.(EXPRESS OR IMPLIED)WITH RESPECT TO ANY NONCONFORMITY,
IMPROPER INSTALLATION,WORKMANSHIP OR MATERIALS.
II.EXCLUSION OF CONSEQUENTIAL AND OTHER DAMAGES
DELSON DESIGN&ENGINEERING,INC.SHALL HAVE NO OBLIGATION OF LIABILITY,WHETHER ARISING IN
CONTRACT(INCLUDING WARRANTY),TORI'(INCLUDING ACTIVE,PASSIVE OR IMPUTED NEGLIGENCE)OR
OTHERWISE,FOR LOSS OF USE.REVENUE OR PROFIT,OR FOR ANY OTHER INCIDENTAL OR CONSEQUENTIAL
DAMAGES.ADAPTATION OF THE DESIGN TO MEET SPECIFIC SITE CONDITIONS,SPECIFIC STATE OR LOCAL CODES
AND REGULATIONS,IS THE RESPONSIBILITY OF THE BUYER.
III.THIS PRODUCT IS FOR SINGLE USE ONLY AND IS NOT TO BE REUSED WITHOUT SPECIFIC
AUTHORIZATION.
1
' DELSON ENGINEERING INC. Project Title: PATINO CANOPY-B
1204 NE 146 AVE Engineer: Project ID: B15-11-146-REI,
VANCOUVER WA 98684 Project Descr: 10660 SW PARK ST TIGARD 97223
360-944-7094 ...
JOHN@DELSONENGINEERING.COM r
Pifriled'<1 I'lAY 2013.12'?OAM
File=c:\B15-JOBS1B15-CA-21B(5-11-1.EC6
Wood Beam pENERCALC,INC.1983-2016,Build:6.16.4.15,Ver:6.16.4.15
fir'"'.'., 'f t ,.. _. �v ,,» 4;47.';' ,'P:''''''''''''' :
1 'Licensee':JOHN DELSON
Description: RB-1
CODE REFERENCES
Calculations per NDS 2012, IBC 2012, CBC 2013,ASCE 7-10
Load Combination Set: IBC2012
Material Properties
Analysis Method: Allowable Stress Design Fb-Tension 875.0 psi E:Modulus of Elasticity
Load Combination iBC2012 Fb-Compr 875.0 psi Ebend-xx 1,300.0 ksi
Fc-Pill 600.0 psi Eminbend-xx 470.0 ksi
Wood Species : Douglas Fir- Larch (North) Fc-Perp 625.0 psi
Wood Grade : No.2 Fv 170.0 psi
Ft 425.0 psi Density 30.580pcf
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling
D(0 119 S(0.175) D(0.119 5(0.175) D(0.119 S(0.175)*
i i * i i i i i ii i
'e 'S os,
A
6x10 6x10 6x10
Span=2.0 ft Span=12.0 ft Span=2.0 ft
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Load for Span Number 1
Uniform Load: D=0.0170, S=0.0250 ksf, Tributary Width=7.0 ft,(ROOF)
Load for Span Number 2
Uniform Load: D=0.0170, S=0.0250 ksf, Tributary Width=7,0 ft,(ROOF)
Load for Span Number 3
Uniform Load: D=0.0170, S=0.0250 ksf, Tributary Width=7.0 ft,(ROOF)
DESIGN SUMMARY Des'•n OK
Maximum Bending Stress Ratio = 0.67a 1 Maximum Shear Stress Ratio = 0.229 1
Section used for this span 6x10 Section used for this span 6x10
fb:Actual = 682.27psi fv:Actual 44.68 psi
FB:Allowable = 1,006.25 psi Fv:Allowable 195.50 psi
Load Combination +D+S+H Load Combination +D+S+H
Location of maximum on span = 5.950ft Location of maximum on span = 2.000 ft
Span#where maximum occurs = Span#2 Span#where maximum occurs = Span#1
Maximum Deflection
Max Downward Transient Deflection 0.140 in Ratio= 1026>=360
Max Upward Transient Deflection -0.070 in Ratio= 686>=360
Max Downward Total Deflection 0.236 in Ratio= 610>=180
Max Upward Total Deflection -0.117 in Ratio= 408>=180
Overall Maximum Deflections
Load Combination Span Max ""Defl Location in Span Load Combination Max."+'Defl Location in Span
1 0.0000 0.000 +D+S+H -0.1173 0.000
+D+S+H 2 0.2357 6.050 0.0000 0.000
3 0.0000 6.050 +D+S+H -0.1174 2.000
Vertical Reactions Support notation:Far left is#1 Values in KIPS
Load Combination Support 1 Support 2 Support 3 Support 4
Overall MAXimum 2.352 2.352
Overall MINimum 0.571 0.571
' DELSON ENGINEERING INC. Project Title: PATINO CANOPY-B
1204 NE 146 AVE Engineer: Project ID: B15-11-146-RE1,
_ VANCOUVER WA 98684 Project Descr: 10660 SW PARK ST TIGARD 97223
360-944-7094 t
- JOHN@DELSONENGINEERING.COM r- ` a,
Pi;;nttdAMAY 2616.123•'M
Wood Beam File c IB15-JOBSIB15 CA 2161511-1 EC6
p y ENERCALC,INC 1983-2016,Build 616 415 Ver:6.16.4.15
.*...-,r . .: ,.. M�e� r> x ..
. �< '*- ..- • . . �Licensee,?;<JO"lN`DEL.�'.ON'
Description: RB-2
CODE REFERENCES
Calculations per NDS 2012, IBC 2012, CBC 2013, ASCE 7-10
Load Combination Set: IBC2012
Material Properties
Analysis Method: Allowable Stress Design Fb-Tension 875.0 psi E:Modulus of Elasticity
Load Combination 1BC2012 Fb-Compr 875.0 psi Ebend-xx 1,300.0ksi
Fc-PrIl 600.0 psi Eminbend-xx 470.0ksi
Wood Species : Douglas Fir-Larch (North) Fc-Perp 625.0 psi
Wood Grade : No.2 Fv 170.0 psi
Ft 425.0 psi Density 30.580pcf
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling
D(0.17 S'0.25) D(0.17i)Sf0.25) + i D(0.17))S(0.225)
X X ,I i
D``'
L\
6x10 6x10 6x10
Span=2.0 ft Span=12.0 ft Span=2.0 ft
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Load for Span Number 1
Uniform Load: D=0.0170, S=0.0250 ksf, Tributary Width=10.0 ft,(ROOF)
Load for Span Number 2
Uniform Load: D=0.0170, S=0.0250 ksf, Tributary Width=10.0 ft,(ROOF)
Load for Span Number 3
Uniform Load: D=0.0170, S=0.0250 ksf, Tributary Width=10.0 ft,(ROOF)
DESIGN SUMMARY
, laesi•n OK
m
Maximu Bending Stress Ratio = 0.969( 1 Maximum Shear Stress Ratio = 0.327 : 1
Section used for this span 6x10 Section used for this span 6x10
fb:Actual 974.67psi fv:Actual 63.83 psi
FB:Allowable = 1,006.25psi Fv:Allowable = 195.50 psi
Load Combination +D+S+H Load Combination +D+S+H
Location of maximum on span = 6.050ft Location of maximum on span = 2.000ft
Span#where maximum occurs = Span#2 Span#where maximum occurs = Span#1
Maximum Deflection
Max Downward Transient Deflection 0.200 in Ratio= 718>=360
Max Upward Transient Deflection -0.100 in Ratio= 480>=360
Max Downward Total Deflection 0.337 in Ratio= 427>=180
Max Upward Total Deflection -0.168 in Ratio= 286>=180
Overall Maximum Deflections
Load Combination Span Max."2 Defl Location in Span Load Combination Max."+"Defl Location in Span
1 0.0000 0.000 +D+S+H -0.1676 0.000
+D+S+H 2 0.3368 6.050 0.0000 0.000
3 0.0000 6.050 +D+S+H -0.1677 2.000
Vertical Reactions Support notation:Far left is#1 Values in KIPS
Load Combination Support 1 Support 2 Support 3 Support 4
Overall MAXimum 3.360 3.360
Overall MINimum 0.816 0.816
DELSON ENGINEERING INC. Project Title: PATINO CANOPY-B
1204 NE 146 AVE Engineer:
VANCOUVER WA 98684 Project Descr: 10660 SW PARK ST TIGARD 97223 r°lett ID: 615-11-146-RE
360-944-7094
JOHN@DELSONENGINEERING.COM /--
- Wood Beam
Purnell'4 t.;A'r 261:1 1238x4;:
File=c1B15-JOBS1615-CA-21815-11-1.EC6
ENERCALC,INC 19832016,Build 6,16.4.15,Ver6.16.4.15. :74011231•14P. ,-,i a Leis e JOHN.DELSON'N Description: RB-3
CODE REFERENCES
Calculations per NDS 2012, IBC 2012, CBC 2013,ASCE 7-10
Load Combination Set: IBC2012
Material Properties
Analysis Method: Allowable Stress Design Fb-Tension 2400 psi E:Modulus of Elasticity
Load Combination IBC2012 Fb-Compr 1650 psi Ebend-xx 1700ksi
Fc-PrIl 1350 psi Eminbend-xx 900 ksi
Wood Species : SP/SP
Wood Grade :24F-V4 Fcc-Perp 650 psi Ebend-yy 1500 ksi
210 psi Eminbend-yy 790 ksi
Ft
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling 975 psi Density 34.32pcf
D(3.4)
7t'
K
*
5.5x11.25
Span=20.0 ft
Applied Loads
Applied
-- Service loads entered. Load Factors will be applied for calculations.
Point Load: D=3.40 k[7x,10.0 ft,(ROOF)
DESIGN SUMMARY
O
= 0
Maximum Bending Stress Ratio ��
Cie a iiy.814 1 Maximum Shear Stress Ratio
Section used for this span 5.5x11.25 Section used for this span 0.218 1
fb:Actual = 1,758.38 psi fv:Actual 5.5x11.25
FB:Allowable = 2,160.00psi = 41.2190 psi
Load Combination p Fv:Allowable = 189.00 psi
Location of maximum on span = 10.000ft Loada Combination of maxim 0D+H
Span#where maximum occurs = Location of maximum on span = 0.000 ft
Span#1 Span#where maximum occurs
Maximum Deflection = Span#1
Max Downward Transient Deflection 0.000 in Ratio=
Max Upward Transient Deflection0<360
Max Downward Total Deflection 0.000 in Ratio= 0 =
0.887in Ratio= 270>=180
Max Upward Total Deflection 0.0000 80
in Ratio= 0<180
Overall Maximum Deflections
....._....
Load Combination -----
Span Max '"Defl Location in Span Load Combination
Max. .0 Defl Location in Span
D Only 1 0.8875 10.000
Vertical Reactions 0.0000 0.000
- - Support notation:Far left is#1 Values in KIPS
Load Combination
Support 1 Support 2
Overall MAXimum 1.700 1.700
Overall MINimum 1.020 1.020
+D+H 1.700 1.700
+D+L+H 1.700 1.700
+�D+Lr++i+ 1.700 1.700
+D+S+HH 1.700 1.700
+D+0.750Lr+0.750L+H 1.700 1.700
+D+0.750L+0.7505+H 1.700 1.700
+D+0.60W+H 1.700 1.700
' DELSON ENGINEERING INC. Project Title: PATINO CANOPY-B
1204 NE 146 AVE Engineer: Project ID: B15-11-146-RE\
VANCOUVER WA 98684 Project Descr: 10660 SW PARK ST TIGARD 97223
360-944-7094
- JOHN@DELSONENGINEERING.COM F.--_/
_-- ---
Firmed a MAY 20i.3.124(P1.1
Wood Beam File=c IB15 JOBSIB15 CA 2161511 1 EC6
„� � � ENERCALC,INC 1983-2016,Build 6 16.415 Ver 6 16 415
,.,, . , , : A ,... as, .�< ,_ _1 ' h a .r . fcensee 8N DE S
Description: RJ-1 �`
CODE REFERENCES
Calculations per NDS 2012, IBC 2012, CBC 2013,ASCE 7-10
Load Combination Set: IBC2012
Material Properties
Analysis Method: Allowable Stress Design Fb-Tension 875.0 psi E:Modulus of Elasticity
Load Combination i BC2012 Fb-Compr 875.0 psi Ebend-xx 1,300.0 ksi
Fc-PrIl 600.0 psi Eminbend-xx 470.Oksi
Wood Species : Douglas Fir-Larch (North) Fc-Perp 625.0 psi
Wood Grade : No.2 Fv 170.0 psi
Ft
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling 425.0 psi Density 30.580pcf
i i D(O.Q6+ i i +
5{0.1) 0.06+S(0.+
atK
T;
A
4x8 4x8
Span=10.0 ft
Span=2.Oft
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Load for Span Number 1
Uniform Load: D=0.0170, S=0.0250 ksf, Tributary Width=4.0 ft,(ROOF)
Load for Span Number 2
Uniform Load: D=0.0170, S=0.0250 ksf, Tributary Width=4.0 ft,(ROOF)
DESIGN SUMMARY Desi n OK
Maximum Bending Stress Ratio = 0.579 1 Maximum Shear Stress Ratio = 0.236 : 1
Section used for this span 4x8 Section used for this span 4x8
fb:Actual 757.44 psi fv:Actual 46.09 psi
FB:Allowable = 1,308.13psi Fv:Allowable = 195.50 psi
Load Combination +D+S+H Load Combination +D+S+H
Location of maximum on span = 4.804ft Location of maximum on span = 9.441 ft
Span#where maximum occurs = Span#1 Span#where maximum occurs = Span#1
Maximum Deflection
Max Downward Transient Deflection 0.142 in Ratio= 844>=360
Max Upward Transient Deflection -0.081 in Ratio= 590>=360
Max Downward Total Deflection 0.239 in Ratio= 582>=180
Max Upward Total Deflection -0.137 in Ratio= 350>=180
Overall Maximum Deflections
Load Combination Span Max.""Defl Location in Span Load Combination Max."+"Defl Location in Span
+D+S+H 1 0.2387 4.972 0.0000 0.000
2 0.0000 4.972 +D+S+H -0.1366 2.000
Vertical Reactions Support notation:Far left is#1 Values in KIPS
Load Combination Support 1 Support 2 Support 3
Overall MAXimum 0.806 1.210
Overall MINimum 0.196 0.294
+D+H 0.326 0.490
+D+L+H 0.326 0.490
+D+Lr+H 0.326 0.490
DELSON ENGINEERING INC. Project Title: PATINO CANOPY-B
1204 NE 146 AVE Engineer: Project ID: B15-11-146-RE1
VANCOUVER WA 98684 Project Descr: 10660 SW PARK ST TIGARD 97223
360-944-7094
JOHN@DELSONENGINEERING.COM
Prin etl'4 f AY 2(1 B.1241 PM
Wood Beam File c IB15 JOBSI815 CA 21815-11 1 EC6
ENERCALC,INC 1983-2016,Build 616 415 Ver•6.16 415
-1-160:see :JOHN_"DE1 S N
Description: PH-1 POST CHECK FOR BENDING
CODE REFERENCES
Calculations per NDS 2012, IBC 2012, CBC 2013,ASCE 7-10
Load Combination Set: IBC2012
Material Properties
Analysis Method: Allowable Stress Design Fb-Tension 575.0 psi E:Modulus of Elasticity
Load Combination i BC2012 Fb-Compr 575.0 psi Ebend-xx 1,100.0 ksi
Fc-PrII 575.0 psi Eminbend-xx 400.0 ksi
Wood Species : Hem Fir Fc-Perp 405.0 psi
Wood Grade : No.2 Fv 140.0 psi
Ft 375.0 psi Density 26.830pcf
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling
W(0.5)
6x8
Span=9.0 ft
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Point Load: W=0.50 k(@,9.0 ft,(WIND)
DESIGN SUMMARYDesi'•n OK..::
N.
Maximum Bending Stress Ratio = 0.683 1 Maximum Shear Stress Ratio = 0.049 : 1
Section used for this span 6x8 Section used for this span 6x8
fb:Actual = 628.36psi fv:Actual = 10.91 psi
FB:Allowable = 920.O0psi Fv:Allowable = 224.00 psi
Load Combination +D+0.60W+H Load Combination +D+0.60W+H
Location of maximum on span = 0.000ft Location of maximum on span = 0.000 ft
Span#where maximum occurs = Span#1 Span#where maximum occurs = Span#1
Maximum Deflection
Max Downward Transient Deflection 0.984 in Ratio= 218>=180.
Max Upward Transient Deflection 0.000 in Ratio= 0<180.0
Max Downward Total Deflection 0.591 in Ratio= 364>=180
Max Upward Total Deflection 0.000 in Ratio= 0<180
Overall aximum Deflections
Load Combination Span Max.""Defl Location in Span Load Combination Max."+"Defl Location in Span
W Only 1 0.9844 9.000 0.0000 0.000
Vertical Reactions Support notation:Far left is#1 Values in KIPS
Load Combination Support 1 Support 2
Overall MAXimum 0.500
-
Overall MINimum 0.225
+D+H
+D+L+H
+D+Lr+H
+D+S+H
+D+0.750Lr+0.750L+H
+D+0.750L+0.750S+H
+D+0.60W+H 0.300
• DELSON ENGINEERING INC. Project Title: PATINO CANOPY-B
1204 NE 146 AVE Engineer: Project ID: B15-11-146-REt
VANCOUVER WA 98684 Project Descr: 10660 SW PARK ST TIGARD 97223
360-944-7094
JOHN@DELSONENGINEERING.COM F --
-- -- Pr11;ST el,^AY20'6 1241PM
Wood Column File=c:1B15-JOBS1B15-CA2161511 1.EC6
ENERCALC,INC 1983-2016,Build 616415 Ver:6.16.4.15
.771t,:,' `V;' p zx:.•"'":::'''h ,. . ,««' 56; .. . :' , .'2.& ..: ,i "•7 : itconsee:JOHNDELSO1
Description: P-1 CHECK FOR COMBINED LOAD
Code References
Calculations per 2012 NDS, IBC 2012, CBC 2013,ASCE 7-10
Load Combinations Used :ASCE 7-10
General Information
Analysis Method: Allowable Stress Design Wood Section Name 6x8
End Fixities Top Free, Bottom Fixed Wood Grading/Manuf. Graded Lumber
Overall Column Height 9.0 ft Wood Member Type Sawn
Wood Species Exact Width 5.50 in Allow Stress Modification Factors
Wood Grade Exact Depth 7.50 in Cf or Cv for Bending 1.0
Area 41.250 inA2 Cf or Cv for Compression 1.0
Fb Tension 1,500.0 psi Fv 150.0 psi Ix 193.359 inA4 Cf or Cv for Tension 1.0
Fb-Compr 1,500.0 psi Ft 1,000.0 psi ly 103.984 in^4 Cm:Wet Use Factor 1.0
Fc-PrIl 1,000.0 psi Density 33.0 pcf Ct:Temperature Factor 1.0
Fc-Perp 1,000.0 psi
Cfu:Flat Use Factor 1.0
E:Modulus of Elasticity. .. x-x Bending y-y Bending Axial Kf:Built-up columns 1.0
Basic 1,400.0 1,400.0 1,400.0 ksi Use Cr:Repetitive? No
Minimum 1,400.0 1,400.0 Brace condition for deflection(buckling)along columns:
X-X(width)axis: Fully braced against buckling along X-X Axis
Y-Y(depth)axis: Fully braced against buckling along Y-Y Axis
Applied Loads - _ Service loads entered. Load Factors will be applied for calculations.
Column self weight included : 85.078 lbs*Dead Load Factor
AXIAL LOADS. . .
Axial Load at 9.0 ft, D=4.20 k
BENDING LOADS. . .
Lat. Point Load at 9.0 ft creating Mx-x,W=0.50 k
DESIGN SUMMARY
Bending&Shear Check Results
PASS Max.Axial+Bending Stress Ratio = 0.4297:1 Maximum SERVICE Lateral Load Reactions. .
Load Combination +D+0.60W+H Top along Y-Y 0.0 k Bottom along Y-Y 0.50 k
Governing NDS Forumla Comp+Mxx, NDS Eq. 3.9-3 Top along X-X 0.0 k Bottom along X-X 0.0 k
Location of max.above base 0.0 ft Maximum SERVICE Load Lateral Deflections...
At maximum location values are... Alon Y-Y
Applied Axial 4.285k g 0.7717 in at 9.0 ft above base
Applied Mx 2.70 k-ft for load combination: W Only
Applied My 0.0 k-ft Along X-X 0.0 in at 0.0 ft above base
Fc:Allowable 1,000.0 psi for load combination:n/a
Other Factors used to calculate allowable stresses...
PASS Maximum Shear Stress Ratio= 0.04849:1 Bending Compression Tension
Load Combination +D+0.60W+H
Location of max.above base 8.940 ft
Applied Design Shear 10.909 psi
Allowable Shear 150.0 psi
Load Combination Results
Maximum Axial+Bending Stress Ratios Maximum Shear Ratios
Load Combination C D C P Stress Ratio Status Location Stress Ratio Status Location
+D+H 1.000 1.000 0.1039 PASS 0.0 ft 0.0 PASS 9.0 ft
+D+L+H 1.000 1.000 0.1039 PASS 0.0ft 0.0 PASS 9.0ft
+D+Lr+H 1.000 1.000 0.1039 PASS 0.0ft 0.0 PASS 9.Oft
+D+S+H 1.000 1.000 0.1039 PASS 0.0 ft 0.0 PASS 9.0 ft
+D+0.750Lr+0.750L+H 1.000 1.000 0.1039 PASS 0.0ft 0.0 PASS 9.0 ft
+D+0.750L+0.750S+H 1.000 1.000 0.1039 PASS 0.0 ft 0.0 PASS 9.0 ft
+D+0.60W+H 1.000 1.000 0.4297 PASS 0.0ft 0.04849 PASS 8.940 ft
+D+0.70E+H 1.000 1.000 0.1039 PASS 0.0 ft 0.0 PASS 9.0 ft
+D+0.750Lr+0.750L+O.450W+H 1.000 1.000 0.3250 PASS 0.0 ft 0.03636 PASS 8.940 ft
DELSON ENGINEERING INC. Project Title: PATINO CANOPY-B
1204 NE 146 AVE Engineer: Project ID: B15-11-146-RE
VANCOUVER WA 98684 Project Descr: 10660 SW PARK ST TIGARD 97223
360-944-7094 ^
�
"_ JOHN@DELSONENGINEERING.COM 1
Piallod 4 I/!AY 2016,12'11Pt„1
Wood Column File=c\B15-JOBS1B15 CA 2161511-1 EC6
ENERCALC,INC 1983-2016,Build 616415 Ver:616415
- q, a` 04 e:f..4gw tt"*Z t „� c � ?. !?�--... . .:77::',,,,'!::::-- - �
,Licensee.;JOHN DELSON
Description : P-1 CHECK FOR COMBINED LOAD
Load Combination Results
Maximum Axial+Bending Stress Ratios Maximum Shear Ratios
Load Combination C D C p Stress Ratio Status Location Stress Ratio .Status Location
+D+0.750L+0.750S+0.450W+H 1.000 1.000 0.3250 PASS 0.0 ft 0.03636 PASS 8.940 ft
+D+0.750L+0.750S+0.5250E+H 1.000 1.000 0.1039 PASS 0.0ft 0.0 PASS 9.0ft
+0,60D+0.60W+0.60H 1.000 1.000 0.4228 PASS 0.0ft 0.04849 PASS 8.940 ft
+0.60D+0.70E+0.60H 1.000 1.000 0.06233 PASS 0.0ft 0.0 PASS 9.0 ft
Maximum Reactions Note:Only non-zero reactions are listed.
X-X Axis Reaction Y-Y Axis Reaction Axial Reaction
Load Combination @ Base @ Top @ Base @ Top @ Base
+D+H k k 4.285 k
+D+L+H k k 4,285 k
+D+Lr+H k k 4.285 k
+D+S+H k k 4.285 k
+D+0.750Lr+0.750L+H k k 4.285 k
+D+0.750L+0.750S+H k k 4.285 k
+D+0.60W+H k 0.300 k 4.285 k
+D+0.70E+H k k 4.285 k
+D+0.750Lr+0.750L+0.450W+H k 0.225 k 4.285 k
+D+0.750L+0.750S+0.450W+H k 0.225 k 4.285 k
+D+0.750L+0.750S+0.5250E+H k k 4.285 k
+0.60D+0.60W+0.60H k 0.300 k 2.571 k
+0.60D+0.70E+0.60H k k 2.571 k
D Only k k 4.285 k
Lr Only k k k
L Only k k
k
S Only k k k
W Only k 0.500 k k
E Only k k k
H Only k k k
Maximum Deflections for Load Combinations
Load Combination Max.X-X Deflection Distance Max.Y-Y Deflection Distance
+D+H 0.0000 in 0.000 ft 0.000 in 0.000 ft
+D+L+H 0.0000 in 0.000 ft 0.000 in 0.000 ft
+D+Lr+H 0.0000 in 0.000 ft 0.000 in 0.000 ft
+D+S+H 0.0000 in 0.000 ft 0.000 in 0.000 ft
+D+0.750Lr+0.750L+H 0.0000 in 0.000 ft 0.000 in 0.000 ft
+D+0.750L+0.750S+H 0.0000 in 0.000 ft 0.000 in 0.000 ft
+D+0.60W+H 0.0000 in 0.000 ft 0.463 in 9.000 ft
+D+0.70E+H 0.0000 in 0.000 ft 0.000 in 0.000 ft
+D+0.750Lr+0.750L+0.450W+H 0.0000 in 0.000 ft 0.347 in 9.000 ft
+D+0.750L+0.750S+0.450W+H 0.0000 in 0.000 ft 0.347 in 9.000 ft
+D+0.750L+0.750S+0.5250E+H 0.0000 in 0.000 ft 0.000 in 0.000 ft
+0.60D+0.60W+0.60H 0.0000 in 0.000 ft 0.463 in 9.000 ft
+0.60D+0.70E+0.60H 0.0000 in 0.000 ft 0.000 in 0.000 ft
D Only 0.0000 in 0.000 ft 0.000 in 0.000 ft
Lr Only 0.0000 in 0.000 ft 0.000 in 0.000 ft
L Only 0.0000 in 0.000 ft 0.000 in 0.000 ft
S Only 0.0000 in 0.000 ft 0.000 in 0.000 ft
W Only 0.0000 in 0.000 ft 0.772 in 9.000 ft
E Only 0.0000 in 0.000 ft 0.000 in 0.000 ft
H Only 0.0000 in 0.000 ft 0.000 in 0.000 ft
DELSON ENGINEERING INC. Project Title: PATINO CANOPY-B
1204 NE 146 AVE Engineer: Project ID: B15-11-146-RE1,
VANCOUVER WA 98684 Project Descr: 10660 SW PARK ST TIGARD 97223
360-944-7094 f-$
_ JOHN@DELSONENGINEERING.COM
File=c:1815-JOBS\B15-CA-21B15-11-1.EC6
Wood Column ENERCALC,INC.1983-2016,BBuilild:6.16.4.15,V�er:6.16.4.15
"kFi T^ 'i r A"'`t �.k' m`3'ii'f�1„ s � - , e� .i�,"� .. 4P�k ✓aaFX.u:/n uce ','�, 7.P
..�.�,�u..,•t..a ...-.r. .�.. +uWr,na,r�,�°.'�n�'i�`.�..':. ,. .. ..., ,°.t. -.`�.G�.,,�r:ic��..� kk�,"�^'r..py<.� ....'.gym. n., ....>. r. "" E. Ci
Description: P-1 CHECK FOR COMBINED LOAD
Sketches
41AN-x Loads
O
713
NI
2
Loads are total entered value.Arrows do not reflect absolute direction.
DELSON ENGINEERING INC. JOB` (-irs./r-.q!
• 1204 NE 146T44 CT
,, VANCOUVER,WA 98684 CALCLLA CEJ BZ: N/A DATE:
ii '1 /360)344-1094 SCALE:
N/A
1
LATERAL LOAD' ANALXS(3
FOR: i'PA-riPo — CAA,07y
,
LOCATION: /0!660 54 7,f,ek sr 774ej ' 123
U WIND ANALYSIS _ pER 20 /Z LLC, Mo mph ExpoguRE 2
l ' - � _
Ake ?_'c
1 �t
t '------ _ .
I/
A) FRONT . l — ,1pAtCA17 *Lter '
y I T I N /s--rif , if-7-7 i's-*x r-z- 757/9- =->
„ k ,- 1 /,,,
14971-9 --r° Pixr --(7,5-)x de/Z.
7 1 1 jr y
k
-i LEFT - fRI T — -0t0-,,v3r r . 6'0
i
( 'Ji PW.1"/ .� 6K T_
ilyti
�s 4 I
I . 3 � '.01-1
- ti . .• CDftjfr 40-4, >mg- 7
--e7 cam( ) lA: Til---/
1
DELSON ENGINEERING INC. Project Title: PATINO CANOPY-B
1204 NE 146 AVE Engineer: Project ID: B15-11-146-RE\
VANCOUVER WA 98684 Project Descr: 10660 SW PARK ST TIGARD 97223
360-944-7094 -,,
_ JOHN@DELSONENGINEERING.COM
Priv^21:4":'A..2016, ^P.1
r File=c:1615-JOBS1B15-CA-2\815-11-1.EC6
- Wood Column ENERCALC,INC.1983-2016,Build:6.16.4.15,Ver:6.16.4.15
-717; ._ .C 4 r e . 1. .ti e .a.iiiit = . A `t 74 ic,Obsee JOHN'DEd.S$ON
Description: P-1 CHECK FOR COMBINED LOAD
Code References
Calculations per 2012 NDS, IBC 2012, CBC 2013,ASCE 7-10
Load Combinations Used :ASCE 7-10
General Information
Analysis Method: Allowable Stress Design Wood Section Name 6x8
End Fixities Top Free, Bottom Fixed Wood Grading/Manuf. Graded Lumber
Overall Column Height 9.0 ft Wood Member Type Sawn
Exact Width 5.50 in Allow Stress Modification Factors
Wood Species Exact Depth 7.50 in Cf or Cv for Bending 1.0
Wood Grade Area 41.250 inA2 Cf or Cv for Compression 1.0
Fb-Tension 1,500.0 psi Fv 150.0 psi lx 193.359 in^4 Cf or Cv for Tension 1.0
Fb-Compr 1,500.0 psi Ft 1,000.0 psi ly 103.984 inA4 Cm:Wet Use Factor 1.0
Fc-Prll 1,000.0 psi Density 33.0 pcf Ct:Temperature Factor 1.0
Fc-Perp 1,000.0 psi Cfu:Flat Use Factor 1.0
E:Modulus of Elasticity. .. x-x Bending y-y Bending Axial Kf:Built-up columns 1.0 l '
Basic 1,400.0 1,400.0 1,400.0 ksi Use Cr:Repetitive? No
Minimum 1,400.0 1,400.0 Brace condition for deflection(buckling)along columns:
X-X(width)axis: Fully braced against buckling along X-X Axis
Y-Y(depth)axis: Fully braced against buckling along Y-Y Axis
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Column self weight included :85.078 lbs*Dead Load Factor
AXIAL LOADS. . .
Axial Load at 9.0 ft, D=5.10k
BENDING LOADS. . .
Lat. Point Load at 9.0 ft creating Mx-x,W=0.30 k
DESIGN SUMMARY _ -
Bending& Shear Check Results
PASS Max.Axial+Bending Stress Ratio = 0.2671 :1 Maximum SERVICE Lateral Load Reactions..
Load Combination +D+0.60W+H Top along Y-Y 0.0 k Bottom along Y-Y 0.30 k
Governing NDS Forumla Comp+ Mxx, NDS Eq. 3.9-3 Top along X-X 0.0 k Bottom along X-X 0.0 k
Location of max.above base 0.0 ft Maximum SERVICE Load Lateral Deflections...
At maximum location values are... Along Y-Y 0.4630 in at 9.0 ft above base
Applied Axial 5.185 k for load combination: W Only
Applied Mx -1.620 k-ft
Applied My 0.0 k-ft Along X-X 0.0 in at 0.0 ft above base
Fc:Allowable 1,000.0 psi for load combination:n/a
Other Factors used to calculate allowable stresses-.,
PASS Maximum Shear Stress Ratio= 0.02909 :1 Bending Compression Tension
Load Combination +D+0.60W+H
Location of max.above base 8.940 ft
Applied Design Shear 6.545 psi
Allowable Shear 150.0 psi
Load Combination Results
Maximum Axial+Bending Stress Ratios Maximum Shear Ratios
Load Combination C D C p Stress Ratio Status Location Stress Ratio Status Location
+D+H 1.000 1.000 0.1257 PASS 0.0 ft 0.0 PASS 9.0 ft
+D+L+H 1.000 1.000 0.1257 PASS 0.0 ft 0.0 PASS 9.0 ft
+D+Lr+H 1.000 1.000 0.1257 PASS 0.0 ft 0.0 PASS 9.0 ft
+D+S+H 1.000 1.000 0.1257 PASS 0.0ft 0.0 PASS 9.0ft
+D+0.750Lr+0.750L+H 1.000 1.000 0.1257 PASS 0.0 ft 0.0 PASS 9.0 ft
+D+0.750L+0.750S+H 1.000 1.000 0.1257 PASS 0.0ft 0.0 PASS 9.0ft
+D+0.60W+H 1.000 1.000 0.2671 PASS 0.0ft 0.02909 PASS 8.940 ft
+D+0.70E+H 1.000 1.000 0.1257 PASS 0.0 ft 0.0 PASS 9.0 ft
+D+0.750Lr+0.750L+0.450W+H 1.000 1.000 0.2043 PASS 0.0 ft 0.02182 PASS 8.940 ft
DELSON ENGINEERING INC. Project Title: PATINO CANOPY-B
1204 NE 146 AVE Engineer: Project ID: B15-11-146-RE
VANCOUVER WA 98684 Project Descr: 10660 SW PARK ST TIGARD 97223
360-944-7094
- JOHN@DELSONENGINEERING.COM - 1J
Punted.4 P:!a.Y 2016, '„c?fA
File=c0815-JOBSIB15-CA-21815-11-1.EC6
Wood Column _ ENERCALC,INC 1983-2016,Build 6164.15 Ver:6.16.4.15
L. � _ =7:17_. 'X"> i sem' 1: kY ..:',',..:'''''''',.'''''-^ .,
'�` �v .. � �, 9 e., ... .��.�ia,�nhh �"�" � ,�',w..d ..� �.,+�f�,..�, l' ,`���rQ� JOHN DEitiQfE
Description : P-1 CHECK FOR COMBINED LOAD
Load Combination Results
Maximum Axial+Bending Stress Ratios Maximum Shear Ratios
Load Combination C D C p Stress Ratio Status Location Stress Ratio Status Location
+D+0.750L+0.750S+0.450W+H 1.000 1.000 0.2043 PASS 0.0 ft 0.02182 PASS 8.940 ft
+D+0.750L+0.750S+0.5250E+H 1.000 1.000 0.1257 PASS 0.0 ft 0.0 PASS 9.0 ft
+0.60D+0.60W--0.60H 1.000 1.000 0.2570 PASS 0.0 ft 0.02909 PASS 8.940 ft
+0.60D+0.70E+0.60H 1.000 1.000 0.07542 PASS 0.0 ft 0.0 PASS 9.0 ft
Maximum Reactions Note: Only non-zero reactions are listed.
X-X Axis Reaction Y-Y Axis Reaction Axial Reaction
Load Combination @ Base @ Top @ Base @ Top @ Base
+D+H k k 5.185 k
+D+L+H k k 5.185 k
+D+Lr+H k k 5.185 k
+D+S+H k k 5.185 k
+D+0.750Lr+0.750L+H k k 5.185 k
+D+0.750L+0.750S+H k k 5.185 k
+D+0.60W+H k 0.180 k 5.185 k
+D+0.70E+H k k 5.185 k
+D+0.750Lr+-0.750L+0.450W+H k 0.135 k 5.185 k
+D+0.750L+0.750S+0.450W+H k 0.135 k 5.185 k
+D+0.750L+0.750S+0.5250E+H k k 5.185 k
+0.60D+0.60W+0.60H k 0.180 k 3.111 k
+0.60D+0.70E+0.60H k k 3.111 k
D Only k k 5.185 k
Lr Only k k k
L Only k k k
S Only k k k
W Only k 0.300 k k
E Only k k k
H Only k k k
Maximum Deflections for Load Combinations
Load Combination Max.X-X Deflection Distance Max.Y-Y Deflection Distance
+D+H 0.0000 in 0.000 ft 0.000 in 0.000 ft
+D+L+H 0.0000 in 0.000 ft 0.000 in 0.000 ft
+D+Lr+H 0.0000 in 0.000 ft 0.000 in 0.000 ft
+D+S+H 0.0000 in 0.000 ft 0.000 in 0.000 ft
+D+0.750Lr+0.750L+H 0.0000 in 0.000 ft 0.000 in 0.000 ft
+D+0.750L+0.750S+H 0.0000 in 0.000 ft 0.000 in 0.000 ft
+D+0.60W+H 0.0000 in 0.000 ft 0.278 in 9.000 ft
+D+0.70E+H 0.0000 in 0.000 ft 0.000 in 0.000 ft
+D+0.750Lr+0.750L+0.450W+H 0.0000 in 0.000 ft 0.208 in 9.000 ft
+D+0.750L+0.7505+0.450W+H 0.0000 in 0.000 ft 0.208 in 9.000 ft
+D+0.750L+0.7505+0.5250E+H 0.0000 in 0.000 ft 0.000 in 0.000 ft
+0.60D+0.60W+0.60H 0.0000 in 0.000 ft 0.278 in 9.000 ft
+0.60D+0.70E+0.60H 0.0000 in 0.000 ft 0.000 in 0.000 ft
D Only 0.0000 in 0.000 ft 0.000 in 0.000 ft
Lr Only 0.0000 in 0.000 ft 0.000 in 0.000 ft
L Only 0.0000 in 0.000 ft 0.000 in 0.000 ft
S Only 0.0000 in 0.000 ft 0.000 in 0.000 ft
W Only 0.0000 in 0.000 ft 0.463 in 9.000 ft
E Only 0.0000 in 0.000 ft 0.000 in 0.000 ft
H Only 0.0000 in 0.000 ft 0.000 in 0.000 ft
:;:i SON ENGINEERING INC. Project Title: PPTINC CANOPY
1204 NE 146 AVE EngineProject ID: 615-11-146t-:r: ,
VANCOUVER WA 98684 Projec:Des.L;r: 13660 CW PARK ST TGARD,C.-,723
360-944-7094
't- 1--'il
jOHN@DELSONENGINEERING.COM
, p,r,:ec.2 DEC 2(15.12.:;-.:7-':,,
File=ai.3115,0riSIE3*A-7814AF1-1'815-11-1.EC6
Wood Column
,
.ENERC,^1.C.INC.1383-2015,auild:6.15.10.6,Ver.O.15.10.6
V0016001400 - - iA4e4er-11,4V.434/ 71,1r;7 .4i7 -44H40R)HINIPIELS04e,
Description: P-1 CHECK FOR COMBINED LOAD
Sketches
441.x i_oads
. ;
• ' i -
,..-
. ; 1
! !
. t
t 1 a,
6' i
. .
t
7z,
1 1
-5.
'5, •
T t.
. I
! !
1 ,
!
Loads are total entered value.Arrows do not reflect absolute direction.
DE SON ENGINEERING IND. P•ojeci Title. . P TINt)CANOP\
204 NE 146 AVE EnPecr:
'VANCOUVER WA 98684 Project t less: 10660 .'"W/PARK S'T'GARD 97223 roiect!D: 815-1 i-146
360-944-7094
iO N@DELSONENGINEERING.CON.
ole Footing Embedded in Soil , - E
Fd cN2:
M1460023 i ENERC .C,INC 983-2(.15 9uilId:6t5,.10.6,V15ero 51.1005 6
Wcnsee JOHNDEiS
.Description: rING
Code References
Calculations per IBC 2012 1807.3, CBC 2013,ASCE 7-10
Load Combinations Used :ASCE 7-10
General Information
Pole Footing Shape Rectangular
Footing Width 30.0 in
Calculate Min.Depth for Allowable Pressures
No Lateral Restraint at Ground Surface
Allow Passive 350.0 pot
Max Passive 1,500.0 Psf rr"..<
Controlling Values
Governing Load Combination: ,-p+0"60'A'+i
Latera!Load 3.30 k
Moment o
2.7Ckft
NC Grana Surface Re_trah.
Pressures at 1i3 Deptrn
Actual sox Surface No ate al euaur
323.563 Ps=
A!:owab!e 324.819 Psf "'< i
^S r 'RNMW�7$t
•'_= .w_.i-•.wr;..�wx-''rot-�Cja tY144Z1 -
Minimum Required Depth 1875
ft i Fco;:r=77Z4:7S
ooting Base Area 6.250 ft^2
Maximum Soil Pressure 0.6720 ksf
Applied Loads
Lateral Concentrated Load Lateral Distributed Load
Vertical Load
D:Dead Load
0.0 x k ft
Lr:Roof'Live k 4.20 k
v`I
L:Live k k/ft k
S.Snow x k/,, k
W:Wind 0.53 k k
Krfi
C Earthquake k kilt k
H.Lateral Earth. K kit
K
Load distance above TOP of Load above ground surface {
ground surface 9.0 ft ft
BOTTOM of Load above ground surface
ft
Load Combination Results
Forces @ Ground Surface Required Pressure at 1!3 Depth
Load Combination Loads actor
{k) Moments-{ft k) Depth Iff) Achim-{psf} AUow-{Psf}: Factor
-D-H 0.000 0.000
-D>L+ 0.13 0.0 0.0 1.000
0.000 0.000
-G+Lr+ 0.13 0.0 0.0 1.000
0.000 0.000 0.13
+D-S+- O.G 0.0 1.000
0.000 0.000 0.13 0.0
-D-0.750U+0.750L+H 0.000 0.0 1.000
0.000 0.13 0.0
D+0.750L+0.75GS--r' 0.000 0.000 C.0 1.000
J+0.60Vv+i-i 0.300 0.13 0.0 0.0 1.000
-0,17.70E+1-10^000 2.700 2.88 323.6 324.8 1.000
. 0.000 0.13 0.0 0.0 1.000
-D+0.750Lr+0.750L+0.45CkN+H 0.225 2.025
2.63 291.6 293.1 1.000
DELSON EN'G NEERING iNC.
1204 NE 146 AVE Project Title. PATIN°CANOPY
VANCOUVER WA 98684 Engineer.
Proec es^r. 10660o,r, ProiectID: 815-11-146
360-944-7094 PARK ST T;GARD 97223
J0i-N@DELS0NENGINEERING.CON - -�
Pole Footing Embedded in Soil File
�7 { bS't81o15 cu 81415.ll6Ve + 1 6
IE1�SdJ"
t y„ � , NERCO C INC.1983 2015,Cuie6.15.10.6.Vero.15.10.6
Description: FTNIG-, `+ ..~.•a�y ri
.._ tea.. , ";..r _ s; L '-l�see
JOH1U33Fysp.
—D+0.750 .75GS+u.450'W-i-i 0.225
`D-O.?50�=00.000 0.0CC 0.0 1.000
.7505-v.5250E-= 2.025 2.e3
.13 0.0
s ^ 221.6 293.1 1.000
0.300 2.70C
ii.ovD-C.70E�v.6C� il gas 3.'3.c 324.8 1.000
0.000 0.000
0.13 0.0 0.0 1.000
.
DELSON ENGINEERING INC. JO5ET No. ft-I--
7 OF
n 1204 NE 146T1-1 GT CALCULATED SY: �.
• �1 VANCOUVER. LVA 98684 DATE: M[ �
. NMI (360)944-1094 SCALE: N/A
it ( : ,57-i-
:
i-
= : : 1 4 i 1- 1/--e----- . i ' :
: 'j • • • • T
,1
. ..-:::.C.. . . .. . 13c12..)Y. '' t-t 7-7c(i.e :
1 F ! ! .i.
, ,,.., : : • .
, , ,. , : - v
, J , • ,t......_ „„..2,,,,,,, . /.2„...i , ,, , : , . .
- ,
3 ,,,;c.,.:29:--',#-47-- Q/
:4----/fr&' R ..vz -.t!
l ; . .: .'.. 4.1.‘ .4.,--j,.!. .!•,fi 4••ii/ii. 4).. .
1 : ____,___L.L._ ..(;, 9 :
" v. 11J % w
• Sri : P *1 4747 --'A? . . flA`
''/2-'4 L vAO**f-n F02- 1f17,07 . "4:1(4
•
DELSON ENGINEERING INC. JOS 1r)4-
SHEET NO. it of
• o II 1204 NE 146TH CT VANCOUVER, WA 98684 CALCULATED BY: J., /). DATE: 4
mini (360)944-1094 SCALE: N/A
. Al ,' crvk/ el F7 4 a
1 WT.; P /Mk*: '. ' :';f11*-s. ' — li . .: . . . ---)r-L'ra '',.:49Se .144,4,' ''5 : : : '. . C
. ) i . : (1.?,14f;.A.,.e'r fDJf G nv
. i. - - /447 r P 44JI
NO-4/ !- i----7, .--' ''74 4 : apic .., ' ,i,?7fie,i/k_9)
P : , 0
, .-I-4 0r 1# iti. e. : : : " : . ..
1 • ; :ke• • ' : . H HH
• • • Gizi. ! : ._J _. : :_.- .._:,. ... : ' : 7 ti :: : :
: . ,i .. -; /i ! ' ! ! ! . .: ii-1 .r / . : : itr_... 0.....!_cib' ,
kk (43 ®7'
�
1 ii '''''. P1 k� I T1s N
1 . : . IL HH H '
30 ' 3®' o.� ,_� .
//fin
o)clir, atit., ..) :
1 ... . ff14i .4.
JOB:
2/5:41 X16
DELSON ENGINEERING INC.
SHEET NO. g,---2 OF
0 1204 NE 146T1-1 CT CALCULATED BY: J-P. DATE: iT-77(
VANCOUVER WA 98684 SCALE: N/A
(360)944-1094
Tot8 “ 2
/ . : ' . ' I '
I e--1,1,--' i.f.P.,P/ 44!)4 ilerc ''' • / : . : : , ,
qr1
; :5;e/cy ,, 7
/
1 ' . . 4. ',: : ,c;------T-T------< 1--tgli. 7-c,
' . ' 4- .
w
- . 7''')rl'''ANNE: . r9.1' : AUDI : L094,4,- /2: ^.- 1
a : 0
,(2)-/ 7,0 -77044- immuimiiiMior "; y :
4P m . :fir.. '`
r Ili 6:1)-776 (' .
It sekL, 77 .
H ' . -- ,,LI/
0 2'EV4IL
i - . . : . 1-� r
1 / .
I
gip"%i -i7:t 1,t7 PW i `-;
(* A 7e' Pte- ', A CBHX .s!
w
S r/4 ,4 4 Jixitic- lin coAvc 'r .;j/A.I'z 434
FOR OFFICE USE ONLY-SITE ADDRESS: ••'• ••• •• •• • ••• ••• •
••••
... . • . . . .
This form is recognized by most building departments in the Tri-Count;area fhr trdhstnitting'informaTion.
Please complete this form when submitting information for plan review responses and revisions.
This form and the information it provides helps the review process and resp. nse to Your plojecl.: .••
. . ••. • . . ) • . •..
•
City of Tigard • COMMUNITY DEVELOPM QTIEPAItTLh"Dl'T •:• •••
11
Transmittal Letter ••• ••. . • •• •••
. . • • • . . . . .
13125 SW Hall Blvd. • Tigard, Oregon 97223. 503.718.2439.ti•vd•wv• . i ard-Qr.gov
•
TO: IOW DATE ' ' [
DEPT: BUILDING DIVISION •Milli t
JUL 2 6 2016
FROM: Je5i CO flyKeoi 01 1 ie;ARRDING !?,N
COMPANY:
PHONE: 603 c7O (7/1 By:
RE: (Site/ &Address) S LN Park 5t �t6T-- ,0cs-6n )
\ (Perrtlit Number)
(Project name or subdivision name and lot number a ]&-ig,/qiit,45 =-
ATTACHED ARE THE FOLLOWING ITEM'
Additional set(s) of plans. y- Revisions:
Cross section(s)and detail-. Wall bracing and/or lateral analysis.
Floor/roof framing. Basement and retaining walls.
Beam calculations. Engineer's calculations./� i
Other(explain):
REMARKS: `—j (J/S ice,/ /
► :C.l . L(7 C/ , 6-0671 /n/ss/
p/a/is , /-//2/7 i,-,, a 6 ii" 'i3 f-eivis/ofij- Jz,t)/avii/76.vedi
l 251
' • / �An
Routed to Permit Technic' Date: 3
Initials. �'
Fees Due: ❑ Yes 2 ' ., �'Fee Description:
Amount Due:0 412116 *—)4)-e- ' $
_
$
Special
Instructions:
Reprint Permit(per PE): 1 ❑ Yes *o 1 ❑Done
Applicant Notified: Date: Initials:
I:\Building\Forms\TransmittalLetter-Revisions.doc 05/25/2012