Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Permit (39)
CITY OF TIGARD BUILDING PERMIT oil :? COMMUNITY DEVELOPMENT Permit#: BUP2015-00368 ARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 07/28/2016 i-t Parcel: 1 S 133AC 14500 Jurisdiction: Tigard Site address: 13435 SW HAWKS BEARD ST Project: Scholls Ferry Apartments Subdivision: Lot: 63 Project Description: Building 8-24 units. 6/27/17 REPRINT:to correct owner information. Contractor: HOLLAND CONSTRUCTION INC Owner: KELLER HOLLAND TIGARD INVESTORS 1111 MAIN ST SUITE 700 BY HOLLAND PARTNER GROUP VANCOUVER,WA 98660 1111 MAIN ST STE 700 VANCOUVER,WA 98660 PHONE: 360-597-2036 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: MF Class of Work: NEW Type of Const: VBPermit Fee-RES-New Construction 07/28/2016 $11,427.68 Occupancy Grp: R-2 Occupancy Load: 12%State Surcharge-Building 07/28/2016 $1,371.32 Plan Review 12/31/2015 $5,888.08 Dwelling Units: 24 Plan Review-Fire Life Safety 12/31/2015 $3,623.43 Stories: 3 Height: 42 ft Wash Co Trans Dev Tax-Apartment 07/28/2016 $127,392.00 Bedrooms: 48 Bathrooms: 36 Parks SDC Improvement-MF 07/28/2016 $76,752.00 Value: $3,072,948 (apartment/condominium) Parks SDC Reimbursement-MF 07/28/2016 $18,072.00 (apartment/condominium) Floor Areas: Parks SDC Neighborhood-MF 07/28/2016 $28,464.00 Total Area: 29818 (apartment/condominium) Metro Const.Excise Tax 07/28/2016 $3,687.54 Accessory Struct: 0 DC Provision Review,COM New-Bldg 07/28/2016 $175.50 Basement: 0 DC Provision Review,COM New-Ping 07/28/2016 $175.50 Carport: 0 Additional Plan Review 07/28/2016 $400.00 Covered Porch: 0 Beaverton School CET-Residential 07/28/2016 $35,781.60 Deck: 890 Plan Review 07/28/2016 $1,539.91 Plan Review-Fire Life Safety 07/28/2016 $947.64 Garage: 0 Mezzanine: 0 Total $315,698.20 Required: Required Items and Reports(Conditions) 1 Special Inspection(see plans) Fire Sprinkler: Yes Parapet: No Fire Alarm: Yes Protected Corridors: Smoke Detectors: Yes Manual Pull Stations: Yes Accessible Parking: 1 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090,. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: /, L/ t1;i444) Permittee Signature: �eft '� "'c ,W Call 503.639.4175 by 7:00 a.m,for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. CITY OF TIGARD BUILDING PERMIT . 11 - COMMUNITY DEVELOPMENT Permit#: BUP2015-00368 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 07/28/2016 TIGARD Parcel: 1 S133AC14500 Jurisdiction: Tigard Site address: 13435 SW HAWKS BEARD ST Project: Scholls Ferry Apartments Subdivision: Lot: 63 Project Description: Building 8-24 units. Contractor: HOLLAND CONSTRUCTION INC Owner: GRABHORN, BURTON E ESTATE OF 1111 MAIN ST SUITE 700 14577 SE ANDERSON RD VANCOUVER,WA 98660 CLACKAMAS, OR 97011 PHONE: 360-597-2036 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: MF Class of Work: NEW Type of Const: VB Permit Fee-RES-New Construction 07/28/2016 $11,427.68 Occupancy Grp: R-2 Occupancy Load: 12%State Surcharge-Building 07/28/2016 $1,371.32 Dwelling Units: 24 Plan Review 12/31/2015 $5,888.08 Plan Review-Fire Life Safety 12/31/2015 $3,623.43 Stories: 3 Height: 42 ft Wash Co Trans Dev Tax-Apartment 07/28/2016 $127,392.00 Bedrooms: 48 Bathrooms: 36 Parks SDC Improvement-MF 07/28/2016 $76,752.00 Value: $3,072,948 (apartment/condominium) Parks SDC Reimbursement-MF 07/28/2016 $18,072.00 (apartment/condominium) Floor Areas: Parks SDC Neighborhood-MF 07/28/2016 $28,464.00 (apartment/condominium) Total Area: 29818 Metro Const.Excise Tax 07/28/2016 $3,687.54 Accessory Struct: 0 DC Provision Review,COM New-Bldg 07/28/2016 $175.50 Basement: 0 DC Provision Review,COM New-Ping 07/28/2016 $175.50 Carport: 0 Additional Plan Review 07/28/2016 $400.00 Covered Porch: 0 Beaverton School CET-Residential 07/28/2016 $35,781.60 Deck: 890 Plan Review 07/28/2016 $1,539.91 Plan Review-Fire Life Safety 07/28/2016 $947.64 Garage: 0 Mezzanine: 0 Total $315,698.20 Required: Required Items and Reports(Conditions) Fire Sprinkler: Yes Parapet: No 1 Special Inspection(see plans) Fire Alarm: Yes Protected Corridors: Smoke Detectors: Yes Manual Pull Stations: Yes Accessible Parking: 1 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 r 1.8 0.332.2344. Issued By: / Permittee Signature: f /' Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. . gLu4 Building Permit Application i 3 v Commercial lt,ll (II l It I I �I t1.1 City of TigardReceived /IVE / 13125 SW Hall Blvd.,Tigard,OR 97223 rr, Date/By: - 3J �/ g Permit No.: !c-60 56 g N._ II Phone: 503-718-2439 Fax: 503-598-19G0�-C 3 0 2015 Date/By: /!� ( 1 t ! Related Permit: Inspection Line: 503-639-4175 �y Date Ready/Ty: u�/\' 1 Juris: la See Page 2 for Internet: www.tigard-or.gov CIT'r OF 1 R AA Notified/Method:/7�( /( Supplemental Information 43 J 3 : '. '? �3 # "ems 9. I' 6 t t ft I ) �i I , )3New construction 0 Demolition Pe ..' fees*are based on the value of the work perfo ed. 0 Addition/alteration/replacement ❑Other: Indica a value(rounded to the nearest dollar)of.1 equipmen ii aterials,labor,overhead,and the p ,t for the . - x : a a i. ' a '' work indicate. on this application. ❑ 1-and 2-family dwelling 0 Commercial/industrial • Valuation: $ ❑Accessory building ' Multi-family Number of bedroo ❑Master builder 0 OtherNumber of bathrooms: v ••,"'''z'''''-'e-1"1-4-600-13.)4101,.0= 1 t. 'e t a ti� a Total number of floors. Job sit:IVe addres..J3435- SW Sshells-Ferry-RtYad ` A CI) / New dwelling ar quare feet City/State/ZIP: Tigard Oregon 97008 Garage/carp, area: squ.= feet Suite/bldg./apt.4: I Project name: Tigard apartments Covere• porch area square fe• Cross street/directions to job site: 135th and Scholls Ferry / area: square feet Other structure area: square feet Subdivision: Lot#: 63 Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Tax map/parcel#: r equipment,materials,labor,overhead,and the profit for the a o s.` I _ x,;.. work indicated on this application. BUILDING t,- 3-story apartment building `i Ahl ij � / s _�/ �� ' Existing building area NA square feet NA New building area: 301,310.00 square feet ( l ^, s Number ofstories: 3 STORIES Name: Keller Holland Tigard Investors, LLC Attn:Brenner Daniels Type of construction: VB Address: 1111 Main Street Suite 700 Occupancy groups: City/State/ZIP: Vancouver,WA 98660 _. _.__.. _..�_— Existing: NA Phone:(360 ) 694-7888 Fax:( ) R2 n a v, r `i Business name: LRS Architects Structural plan review fee(or deposit): Contact name: Dean Masukawa Address: 720 NW Davis Suite 300 FLS plan review fee(if applicable): City/State/ZIP: Portland OR 97209 Total fees due upon application: Phone:( )503-221-1121 Fax::( ) 503-221-2077 Amount received: E-mail: dmasukawa@Irsarchitects.com C' ". u 0q 'tk ? ; ', 5(.T + gy,,,,t h �, a a Commercial and residential rescri tive installation of a .0 .-_.. W.m.. ,. ._. _._. $ , .t roof-top mounted Photovoltaic Solar Panel System. Business name: Holland Construction, Inc Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address: 1111 Main Street Suite 700 Solar Installation Specially Code checklist. City/State/ZIP: Vancouver, WA 98660 Permit fee(includes plan review $180.00 and administrative fees): Phone:( 360) 694-7888 Fax:( ) State surcharge(12%of permit fee): $21.60 CCB Lic.: 193 872 Total fee due upon application: $201.60 Authorized signature: 4 This permit application expires if a permit is not obtained °'� within 180 days after it has been accepted as complete. Print name: ,t)4.01 'u"It��'4 • l` � Date: ///7//5 * Fee methodology set by Tri-County Building Industry Service Board I:\Building\Permits\BUP_COM_PermitApp.doe Rev.04/21/2014 440-4613T(11/02/COM/WEB) City of Tigard 71 r COMMUNITY DEVELOPMENT DEPARTMENT TIGARD Building Permit Review — Commercial - With Land Use ...,,,,;7,, Building Permit #: ---e:Dt4 Pacts---003(.0g Site Address: 13,135 .S ch offs P r'r`) (ad Suite/Bldg#: Project Name: 3C.h o I I k Fe r ej Apn rt-► l e,,r)t-Ts (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: 10 mi C( /) t ci.A... 0(..);),L4-n,9S 1. Co h1( /t1r lI�� 24 1111 i f3/ Verify site address/suite# exists and active in permit system. -B—River Terrace Neighborhood: ❑ Yes / No X Land Use Case#: QR 2.0)5 -00001 121-Plans Match Approved Land Use: iT"?..oi.S 000ie 6Site Plan ❑°Landscape Plan 111 other: Urban Forestry Plan X Elevation Plan Z Building Height: Maximum Height q Actual Height 4 2- ;2`;2( Conditions Met: q 0 ❑ Prior to Submittal JZ( Prior to Permit Issuance Q--Business License: N/A Exists: ❑ Yes ❑ No,applicant notified to obtain business license X Public Facilities Improvement(PFI) Permit: PEI ZD I c- 00 I q 0 Required: ❑ Yes, applicant was notified ❑ No Applied For: / Yes ❑ No,stop intake Notes: CO n cti 111)r)S re ti1C4 g n i r)9 , Cia y r1©+ 1 s f ue U n ti l Ccr h s(,, e ct Approved by Planning: M,O(r'kc Gt_ f (od, Date: 121 30 11 5 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: /a-///,r Site Plans: # / Building Plans: # 3 Building Permit#: 1,2'Enter building permit# above. � Workflow Routing: AN ,B�Engineering [ -P rmit Coordinator .�'Building Workflow Sign-off: 0/Sign-off for Planning(include notes from planning review) Route Application Documents: iBuilding: original permit application, site plans,building plans, engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: i _ Date: /g._/..0/5--- I:\Building\Fonns\B1dgPennitRvw_COM_WithLandUse 070915.docx Engineering Review 'J .'Slope at building pad: /�o ❑ PFI Permit#: ❑ Conditions "Met"prior to issuance of building permit ❑ Easements (encroachments)per engineering conditions of approval and plat (not typical on SDR/CUP) ❑ Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes ,No Assess Water Quantity Fee in-lieu: 0 Yes ,0" No LIDA Facility on lot: 'Yes ❑ No ❑ NOT Approved by Engineering: Date Notes: £l.T d t71 o*- ?/1-t a7 ,,JfL i f-3, Approved by Engineering: fit I"l‘ 4314 i7i• Date: i Vi 4. Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: 0 Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit Approved, NOT Released: ,`�tov‘.,s Ole ° ate: 0/A4' J Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: 1SDC Fees Entered: Wash Co Trans Dev Tax: des ❑ N/A Tigard Trans SDC: ❑ Yes ,N/A Parks SDC: ('Er'Yes ❑ N/A K to Issue Permit Appby roved Permit Coordinator: Date: /'-g/j‘e'' I:\Building\Fonns\B1dgPennitRvw_COM_WithlandUse_070915.docx DESIGN WITH INTEGRITY PLANNING DESIGN INTERIORS ARCHITECTURE 720 NW Davis 503.221.1121 le Suite 300 503.221.20776 Portland OR 97209 www.lrsarchitects.com TRANSMITTAL To: City of Tigard, Oregon Date: 12.29.15 13125 SW Hall Blvd Project Number: 215079 Tigard, OR 97223 Project Name: Tigard Apartments Total Pages: 503-718-2448 Copies To: File Transmitted By: Dean Masukawa Transmit Via: 0 Fax 0 Mail 0 Messenger 0 Overnight 0 Other walk in Item Description 1 1 copy of building permit applications (11) total 2 Building permit intake fee check 3 1 copy ComCheck form signed 4 3 sets of plans for each building (11 buildings total) 5 2 set of specifications 6 2 sets of structural calcs Sincerely, Dean Masukawa Lrors ARCHITECTS Ltzi Ris( Q OWL ; TRANSMITTAL OF Project Tigard Apartments JJ Office Locations8t No.: film 11,L 12/16/15 &; / ALASKA Date: ^ , ��1111 City of Tigard AnchorageT,o: 13125 SW Hall Blvd Juneau Tigard, OR 97223 Fairbanks Building Department Ketchikan Regarding: SiteWork Permit Submittal Kodiak Palmer We are ® Attached sending you ❑Under Separate Cover ARIZONA Via Tem e Delivery the following items: p Tucson 0 Shop drawings ❑Prints ®Plans 0 Specifications COLORADO ❑ Copy of Letter Golden 0 Change Order 1:1 Samples ®Other Gunnison Copies Date Description Montrose 1 12/16/15 Signed Building Permit Application 7 MONTANA 1 12/16/15 Permit Fee Deposit-$4,028.32 1 12/16/15 Geotechnical Report(Terra&Assoc dated 5/13/15) Billings Bozeman 1 12/16/15 Fire Flow Worksheets(6 total—1/per Building Type) Butte 2 12/16/15 Full Size Civil Plans—Onsite Improvements(dated 12/11/15) ✓ Great Falls Helena Miles City These are transmitted as indicated below: O For approval 0 Approved as submitted ❑ Resubmittal Copies for approval NORTH DAKOTA O For your use 0 Approved as noted 0 Bids due Copies to distribute Dickinson O Return 0 Returned for corrections Corrected prints OREGON ® Review and Comment ❑ Prints returned after loan to us Bend ❑ Other: Portland Message: WASHINGTON Redmond Copy to: Printed Name: Kevin Russell Seattle Printed Name: Signature: WYOMING Gillette Lander Laramie Sheridan 971-280-8641 ■ 800-865-9847(fax) ® 720 SW Washington Street, Suite 750 ® Portland, Oregon 97205 ® www.dowl.com �N �k - - z At.) :s We � n ) 5{ '," fit t .,. y. i y t - - r4 .mwrS ATTACHED - r F 'c i ..los:. v :,,,,;,,,,,,,, It„.. + yrc {,. &p X8 0t'`.f 7, 5 'i „1 6 s , Remarks: o-= r NOTE:Documents for deferred submittal items shall be submitted to the registered design professional in } , > : i=,'responsible charge who shall review them and forward them to the building official with a notation indicating that n, `,t3 the deferred submittal documents have been reviewed and been found to be in general conformance to the design of the building.The deferred submittal items shall not be installed until the design and submittal documents have been approved by the building official. Oregon Structural Specialty Code Section 106.3.4.2 ' 1'(}I;(I. FICE USE 0IY`` Routed to Permit Technician: Date: Initials: I3u�•',, .r __ Y _ s Ej No Fee Description: Amount Due: 3: p'-V.Y Deferred Submittal Fee: - ;t•: Additional fee based on valuation: $ $ . .,..,'-',1 Other: # x: Total Fees Due: Special Instructions: Reprint Permit(per PE): ri Yes 1 0 No Q Done c Applicant Notified: Date: Initials: The fee for processing and reviewing deferred plan submittal shall be an amount equal to 65%of the building based on the valuation of the particular portion or portions of the project with a minimum$200.00 fee. This fee is in addition to the project plan review fee based on the total project value. I:Building\Forms\TransmittalLetter-De&dSubmtl.doc 04/04/07 d xh ' y f x " ' r - �-�ap 1 Ot Ttit r e� ''" ' , , i 4 (. S t 1 i9 f $ L .. �53 AT ''-HED IS THE i >,' y' 1 vITTAL ITEM et5gI1+try, ` -.___ "' w r '- ..',7:-. Remarks: '" -. NOTE:Documents for deferred submittal items shall be submitted to the registered design professional in responsible charge who shall review them and forward them to the building official with a notation indicating that the deferred submittal documents have been reviewed and been found to be in general conformance to the design of the building. The deferred submittal items shall not be installed until the design and submittal documents have been ,' approved by the building official Oregon Structural Specialty Code Section 106.3.4.2 ,_ F()itOFFICE UgE,OlsiLY" Routed to Permit Technician: Date. Initials: Fees Due: [3Yes $ No Fee Description: Amount Due: ``,tt Deferred Submittal Fee: ' ''' f : Additional fee based on valuation: $ , %-'1" Other: e - Total Fees Due: $ Special Instructions: ij Reprint Permit(per PE): Yes Q No 0 Done '''''4,1 Applicant Notified: Date: Initials: The fee for processing and reviewing deferred plan submittal shall be an amount equal to 65%of the building based t on the valuation of the particular portion or portions of the project with a minimum$200.00 fee.This fee is in ' addition to the project plan review fee based on the total project value. I:Building\Forms\TransmittalLetter-DefrdSubmtldoc 04/04/07 Case# Address Building BUP2015-00363 13295 HAWKS BEARD 3 BUP2015-00366 13351 HAWKS BEARD 6 BUP2015-00361 13465 HAWKS BEARD 1 BUP2015-00364 13205 HAWKS BEARD 4 BUP2015-00367 13215 HAWKS BEARD 7 BUP2015-00362 13375 HAWKS BEARD 2 BUP2015-00365 13145 HAWKS BEARD 5 BUP2015-00368 13435 HAWKS BEARD 8 Site Address: (?75#` t`_L,.' III Building Division -r 1 vA R DD Deferred Submittal Transmittal Letter BUP2015-00369 13327 HAWKS BEARD 9 BUP2015-00370 13225 HAWKS BEARD 10 BUP2015-00371 13285 HAWKS BEARD 11 TO: k ii .(...... j DATj E1VED DEPT: BUILDING DIVISION SFP 1 21116 FROM: 'v 1N .0 J r isiti , . ,, COMPANY: 1 Cof4cr aulcrt or..+ - PHONE: $1:43 . (010 . ft)Y8 BY: 8.72 RE: 13111f-96v k4 if.orkieD ,ST. B ' y„., 6, , - 0 3"70 (Stte Address) '- t ase 'um r OFFICE COPY 6ea' su tvt name and lvumbet. OFFICE COPY Valuation of Deferred Submittal: $ 028 dt .00 ATTACHED IS THE FOLLOWING DEFERRED SUBMITTAL ITEM: , L.' .1 :/ th .� to L6,., 2 .._...4i01.a 1.1A ! E Remarks: NOTE:Documents for deferred submittal items shall be submitted to the registered design professional in responsible charge who shall review them and forward them to the building official with a notation indicating that the deferred submittal documents have been reviewed and been found to be in general conformance to the design of the building.The deferred submittal items shall not be installed until the design and submittal documents have been approved by the building official.Oregon Structural Specialty Code Section 106.3.4.2 I US ONLY Routed to P- •j ,T,,:,..,1”' ian• Date. '22 ( Initials / 1 Fees Due: .re'stifle' [ K! 'es No Fee Description: Amoun 0 e irL'-31. Deferred Submittal Fee: $ =:wis __a_ ____._.„., „,'._ _�. N-, Additional fee based on valuation: $ Other: $ - t - Total Fees Due• $ Special Instructions: Reprint Permit(per PE) ❑ Yes 0 No 0 Done Applicant Notified: Date: Initials: The fee for processing and reviewing deferred plan submittal shall be an amount equal to 65%of the building based on the valuation of the particular portion or portions of the project with a minimum$200.00 fee.This fee is in addition to the project plan review fee based on the total project value. I:Building\Forms\TransmittalLetter-DefrdSubmtl.doc 04/04/07 FOR OFFICE USE ONLY—SITE ADDRESS: 9-5V J)) AIttr lA1' A/ g i This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard ' COMMUNITY DEVELOPMENT DEPARTMENT liAll Transmittal Letter TIGAIR.I 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: DATE RECEIVED: DEPT: BUILDING DIVISION ir PO RECEIVED FROM: ! ._ ; ,- QCT 262015 COMPANY: ,/ _ �` r„ CITY OF TIGARD PHONE: --6,-, ,r 7��� BUILDING DIVISIN _1� RE: / / A. A 0111 A lk, V' a0(.4'' , VP f-- (.? 49 5--a-o 2.-.. ..7 ite A..ress2 (Permit Nti 1 —SP Or roject name or su.owl ton nam- an• of num.er092% + �\ ATTACHED ARE THE FOLLOWING ITEMS: I Copies: ,Description Copi c y tion•� F ii",:. P Additional set(s) of plans. ' : isions: Cross section(s) and details. # # all bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. Other(explain): q> REMARKS: - jam K ri4 T 5 z -FO>: ,?. E USE.9NLY ,,Routed to Permit Technician: Date: ( 3 /b'' Initials. Fees Due: ❑ Yes L&J"lC o Fee De:cription: Amount Due: S , $ $e ' (<.. $ Special Instructions: Reprint Permit(per PE): ❑ Yes No ❑ Done Applicant Notified: L',, yz-x. Date: /r/S71s" Initials:45 -- I:\Building\Fonns\TransmittalLetter-Revisions.doc 05/25/2012 City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 Location: Inspection Date: 13435 SW HAWKS BEARD ST, TIGARD, OR, November 7, 2017 at 9:32:14 97223 AM Record Type: Record ID: Commercial - Building BUP2015-00368 Inspection Type: Inspector: 299 Final inspection Jeff Grove Result: PASS - CofO Comments: Violation Summary: Inspector Contractor