PFI2016-00165 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
:zJ COMMUNITY DEVELOPMENT Permit#: PF12016-00165
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 08/03/2016
g
Parcel: SEG1558
Jurisdiction: Tigard
Site address:
Subdivision: Lot:
Project: Astound Wave Broadband
Project Description: Wave will be installing approx. 3,800 ft of fiber underground to the Tigard-Tualatin School District
Owner: FEES
Description Date Amount
PFI Permit Fee 08/03/2016 $300.00
PHONE:
Contractor:
PHONE:
FAX:
Applicant:
KRIS MARTINEZ
669 GLATT CIRCLE
WOODBURN, OR 97071
PHONE: 971-264-4448
Total $300.00
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant
Signature: Not Present
Issued By:
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PF12016-00165
Type: Condition Name: Status: Severity:
PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of
any agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI_Utilities 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited
and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up
and suspension of work to accomplish clean-up.
PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Utilities 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes,etc. shall be
reinstalled or replaced,with like kind of material. Obtain City approval of restoration work.
PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services
Association[ATSSA), and Oregon Temporary Traffic Control Handbook[OTTCH].
PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work
area.Traffic control devices,flag persons,etc., shall be in place prior to initiation of construction work and shall be
effectively maintained.
PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and
area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met)
and 503-431-2345(Tigard School District)and other service providers impacted by such closure.
PFI_Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City
approval of any access closures.
PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice
Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City.
PFI_Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the
City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized
by the City Engineer.
PFI_Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI_Utilities 12-UTILITY NOTIFICATION Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987.
If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense.
PFI_Utilities 13-UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole
before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at
the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work
with affected utility agencies.
PFI Utilities 14-TEMPORARY PATCH Applied Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI_Utilities 15-REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities(roads,ditches,etc.)as may be necessary, as determined by
the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI_Utilities 16-PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert
Phone#>, to establish a preconstruction meeting.
PFI_Utilities 17-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged
inspection, and after completing work covered by the permit. Jonny Gish 971-713-0281 or jonny@tigard-or.gov
Both Sandburg St and Bonita Rd have NO CUT moratoriums on them,there is to be no potholing, or cutting of or within the
asphalt.
Traffic restrictions are in effect and there is to be no work or staging done between 6:30am-9am and 3pm-6:30pm
PFI_Utilities 18-PERMIT/PIAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance,and all attachments, and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and
provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI_Utilities 19-MONUMENT PROTECTION Applied Notice
Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI_Utilities 20-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have
authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing, of any/all assignment changes.
PFI_Utilities 21 -OTHER Applied Notice
RECEIVED
City of Tigard AUG 0 3 2016
PUBLIC WORKS — ENGINEERING CITY OF TIGARD
Public Facility Improvement (PF EERING
DESCRIPTION OF WORK(in the right-of-way) TYPE OF WORK
Check one: ® Utility Connection
❑ TYPE 1—Franchise Utility Work
❑ Sidewalk/driveway approach Work performed by NWN,PGE
❑ Street improvements and/or utility agency.
Detailed description: Wave will be installing ap=x.3-800ft of fiber undaMmund to ❑ TYPE 2—Sidewalk/Driveway/Sewer
the Tloard Tualabn School District. Work performed for the purpose of:
• Sidewalk installation or repair.
• Driveway approach installation
Property address/location(s): Beginng at SW 72nd Ave and Bonitpand will end
and/or repair
Ti • Sanitary sewer lateral installation
6960 Southwest Sandburg Lane
Tigard,OR 97223. and/or main line tap
❑ TYPE 3—Full scale Development
Applicant: Astound Work performed with Land use
Address: 669 Glatt Cirlce approval which includes any of
the following:
City/state: Woodburn OR Zip: 97071 • Subdivisions or Partitions
Phone: 971-264-4448 Email: Iumartlnez®wavebmadband.00m • Street widening
Contact name: Kris Martinez Phone: 971-2644448 • Mainline installation for Sanitary
sewer,Storm sewer,Tigard water
Contractor: TBD and/or Tigard Water Service Area
CCB#: Expiration: SUBMIT COMPLETED APPLICATION TO:
Address: City of Tigard
City/state: Zip: Planning/Engineering
13125 SW Hall Bbd.
Phone: Email: Tigard,OR 97223
Contact name: Phone: Applications for"minor work in right-of-way"
only may be emailed to:
Engineer: rermits tiQ�d=or.g�v
Address:
City/state: Zip:
Phone: Email: Case No.: — S
Contact name: Application submittal fee:
Additional fees:
Estimated value of work is required(if over$5,000):$ Application accepted:
(within the public right-of-way) By: 4-C Date:
Is work related to a LAND-USE DECISION? [I Yes El :
No By ::,aon reviewed-
Is
By:` �r3 L__ Date:
If so,please specify (MLP, SDR,SUB,etc.) case#:
Applicant notified:
Is work related to a BUILDING PERMIT? ❑ Yes W No By:3G-1 L_ Date: 3 ��
If so,please specify(BUILDING PERMIT)case#: l:\CURPLN\Masters\LandUs Applications R".07/09n015
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 www.tigard-or.gov • 503-718-2421 • Page 1 of 4
APPLICANTS
NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for work.
*When the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written
authorization from the owner or an agent of the owner. The owner(s)must sign this application in the space provided or submit a written
authorization with this application.
BY SIGNING BELOW,THE APPLICANT(S) SHALL CERTIFY THAT:
• The above request does not violate any deed restrictions that may be attached to or imposed=on the subject prop
• If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the
conditions and limitations of the approval.
• All of the above statements and the statements in the plot plan,attachments,and exhibits transmitted herewith,are true;and
the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such
statements are false.
• The applicant has read the entire contents of the application,including the policies and criteria,and understands the
requirements for approving or denying the application.
SIGNATURES of each owner of the subject property required.
Ap
Applicm44Auihorized Agen ' e Print name Date
Owner's signature Print name Date
Owner's signature Print name Date
Owner's signature Print name Date
PUBLIC FACILITY IMPROVEMENT PERMIT
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov 503-718-2421 • Page 2 of 4
DEVELOPMENT ENGINEERING FEES FOR STAFF USE ONLY
Public Facility Improvement(PFI) Permit:
DETAILED SUBMITTAL
APPLICATION FEE REQUIREMENTS
Part 1: Required submittal fee$300.00
FRANCHISE UTILITY AND SIDEWALK/
PERMIT FEE DRIVEWAY AND UTILITY
Part 2: All non-water system improvements CONNECTIONS,ETC. -
Engineer's estimate X 5% (less$300.00 submittal fee) (` rk in the right of way)
Engineer's estimate X 2%Plan Review Sketch
(including information below)
WATER SYSTEM FEE
TI Dimensions-
Part 3: All public water system improvements
❑ Street Name
Engineer's estimate X 12%
❑ Site Address
PFI Permit Fee Exemptions:
There will be no permit fee charged,or assurance required FULL SCALE DEVELOPMENT
for the following types of work: (Subdivisions/Partitions andStreet Improvements)
• Sidewalk repair(less than 20 lineal feet)
• Relocate or replace mailbox Design Plans
• Ditch cleaning that does not involve regrading. (6 sets,24x36 or 22x34)
• Weephole repair ❑ Cover—Site;-Vicinity,Abbreviation,Legend
• Curb repair or replacement(less than 20 lineal feet) ❑ General Notes (City,Water;Sewer,etc.)
• Lawn sprinkler system installation or repair ❑ Street(Plan,Profile)
• Street tree pruning or planting ❑ Water,Storm and Sanitary(Plan Profile)
• Planter strip landscape maintenance ❑ Water Quality Facilities
• Test wells ❑ Grading
❑ Landscaping/Tree Plan
❑ Composite Utility Plan(Electrical,Phone,Gas,
Note: A cash assurance maybe required per Storm,Sanitary,Water,Signage,Street Lights,etc)
TMC 15.04.140.(customer deposit) ❑ Details
❑ Traffic Sight Distance
.❑ Signing and Striping
❑ Street Light Plan and Photometric
❑ Engineers seal/signature
❑ Sheet label(project land,use name,revision and
plan log block,dates and sheet numbers.)
Additional Submittals
(per Land Use conditions)
❑ Traffic Report
❑ Storm water Drainage Calculations
❑ Geotechnical Report
❑ Preliminary Access Report(Sight Distance)
❑ Proposed Plat
❑ Pathway Design(if applicable)
❑ Water Department Approval
PUBLIC FACILITY IMPROVEMENT PERMIT
City of Tigard 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 Page 3 of 4
SAMPLE SKETCH:
Edge of Pavement
I
I Ditch
StreetlightI --------•—•—•—•—r---
1 I Radn Drain�T� g
I `moo ° 1
' T—'�ro'pos cf'SelniverTi'ne" �
N�
61 ..Existing'House, .
I I al I Existing 1
2:r Driveway
a�
0i I 1
zo.
0i 1
0
o
>
>� I i
0
Existing Shop
J .• i
Powerpole i
�,► o • o
I a 95' 1
-7ropertp Line
II Fire Hydrant(FH)
I
Scale: 1-=30'
� I I
� I I
I I
� I �
MINIMUM SKETCH REQUIREMENTS (Put"N/A" if Not Applicable):
North arrow Property lines &dimension Slope of property
Street& street name(s) Existing building, structures Utility& street light poles
Proposed work Existing curb or edge Trees
Existing S/W or of pavement Existing utility locations
D/W apron (sewer,water, storm)
PUBLIC FACILITY IMPROVEMENT PERMIT
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov 503-718-2421 • Page 4 of 4
#1995884: 100010215 - Tigard Tualatin SD - "
Tigard Tualatin School District DF Office to Pittock "" E • • • •
S CONSTRUCTION NOTES:
1-ALL WORK AREAS TO BE RESTORED TO
LIKE OR BETTER CONDITION.
General Location Scope of Work 2-ALL OTHER UTILITIES ARE BASED
OFF EXISTING LOCATES OR
UTILITY STRUCTURES
Wave will be installing approx 3,800ft of fiber 3-IT IS THE CONSTRUCTION
underground to the Tigard Tualatin School District CONTRACTORS RESPONSIBILITY
g g TO CALL FOR LOCATES PRIOR
TO DIGGING
,.. ' CONTACTS:
Mark Jacobson
503-349-6824
mjacobson@wavebroadband.com
Kris Martinez
971-264-4448
krmartinez@wavebroadband.com
SITE ADDRESS/SECTION:
Vicinity Map Packet Description SW 72nd and SW Bonita RD
Page DES CRIPTIONISYMBOLOGY:
Underground
1 Over all description of project 0
Vault
2 Map of underground route for fiber
3 ODOT traffic control plan
4 ODOT traffic control plan
5 ODOT traffic control plan
a' 6 Vault specs SCALE TITLE
PAGE NUMBER PROJECT NUMBER
100010215
PAGE X -- Y
#1995884: 100010215 - Tigard Tualatin SD - Tigard N
Tualatin School District DF Office to Pittock "" E
s CONSTRUCTION NOTES:
1-ALL WORK AREAS TO BE RESTORED
TO LIKE OR BETTER CONDITION.
2-ALL OTHER UTILITIES ARE BASED
OFF EXISTING LOCATES OR
UTILITY STRUCTURES
3-IT IS THE CONSTRUCTION
CONTRACTORS RESPONSIBILITY
® TO CALL FOR LOCATES PRIOR
TO DIGGING
CONTACTS:
Mark Jacobson
503-349-6824
mjacobson@wavebroadband.com
Kris Martinez
rou,e underground,Oe, 971-264-4448
v krmartinez@wavebroadband.com
SITE ADDRESS/SECTION:
SW 72nd and SW Bonita RD
DESCRIPTION/SYMBOLOGY:
I Underground route
i
Q Vault
i
sm
v
m
�P ro:nate ioCS'on SCALE TITLE
o s=a a==mt FIBER ENHANCEMENT
n - -
PERMIT DRAWING
RdF PAGE NUMBER PROJECT NUMBER
2
. 100010215
.._ ., U ,
PAGE OF
#1995884: 100010215 - Tigard Tualatin SD - "
Tigard Tualatin School District DF Office to Pittock w -0
E •
S CONSTRUCTION NOTES:
1-ALL WORK AREAS TO BE RESTORED TO
6 LIKE OR BETTER CONDITION.
t eon Ebbon vagea5 2-ALL OTHER UTILITIES ARE BASED
Stations Lane Closure with Flagging Diagram 320 Stations Lane Closure with Flagging 320 OFF EXISTING LOCATES OR
Stationary 99 � 9 Stationary 98 9 �fagratn UTILITY STRUCTURES
Diagram 320 covers total closure of one lane of a two-lane,two-way
roadway See the detail inset for the layout it using a single fagger to control 3-IT IS THE CONSTRUCTION
both directions o1 traffic on low volume roads(less than 400 ADT)with good is CONTRACTORS RESPONSIBILITY
sight distance as discussed below m
TO CALL FOR LOCATES PRIOR
I Use truck-mounted flashing warning lights on work and protection Ll TO DIGGING
vehicles See Section 4 3-Lights and Lighted Signs for exceptions
2. For added visibility,a truck-mounted arrow board or PCMS in caution 1 CONTACTS:
made may be used
Mark Jacobson
3. Flaggers at each approach are required d any of the following R I '' 503-349-6824
conditions exist mjacobson@wavebroadband.com
a Night Operations
b Work space is over 200 feet in length se Kris Martinez
c. Sight distance Is less than 750 feet from each approach �• 971-264-4448
through the lane closure — -----I 1 I��
d Traffic volumes are greater than 400ADT i , I i .® krmartinez@wavebroadband.com
I
4 The length between the Flagger Ahead signs shall not exceed one 1 SITE ADDRESS/SECTION:
mile Use Diagram 340-Lane Closure with Pilot Car 4 exceeding one 1 I M
mile i I SW 72nd and SW Bonita RD
5 Cones should be used to outline the work space when curves or other
roadway salignmentspace safety vent clear dxectlorh for the molonsts ro pass i i�s'.� i I••• DESCRIPTIONISYMBOLOGY:
the work spire safe I i
6 Cones along the work space are recommended when posted speeds i $ j•, Ii I Underground route
are 45 mph or greater,when working under heavy traffic or when travel v
Lanes are narrower than 11 feet j I I I Q Vault
I i
7 Extended queue signing(see Diagram 54)should be used when
traffic queues extend beyond the initial advance warning sign I 41 t
8 When flagging near an mtersechon.the'Flagger Ahead'(CW23-2) I I
sign should be visible to traffic entering from any side road Addrbonal Y
advance warning and Flagger Ahead symbol signs may be placed on "v°paoq i°B'"L' ft P"4
Ndft
the side road(s) o15 >Yw. V
9 Sign set-up and ftagger placement shown may be used for intenrutlent a a m n
full road closures of 20 minutes or less x; 10D gig SCALE TITLE
10 The-ONE LANE ROAD AHEAD'(W204)sign is opbonal and should 170 <PAGE TITLE
be considered on high volume or high speed roads,or when extended em 700 DO PAGE NUMBER PROJECT NUMBER
queues are expected
Chal)Wf- Dec~2011 Decembar:011 Chapter 5 3 100010215
PAGE X OF Y
F
884: 100010215 - Tigard Tualatin SD - "
Tualatin School District DF Office to Pittock ' _0 E
S CONSTRUCTION NOTES:
1-ALL WORK AREAS TO BE RESTORED TO
LIKE OR BETTER CONDITION.
2-ALL OTHER UTILITIES ARE BASED
OFF EXISTING LOCATES OR
UTILITY STRUCTURES
3-IT IS THE CONSTRUCTION
Lane Closure with PortaW Traffic Signals Dis ram 330 Lane Closure with Portable Traffic Signals Diagram 110
CONTRACTORS RESPONSIBILITY
-Ke Tr+S oe.mi ar a Line:tuffe on a t•o-ar.e t*o-+3t,oaa.rung Doraoa TO CALL FOR LOCATES PRIOR
tramt:6ThAS TIM(Sane*between STOP taus 6"000 be 066 ma,
I Trmmc roues MOW tx r66 mm 3e0C A7T I TO DIGGING
Pace ane as-neo(Lm eam.(atop"wan the Ore+Mac veyta N"
De*W me cemw Dr the 3waam care rd ter-r+ra am ♦
"pole .;; A 1 CONTACTS:
r"ou"t(Sgr>r"tad a+e snttuaer
t. Prwwe trt Of S"a r ce•e6 xteeen Stat UM a I Mark Jacobson
2 TSM M'MltrtM Pwm"*m or rw:"Trt W"a"mi be on" A 503-349-6824
•"'Dfo"'�'� 1ri°'�N�1 Y1g��'dO"0'°
mjacobson@wavebroadband.com
IW"ia1CAMl.1MIglMrgya�MrlNt>pprpri A ""
Trp red l"me fir*M(SOtlerf Slue td rt v"0C"lDc*Y W
•aeSpam compelery"eft"wpangrim smieme( ConuOer � • I � T��� Kris Martinez
X70•or owesman ramc w"er r",Ni
3 Puce enough wanng"m tp pro-We 3eepux*wamrrg-f ramc •w 971-264-4448
ipprDadfr+g t"e enp of ft"mc queue r.ma,ot"OK&MY L am krmartinez@wavebroadband.com
6lCON(iH Or 6Tn6 Or agoM tM paLY"Yn aSnrT 7Se(il' TIN* •
MW De a Si ra Ahead Mang 6T Ste*Stance A"the SSD Dar •
6 AtttMtpdary*lopou•regureavronw6De.npacera�ore j • SITE ADDRESS/SECTION:
Zo a e •
5 T" imt�t dt•*4gna neadDn"Do*ar6wm*aaw DhM • SW 72nd and SW Bonita RD
:far�OArttHtt m*Boge(fear*avI
e T"mmmarm pm•-ffmr' ST.a nem ShmI*exp m's W. • DESCRIPTIONISYMBOLOGY:
MW VSl WOoe or6Mwa! Tee pocon ar r e aceta( •
Vr4j hW t 0•17 to 19 het aDO.Y 7*road bur 3w •
T 0oeeeaatawrormamnumv%Wry00V**ns 1.0Ahnes • I Underground route
approaw"A LaIo het r nArai areal to a m"i"ner tX Z00 Tea.m o•
Spell Mort Ifeet6
s'�• •+a Q Vault
a on state tt6glSMa/e.approra";xr re;tat Trrnc E17rlar'.6 requr*a �+ _ y
(elm th mgwre(Damn d"um V muff raft conOD sgnas wr Ywv 0.
AI&O b SIM nfgflway6.equp'Mnt 00 be I6St(an M OOT •
Quark(Pfo*jcS L.0 40L', On Ori r0a(S.chlCS 90'ora
M Yrw www.M►..� ,
Iww
17.
� SCALE TITLE
•.w
cram! ecrmS• oeerer_' :nM•wS PAGE NUMBER PROJECT NUMBER
4 100010215
�
#1995884: 100010215 - Tigard Tualatin SD - Tigard N
Tualatin School District DF Office to Pittock W E
s CONSTRUCTION NOTES:
Page 118 2011 Edition Page 119 1-ALL WORK AREAS TO BE RESTORED
TO LIKE OR BETTER CONDITION.
Lem Closure at Intersection with Flagging Diagram 620 Lane Closure at Intersection with Flagging Diagram 620 2-ALL OTHER UTILITIES ARE BASED
Diagram 620 covers work within an Intersection when normal traffic control OFF EXISTING LOCATES OR
must be interrupted Work vehicles may or may not be in the work space UTILITY STRUCTURES
1 During flagging,traffic signals shall be turned off Contact the road
junsdrdion for approval and assistance(see Chapter 3) 3-IT IS THE CONSTRUCTION
' CONTRACTORS RESPONSIBILITY
2 For multi-lane facdrties,traffic approaching the intersection shall be c j t TO CALL FOR LOCATES PRIOR o
reduced to a single lane on each approach See Chapter 3 for 14"" TO DIGGING
information on flagging through intersections . a .�
3 There should be one flogger for each approach One Haggler may CONTACTS:
e
control two adjacent approaches if sight distance,low volumes on side Mark Jacobson
roads.and(agger position allows for safe operation and clear direction A r wr 503-349-6824
to motorists For low traffic volume intersections(fewer than 400
entering vehicles per day),one Fagger may be used mjacobson@wavebroadband.com
4 The`ONE LANE ROAD AHEAD°(W20A)sign is optional and should �a t8C
Kris Martinez
be considered on high volume o high speed roads or when extendedqueues may be expected A 971-264-4448
krmartinez@wavebroadband.com
Sten spaenp and Bi/rsr uripns(h+p .
•' ~ SITE ADDRESS/SECTION:
20 50 `• SW 72nd and SW Bonita RD
25 100 100 100 75 .�
30 t00 rair+{ DESCRIPTIONISYMBOLOGY:
35 40 350 S50 350 15500 c 0 A
45 18D "°" ..� Underground route
50 500 500 5W 210 e
55 250
o... � Vault
A
s
e rw..
4 1 c "•
SCALE TITLE
FIBER ENHANCEMENT
PERMIT DRAWING
PAGE NUMBER PROJECT NUMBER
5 100010215
chapter 5 December 2011 December 2011 Ctuprer
PAGE OF
#1995884: 100010215 - Tigard Tualatin SD - "
Tigard Tualatin School District DF Office to Pittock ' 0 E
S CONSTRUCTION NOTES:
1-ALL WORK AREAS TO BE RESTORED TO
LIKE OR BETTER CONDITION.
2-ALL OTHER UTILITIES ARE BASED
OFF EXISTING LOCATES OR
SPECIFICATION SET UTILITY STRUCTURES
6~0w°""'"' •"°i 3-IT IS THE CONSTRUCTION
au.y a.a
Fil 1w 40
CONTRACTORS RESPONSIBILITY
TO CALL FOR LOCATES PRIOR
Fro.M .,,,• TO DIGGING
. w r T»l r�ewsr
TO' CONTACTS:
Ms,sti-Z�x� r
4ft y � Mark Jacobson
503-349-6824
�---'�a--
mjacobson@wavebroadband.com
Kris Martinez
�
54 \ j jam. 971-264-4448
LOWkrmartinez@wavebroadband.com
>r
SITE ADDRESS/SECTION:
r•
Rff.0 � SW 72nd and SW Bonita RD
R .�r..r
DESCRIPTION/SYMBOLOGY:
iMHM MM� f—r
h 6M Cir) \ J L•Y• Y iw.rM
Underground route
r( e*ALK/INCIDENTAL TRAFFIC LOC.) ' Q Vault
1/TN 1TY VAULT PRE-CAST 233-LA
SCALE TITLE
PAGE NUMBER PROJECT NUMBER
6 100010215
PAGE X OF Y