Loading...
PFI2016-00145 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT m COMMUNITY DEVELOPMENT Permit#: PF12016-00145 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 08/02/2016 Parcel: SEG695 Jurisdiction: Site address: Subdivision: Lot: Project: Astound Broadband-Wave Fiber Project Description: Adjacent to 12753 SW 68th Parkway/SW 72nd Ave/SW Gonzaga/SW 70th Ave?SW Hampton. Starting at our splice case on the north side of Highway 99 and SW 72nd Ave.Wave will attach the fiber to PGE poles on the east side of SW 72nd Ave heading south on existing poles.At 11720 SW 72nd Ave,we will dip underground in the grass(no existing sidewalk)and head south near SW Hermoso Way Owner: FEES Description Date Amount PFI Permit Fee 07/27/2016 $300.00 PHONE: Contractor: PHONE: FAX: Applicant: PHILLIP FAGIN 669 GLATT CIRCLE WOODBURN, OR 97071 PHONE: 503-310-5340 Total $300.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Not Present Signature: Issued By: Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12016-00145 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up- PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work,effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices, flag persons, etc.,shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 12-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 13-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 14-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI—Utilities 15-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads,ditches, etc.)as may be necessary, as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 16-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>,to establish a preconstruction meeting. PFI_Utilities 17-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection,and after completing work covered by the permit. Ken Fisher 503-816-6146 or Kenny@tigard-or.gov PFI_Utilities 18-PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance,and all attachments,and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 19-MONUMENT PROTECTION Applied Notice Existing monuments, property corners,and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 20-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems,take corrective action and,in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing,of any/all assignment changes. PFI_Utilities 21 -OTHER Applied Notice RECEIVED City of Tigard JUL 11 2016 — FPUBLIC WORKS — ENGINEERING . CIN OF TIGARD rTIGARD Public Facility Improvement (PFI) PetrMlINEERING DESCRIPTION OF WORK(in the right-of-way) TYPE OF WORK Check one: ® Utility Connection ® TYPE 1—Franchise Utility Work ❑ Sidewalk/driveway approach Work performed by NWN,PGE ❑ Street improvements and/or utility agency. Detailed description: Starting at our splice case on the north side of hwv 99 and 72nd Wave ❑ TYPE 2—Sidewalk/Driveway/Sewer will attach fiber to PGE poles on east side of 72nd ave heading south on existing poles.At 11720 SW 72nd Ave, we will dip underground in the grass(no existing sidewalk)and head south near SW Hermoso Way and 72nd Work performed for the purpose of: ave riser back up at pole 3568 and continue south aerially to SW Gonzaga St and head east on the existing poles and dead end at pole 4499 at end of driveway.Route continues underground south at a minimum depth of • Sidewalk installation or repair. 48 inches in unimproved right of way on SW 70th and goes east on SW Hampton St on north side of road and rises up with 2 inch conduit at pole 5662 on SW 69th Ave and SW Hampton St. Driveway approach installation Property address/location(s): 12753 SW 68th Ave Tigard.Oreon 97223 and/or repair SW 72nd Ave/SW Gonzaga/SW 70th Ave/SW Hampton. - Sanitary sewer lateral installation 1 and/or main line tap SE& (�JLIS —I-1 S b48 -1 q33 `�1/�p C) 1-043 11110 1 �� �, J ❑ TYPE 3—Full scale Development Applicant: Phillip Fagin -Astound Broadl and.Wave Fiber Work performed with Land use 669 Glatt Circle approval which includes any of Address: the following: City/state: Woodburn,Oregon Zip: 97071 - Subdivisions or Partitions Phone: (503)310-5340 Email: pfagin@wavebroadband.com - Street widening Contact name: Phil Fagin Phone: (503)310-5340 • Mainline installation for Sanitary sewer,Storm sewer,Tigard water Contractor: Waiting for Bid once Poles are approved to attach and/or Tigard Water Service Area CCB#: Expiration: SUBMIT COMPLETED APPLICATION TO: Address: City of Tigard City/state: Zip: Planning/Engineering Phone: Email: 13125 SW Hall Blvd. Tigard,OR 97223 Contact name: Phone: Applications for"minor work in right-of-way" only may be emailed to: Engineer: rynoermits .tigard-or.�ov Address: City/state: Zip: Phone: Email: Case No.: fT-1201 W-c-jo irks Contact name: Application submittal fee: X;06. .50 Additional fees: Estimated value of work is required(if over$5,000):$ Application accepted: .., (within the public right-of-way) By: ilyll-1- Date: Ll I l V_ Application reviewed: Is work related to a LAND-USE DECISION? ElYes ® No If so, please specify (MLP, SDR,SUB,etc.) case #: By: I�.f,s rr VL Date: Applicant notified: Is work related to a BUILDING PERMIT? ❑ Yes ® No By: `--S Date: If so,please specify(BUILDING PERMIT)case#: 1:\cuRVIN\Masters\tand use Applications Rev.07/09/2019 City of Tigard 13125 SW Hall Blvd. Tigard,Oregon 97223 www.tigard-or.gov 503-718-2421 Page 1 of 4 t k P{t, ST 2x-�w� Yt' - 1-,{o Tim DRi c 2t ST12a�`rt trw3 6 0 - q�. B e. 7,;V �- is u-q + c� A fJ w t f l t'a !Q r tU �Aa2F,as 3`x°.6^ APPLICANTS NOTE: Person specified as "Applicant"shall be designated"Permittee"and shall provide financial assurance for work. i=When the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner(.-)must sign this application in the space provided or submit a written authorization with this application. BY SIGNING BELOW,THE APPLICANT(S) SHALL CERTIFY THAT: • The above request does not violate any deed restrictions that m1y be attached to or imposed upon the subject prop=. • .If the application is granted,the applicant will exercise the rights granted in accordance w-idi the terms and subject to all the conditions and limitations of the approval. • All of the above statements and the statements in the plot plan,attachments,and exhibits transmitted herewith,are true;and the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such statements are false. • The applicant has read the entire contents of the application,including the policies and criteria,and understands the requirements for approving or denying the application. SIGNATURES of each owner of the subject property required. Phillip Fagin 7/7/2016 pl.icant/ cd Agcnt's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date PUBLIC FACILITY IMPROVEMENT PERMIT Cityof Tigard • 13125 SNV Hall Blvd. • "Tigard,Oregon 97223 • unvw.tigard-or.gov 503-71.8-2421 • Page 2 of 4 DEVELOPMENT ENGINEERING FEES 1`011 STAFF USE` ONLY Public Facility Improvement(PFI) Permit: DETAILED SUBMITTAL REQUIREMENTS APPLICATION FEE Part 1: Required submittal fee$300.00 FRANCHISE UTILITY AND SIDEWALK/ PERMIT FEE DRIVEWAY AND UTILITY Part 2: All non-water system improvements CONNECTIONS,ETC. Engineer's estimate X 5% (less $300.00 submittal fee) (work in the right of way) Engineer's estimate X 2%Plan Review Sketch (including information below) WATER SYSTEM FEE ❑ Dimensions Part 3: All public water system improvements ❑ Street Name Engineer's estimate X 12% ❑ Site Address PFI Permit Fee Exemptions: There will be no permit fee charged,or assurance required FULL SCALE DEVELOPMENT for the following types of work: (Subdivisions/Partitions and Street Improvements) • Sidewalk repair(less than 20 lineal feet) • Relocate or replace mailbox Design Plans • Ditch cleaning that does not involve regrading. (6 sets,24x36 or 2204) • Weephole repair ❑ Cover—Site,Vicinity,Abbreviation,Legend • Curb repair or replacement(less than 20 lineal feet) ❑ General Notes(City,Water,Sewer,etc.) • Lawn sprinkler system installation or repair ❑ Street(Plan,Profile) • Street tree pruning or planting ❑ Water,Storm and Sanitary(Plan Profile) • Planter strip landscape maintenance ❑ Water Quality Facilities • Test wells ❑ Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Note: A cash assurance maybe required per Storm,Sanitary,Water,Signage,Street Lights,etc) TMC 15.04.140.(customer deposit) ❑ Details ❑ Traffic Sight Distance ❑ Signing and Striping ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) Additional Submittals (per Land Use conditions) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design(if applicable) ❑ Water Department Approval PUBLIC FACILITY IMPROVEMENT PERMIT City of Tigard 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 3 of 4 SAMPLE SKETCH: Edge of Pavement I Ditch —� Streetlight I — -----,-----f —C--- Rain �, C=1 I Drain ' a rflma77 ffr— 1 I � Existing House 1 Existing Drivewy I CI � I ' �• dl o, I 0- .0 I w >� I 1 o O� I Existing Shop j t � I Powerpole �► o • o I a ' 95 1 I ------- ------�--- I � -�oPerty Line II Fire Hydrant(F H) I � I Scale: 'I"=30' I � I I I I I I � � I MINIMUM SKETCH REQUIREMENTS (Put"N/A" if Not Applicable): North arrow Property lines &dimension Slope of property Street&street name(s) Existing building, structures Utility&street light poles Proposed work Existing curb or edge Trees Existing S/W or of pavement Existing utility locations D/W apron (sewer,water, storm) PUBLIC FACILITY IMPROVEMENT PERMIT City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 4 of 4 Kenny Fisher From: Mike McCarthy Sent: Wednesday, July 06, 2016 6:24 PM To: #All Employees Subject: Transportation Project Update - July 6, 2016 Attachments: Transportation Project Update 160706.docx Below and attached is this week's update on projects around Tigard: Transportation Project Update —July 6, 2016 Summer Paving Summer paving work is in progress, with the major paving work beginning this week. Signs have been posted and cards sent to notify the public of upcoming construction. This summer's tentative paving schedule (weather permitting) is: Street Begin/End Location Paving Dates Paving Time 72nd Avenue Hwy 99W to 260 feet south of Hwy 99W July 18 — 22 Night 72"d Avenue Beveland Rd to Hwy 217 northbound ramps July 19 — 22 Night 72nd Avenue Upper Boones Ferry Rd to Bridgeport Village July 25—Aug 4 Night 78th Avenue Pfaffle St to Hwy 99W July 17— 21 Night 121St Avenue Ann St to Tippitt St July 8 — 15 Day Dartmouth Street Hwy 99W to Atlanta St (Costco) July 17 — 21 Night Hunziker Street 72nd Ave to 7585 Hunziker July 20— 22 Night Landmark Lane 72nd Ave to end of street July 24 - 28 Night Locust Street Hall Blvd to Greenburg Rd July 7 - 14 Day Oak Street 69th Ave to 71St Ave July 6— 8 Day Sandburg Street End of street to 72nd Ave July 21 — 27 Night Ventura Court Alfred St to Barbara Ln July 5 —8 Day Walnut Street 116th Ave to 122nd Ave July 8 - 15 Day Busier streets and nonresidential streets will be paved at night to avoid traffic and business disruption (note: work is not planned on Friday and Saturday nights). Striping and replacement of traffic signal loops, speed bumps, etc. will be done a couple of weeks after paving. Call the project information line at 503-718-2760 or Mike McCarthy at 503-718-2462 with questions, comments, or concerns. 1 N 12753 SW 68th AveJON "' E 5 Tigard,Oregon CONSTRUCTION NOTES: 1-ALL WORK AREAS TO BE RESTORED TO LIKE OR BETTER CONDITION. General Location Scope of Work 2-ALL OTHER UTILITIES ARE BASED OFF EXISTING LOCATES OR UTILITY STRUCTURES -OVERLASH FOOTAGE= 0 -NEW FIBER/STRAND FOOTAGE= 3,057' 3-IT IS THE CONSTRUCTION r CONTRACTORS RESPONSIBILITY -UNDERGROUND FOOTAGE= 2,535' TO CALL FOR LOCATES PRIOR -NEW RISERS=4 TO DIGGING ` CONTACTS: Construction Manager-Jeff McConville .mcconville@wavebroadband.com (503)318-9804 ° Permit Tech-Phillip Fagin ! pfagin@wavebroadband.com (503)310-5340 SITE ADDRESS/SECTION: Vicinity Map Packet Description 12753 sw 68th ave Portland,OR 97223 DESCRIPTION/SYMBOLOGY: Page ei UTILITY POLE Cover page UNDERGROUND BORE — OVERLASH 2-3 Aerial route overview NEW FIBER BUILD \\ — STRAND ONLY 4-6 Underground details ♦ DOWN GUY 7 Aerial and Underground overview ® NEW RISER FGA FIBER GLASS ARM u 8-9 Underground details HOA HEIGHT OF ATTACHMENT SCALE TITLE <eg 1' = 100'> Fiber Enhancement Drawing PAGE NUMBER PROJECT NUMBER 1 GeorgeFoxUniversity 100010044 sEPAGE 1 OF 12 ri W E astound i Broadband S CONSTRUCTION NOTES: 1-ALL WORK AREAS TO BE RESTORED TO to-HOA LIKE OR BETTER CONDITION. 28.11 2-ALL OTHER UTILITIES ARE BASED OFF EXISTING LOCATES OR 1369-HOA UTILITY STRUCTURES 29.10 MaiY 3-IT IS THE CONSTRUCTION CONTRACTORS RESPONSIBILITY TO CALL FOR LOCATES PRIOR L6j - TO DIGGING CONTACTS: i7 r r Construction Manager-Jeff McConville jmcconvllle@wavebroadband.com (503)318-9804 _. 660-HOA H j 25.06 0 Permit Tech-Phillip Fagin O 503 101)30 v Oroadband.com w512-HOA < 12y vi 1 _ � SITE ADDRESS/SECTION: F-e U) 12753 sw 68th ave O Portland,OR 97223 DESCRIPTION/SYMBOLOGY: 4661-HOA Q 28.08 O UTILITY POLE w UNDERGROUND BORE Q — OVERLASH 6880-HOA NEW FIBER BUILD 22.06 ' STRAND ONLY Ar�A 4- DOWN GUY R NEW RISER FGA FIBER GLASS ARM a HOA HEIGHT OF ATTACHMENT 6882-HOA F c 23.09 0 SCALETITLE < 9 e 1 'I - ' = 1005Fiber Enhancement Drawing BAYLOR s PAGE NUMBER PROJECT NUMBER 2 GeorgeFoxUniversity 100010044 PAGE 2 OF 12 N astound W E 5 • CONSTRUCTION NOTES: 1-ALL WORK AREAS TO BE RESTORED TO 6867-HOA LIKE OR BETTER CONDITION. J 23.02 e 2-ALL OTHER UTILITIES ARE BASED OFF EXISTING LOCATES OR UTILITY STRUCTURES ® J 6690-HOA J 24.00 = 3-IT IS THE CONSTRUCTION a CONTRACTORS RESPONSIBILITY o _! a z TO CALL FOR LOCATES PRIOR 1 TO DIGGING go ..l s CONTACTS: Construction Manager-Jeff McConville jmcconville@wavebroadband.com CLINTON ST _ CLINTON ST (503)318-9804 W W Permit Tech-Phillip Fagin pfagin@wavebroadband.com O- = > (503)310-5340 ogRrMOUT O - SITE ADDRESS/SECTION: y Sr U i 12753 sw 68th ave � � - Portland.OR 97223 z DESCRIPTION/SYMBOLOGY: -=-._ ... g O p UTILITY POLE m U UNDERGROUND BORE o z 3M OVERLASH a O — NEW FIBER BUILD o — STRAND ONLY W a ♦ DOWN GUY z ? ® NEW RISER D u FGA FIBER GLASS ARM �i HOA HEIGHT OF ATTACHMENT - l SCALE TITLE <eg 1' = 100'> Fiber Enhancement Drawing ELMHURST ST ELMHURST ST q PAGE NUMBER PROJECT NUMBER 3 GeorgeFoxUniversity 100010044 .PAGE 3 OF 12 N astound W F ■ ■ CONSTRUCTION NOTES: 1-ALL WORK AREAS TO BE RESTORED TO LIKE OR BETTER CONDITION. 2-ALL OTHER UTILITIES ARE BASED OFF EXISTING LOCATES OR UTILITY STRUCTURES CLOSE UP VIEW OF UNDERGROUND WORK -1W 3-IT IS THE CONSTRUCTION CONTRACTORS RESPONSIBILITY WO Ilm" TO CALL FOR LOCATES PRIOR �► 1 A* 1160 TO DIGGING T I, CONTACTS: 5.O,W,I�--x'80 ft--� 11680 »' Construction Manager-Jeff McConville 1y jmcconville@wavebroadband.com ROADWAY�-45 ft—►I of (503)318-9804 DEWAL 4F � * Permit Tech-Phillip Fagin o i pfagin@wavebroadband.com �11M 12 ftEDCE CE R.O.W (503)310-5340 ►•� z !! w > � 7 SITE ADDRESS/SECTION: Q , BORE PIT 2X5 .. 12753 sw 681h ave '��: ,,� ■ Portland,OR 97223 LL N, w •� "DESCRIPTIONISYMBOLOGY: O o -1 } O UTILITY POLE 1501 _ m E UNDERGROUND BORE o Lu ~ w — OVERLASH — NEW FIBER BUILD 0Iz T STRAND ONLY a' � 4- DOWN GUY ® NEW RISER 7297 7295 of a FCA FIBER GLASS ARM HOA HEIGHT OF ATTACHMENT .� A4 SCALE TITLE <eg 1' = 100'> Fiber Enhancement Drawing o � � PAGE NUMBER PROJECT NUMBER 11750 a: 4 George Fox University 100010044 P E 40F12 N W-0 E 5 • CONSTRUCTION NOTES: 1-ALL WORK AREAS TO BE RESTORED TO LIKE OR BETTER CONDITION. 2-ALL OTHER UTILITIES ARE BASED OFF EXISTING LOCATES OR UTILITY STRUCTURES 3-IT IS THE CONSTRUCTION CLOSE UP VIEW OF UNDERGROUND WORK CONTRACTORS RESPONSIBILITY TO CALL FOR LOCATES PRIOR Y 7255 57 ft TO DIGGING I 3 ft—+1CONTACTS: 0�ft Construction Manager-Jeff McConville jmcconville@wavebroadband.com Q (503)318-9804 g; p C/) BORE PITITIE-IN 2X5 Permit Tech-Phillip Fagin pfagin@wavebroadband.com z 11990 (503)310-5340 SIDEWAL RTS SITE ADDRESSISECTION: gellill 12753 sw 68th ave .+ Portland,OR 97223 DESCRIPTION/SYMBOLOGY: 7 O UTILITY POLE UNDERGROUND BORE — OVERLASH — NEW FIBER BUILD STRAND ONLY ♦ DOWN GUY mNEW RISER DVTMOUTH S' FGA FIBER GLASS ARM HOA HEIGHT OF ATTACHMENT SCALE TITLE <eg 1' = 100'> Fiber Enhancement Drawing PAGE NUMBER PROJECT NUMBER 5 GeorgeFoxUniversity 100010044 PAGE 5 OF 12 N • • w F Broadband 5 CONSTRUCTION NOTES: 1-ALL WORK AREAS TO BE RESTORED TO LIKE OR BETTER CONDITION. 2-ALL OTHER UTILITIES ARE BASED OFF EXISTING LOCATES OR UTILITY STRUCTURES ,56 3-3-IT IS THE CONSTRUCTION CLOSE UP VIEW OF UNDERGROUND WORK CONTRACTORS RESPONSIBILITY TO CALL FOR LOCATES PRIOR 341j TO DIGGING 72,'11 bd— CONTACTS: Construction Manager-Jeff McConville ' jmcconvilte@wavebroadband.com 'y y� (503)318-9804 i % r� . ��- <u Permit Tech-Phillip Fagin y _ pfagin@wavebroadband.com (503)310-5340 t. `• _ ,ate SITE ADDRESS/SECTION: ~ 12490 t 4901 12753 sw 68th ave C• Portland,OR 97223 Ll49111DESCRIPTION/SYMBOLOGY: v4�n r•. � ,,� i / O UTILITY POLE 124 u UNDERGROUND BORE OVERLASH NEW FIBER BUILD STRAND ONLY •"� f- DOWN GUY 7-07 ADiY ' '• ® NEW RISER FGA FIBER GLASS ARM HOA HEIGHT OF ATTACHMENT ` w ` NOTE:POSSIBLE �. 7 M7 REMOVAL OF 5X5 PANEL. SCALE TITLE 57 ft POLE IS SET IN SOIL. <eg 1' = 100'> Fiber Enhancement Drawing w ♦ 1117 ; , �- +� PAGE NUMBER PROJECT NUMBER � 83 fl 6 George FoxUniversity 100010044 PA F 12 W NE astound• s CONSTRUCTION NOTES: 1-ALL WORK AREAS TO BE RESTORED TO ELMHU RRSS T S7 LIKE OR BETTER CONDITION. UNDERGROUND CONSTRUCTION ROUTE }_ 2-ALL OTHER UTILITIES ARE BASED OFF EXISTING LOCATES OR y UTILITY STRUCTURES mono 3-IT IS THE CONSTRUCTION CONTRACTORS RESPONSIBILITY IL - TO CALL FOR LOCATES PRIOR 15 TO DIGGING -_j -3568-HOA CONTACTS: 24.03 avnuta s McConville jmcconville@wavebroadband.com . 4, (503)318-9804 < a Permit Tech-Phillip Fagin _ . pfagin@wavebroadband.com AERIAL CONSTRUCTION ROUTE aevELANO RO a (503)310-5340 1063-HOA 28.03 80-HOA4499-HOA SITE ADDRESS/SECTION: 21.08 22,04 12753 sw 68th ave 61-HOA 4497-HOA Portland,OR 97223 2 25.01 5 no _ . / / � DESCRIPTION/SYMBOLOGY: > ® UTILITY POLE GONZ GA STUNDERGROUND BORE — OVERLASH — NEW FIBER BUILD 4298-HOA STRAND ONLY 25.02 �- DOWN GUY 915-HOA T9-HOA ® NEW RISER 23.04 21.11 ❑ FCA FIBER GLASS ARM HAMPTON ST - HOA HEIGHT OF ATTACHMENT SCALE TITLE <g9 1 = 100'> Fiber Enhancement Drawing Y a = PAGE NUMBER PROJECT NUMBER HUNZIKER RD m 7 GeorgeFoxUniversity 100010044 N 1 W E 5 CONSTRUCTION NOTES: 1-ALL WORK AREAS TO BE RESTORED TO LIKE OR BETTER CONDITION. 30 ft 2-ALL OTHER UTILITIES ARE BASED CLOSE UP VIEW OF UNDERGROUND WORK OFF EXISTING LOCATES OR UTILITY STRUCTURES 1 3-IT IS THE CONSTRUCTION BORE PIT 2X5 CONTRACTORS RESPONSIBILITY TO CALL FOR LOCATES PRIOR TO DIGGING • Cl) co crw...y uS ♦f CONTACTS: o`— + 1 a n Construction Manager-Jeff McConville jmcconville@wavebroadband.com (503)318-9804 W _ 'Permit Tech-Phillip Fagin fo . - - - 126 Z pfagin@wavebroadband.com �� ♦d 1166 (503)310-5340 y 7070 •'r •_.e 7070 a IOy SITE ADDRESS/SECTION: a J f 12753 sw 68th ave — �y Portland,d,OR 97223 -� - 12755 7 DESCRIPTION/SYMBOLOGY: o ' J UTILITY POLE 01% 12755 T UNDERGROUND BORE — OVERLASH 12755 — NEW FIBER BUILD �.. � STRAND ONLY 12755 ♦ DOWN GUY ice= i }� s{ r` �' ® NEW RISER • } � 1�5 FGA FIBER GLASS ARM �7 AlkIft ;r HOA HEIGHT OF ATTACHMENT � SCALE TITLE <eg 1' = 1005 Fiber Enhancement Drawing PAGE NUMBER PROJECT NUMBER 8 GeorgeFoxUniversity 100010044 PAGE 8 OF 12 N W E S CONSTRUCTION NOTES: 1-ALL WORK AREAS TO BE RESTORED TO LIKE OR BETTER CONDITION. 2-ALL OTHER UTILITIES ARE BASED CLOSE UP VIEW OF UNDERGROUND WORK OFF EXISTING LOCATES OR UTILITY STRUCTURES VIP rt t 3-IT IS THE CONSTRUCTION CONTRACTORS RESPONSIBILITY w TO CALL FOR LOCATES PRIOR 2 TO DIGGING >Q � iy.r..... CONTACTS: LL O, Construction Manager-Jeff McConville _•" W jmcconville@wavebroadband.com (503)318-9804 W IF j A� 6969 t 12753 Permit Tech-Phillip Fagin I pfagin@wavebroadband.com 6969 57 (503)310-5340 SITE ADDRESS/SECTION: • f BORE PIT 4X5 12753 sw 68th ave Portland,OR 97223 DESCRIPTION/SYMBOLOGY: BORE PIT/ASPHALT-2X5-2X5 EDGE OF PAVEMENT • UTILITY POLE UNDERGROUND BORE OVERLASH NAMATON , — NEW FIBER BUILD b 8T � v o, STRAND o 4- DOWN GUY ONLY ..�_ rn � _%� NEW RISER 7000 7 t FGA FIBER GLASS ARM r000 HOA HEIGHT OF ATTACHMENT SCALE TITLE <eg 1' = 1005 Fiber Enhancement Drawing PAGE NUMBER PROJECT NUMBER 9 GeorgeFox University 100010044 PAGE 9 OF 12 N astound W E Broadband Right Lane Closure,Multi-Lane Non-Freeway Dlag. 500 5 5.5 Muttl-Lane Roads CONSTRUCTION NOTES: Right Lane Closure.Muhl-Lane Non-Freeway Dii SOO 1-ALL WORK AREAS TO BE RESTORED TO Diagram 500 covers work which doses the right tine of a multi-lane non LIKE OR BETTER CONDITION. heewvay rose t t t n closing more than one tang on a multilane road.provide a mrnxnxnm 2-ALL OTHER UTILITIES ARE BASED tangent distance of A between the end of the rest Orr clnnre tape and the OFF EXISTING LOCATES OR beginning of the second lane closure taper UTILITY STRUCTURES �• alaar�w NalYe t Use tfusck-rnounlled flashing waning 6"on work and protectwn • , ygary vehicles See Section a 3—Lights and Lghtea Signs for exceptions 3-IT IS THE CONSTRUCTION • ei0""' 11 CONTRACTORS RESPONSIBILITY 2 For added visibility it(ruck-mounted arrow board or PCMS in caution mode may be used TO CALL FOR LOCATES PRIOR TO DIGGING 3 When the posted speed is 40 mph or rets.the RIGHT LANE CLOSED ,.,,,•r,a l --r— --------- AHEAD signs may be omtled l •� CONTACTS: l • r 4 P18certreM of sights in a ran Vevtrsabie median or other median that r5 I . not a two way raft turn lam is recurred for lane triunes any time there Construction Manager-Jeff McConville l • is room for a thick to be perked nn the len out of the travel tare jmcconville@wavebroadband.com Mien there is no room for a truck to he parked a1 the len an addtorvN (503)318-9804 RIGHT LANE CLOSED AHEAD sign should be placed on le fight side I • and placement of signs In the median is oobonal w : 5 If IliIliis needed for work vehicle vow eswegress use Ftaggn ` oted • k I Layout D (see Insall Permit Tech-Phillip Fagin –1 • l _-- _–; I I pfagin@wavebroadband.com • sign sporri and•Mian t o mitis(loon (503)310-5340 ""iWL"" • Asan• 0 s luaer A a o so �, SITE ADDRESS/SECTION: 25 too top 100 75 12753 sw 68th ave 30 100 sr.a'ta.a.m reef. Portland,OR 97223 a 35 350 3W 360 175 •1>ra>rn• �° ,e Mr. DESCRIPTION/SYMBOLOGY: sou so Sao " • UTILITY POLE j I 1 t It "'"° f 5�t 1 iso 'M� UNDERGROUND BORE a ROAD stns ocln and auaer tonal hs root su poloni — OVERLASH •awn Posted Spacing/•tw«nSigns "sutler• — NEW FIBER BUILD Speed A a c swce STRAND ONLY 60 les ♦ DOWN GUY 65 700 700 700 32S cwpror s 70 36S Doo—e-c" ® NEW RISER EGA FIBER GLASS ARM HDA HEIGHT OF ATTACHMENT SCALE TITLE <eg 1' = 100r> Fiber Enhancement Drawing PAGE NUMBER PROJECT NUMBER 10 GeorgeFoxUniversity 100010044 PAGE 10 OF 12 W N IE 1 • F !,. Page 79 Broadband Work on Shoulder Diagram 210 work on Shoulder Diagram 210 CONSTRUCTION NOTES: s I Diagram 210 coven stework with wowith work or parked eaupment on the shoulder This diagram does not cover work on a freeway shaldor see 1-ALL WORK AREAS TO BE RESTORED TO Diagram 710 for Freeway Shoulder work LIKE OR BETTER CONDITION. 1 Vehicles Should be parked as far off the roadway as prww-,#1 2-ALL OTHER UTILITIES ARE BASED 2 Use truck-mounled Ilashkng warning tights on work and protection OFF EXISTING LOCATES OR • vehicles. See Section 4.3-Lights and txptted Signs for exceptions UTILITY STRUCTURES 3 For added visibility trucik-mounted arrow boards or PCMS in caution • mode may be knee 3-IT IS THE CONSTRUCTION CONTRACTORS RESPONSIBILITY 4 Mow pants in caution mode are recommended for work on roads TO CALL FOR LOCATES PRIOR • with posted speeds or 45 mph ot greater and high tiaf5c volumes TO DIGGING r greater than 2000 average daily traffic(ADT) • 5. Repurements for sgnria ana devices are shown,n Table rr2 below CONTACTS: • Table 5-2:Device and Sfanaae Guidelines Construction Manager-Jeff McConville • Praflecla Vehicle Proximity to Edge of Traveled Way 7mCoonville@wavebroadband.com WnM Sea Op•per 4rt� Mlererhen 1S feet (503)318-9804 • ce bift 90 1&or I1 than 15 feet t GuanbY ---- • t One advance warning sgn is Permit Tech-Phillip Fagin sawAdvance warming regruedariltwosignsare pfagin@wavebroadband.com • Work in Place signs.devices.and reeOnnMended (503)310-5340 More than 1 Hour flashing warning Core taper n required Cara • Monts are optional along the edge of traveled say • I are optional SITE ADDRESS/SECTION: • �* Work In Piece 12753 sw 68th ave • �d'41 n;.P vnimrng ss and clawtoes are 0(nrarlY. Less than 1 Hour ign _ Portland,OR 97223 sign Sr—ng.nd er,ff�r Lnngn.a(nett DESCRIPTION/SYMBOLOGY: • UTILITY POLE Sesed A POOM in B sp ir ERMIA: UNDERGROUND BORE 20 50 — OVERLASH A 25 100 too foo 75labk 30 foo — NEW FIBER BUILD k....r....,,. — I * * 35 35(1 360 350 125STRAND ONLY „,� ♦ DOWN GUY lIOAG atoun�t 45 ttl0 w.oea k.4a.a..err OR w� se Soo ttoo 5000 210 *�^� ® NEW RISER ss 1 2W FGA FIBER GLASS ARM �k k_hapwr5 sI n s sin, and buffer ten thi[feet)w m laent 0ew,,"2011 HOA HEIGHT OF ATTACHMENT III"WWT*V SW Po.ted S •cin Benreen SiSn•_ -Buffer" 1 seed A a . c ce SCALE TITLE 60 285 <e 1' = 1005 e the an aPProPrw'ave Tab*5-2 6S 71x1 700 700 325 g Fiber Enhancement Drawing 70 365 PAGE NUMBER PROJECT NUMBER 11 GeorgeFoxUniversity 100010044 P 12 N W E astound Broadband 5 Lane Closure at Intersection with Flagging Diagram 620 Lane Closure at Intersection with Flagging Diagram 620 CONSTRUCTION NOTES: 1-ALL WORK AREAS TO BE RESTORED TO Diagram 620 covers work within an intersection when normal traffic control LIKE OR BETTER CONDITION. must be interrupted. Work vehicles may or may not be in the work space. 1 During flagging,traffic signals shall be turned off Contact the road 2-ALL OTHER UTILITIES ARE BASED OFF EXISTING LOCATES OR jurisdiction for approval and assistance(see Chapter 3) e. UTILITY STRUCTURES C 2 For multi-lane facilities,traffic approaching the intersection shall be ro,rrr b„ 4 t reduced to a single lane on each approach. See Chapter 3 for 3-IT IS THE CONSTRUCTION B information on flagging through intersechons. CONTRACTORS RESPONSIBILITY TO CALL FOR LOCATES PRIOR 3 There should be one flagger for each approach. One flagger may TO DIGGING e control two adjacent approaches if sight distance.low volumes on side roads.and flagger position allows for safe operation and clear direction CONTACTS: to motonsts. For low traffic volume intersections(fewer than 400 j A ram+ entering vehicles per day).one flagger may be used Construction Manager-Jeff McConville jmcconville@wavebroadband.com . "' 4 The-ONE LANE ROAD AHEAD'(W204)sign is optional and should j(503),318-9804 1 • •� be considered on high volume or high speed roads.or when extended ' queues may be expected. A B B C Permit Tech-Phillip Fagin sswr • Sign Spacing and Buffer Lengths(feet) pfagin@wavebroadband.com • Posted Spaciing Between Si ns Buffer 503)310 5340 \, 4 Speed A B C Space .... zo 50 'ERPATA: SITE ADDRESSISECTION: • ♦ 26 100 100 00 75 ' 30 100 5upplem•MT•bl• 12753 sw 68th ave �. POniand.OR 97223 �-� 40 iso 350 iso iso "" '«° "" "', DESCRIPTION/SYMBOLOGY: • R A T as 5W 2100 UTILITY POLE SIX) 5W 250 UNDERGROUND BORE •.+ - — OVERLASH e u nt NEW FIBER BUILD e.... A Posted Spacing Between Sl ns 'Buffer' STRAND ONLY Speed A B C space DOWN GUY B ® NEW RISER � 60 285 65 700 700 700 325 FGA FIBER GLASS ARM B 10j"" CA HEIGHT OF ATTACHMENT .e. 70 _ 365 l t C SCALE TITLE •� <eg 1' = 1005 Fiber Enhancement Drawing PAGE NUMBER PROJECT NUMBER 12 GeorgeFoxUniversity 100010044 PAGE 12 OF 12 1