Loading...
Report ms -- © 0 `z �J �v l ,�0 ),-S- - 5 L) 6/4/. G.J & ACS Testing,Inc. DAILY FIELD REPORT FOR STRUCTURAL WELDING 7409 SW Tech Center Dr.Ste.145 ENlAtf Tigard,OR.97223 ;:„„,„'� Date: Jul 12,2016 Ph:503-443-3799 Fax:503-620-2748 ACS Job# 16-6621 OM :rsrl�4 ,hvc Permit#: 2015-00114/2015-00129 $03.443.3 799 PARR LUMBER IMPERIAL STEEL CRAFT,INC Inspection type: PERIODIC LOT 155 &LOT 157 5455 SE ALEXANDER Is this a re-inspection? n Yes C No TIGARD,OR HILLSBORO,OR 97123 Weld Process Used: FCAW-G If Continuous Inspection performed,complete the following INSPECTOR: Jerry Frampton Cert#OBOA 859 Volts/Amps Monitored? ❑Yes ON. (✓ NA Pre-Heat Monitored? C Yes ❑No Ir INA Reviewed prior inspection reports: n Yes ❑ N• o 0 NA Joint Assembly Verified? ❑Yes ❑No ®NA [ Approved plans available: l Yes n No n N• A Interpass temps checked per WPS? ❑Yes ❑No DNA QA Manual Reviewed: [ ] Yes n No ❑ N• A Rebar welding? ❑Yes ❑✓No ENA MTR's Randomly reviewed: lY l Yes ❑ N• o ❑ NA CE below.55%? El Yes END Rebar size and grade? Size(s)# ASTM: Welder Certification Verified: E..] Yes n N• o ❑ N• A RE-WORK NEEDED ❑Yes ✓❑No WPS verified: a Yes ❑ No ❑ N• A Electrodes per WPS used? 1711 Yes ❑ No ❑ NA NCR/Notes/Conditions: N/A Seismic Inspection 0 NA Electrode: Continuity Plates❑Yes ❑No Frame: KZone checked ❑Yes ❑No Other: MT Required? EYes CNo ., C 4 ,, I r i Location of Inspection? non Site ril Fab.Shop w Fab Shop IMPERIAL STEEL CRAFT,INC. 1 Type of Weld(s): Full Pen,Fillet&Partial Pen rix .w The following was noted: lt ACS representative at fabrication shop for visual inspection of completed steel frame connections.This work is per 11/S1.1,no revisions.All of the 41 required shop fabrication of the e \ 4 . • ,'' - -- '" connections'I , miinimum requirements of AWS D1 1sectioncompleted 6, isuaect aand meets the Picture 1 Picture 2 requirements.No issues noted. NON-DESTRUCTIVE TESTING ®NA CUT ❑MT ❑ PT If NDE is required there will be a separate report attached. Foreman notified of nonconformance items? ❑Yes ❑No DNA Foremans Name: Pieces noted in box above unless poled otherwise meet the minimum visual requirements of AWS DI.1 Section 6 n No ®Yes Reviewed /1( 7([7.---Date:07-13-2016 ._,,, PAD,...c,- 40 Bob Brown, President Int. BB/JF cc: ACCREDtT£B Visual Inspectors are in compliance with ACS Testing's Written Practice.