Loading...
Report • s'2i2-,6QJ. Cascade l 3/5 0®Boise Single 11-7/8" BCI®5000-1,7 DF BC CALC®3.0 Design Report-US Service class 112 spans 1 Left cantilever 1 0/12 sloe JOISt1UPPERID5 pBuild 517 16 OCS Repetitive 1 Glued&nailed construction- Wednesday, September 26,2012 Job Name: MISSION HOMES-HIGHLAND HILLS LOT 1 File Name: 12-756 Address: Description: UPPERID5 City, State,Zip: , Specifier: PDG Customer: PROBUILD FOREST GROVE Designer: Company: BOISE CASCADE BMD Code reports: ESR-1336 Misc: _____ �'4:0� *+ i " term k^ rd* , 01-07-12 07 m# -12-05-12B1,5-1/2" 82 LL 424 lbs DL 106 lbs LL 336 lbs DL 82 lbs Total Horizontal Product Length=14-01-08 Load Summary Ta� Descri�tion Live Dead Snow Wind Roof Live OCS 1 Standard Load Load T .e Ref. Start End 100% 90%0 Unf.Area(psf) L 00-00-00 14-01-08 40 115% 133% 125% Controls Summa Value ° 10 Pos. Moment 1,267 ft-lbs /°AllowableoDuration Case S.an 16 Neg. Moment 40.2/0 100% Disclosure End Reaction -90 ft-lbs 2 9% 100% 16 2-Internal Completeness and accuracy of input must 418 lbs 1 1 -Right be verified by anyone who would rely on Int. Reaction 529 lbs 39.1% 100% 1 g g End Shear 21.0% 100% 2-Right output as evidence of suitability for -407 lbs 25.0% 100% 1 2-Left particular application.Output here based End Shear 405 lbs on buildingand analysis ted design 'Total Load Defl. 24.9% 100% 16 2-Right propertiesio DISE a methods. L/1,191 (0.125") 20.1% 2-Left Installation of BOISE engineered wood Load Defl. 2/1,1 g1 (0.042") 0 16 2 products must be in accordance with Live- l Neg. Defl. 2xL/-76594238 20° current Installationcdes. Guide and applicableoGuide Max Defl. (-0.052") 31.4% 16 1 -Cantilever or ask q codes.To pleasesInstallation Guide Span/Depth 0.125" 12.5% 16 1 -Cantilever or ask questions, call 12.5 16 n/a 2 (800)232-0788 before installation. Bearin• Su. 'oils %Allow % BC CALC®,BC FRAMER® AJSTm, Dim. L x Value Allow ALLJOIST®,BC RIM BOARD TM B1 Wall/Plate 5-1/2"Lx 2" Su Member Material BOISE GLULAMTM SIMPLE FRAMING , B2 Hanger Load x 2" 529 lbs n/a n/a Unspecified SYSTEM®,VERSA-LAM®,VERSA-RIM 418 lbs n/a n/a Hanger VPERSA- VERSA-RIM®, Cautions g VERSA-STRAND®,VERSA-STUD®are Design assumes Top and Bottom flanges to be restrained at cantilever. trademarks of Boise Cascade Wood Products L.L.C. Notes Design meets Code minimum (L/240)Total load deflection criteria. Design meets User specified(2xL/360) Live load deflection criteria. Design meets arbitrary(1") Maximum load deflection criteria. Header for the hanger at B2 is a Single 5-1/2"x 11-7/8"BOISE GLULAM®24F-V4/DF. Composite El value based on 23/32"thick sheathing glued and nailed to joist. Page 1 of 1 ®Boisecascade Single 11-7/8" BCI®5000-1.7 DF BC CALC®3.0 Design Report-US Service class 114 spans 1 Left cantilever 10/12 slope JOISt1UPPERID3 Build 517 16 OCS 1 Repetitive 1 Glued&nailed construction Wednesday, September 26,2012 Job Name: MISSION HOMES-HIGHLAND HILLS LOT 1 File Name: 12-756 Address: Description: UPPERID3 City, State,Zip: , Specifier: PDG Customer: PROBUILD FOREST GROVE Designer: - Company: BOISE CASCADE BMD Code reports: ESR-1336 Misc: 'Y-u y'tFr- # w' -an* r* *,, *� .,*n. -R,r y, flt * m r + -----� *»- ai r# "a ' ' "�t" s #"�' #'.m,t . + igl iketa 4E41 0111117-09 r k #" �_ B1,5-1/8" 10-01-15 ��� # III `1 12-10-04 ���"_ +� '� ���"" � ��� -<<.�`�� � mit ,,lir p�' � 's LL 274 lbs B2,5-1/8" 13-11-12 DL 61 lbs LL 734 lbs B3,5-1/2" DL 160 lbs LL 858 lbs B4 DL 205 lbs LL 330 lbs DL 75 lbs Total Horizontal Product Length=37-07-08 Load Summary Live Ta. Descri.tion Dead Snow Wind Roof Live Load T .e OCS 1 Standard Load Ref. Start End 100% 90% 115% 133% 125% Unf.Area(psf) L 00-00-00 37-07-08 40 Controls Summa Value 10 Pos. Moment /°Allowable Duration 16 1,187 37 7% 100% Case s.an Disclosure Neg. Moment -1,3851,187 ft-lbs 44.0%7 16 4-Internal Completeness End Reaction100% 22 3-Right be verified by anyone who accuracyof rely on must Int. Reaction 405 lbs 37 9% 1,063 lbs 100% 16 4-Right output as evidence of suitability for - End Shear -394 lbs 42.1% 100% 22 4-Left on buildinguular spode-acc Outputd sereign based Cont. Shear lbs 24.2% 100% 16 4-Right propeon tisand analysis methods.s Conal Load Defl. L/1,2814 s (0.13") 3 18.7% 100% 222 4-Left Installation of BOISE sengineered wood Live Load Defl. L/1,521 (0.109") 23 7% 4 products must be in accordance with Total Neg. Defl. 2x5/-1,725(-0.009") 0 16 4 current Installation Guide and applicable Max Defl. 0 13" 13.9/0 16 1 -Cantilever or ask buildinquest ons, obtain callInstallation Guide - 13.0% 16 4 n/a 4 (800)232-0788 before installation. Span/Depth 14.0 Bearin• $U• .prig %Allow BC CALC®,BC FRAMER®,AJSTM, Dim. L x W Value %Allow ALLJOIST®,BC RIM BOARDTM B1 Beam 5-1/8"x 2„ Su Member Material BOISE GLULAM TM,SIMPLE FRAMING B21 Beam 5-1/8x 2" 335 lbs 5.0% n/a Glulam 24F-V4 PSYSTEM® VERSA-LAM®,VERSA-RIM B2 Beam Wall/Plate 5-1/2"x 2" 894 lbs 13.4% n/a Glulam 24F-V4 VERSA-STRAND®,l VERSA-STUD®are B4 Hanger Load 5-x 2" 1,063 lbs n/a n/a Unspecified 405 lbs Unspecified trademarks of Boise Cascade Wood Cautions n/a Hanger Products L.L.C. Design assumes Top and Bottom flanges to be restrained at cantilever. Notes Design meets Code minimum (L/240)Total load deflection criteria. Design meets Code minimum (L/360) Live load deflection criteria. Design meets arbitrary(1")Maximum load deflection criteria. Composite El value based on 23/32"thick sheathing glued and nailed to joist. Page 1 of 1 ®BOiseCascade Single 11-7/8" BCI® 5000-1.7BC CALC®3.0 Design Report-US DF JoistIUPPERID2 Build 517 s pService class 113 spans No cantilevers 10/12 slope 16 OCS Repetitive 1 Glued&nailed construction Wednesday, September 26,2012 Job Name: MISSION HOMES-HIGHLAND HILLS LOT 1 File Name: 12-756 Address: Description: UPPER\D2 City, State,Zip: , Specifier: PDG Customer: PROBUILD FOREST GROVE Designer: Company: BOISE CASCADE BMD Code reports: ESR-1336 Misc: -'"-.? sa - >_+' -* -, 'kms #` - r•'�,'-1 �( * - t -7 08-08-12 m. ..=_a # # 11-1 BO 236 lbs B1,5-1/8" 2 III 12-10-04 13-11-12 LL 43 lbs LL 692 lbs LL 55 lbs UP 19 lbs DL 149 lbs 855 lbs B3 DL 208 lbs LL 328 lbs DDL 75 lbs Total Horizontal Product Length=35-06-12 Load Summary Live Dead Snow Wind Roof Live Ta. Descri.tion OCS 1 Standard Load Load T .e Ref. Start End 100% 90% 115% 133% 125% Unf.Area(psf) L 00-00-00 35-06-12 40 Controls Summa Value o 10 /o Allowable Duration16 Pos. Moment 1,172 ft-lbs o Case s.an Disclosure Neg. Moment 37.2% 100% 14 3-Internal -1,384 ft-lbs 44.0% 100% fedCompleteness and accuracy of input must End Reaction 402 lbs 37.6% 100% 20 2-Right be verified by anyone who would rely on Int. Reaction 14 3-Right output as evidence of suitability for End Shear 1,063 lbs 42.1% 100% 20 3-Left particular application.Outputd here based -- End Shear -3911bs 24.1% 100% on buildingcode-accepted ted methods.s 33.7% 14 3-Right propertiesioand DISE engineered -f.Jplift 19 lbs n/a 100% 20 3-Left Installation of BOISE wood Total Load Defl. L/1,305(0.128") 18.4% 16 1 -Left products must be in accordance with Live Load Defl. L/1,551 (0.107") 23 2% 14 3 current Installation Guide and applicable l Total Neg. Defl. L/-3,862 (-0.04") g 2% 14 3 or ask buildinquest ons,pleaine tcallati codes.To obtain Installation Guide Max Defl. 0.128" 12 8% 14 2 (800)232-0788 before installation. 14 3 3 BC CALC®,BC FRAMER®,AJSTM Span/Depth 14.0 n/a ALLJOIST®,BC RIM BOADTM BCI®, Bearin• SU. •OrtS Dim. L x W %Allow %Allow BOISE GLULAMT"^ SIMPLE FRAMING 60 Hanger Load 2"x 2" Value Su..ort Member Material SYSTEM®,VERSA-LAM®,VERSA-RIM BO Load 2"x 279 lbs n/a n/a Hanger VERSPLUSA-TRAND®I VERSA-STUD®are B1 Hangerem 2"x 2"x 2" 19 lbs n/a n/a Hanger trademarks of Boise Cascade Wood B2 Beam Wall/Plate 5-1/2"x 2" 840 lbs 12.6% n/a Glulam 24F-V4 Products L.L.C. B2 Hanger Load 2-x 2" 1,063 lbs n/a n/a Unspecified 402 lbs n/a n/a Hanger Notes Design meets Code minimum (L/240)Total load deflection criteria. Design meets Code minimum (L/360) Live load deflection criteria. Design meets arbitrary(1") Maximum load deflection criteria. Header for the hanger at BO is a Single 1-3/4"x 11-7/8"VERSA-LAM®2.0 2800 DF. Header for the hanger at B3 is a Single 3-1/2"x 11-7/8"BOISE GLULAM®24F-V4/DF. Composite El value based on 23/32"thick sheathing glued and nailed to joist. Page 1 of 1 ®Boise Cascade Single 11-7/8" BCI® 5000-1.7 DF BC CALC®3.0 Design Report-US JoistIUPPERID1 Build 517 g pService class 1 11 span No cantilevers 0/12 slope 16 OCS I Repetitive I Glued&nailed construction Wednesday, September 26,2012 Job Name: MISSION HOMES-HIGHLAND HILLS LOT 1 File Name: 12-756 Address: Description: UPPER\D1 City, State,Zip: , Specifier: PDG Customer: PROBUILD FOREST GROVE Designer: Company: BOISE CASCADE BMD Code reports: ESR-1336 Misc: L. 1 # r v rfl ,' �tr, I; . j TAT` +1,P+17-4 WPM r".7.7.5ANNVar 4iNar , BO 13-11-08 ��"'" 01 LL 367 lbs LL 378 lbs DL 92 lbs B1,78 lbs DL 94 lbs Total Horizontal Product Length=13-11-08 Load Summary Live Dead Snow Wind Roof Live Ta• Descri•tion OCS Load T •e Ref. Start End 100% 90% 115% 133% 125% 1 Standard Load Unf.Area (psf) L 00-00-00 13-11-08 40 10 Controls Summa Value o 16 /o Allowable Duration Case S•an Pos. Moment 1,529 ft-lbs 48.5% Disclosure End 100% 1 1 -Internal Completeness and accuracy of input must End Reactioner 447 lbs 458 lbs 42.9% 100% 1 1 -Left be verified by anyone who would rely on Total Load Defl. L 926(0.175") 27.5% 100% 1 1 -Left output as evidence of suitability for Live Load Defl. 25.9% 1 1 particular application.Output here based L/1,158(0.14") 31.1% on buildingisode-accepted design - Max Defl. 0.175" 17 5% 1 1 properties and analysis methods. :Max /Depth 13.7 1 1 Installation of BOISE engineered wood n/a 1 products must be in accordance with current- Bearin• SuDim.OrtS L x W %Allow %Allow building lc des.tTo obtain InstallatioGuide ion Guide and fn BO Hanger Load 2"x Value Su.•ort Member Material or ask questions,please call B1 Wall/Plate 4-1/2"x 2" 458 lbs 30.2% n/a ITS2.06/11.88 (800)232-0788 before installation. 472 lbs n/a n/a Unspecified BC CALC®,BC FRAMER®,AJST^", Notes ALLJOIST®,BC RIM BOARDTM,BCI®, BOISE GLULAMT"" Design meets Code minimum (L/240)Total load deflection criteria. SIMPLE FRAMING Design meets Code minimum (L/360) Live load deflection criteria. SYSTEM®,VERSA-LAM®,VERSA-RIM Design meets arbitrary(1") Maximum load deflection criteria. trademarks of Boise Cascade Wood PLUS®,VERSA-RIM®, Header for the hanger ITS2.06/11.88 at BO is a Single 5-1/2"x 11-7/8"BOISE GLULAM® VERSAs .L.C. L.L.C. ®,VERSA-STUD®are 24F-V4/DF. Products L.L.C. Hanger ITS2.06/11.88 requires(2) 10d face nails, (4) 10d TF nails, (2) Strong-Grip joist nails. Hanger Manufacturer: Simpson Strong-Tie, Inc. Composite El value based on 23/32"thick sheathing glued and nailed to joist. Page 1 of 1