Loading...
Plans PLM2015 - 00063 o v o o c c c o C 0 c c c c c c c cc 5 c. PLUMBING PLAN NOTES -7 $ I ° C a°° ° o ° c c c C c c c 0 1❑ SANITARY WASTE:CONNECT TO LANDLORD PROVIDED SANITARY PIPING, FIELD a VERIFY EXACT LOCATION AND MAKE NECESSARY CONNECTIONS AS REQUIRED °c c c c c c c cc c c PER THE EXISTING FIELD CONDITIONS. PLUMBING CONTRACTOR SHALL FIELD I c ° o c c c ° ° c o ff \\\ c c c c c o o o c VERIFY INVERT ELEVATION PRIOR TO SANITARY LINE INSTALLATION. NOTIFY I c c c o c c o c o 0 o o c c c c c c c c c c ARCHITECT/ENGINEER WITH ANY DISCREPANCIES IMMEDIATELY. & c c c c c c ° ° °° G G 2 PROVIDE NEW VENT THRU ROOF IN THIS VICINITY, SEE"VENT THRU ROOF(VTR)-- 15 � � 01S DETAIL ON SHEET P4.0. LOCATE VENT THRU ROOF A MINIMUM OF 10'-0"AWAY ) I MAR 1 2 �� _M D FROM NE _ R AREST AIR INTAKE ON ROOF. -. .�•��ro�,�.-..- .m..,,, u .......mu�.ur. .�. ua .� ..u�......�: am �.r...0 r tiu.... ...m .� a� ..u � ���...u.�. .r....r� �19. 14 I „` D D, G G p v,s`G ❑3 WASTE PIPING FROM THIS FIXTURE SHALL BE CAST IRON MINIMUM 10'-0" 375 E2 i D\N DOWNSTREAM FROM EQUIPMENT CONNECTION POINT IF PVC PIPING IS USED. 3 zlei �� I � 3 i 3" ® DISCHARGE CONDENSATE DRAIN INTO DRAIN,WITH AIR GAP TWICE PIPE 13 11 DIAMETER. REFER TO"INDIRECT DRAIN"DETAIL ON SHEET P4.0. ROUTE 2 CONDENSATE TIGHT TO COOLER WALL AND DRAIN INTO FLOOR DRAIN. 4" VTR p,„ t° 12 364 I` R ° � - ? I "342 2 F5] CONDENSATE CONDENSATE DRAIN PIPING: PROVIDE 1" INSULATED CONDENSATE DRAIN PIPE WCO "" r FROM THE EVAPORATOR COIL IN THE COOLER. REFER TO"WALK-IN 220 E 4 °t t 2 2 / 1-1/2 2 D M �+V COOLER/FREEZER CONDENSATE DRAIN"DETAIL ON SHEET P4.0. 363 E2 _ .2. _.r 1...... -1.............................. ..... T p �b y © SODA CONDUIT: PROVIDE 6"CONDUIT ABOVE FLOOR FROM SODA STORAGE TO g j — — a ..` » SODA DISPENSER. MAXIMUM OF 15° HORIZONTAL BENDS. = I- -I_ I I I " ' I ~ FFCO W ❑7 DISCHARGE 1"HOOD CONDENSATE DRAIN LINE TO FLOOR SINK WITH AIR GAP OF ®� ® I 3° I I I 1FfFCO 4 I �2° 2 TWICE THE PIPE DIAMETER. 2" 2 I _ I �_ i 1. I ~e„ I 4" 00 _, _ rm,_. I I__ � .R Q — L- = - - —f —I sAN' t WCO I— Q ® 6"CONDUIT THROUGH FURRING AND WALL AS REQUIRED. INSTALL USING I z J — I— — J — _ L_— — — L — —— —L_ rn MAXIMUM OF 45°SWEEPING ELBOWS. FIELD VERIFY WITH GC AND OTHER 2" 3" — — GW—V-— —— V- — — —I-0 A -: . - = 1-1/2° , �+J O DISCIPLINES THE ROUTING OF SODA CONDUIT.VERIFY REQUIREMENTS OF I '. —� _.__.. ._. I 2 INSTALLATION PRIOR TO BID AND CONSTRUCTION.4"PVC SODA CONDUIT IS 3° 2 I 302 Ez I 4" 3„ 4„ ( I W ALLOWABLE WHERE 6"CONDUIT WILL NOT FIT, NOTIFY GC PRIOR TO ; , I, D z 3° ~....»,: INSTALLATION. FFCO CO < 2 - � „ j 4„ r. D FF 1 I gI z 0 REFER TO"TWO-COMPARTMENT SINK"DETAIL ON SHEET P4.0. I _ 4 —2' —J'—_ —J — 9;t 1` 350 — — — OB - - I �. __t,,..� - - roe_,_ f � _, I , �� �, `� ��� - - - r - - - - - - - I =�� � 10 PROVIDE MINIMUM 1,250 GALLON GREASE INTERCEPTOR. PLUMBING -� ��."e ..p• .r .. .,.m.,,- I �' —T ® I t ' n co CONTRACTOR TO VERIFY EXACT SIZE AND LOCATION, PLUMBING CONTRACTOR I €- I 4„ ;# x! I �� I n'. VU % °: I' i z 218 E2 u . SHALL FIELD VERIFY INVERT ELEVATION PRIOR TO GREASE WASTE LINE I iq _ ° / WCO ¢ 1 ° 'i' a „f�y..1�/ 'f'-;r, e w ., Ufa — INSTALLATION. NOTIFY ARCHITECT/ENGINEER WITH ANY DISCREPANCIES ? I I � � IMMEDIATELY. I a 2.. F O O / 3 2 �, M.. 231 Ez 3 � F 1 I t . �,?j 2 7 z 11 4"PVC AIR INTAKE LINE AND 4"PVC EXHAUST VENT LINE FOR WATER HEATER. t z ( .... -- h- "I t m z_ M L ❑ ROUTE THROUGH ROOF AND ) I 1-1/2 D Q I WCO.. rn_.w.mI N ui O TERMINATE WITH CONCENTRIC TERMINAL KIT PER . -mms. . F. 18 (TYPICAL) i �( = N Q \ MANUFACTURER'S RECOMMENDATIONS. I �� A 212 I ry �/ R 4 •; 352 ,, FCO 2 L, I Q 12 REFER TO"THREE-COMPARTMENT SINK DETAIL ON SHEET P3.0. 286 Di I E2 224 212A z 4 3 I 3„ t 1A �� Q 13 FOR CONTINUATION SEE SHEET MP1.0. a� m L ---� Z ❑ �I m .. mLu 14 ROUTE WATER SOFTENER DISCHARGE PIPING HERE WITH 2"AIR GAP. , i d1 g 4244 a y � E 15 AREA FOR ELECTRICAL EQUIPMENT, PIPING SHALL NOT CROSS WITHIN THIS E2 213 [ O U) AREA. —` — - _ j 0 O ( Q a ❑ 211 z � � � � 16 CONTRACTOR SHALL FIELD VERIFY EXACT CONTINUATION AND ROUTING OF LANDLORD PROVIDED SANITARY PIPING FOR A PROPER OPERATING SYSTEM 8 2 j i PRIOR TO PIPING INSTALLATION. NOTIFY ARCHITECT/ENGINEER WITH ANY I = "' DISCREPANCIES IMMEDIATELY. =E] NOT USED. "X €g ; g • o co 0 V o � •o OFFSET PLUMBING PIPING AS NECESSARY TO AVOID ANY STRUCTURAL �� 18 ELEMENTS AND OTHER PIPING IN THE WALL. REFER TO ARCHITECTURAL _DRAWINGS FOR F GC3. ,,, 4 k g — _ £ N GS OR ADDITIONAL INFORMATION. I . M z I I @ t f P^' ' 'o N Co 2 31' n -co CO D1 2p to ., cr 07 s a v sLO I ��y . � € .o t I 8 495 E2 3xx �a�� ..# ,. V NIMM, H M E gg PIPING SLOPE NOTE 3,' I 14 XISTNGCLEANOUTToLL \ �_ ' ;sXN E 2" REMAIN. MAINTAIN \ �� CDLL O a cu '13 a�,� y— N N(I J C ALL SANITARY PIPING l"AND SMALLER SHALL BE INSTALLED WITH A SLOPE OF/ L— ——— - i CLEARANCES FOR ACCESS. I ; pg \\ v iw�, d °' .y3 Y € € „ w W �� m PER FOOT.ALL OTHER PIPING LARGER THAN�"SHALL BE PIPED AT A SLOPE OF —'- - ¢ � 3° I i o U t` FFCO� ) � Q a, C o-0o� Ya"PER FOOT. PROVIDE PROPER SLOPE FOR VENT PIPING TO DRAIN BACK TO I `� I N o ova 0 pp� 01^��3 DRAINAGE SYSTEM TO DRAIN ANY ACCUMULATIVE MOISTURE . ' I ' 3 — �GW— . r ro 3„ �_ � I „ W 3 GENERAL PLUMBING PLAN NOTES A -- _ I \ — - - — — �w — .. sy K I M ,1 I.. i51 CD Mi 1. REFER TO SHEET A2.3 FOR DIMENSIONS TO LOCATE ALL FLOOR DRAINS AND x 1 I4. FLOOR SINKS. D 3 a ¥ — _ -- I ) 2. t REFER TO SHEET P3.1 FOR ADDITIONAL PLUMBING SIZES. �__ _.w_.-. � �� a: .-._.�', =gym.. �:� ., � � G GREASE INTERCEPTOR NOTES I F\ I p Revisions \ ISSUED FOR LANDLORD REVIEW • THE TANK CONSTRUCTION MUST MEET ASTM STANDARD C1227. I � �01-21-2015 • THE INVERT OF THE INLET MUST BE AT LEAST 2 INCHES ABOVE THE INVERT IA ISSUED FOR PERMIT BA THE OUTLET OF THE INTERCEPTOR TANK. ? 02-04-2015 • BAFFLES MUST BE PROVIDED ON THE INLET AND OUTLET OF THE TANK.THE - , INLET BAFFLE MUST EXTEND AT LEAST 6 INCHES BELOW THE LIQUIDk ;z DEPTH(OUTLET INVERT),AND THE OUTLET BAFFLE MUST EXTEND AT LEAST 12 I9 i E 3 N \�� Q ISSUED FOR CONSTRUCTION INCHES BELOW THE LIQUID DEPTH OF THE TANK. BOTH INLET AND OUTLET I y I ' ' ' 02-26-2015 \ _ BAFFLES MUST EXTEND AT LEAST 6 INCHES ABOVE THE LIQUID DEPTH. � -. -. �.--w - + -.-..- .���.. .m„„..�.� � � .. � ___._._ - _m .,.�,�,.�,z� �. ,�__..._. �� ...,.�,,, � �,,;�..- ,.:,.:� � �..�,,�, � SANITARY REVISIONS BAFFLES AND FASTENERS MUST BE PLASTIC AND/OR STAINLESS STEEL.THE m - M I \ \ .:� �\ Q2 I I � � �,,,- 03-13-2015 TANK AND BAFFLE DESIGN MUST ALLOW FOR CONTINUOUS CIRCULATION OF AIR THROUGH THE TANK. __ „„ •..___.w.___ } • THE TANK MUST BE ACCESSIBLY LOCATED TO PERMIT INSPECTION AND MAINTENANCE.A MAINTENANCE MANHOLE,AT LEAST 24 INCHES IN DIAMETER, T DEEP SAN (,ETR) ��.. - I - N__. R,T� �„ • ST ALSO BE PROVIDED. INSPECTION PIPES AT LEAST 4 INCHES IN DIAMETER MUST BE PROVIDED ABOVE THE BAFFLES. .,, I z a_ • THE TANK MUST BE MARKED TO INDICATE THE FOLLOWING:THE 16 MANHOLE (ETR) 2” < 73 MANUFACTURER,THE STANDARD TANK IS MANUFACTURED TO,THE LIQUID Q CAPACITY, DESIGNATION AS A GREASE TRAP,AND IF IT IS APPROVED FOR C:) WHEEL LOADING. MANHOLES SHALL BE MARKED WITH A WARNING NOT TO 77 ��� 0 PRUFFs� 00 ENTER WITHOUT PROPER EQUIPMENT. G1NF�� /0�9 • -PLACE TANK MUST PASS A MANOMETER TEST WITH 1 INCH OF WATER CD COLUMN FOR 5 MINUTES,OR A VACUUM TEST WITH 2 INCHES OF MERCURY �--SAN (ETR)-— — —— FOR 60 MINUTES. I 65122PE C) • THE TANK MUST BE CLEANED REGULARLY,AND RECORDS OF MAINTENANCE MUST BE KEPT FOR AT LEAST THREE YEARS. I 2 • VERIFY THAT THE STRUCTURAL DESIGN OF THE TANK IS ADEQUATE FOR THE 1 2 ” OREGON � MAXIMUM ANTICIPATED WHEEL LOADING OR PROTECT THE TANK BY PLACING PERMANENT CONCRETE BARRIERS OR SIMILAR STRUCTURES AROUND s PERIMETER OF THE TANK. _______________ L-1 .0 sFpy ���� 25 • VERIFY THAT THE CITY HAS REVIEWED THE TANK DESIGN AND HAS — I 2 ACCEPTED THE INSTALLATION AS SHOWN ON THE DRAWINGS PRIOR TO 4” r Z� Ex?IP,ATIDtd DA J! 30.201 Q INSTALLATION. w N 4" OFFICE COPS' Signat I k� �" I 03/13/2015 Q 4., Date _ 06/30/2016 d4" Expiration Date N L - - � � - - JL - - 0° ?�73 PLUMBING CONTRACTOR TO PLUMBING PLAN — WASTE AND VENT ENGINEER N 0 RTH 0 I*tr/� 1 HEREBY CERTIFY THAT THESE PLANS HAVE BEEN PRE- 14' DEEP SAN (ETR) PROVIDE MINIMUM 1,250 0 1/4"- 1'-0" jI��17�1. PARED UNDER MY SUPERVISION AND THAT TO THE BEST OF MY KNOWLEDGE,THE SAME COMPLY WITH ALL RULES, GALLON GREASE FQRjjj$„ p� ► r REGULATIONS AND ORDINANCES OF PORTLAND,OREGON OI INTERCEPTOR. OLDCASTLE PLAN AppmvedtRELATING TO STRUCTURES AND BUILDINGS. rnl \ OR APPROVED EQUAL. OTC; Fr 00 ft ENGINEER a1d��• o N SQ DrawnByCheckedSK y 0 �.6.....�, 1/4" = V-0" 01-06-2015 n 16 $� .""".' O Scale Date rn ■r�•rl�. Job No. o APPROXIMATE LOCATION OF rn ADJACENT TENANT'S 14-2115 a' GREASE INTERCEPTOR. Z' Sheet No. P 1 . 0 o C C 0 FIRE PROTECTION GENERAL NOTES C`a a°0 1. PROVIDE ALTERATIONS AND MODIFICATIONS AS NECESSARY TO FURNISH 14. AUTOMATIC SPRINKLERS SHALL BE OF THE OPERATING TEMPERATURE AS 35 34cc 1 AND INSTALL COMPLETE FIRE PROTECTION SYSTEM PER NFPA#13.THE REQUIRED BY THE LOCATION WITH SPECIAL REGARD FOR HEATING UNITS. PRESSURE REDUCING I 1000 I 7 8 I � SYSTEM SHALL COMPLY WITH ALL REQUIREMENTS OF LOCAL, STATE AND SPRINKLER PIPING SHALL ROUTE AROUND, PROVIDE PROPER CLEARANCES, VALVE. SET TO 60 PSI I ° ° o ` o °o 0 o FEDERAL AUTHORITIES AND LANDLORD'S INSURING AGENCY. AND AVOID CONFLICT WITH BUILDING EQUIPMENT AND SYSTEMS. o C C 0 C }- o o o 0 0 0 0 }I- o 0 0 2. ALL WORK SHALL BE IN ACCORDANCE WITH THE RULES AND REGULATIONS 15. ALL PIPING SHALL BE ROUTED IN THE SUSPENDED CEILING SPACE, w o 0 ooc I o0 o f OF THE LOCAL FIRE PROTECTION DISTRICT AND WATER DEPARTMENT. CONCEALED IN WALLS AND BEHIND FIXED FURNISHINGS, UNLESS 342 K2 II {I{ 1 c° cCc o °o c,l i a OTHERWISE INDICATED.ALL PIPING EXPOSED TO VIEW SHALL BE ROUTED AS v BALANCING ° ° ° ° `I ° ° 3. ALL AUTHORITIES HAVING JURISDICTION SHALL BE NOTIFIED AT LEAST HIGH AS POSSIBLE AND TIGHT TO THE UNDERSIDE OF THE STRUCTURE. 21 j 496A 15 K3 364 D C ' 000° I "\ 23 J I VALVE C ° ° ; THREE(3)WORKING DAYS PRIOR TO COMMENCEMENT OF WORK. 16. REFER TO ARCHITECTURAL DRAWINGS OR CONSULT ARCHITECT FOR EXACT I 4. PROVIDE AN AUTOMATIC WET PIPE SPRINKLER SYSTEM INCLUDING PIPING, LOCATION OF FIXTURES, EQUIPMENT, ETC.AND FINAL FINISHED ELEVATIONS a HANGERS,VALVES,ALARMS,SUPPORTS AND SPRINKLER HEADS, PRIOR TO ANY INSTALLATION WORK. _. �"° DISHWASHING �m 4966 F _ r I NECESSARY AND AS REQUIRED FOR INSTALLATION OF COMPLETE AND 5 16 275 107 32 APPROVED FIRE PROTECTION SYSTEMS. 17. EXISTING SYSTEMS THAT REQUIRE RELOCATION AND SERVE EXISTING f~__ ~� i HWS HWR `.-- I - 1 I __ _ FIXTURES OR EQUIPMENT OR AREAS THAT MUST REMAIN ACTIVE, SHALL BE _ � � � ~ - CWS �' --� HB I 5. WORK SHALL BE PERFORMED BY AN APPROVED AUTOMATIC FIRE RELOCATED DURING OWNER SCHEDULED SHUT-DOWNS. TEMPORARY ° ° I PROTECTION SPRINKLER CONTRACTOR. SHOP DRAWINGS AND CONNECTIONS AND EXTENSIONS OF REQUIRED SYSTEMS SHALL BE CALCULATIONS SHALL BE PREPARED BY A REGISTERED PROFESSIONAL PROVIDED AS NEEDED AND AT THE CONTRACTOR'S EXPENSE. rY__wta 20 (TYPICAL a._ ._ _ INlNG C I ENGINEER. APPROVED CONTRACTOR AND THE CONTRACTOR'S REGISTERED I f k, p F `r I ENGINEER SHALL BE LICENSED WITH THE PROPER AUTHORITIES FOR THE 18. CONTRACTOR SHALL VISIT THE SITE AND DOCUMENT EXISTING CONDITIONS F - MENS •., I LOCATION OF THIS PROJECT. WITHIN THE LIMITS OF DEMOLITION, PRIOR TO START OF ANY WORK. 4° ..�.,..<�.».yw�: � � 106 1 FORWARD TO ARCHITECT/ENGINEER, FOR REVIEW, ONE(1)COPY OF 363 [ ° - - - -- ' K 1 9 w wwn., „. ! 6. PROVIDE A COMPLETE WET PIPE SPRINKLER SYSTEM FOR ALL AREAS, EQUIPMENT AND SYSTEMS BEING REMOVED BY DEMOLITION WORK AND NEW '"(1 __.._ 1 � I�. � �' ,r100 1 � 9 „> � 350 J 23 „� �-.. I , UNLESS OTHERWISE INDICATED OR REQUIRED FOR FREEZE PROTECTION. INSTALLATION WORK. LIMITS OF DEMOLITION AREA SHALL BE AS INDICATED "t 3 227A ♦ I�� �° F K ON DRAWINGS PREPARED BY THE ARCHITECTURAL CONSULTANT. 9 a; q 7. SPECIAL CONSIDERATION SHALL BE GIVEN TO AREAS THROUGHOUT THE (90 CFH) „` "♦ �) 227 3 ' I_ ' W BUILDING SUCH AS DROPPED SOFFITS, LIGHTING SOFFITS AND RECESSED 19. CARFULLY REVIEW THE INTERIOR DESIGN,ARCHITECTURAL, STRUCTURAL 22 497 ? w 3/4" ♦♦ e `" STORAGE RACKS THAT NECESSITATE ADDITIONAL SPRINKLER HEADS. AND ELECTRICAL DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL ITEMS ' ; ♦♦� T(60 CFH) 222 3r- I ' TO BE REMOVED, RELOCATED, OR ACCOMMODATED; INCLUDE ALL COSTS IN 4" 220 3 ;♦♦ 3/4 (135 CFH) I o 8. RUN PIPING HORIZONTALLY AND AT RIGHT ANGLES TO WALLS AND CEILINGS. BASE BID FOR THIS WORK. (80 CFH) I KITCHEN/PREP 1 I i Q 6 18 CENTER SPRINKLER HEADS IN BOTH HORIZONTAL DIRECTION WITH RESPECT 218 - 3/4,,, 14 302 �...,„, Vis,° TO CEILING COMPONENTS, SUCH AS CEILING GRID, LIGHT FIXTURES, HVAC 20. NEW OR EXISTING EQUIPMENT SHALL NOT BE LOCATED ABOVE I J 23 '° q ;:,` \ F '�->, U) O DIFFUSERS AND SPEAKERS OR AS DIRECTED BY OWNER'S REPRESENTATIVE. UNACCESSIBLE CEILINGS. PROVIDE LOCATION OR RELOCATION OF 350 a a I 352 EQUIPMENT TO AREAS ABOVE ACCESSIBLE CEILINGS AND RECONNECT 9. FIRE PROTECTION SYSTEM SHOP DRAWINGS SHALL INCLUDE SEPARATE AND EQUIPMENT TO SYSTEMS. F K,, � : I = F K ♦ [ D ( § W COMPLETE REFLECTED CEILING LOCATION F EACH ' C G PLANS INDICATING LOC O O C -------- 7 ----- - ----- - SPRINKLER HEAD AS WELL AS PIPING LAYOUTS. 21. DRAINING AND REFILLING OF SYSTEMS AS REQUIRED FOR DEMOLITIONC F— Q AND/OR NEW INSTALLATIONS WORK, SHALL BE THE RESPONSIBILITY OF THIS ( §_ 7711 m + ` . `. , .. WOMENS ., � -. .,.awn..»..,..:_.„. ....-,,.,” =5F- - 10. PROVIDE MAIN DRAINS AND AUXILIARY DRAINS WHERE NECESSARY. CONTRACTOR. . _ !..r -,.moi: I ? ' !.: a ;•> jc `r /'lam: a= 107 \ I IE 27 .......a....._...._...._.... r. /...: ;� 0- co az, 11. PROVIDE TEST CONNECTIONS AT MOST REMOTE POINT OF MAIN PORTION OF 22. ALL SPRINKLERS IN CEILINGS SHALL BE CONCEALED FLUSH PLATE TYPE OF I \ I F 11 I SII t 1 z EACH SPRINKLER SYSTEM. WHATEVER TYPE AND FINISH APPROVED BY INTERIOR DESIGNER AND OWNER. ALL SPRINKLERS IN OPEN CEILING AREA SHALL BE UPRIGHT TYPE ♦` 1 231 €sw _ : 1M o 24 TYPICAL Win. ) I a... BA NCING 212 l I o I- 12. LAYOUT THE SPRINKLER PIPING SO THAT THERE IS A MINIMUM SEPARATION AND FINISH APPROVED BY INTERIOR DESIGNER&OWNER. EXACT LOCATIONS ♦� " ` Ixµ j 3 L22117- C , OF 12" BETWEEN THE CEILING HEIGHT AND THE BOTTOM OF THE SPRINKLER OF EACH AND EVERY SPRINKLER WILL BE APPROVED BY INTERIOR DESIGNER - CWS— - VALVE II,< A 212A I rn "°" v z C7 z U, PIPE OR ROUTE PIPING AROUND LIGHT FIXTURES TO AVOID CONFLICTS. AND OWNER. SUBMIT PRODUCTS AND SPRINKLER LOCATIONS TO INTERIOR I N Q + Q DESIGNER AND OWNER FOR APPROVAL PRIOR TO SHOP DRAWING PROCESS. I - CWS - - t „ O� Z N 13. FIRE PROTECTION CONTRACTOR SHALL FIELD VERIFY EXACT REQUIREMENTS — - HWR- ----�--- -- -- s + I g � � III FOR BUILDING REGARDING PIPE SIZES,ADAQUATE PRESSURES, SERVICEgE i 9I Q 0 " ORDER/TO GO `' LOCATIONS,ZONING AND SUBMIT SHOP DRAWINGS TO THE AUTHORITIES I� � R1°� 109 "_ •� r�` � `�`"` "�` `` � �"""� � � �� � � � Z FOR APPROVAL PRIOR TO FABRICATION OR INSTALLATION OF FIRE Mfr" I k PROTECTION WATER SERVICE AND SYSTEMS. "°�� r ��� a I 1 - .�, 213 I I1 m 9JJ/ 1 .,s.»..,m... -F &d. Hs St I" .w..-......».»,...»,,,.w,. ....w� �'€' ..__.. .1. !9 -...._.... ' 1 1 ' 2424€ 7 8 i£ W � � Q PLUMBING PLAN NOTES 2 $ - I I I I o o Q 5 I z � E— ❑ DOMESTIC WATER: CONNECT NEW 1-1/2"WATER LINE TO LANDLORD PROVIDED 18 PROVIDE WATER CONNECTION TO PASTA COOKERS 12"AFF. PROVIDE WATER SUPPLY WITH SHUT-OFF VALVE IN THIS AREA, FIELD VERIFY EXACT SIZE DISCONNECT, DORMANT MODEL#71-1114-48, COORDINATE WITH NOODLES 490 I I 30'X 48' I AND LOCATION. FIELD VERIFY SUB-METER AND WATER METER LOCATIONS. PROJECT MANAGER FOR REQUIREMENTS PRIOR TO INSTALLATION. I ' 4011 i a.... C14 COOLER. PROVIDE NEW PRESSURE GAUGE ON MAIN WATER LINE AND AFTER WATER _• =• f a. < -_ DINING Bi SOFTENER. CONTRACTOR SHALL MAKE NECESSARY CONNECTIONS AS REQUIRED. 19 DROP 1-1/4"COLD WATER PIPING WITH BYPASS VALVE FOR FUTURE WATER � � � 113 �� � II #j$ � j �� 102 I} u o o 10 € �'JE". ) S3Ak 'a< } £ .tee x x ° 1 °'. R„, f.i '% t V PROVIDE WATER PRESSURE TEST AND GPM TEST(MIN.35 GPM)AND NOTIFY SOFTENER. SEE DETAIL ON SHEET P3.0. CONTRACTOR TO PERFORM WATER 8 10 13 '� I pmm } + ; v o o. CONSTRUCTION MANAGER WITH RESULT. PROVIDE AND ADJUST PRESSURE PRESSURE TEST AND WATER QUALITY TEST AND NOTIFY CONSTRUCTION -FS \ I € s ( ? m o ° 26 1 3 REGULATOR TO SET AT 60 PSI. MANAGER WITH THE REPORT.WATER SOFTENER IS REQUIRED IF THE WATERQUALITY Y IS HIGHER THAN 6 GRAINS PER GALLON. 1-1/2”COLD WATER PIPING 499A \ I ( -- ( N ❑2 PROVIDE NEW WATER HEATER HERE PER THE DETAIL.SEE SHEET P3.0.CHECK CONNECTION MAY BE REQUIRED DEPENDING ON THE WATER PRESSURE,CONSULT o rF711a °, 00 WITH NOODLES CONSTRUCTION MANAGER PRIOR TO BID/PURCHASE ON FINAL WITH CONSTRUCTION MANAGER. 4996 T } t' 1(_ I } 1 € ) = o c m °p APPROVED WATER HEATER SPECIFICATIONS. \ ' I M _- ,„ 1° ❑20 CONTRACTOR TO PROVIDE STANDOFF FOR WATER, GAS, ETC. PIPING BEHIND 9 25 \ U .o • o ❑3 COOKING APPLIANCE GAS PIPE SUPPLY, REFER TO"COOKING APPLIANCE GAS COOK LINE AND ALL PIPING SHALL TURN AND BEND AS SOON AS IT COMES OUT - 25 € y o V E PIPE" DETAIL ON SHEET P4.0. THE WALL IN CLEAN AND NEAT MANNER. mm DINING A > m 10 _ rno 1 � > m _ o 00 — ® GAS SHUT-OFF VALVE: FURNISHED BY KITCHEN HOOD SUPPLIER AND INSTALLED 21 AREA FOR ELECTRICAL EQUIPMENT. PIPING SHALL NOT CROSS WITHIN THIS AREA. `� - - "� I a, ��I I SO ° ° h� c BY PC INTERCONNECT TO HOOD FIRE SUPPRESSION SYSTEM BY FPC. ❑ tl - - } , `�� "' a a L c U �. d m 22 PROVIDE COLD WATER SUPPLY TO ECOLAB VICTORY SYSTEM.STUB LINE AT 60" �� � ;_FOI , r 495 19 „>r t '� i o ^v Up ❑5 GAS PIPING STUBBED THROUGH THE ROOF SEE SHEET MP1.0. FOR GAS PIPING I „_. € n v CO U A.F.F.WITH HORIZONTAL LEAVE TOWARDS ICE MACHINE/DRAIN BOARD. INSTALL ------- _ '� - ----- - - ---- - -------- --_ p C o-°o ROUTED ON ROOF. PER MANUFACTURER RECOMMENDATIONS,AND PROVIDE BACKFLOW PREVENTION A ♦ _ _ "s. 29 �1r 000 3 AS REQUIRED BY AUTHORITY HAVING JURISDICTION. PROVIDE WITH 3/8” KITCHEN/STORAGE ♦ �LO 3 © PROVIDE y"VALVED CW LINE TO THE PASTA COOKERS. ROUTE REINFORCED FOOD ENTRY THREADED ANGLE STOP. 112 . ♦ H 2 � jj 3 _ ,_ "_ � -"'- � � � ���; W �3 GRADE PLASTIC FILTERED WATER TUBING AND QUICK DISCONNECT PROVIDED BY ♦♦ / I ( loo I ( o 33 ♦. �,, KITCHEN EQUIPMENT SUPPLIER. 23 TRAP PRIMER/VALVES TO BE IN AN ACCESSIBLE SPACE ABOVE CEILING, IF NOT ": I. 200 CFH '> �'.11 g € m » „,.• �. r 119 � ���:: PROVIDE A MINIMUM 12"X12"ACCESS PANEL,OR LARGER IF REQUIRED TO , e, 1 ...�»,�..�,.«.» .»nw�wa,„�.,.a,n aaa„.„„ , „,,,.„.»,.,,,w.��•n ❑ ROUTE REINFORCED FOOD GRADE PLASTIC FILTERED WATER TUBING TO ADEQUATELY ACCESS THE TRAP PRIMERA/ALVES. �'~�•~°” •.-------..� --•-•• -••• -_�.__� - � ......... °~•°�-~» �-�%°-°�>-�--°...`,„.wa,,� -°•-' '»-<��- ^- �° -„°�,.nr-w�waawawn, � ? � BEVERAGE DISPENSER. REFER TO BEVERAGE STATION DETAIL ON SHEET P4.0. L B 24 OFFSET PLUMBING PIPING AS REQUIRED TO AVOID STRUCTURAL ELEMENTS AND 23 J ® PROVIDE A REDUCED PRESSURE/DOUBLE CHECK BACKFLOW PREVENTER OR AS OTHER PIPING IN WALL. REQUIRED FOR THE WATER SUPPLY LINES.THE RELIEF VALVE SHALL DRAIN INDIRECTLY TO THE FLOOR SINK/DRAIN WITH AN AIR GAP OF TWICE THE PIPE 25 PROVIDE WATTS#L7 BACKFLOW PREVENTER OR CITY APPROVED AT WATER G DIAMETER. REFER TO"KITCHEN EQUIPMENT LIST&CONNECTION SCHEDULE”FOR SOFTENER AND WATER FILTER. j SEASONAL PATIO ° MODEL AND TYPE. NO COPPER TUBING IN THE SYSTEM DOWNSTREAM OF THE 17 498 i 114 BACKFLOW PREVENTER TO PRECLUDE THE POSSIBILITY OF COPPER POISONING. 26 PROVIDE PRESSURE REDUCING VALVE,WATTS 3/425AUB-Z3. W a s Y- Revisions ❑9 CONNECTy”CW LINE TO NEW FILTER FOR ICE DISPENSING MACHINES AND TEA I `T''• 27 ALL PLUMBING PIPING SHALL BE COORDINATED WITH JOISTS,JOIST WEBBING,AND -- ----- - ” ISSUED FOR LANDLORD REVIEW BREWER TO BE SUPPLIED BY KITCHEN EQUIPMENT SUPPLIER. PROVIDE STAINLESS WITH OTHER DISCIPLINES PRIOR TO INSTALLATION. 01-21-2015 STEEL BACKFLOW PREVENTER AT WATER SUPPLY. t I 1 [ 1 ISSUED FOR PERMIT -8 3/4"CWS DOWN IN WALL AND TURN 90°AND OUT THE WALL 12"A.F.F.WITH » g" m 02-04-2015 10 PROVIDE y' VALVED FILTERED LINE TO BAG-N-BOX BOOSTER PUMP SYSTEM AND -w - n , .- _- .m»„ - =.a_w-gn , n _ \r >, - _ _m - ❑ ESCUTCHEON,SHUT-OFF VALVE, FOR USE WITH FUTURE WATER TEMPERING KIT. — "�» �—�'�� ��� � � �» � � ISSUED FOR CONSTRUCTION FREESTYLE COKE MACHINES,SEE SHEET P1.0 FOR CONDUIT ROUTING. PROVIDE 1 STAINLESS STEEL BACKFLOW PREVENTER AT WATER SUPPLY VERIFY AND 1 02-26-2015 29 ALL PIPING INSTALLATION SHALL NOT OBSTRUCT THE OPERATIONS OF THE WATER \ �� COORDINATE ALL REQUIREMENTS FOR SODA DISPENSING SYSTEM WITHI m \\ MANUFACTURER PRIOR TO INSTALLATION. ROUTE PIPING IN SODA CONDUIT TO SOFTENER AND SHALL NOT INTERFERE ACCESS TO CONTROL BLOCK. SANITARY REVISIONS" � Q COKE MACHINE OR AS DIRECTED BY MANUFACTURER. 03-13-2015 30 PROVIDE 1/2”VALVED CW AND HW LINE WITH MIXING VALVE LOCATED RIGHT BELOW CEILING AND SET TO 70'F FOR FUTURE ECOLAB QUAT SANITIZER ABOVE a ,„ - „ . ,, ., n,�•, _„„ a ...,•aa� a w- ww w-� n, „° - .a -,., 11 1/2”FW WATER FOR ICE MACHINE ON TOP OF FREESTYLE COKE MACHINE. SINK,STUB LINE AT 60"A.F.F.WITH HORIZONTAL LEAVE TOWARDS PRE-RINSE 12 GAS LINE ROUTED IN LOW WALL TO SERVICE GAS EQUIPMENT. SINK/DISHWASHER. PC TO PROVIDE BFP IF NOT SUPPLIED BY CHEMICAL SUPPLIER. Q PROVIDE WITH THREADED 3/8"ANGLE STOP. _ 13 ALL PIPING AND ASSOCIATED PLUMBING EQUIPMENT FOR SODA SYSTEM SHALL BEQ INSTALLED BY A STATE LICENSED PLUMBER. 31 ROUTE CW, HW,AND FW PIPING CONCEALED UNDER FLOOR SLAB OR IN LOW WALL AS REQUIRED PER FIELD CONDITIONS. PROVIDE WATER TIGHT PIPING. co Q 14 ROUTE 1/2"CW WATER LINE TO SERVE DIPPER WELL. 32 VERIFY IN FIELD FUNCTIONALITY OF EXISTING HOSE BIBB. IF HOSE BIBB IS IN PLUMBING PLAN - WATER AND GAS 15 PROVIDE 1/2"VALVED HW LINE FOR FUTURE ECOLAB SCOUT ABOVE SINK, STUB PROPER WORKING ORDER,ADDITIONAL HOSE BIBB NEED NOT BE PROVIDED. NORTH 00 NOTIFY CONSTRUCTION MANAGER WITH RESULTS PRIOR TO BID. u>> C? LINE AT 60"A.F.F.WITH HORIZONTAL LEAVE AWAY FROM PRE-RINSE01 r SINK/DISHWASHER. INSTALL APPROVED BACKFLOW PREVENTER, RPZ BACKFLOW LO PREVENTER WATTS#009 OR AS REQUIRED BY AUTHORITY HAVING JURISDICTION. 33 LOW PRESSURE GAS SYSTEM AFTER MAXITROL VENT LIMITER PRESSURE Q 65 2 P Ez CD PC TO PROVIDE BFP IF NOT SUPPLIED BY CHEMICAL SUPPLIER. PROVIDE WITH REGULATOR. INLET PRESSURE 2 PSI;OUTLET PRESSURE 7"W.C. FIELD VERIFY PLAN THREADED 3/8"ANGLE STOP. EXACT LOCATION AND LENGTHS. X11 CGS 34 PROVIDE NEW GAS PIPING ROUTED FROM NEW/EXISTING GAS METER LOCATED IN S C`) 16 DISHWASHER ELECTRICAL ACCESS SHALL BE LOCATED IN OPEN AREA FOR EASY REAR OF SPACE.TOTAL GAS SYSTEM IS 1,364 CFH AND SIZED AT 200'DEVELOPED ✓ �A ACCESS AND NOT IN AGAINST WALL. COORDINATE WITH ELECTRICAL DRAWINGS. LENGTH WITH 2 PSI PRESSURE AND A 1 PSI PRESSURE DROP. CONTACT GAS 25.`�' 17 PROVIDE A WATTS MODEL#N9 CD FIELD TESTABLE DUAL CHECK VACUUM COMPANY FOR NEW GAS SERVICE LOADS. FIELD VERIFY EXACT LOCATION. NOTIFY r z BREAKER OR AHJ APPROVED ON FAUCET OUTLET,ALSO PROVIDE DEDICATED 1/2" ARCHITECT/ENGINEER IF DIFFERENT PRESSURE IS PROVIDED. EXPIRATION DAVE IN -1,20140 Q CW AND HW LINE WITH POWERS E480 THERMAL MIXING VALVE LOCATED RIGHT F -- W BELOW CEILING.SET WATER TEMPERATURE TO 70°F FOR OPTIMAL CHEMICAL 35 PROVIDE PIPING AND FITTINGS ON GAS PIPING INSTALLED UNDERGROUND AS MIXING. STUB OUT WALL AT 60"A.F.F. FOR FUTURE ECOLAB OASIS. PROVIDE REQUIRED BY LOCAL CODES. PROVIDE PROTECTIVE COATING AND WRAPPING ON Si Q WATTS#009 RPZ BACKFLOW PREVENTER OR CITY APPROVED AT CHEMICAL .GAS PIPINGUNDERGROUND GAS PIPING SHALL BE INSTALLED WITHIN CONDUIT OF STATION. PROVIDE WITH THREADED 3/8"ANGLE STOP. SCHEDULE 40 STEEL OR AS REQUIRED BY LOCAL AUTHORITY. 03/13/2015 Z Q Date 06/30/2016 J Expiration Date 4- Z COORDINATE ALL HAND SINK FAUCETS WITH GENERAL ENGINEER m CONTRACTOR. DISCARD ALL HAND SETS THAT ARE PROVIDED WITH PLUMBING PLAN DEMOLITION NOTES BOWLS AND PROVIDE NEW HAND SINK FAUCET PER THE IHEREBY CERTIFY THAT THESE PLANS HAVE BEEN PRE- REMOVE ALL EXISTING PLUMBING RELATED FIXTURES, EQUIPMENT, PAREDUOWLEDGNDER MY ,THEE MECOMPLYWSION AND THALLRU TO THE ES, ST � SPECIFICATION LISTED ON P2.O. OF MY KNOWLEDGE,THE SAME COMPLY WITH ALL RULES, PIPING, ETC. NOT TO BE UTILIZED IN THE COMPLETED REMODEL REGULATIONS AND ORDINANCES OF PORTLAND,OREGON WORK. FIELD VERIFY EXISTING CONDITIONS PRIOR TO BID. RELATING TO STRUCTURES AND BUILDINGS. �I FURNISH AND INSTALL BRAIDED STAINLESS STEEL FAUCET CONTRACTOR SHALL REMOVE ALL EXISTING DRAINS; CUT AND CAP AT ACTIVE MAIN. CONNECTORS AT ALL EXPOSED FLEXIBLE HOSE LOCATIONS ENGINEER CO EXCEPT AT EQUIPMENT PROVIDED BY KES. 3 Drawn By Checked By THE GENERAL CONTRACTOR AND PLUMBING CONTRACTOR MUST CW SK FIELD DETERMINE REQUIRED DEMOLITION AND RELOCATION OF o_ CONTRACTOR SHALL PROVIDE ALTERNATE BID FOR ZURN PEX EXISTING PLUMBING ITEMS INCLUDING SANITARY PIPING PRIOR TO Scale Date I rn TUBING SYSTEM ON THE DOMESTIC WATER SYSTEM INCLUDING BID. 1/4" - V-0" 01-06-2015 ALL THE FITTINGS, MANIFOLDS, REGULATORS, SUPPORTS, ETC. SEE MP SHEET FOR PEX TUBING SYSTEM SPECIFICATIONS. Job No DO NOT INSTALL TRAP GUARDS OR TRAP SEALS IN LIEU OF TRAP 2 14-2115 PRIMERS. rn v Sheet No. P1 . 1 NOTE BACKFLOW PREVENTER NOTES PLUMBING SYMBOLS LEGEND GENERAL NOTES PLUMBING FIXTURE SCHEDULE ALL TYPES OF BACKFLOW/BACK SIPHONAGE DEVICES SHALL BE THE INSTALLATION OF EACH RP, RP DETECTOR, PVB AND SVB SHALL DISPLAY A DEPARTMENT HWR HOT WATER RETURN A. SPECIFICATIONS, REFER TO"PLUMBING"SECTIONS,SEE MEP1 DRAWING, PLUMBING CONTPACTOR SHALL FURN;£H AND INSTALL FIXTURES IN THIS SCHEDULE: FIELD TESTED IN ACCORDANCE WITH THE MANUFACTURER'S ASSIGNED IDENTIFICATION NUMBER. - COLD WATER(CW) "GENERAL CONDITIONS"/"SUMMARY OF WORK"SECTIONS AND ELSEWHERE IN AO TANK WA FER CLOSET(HANDICAP):AMERICAN STANDARD#2467.016"CADET", FLOOR INSTRUCTIONS BY A CERTIFIED TESTER BEFORE INITIAL OPERATION. FW FILTERED COLD WATER(FW) DRAWINGS FOR FURTHER INFORMATION AND REQUIREMENTS FOR PLUMBING MOUNTED,WHII E VITREOUS CHINA, ELONGATED SIPHON JET BOWL, PRESSURE ��uu FINAL PLUMBING INSPECTIONS WILL NOT BE APPROVED WITHOUT THE BACKFLOW PREVENTER SHALL BE INSTALLED SO THAT THE RELIEF VALVE OUTLET IS CONTRACTOR. ASSISTED 1.6 GPF, RIM 16-1/2"AFF WITH#4142.600 TANK COVER LOCKING DEVICE. HOT WATER HW 140° I T \\\�\��� \ TESTER'S REPORT BEING SUBMITTED TO THE VILLAGE PLUMBING PROTECTED BY AN APPROVED AIR-GAP.THE DRAIN FROM THE RELIEF VALVE MUST -- ( ) OLSONITE#95CTSS OPEN FRO(`T SE4 LESS COVER. PROVIDE LOOSE KEY ANGLE STOP. INSPECTOR PRIOR TO FINAL INSPECTION. DISCHARGE TO EITHER A FLOOR DRAIN OR AN APPROVED RECEPTOR. NO PART OF THE G GAS LINE (G) G) B. SUSPEND ALL HORIZONTAL SERVICE PIPING SHOWN ON THIS PROJECT SUCH AS, AmEmOxft -> BACKFLOW PREVENTER MAY BE SUBMERGED UNDER ANY CIRCUMSTANCE. BUT NOT LIMITED TO,WATER,SANITARY,WASTE/VENT,STORM WATER,GAS, ETC. O URINAL(HAI"DICAP):l,rJERICi1N STANDARD#6550.001 "ALLBROOK FLOWISE",WHITE PEM111M," D CONDENSATE LINE(D) FROM UNDERSIDE OF ROOF AND/OR FLOOR STRUCTURE, UNLESS OTHERWISE VITREOUS CHIN.\, 'ilGl I EFFICIENCY 0.3 GPF,WALL MOUNTED,3/4"INLET SPUD, FLUSHING ALTERNATE LOCATION,TERMINATE THRU WALL AND ELBOW DOWN RP, PVB,OR SVB'S SHALL NOT BE BY-PASSED. EXCEPT FOR REPAIR,THEY SHALL NOT BE PLUMBING VENT(V) NOTED OR INDICATED. HOLD SUCH PIPING HIGH AS POSSIBLE. EXTEND PIPING RIM AND WALL HANGERS;SLOAN"ROYAL' #186-0.5 WITH VACUUM BREAKER,ANGLE MADE INOPERATIVE OR REMOVED WITHOUT DEPARTMENTAL APPROVAL. DOWN IN WALLS, PARTITIONS, CHASES, ETC..TO SERVE FIXTURES AND CHECK STOP AND CHROME PLATED SOLID RING PIPE SUPPORT NUMBER J-212-A.RI WITH BRASS NIPPLES, FITTINGS AND ESCUTCHEON. EQUIPMENT AS SHOWN ON PLANS. 15-1/4"AFF TO RIM. PROVIDE WATTS BACKFLOW PREVENTER FOR 3-COMP SINK CHEMICAL STATION, MOP SINK SANITARY WASTE(SAN)-BELOW SLAB/GRADE CHEMICAL STATION,CARBONATOR,WATER FILTER,TEA MAKER,COFFEE MAKER, ICE GW GREASE WASTE LINE C. CONTRACTORS AND SUB-CONTRACTORS SHALL CAREFULLY REVIEW THE O LAVATORY: KOHLER#K-2084"SOHO"WITH OVERFLOW,20"x18"WALL MOUNTED,WHITE ROOF MACHINE, ETC.AS REQUIRED BY HEALTH DEPARTMENT. CONSTRUCTION DOCUMENTS. INFORMATION REGARDING THE COMPLETE WORK VITREOUS CHINA LAVATORY; MOEN FAUCET"ALIGN"MODEL NO.6190, POLISHED CHROME - - - - - - EXISTING PIPING IS DISPERSED THROUGHOUT THE DOCUMENT SET AND CANNOT BE ACCURATELY FINISH. LOW SPOUT DESIGN WITH 0.5 GPM FLOW RATE.TEMPERATURE MEMORY FAUCET. PIPE PENETRATION THROUGH ROOF PER"ROOF AN ATMOSPHERIC VACUUM BREAKER OR BACKFLOW PREVENTION DEVICE MUST BE DETERMINED WITHOUT REFERENCE TO THE COMPLETE DOCUMENT SET. HIGH TEMPERATURE LIMIT SETTING FOR SAFETY.ONE-PIECE,SELF CONTAINED CERAMIC PENETRATION" DETAIL ON SHEET P4.0. INSTALLED ON ALL THREADED HOSE BIBBS INSIDE AND OUTSIDE THE ESTABLISHMENT. DISC VALVE. PROVIDE WITH POLISHED CHROME STRAINER.CHROME PLATED CAST ____+O PIPE TURNING UP/DOWN D. COORDINATE WITH THE WORK OF OTHER SECTIONS, EQUIPMENT FURNISHED BY BRASS P-TRAP WITH CLEANOUT AND WASTE ARM TO WALL WITH ESCUTCHEON, LOOSE GAS PIPING IN CEILING -} - -4- SHUTOFF VALVE(BALL TYPE) OTHERS, REQUIREMENTS OF THE OWNER,AND WITH THE CONSTRAINTS OF THE KEY ANGLE STOP VALVES AND INSULATE WATER/WASTE PIPING UNDER LAVATORY WITH CEILING BALANCING VALVE(BALL TYPE WITH MEMORY STOP) EXISTING CONDITIONS OF THE PROJECT SITE. PROVIDE PIPE RISES, DROPS,AND TRUEBRO"LAV-GUARD 2"#102E-Z KIT. RIM 34"AFF TO RIM. PROVIDE ADEQUATE FRAMING MINIMUM TRAP SIZES OFFSETS,AS REQUIRED FOR FIELD INSTALLATION AND TRADE COORDINATION. FOR MOUNTING HARDWARE KIT 6951, REFER TO MANUFACTURER INSTALLATION ROUTE yFIXTURE IDENTIFICATION"COPPER VENT LINE TO SLEEVE AND O NOTIFY ARCHITECT OF ANY DISCREPANCIES BEFORE STARTING WORK. INSTRUCTIONS. TERMINATE ABOVE ROOF WITH GOOSENECK. TAG FIXTURE TRAP PLAN NOTE E. DRAWINGS FOR PLUMBING WORK ARE DIAGRAMMATIC, SHOWING THE GENERAL OD FLOOR DRAIN(LIGHT DUTY):J.R.SMITH#2010-P050 CAST IRON DRAIN WITH NICKEL SIZE LOCATION,TYPE, LAYOUT,AND EQUIPMENT REQUIRED.THE DRAWINGS SHALL BRONZE STRAINER, MEMBRANE FLASHING CLAMP. PROVIDE OUTLET WITH P-TRAP. PIPING TO KITCHEN APPLIANCES, REFER TO"COOKING D D1 FLOOR DRAIN SEE PLANS O KITCHEN EQUIPMENT IDENTIFICATION NOT BE SCALED FOR EXACT MEASUREMENT. REFER TO ARCHITECTURAL CLEAN AND POLISH ROUND STRAINER TOP AFTER INSTALLATION. uj APPLIANCE GAS PIPE"DETAIL ON SHEET P4.0. DRAWINGS FOR DIMENSIONS. REFER TO MANUFACTURER'S STANDARD ry E E1 E2 FLOOR SINK SEE PLANS AFF/AFG ABOVE FINISHED FLOOR/GRADE INSTALLATION DRAWINGS FOR EQUIPMENT CONNECTIONS AND INSTALLATION D1 FLOOR DRAIN:J.R.SMITH#3510 WITH 4"DIAMETER FUNNEL CAST IRON DRAIN WITH sso ss2 O HAND SINK 2„ REQUIREMENTS. PROVIDE PIPING, CONNECTIONS, FITTINGS, VALVES,OFFSETS, NICKEL BRONZE STRAINER. PROVIDE OUTLET WITH P-TRAP.CLEAN AND POLISH ROUND STUB SLEEVE 6"AFF AND IW INDIRECT WASTE ETC.AND ALL MATERIALS NECESSARY FOR A COMPLETE SYSTEM.SUBMIT SHOP STRAINER TOP AFTER INSTALLATION. PROVIDE WITH EXTENSION ADAPTOR. 1-- SEAL -SEAL GASTIGHT WITH VTR VENT THRU ROOF DRAWINGS PER THE SPECIFICATIONS. U) CAULK OR SILICONE OE FLOOR SINK:J.R. SMITH 3421,WITH FULL COVER GRATES, CAST IRON BODY,ACID V FLOOR FIXTURE BRANCH SCHEDULE CO CLEANOUT F. ALL WORK SHALL COMPLY WITH STATE AND LOCAL CODE REQUIREMENTS AS RESISTANT COATED INTERIOR AND ACID RESISTANT COATED CAST IRON GRATE,6"DEEP APPROVED AND AMENDED BY THE GOVERNING CITY, INCLUDING APPLICABLE SUMP. PROVIDE OUTLET WITH P-TRAP. �f J a FIXTURE COLD HOT WASTE VENT WCO WALL CLEANOUT SECTIONS OF ANY INTERIM AMENDMENTS AT THE TIME OF THE PROPOSAL. WATER WATER PURCHASE ALL PERMITS ASSOCIATED WITH THE WORK. OBTAIN ALL INSPECTIONS E1 FLOOR SINK:J.R.SMITH 3421,WITH 1/2 COVER GRATES, CAST IRON BODY,ACID Q 4. REQUIRED BY CODE. RESISTANT COATED INTERIOR AND ACID RESISTANT COATED CAST IRON GRATE,6"DEEP ------------------------ MOP BASIN �" 3" 2" FFCG/FGCO FLUSH FLOOR/GRADE CLEANOUT SUMP. PROVIDE OUTLET WITH P-TRAP. BV BALL VALVE G. PROVIDE BACKFLOW PREVENTION DEVICES, (BPD)IN WATER LINES FEEDING ^^ PIPE SLEEVE BELOW SLAB: SCHEDULE 40 PVC CONDUIT AND FLOOR DRAIN - - SEE PLANS 2" PLUMBING FIXTURES AND/OR EQUIPMENT,AS SHOWN ON PLANS AND ELSEWHERE E2 FLOOR SINK:ZURN FD-2370-H-Y. PROVIDE WITH 1/2 GRATE COVER, PVC BODY, PVC lel. u) FITTINGS WITH SOLVENT WELD JOINTS. INSTALL IN CRUSHED ROCK BACKFILL.ARRANGEMENT SHOWN IS SCHEMATIC.REFER TO FLOOR FLOOR SINK SEE PLANS 2" AS ANGLE STOP c AS REQUIRED BY LOCAL AUTHORITIES. USE DEVICES OF APPROVED TYPE AND SEDIMENT BUCKET. PROVIDE OUTLET WITH P-TRAP. C z -- -- PLAN FOR MORE EXACT CONFIGURATION. MODIFY TO SUIT ACTUAL MANUFACTURER(ATMOSPHERIC VACUUM, PRESSURE VACUUM, DOUBLE CHECK, FIELD CONDITIONS AND MAKE SLEEVE GASTIGHT ABOVE FLOOR AND HUB DRAIN - - SEE PLANS 2" RI ROUGH-IN AND REDUCED PRESSURE). REFER TO SCHEDULE ON THIS SHEET OF MIXING VALVE:WITH CASTYMMONS#5-225"MARLINE", AS INLET AND OUTLET,THERMOSTATIC O U) WATERTIGHT BELOW FLOOR.THE USAGE OF A FLEXIBLE CSST CONTROLLER WITH CAST BRONZE BODY, BRASS AND STAINLESS STEEL CONTROL r , TUBING WITH CONTAINMENT SLEEVE SUCH AS FLEXIBLE TRACPIPE PS-II IS AN OC ON CENTERS H. VERIFY SERVICE CONNECTION POINTS,SIZES, ELEVATIONS,AND METERING COMPONENTS, COLOR-CODED TEMPERATURE INDICATION DIAL,VANDAL RESISTANT, U z M UJ W LOCATIONS FOR PROJECT WITH LOCAL UTILITIES CO.AND/OR CIVIL ENGINEER. LOCKING POSITIVE GRIP ADJUSTMENT HANDLE.SPARE CARTRIDGE FOR Ax _ N �- J ACCEPTABLE ALTERNATIVE AS LONG AS IT IS INSTALL PER PC PLUMBING CONTRACTOR SERVICES TO INCLUDE BUT NOT LIMITED TO(DOMESTIC WATER, FIRE,SANITARY NON-INTERRUPTED SERVICE.OUTLET TEMPERATURE SET AT 105°. MOUNT IN W = N O MANUFACTURER'S REQUIREMENTS AND LOCAL/STATE CODES. SEWER,STORM SEWER,GAS, ETC.) ACCESSIBLE LOCATION. (n �/ ~ Z FPC FIRE PROTECTION CONTRACTOR V) Q 0-) 1. WATER PRESSURE, PLUMBING CONTRACTOR SHALL VERIFY WATER PRESSURE GO MOP BASIN: MUSTEE#63M,24"x24"x10"DURASTONE FIBERGLASS CONSTRUCTION WITH W > UI ui 1 GAS PIPE SLEEVE MC MECHANICAL CONTRACTOR PRIOR TO CONSTRUCTION. IF PRESSURE AT BUILDING ENTRY PRIOR TO ALL INTEGRAL STAINLESS STEEL 3"DRAIN,#63.600A SERVICE FAUCET WITH INTEGRAL STOPS LOCALLY REQUIRED DEVICES SUCH AS WATER METER, BACKFLOW PREVENTION AND VACUUM BREAKER, RUBBERMAID#1992 MOP BRACKET WITH 3 GRIPS AND#65.700 O z 0NOT TO SCALE EC ELECTRICAL CONTRACTOR DEVICES, ETC. IS LESS THAN 60 PSIG STATIC, CONTACT OWNERS HOSE AND HOSE BRACKET. MOUNT FAUCET 36"ABOVE FINISHED FLOOR. 0 Q m U REPRESENTATIVES. IF PRESSURE IS IN EXCESS OF 80 PSIG STATIC, INSTALLATION CC FSEC FOOD SERVICE EQUIPMENT CONTRACTOR O Op OF PRESSURE REDUCING VALVE IS REQUIRED. OH GAS WATER HEATER: BRADFORD WHITE CORPORATION#EF-100T199E-3N, NO G BFP BACKFLOW PREVENTER SUBSTITUTIONS ALLOWED, 100 GALLON STORAGE, 199,999 BTUH GAS INPUT,239 GPH Q 0 J. WATER HAMMER ARRESTER SHALL BE INSTALLED THROUGHOUT PLUMBING RECOVERY AT 100°F, 98.5%THERMAL EFFICIENCY, FLEXIBLE VENTING:4"PVC,ABS OR 94 O O C� J Z AHJ AUTHORITY HAVING JURISDICTION WATER SYSTEMS AS REQUIRED,SEE DETAIL ON SHEET P4.0. CPVC IS RECOMMENDED(150 FEET MAXIMUM), ELECTRONIC CONTROLS: z 0 MICROPROCESSOR CONTROLS IGNITION AND THERMOSTAT, DIGITIAL DISPLAY PANEL O CONNECT TO EXISTING K. FOOD SERVICE EQUIPMENT CONTRACTOR, REFER TO OTHER PORTIONS OF PLANS SHOWS OPERATING MODES,ALL USER SETTINGS AND ANY FAILURE MODES,GLASS LINED AND SPECIFICATIONS FOR FURTHER INFORMATION ABOUT ITEMS FURNISHED AND TANK, 160 PSI WORKING PRESSURE, MEETING ASHRAE 90.1 B-1992 AND LOCAL ENERGY (E) EXISTING WORK PERFORMED BY FOOD SERVICE EQUIPMENT CONTRACTOR(FSEC).VERIFY CONSERVATION REQUIREMENTS. PROVIDE T&P RELIEF VALVE, INSTALL PER DETAIL ON ROUGH-IN AND CONNECTION REQUIREMENTS W/FSEC SHOP DRAWINGS. DRAWINGS AND PER MANUFACTURER'S INSTRUCTIONS. PROVIDE 6"HOUSE PAD • o 0o•o Da/IIDG BACKFLOW PREVENTER CONCENTRIC VENT KIT. PURCHASED FROM NATIONAL WHOLESALE SUPPLY, INC, U 0 00. TEMPERATURE MIXING VALVE L. HEALTH DEPARTMENT, COMPLY W/LOCAL HEALTH DEPARTMENT REGULATIONS. 888-444-4435;TEMPERATURE SENSOR INSTALLED BY PC,WIRING, LIGHT,AND o OMIT ESCUTCHEONS IN FOOD SERVICE AREAS.SEAL PIPES NEATLY WITH GROUT TRANSFORMER INSTALLED BY EC. - - '0 co AT WALL, FLOOR, OR CEILING PENETRATIONS.OMIT INSULATION ON EXPOSED CID PIPING BEHIND AND UNDER EQUIPMENT. PROVIDE CLEARANCE BEHIND AND O TRAP PRIMER: PRECISION PLUMBING PRODUCTS PR-500, PRESSURE DROP OF 5 TO 10 PSI `" o � - FIXTURE UNIT COUNT UNDER EXPOSED PIPING AS REQUIRED BY HEALTH DEPARTMENT.WHEREVER OPENS VALVE, OPERATING RANGE: 35 TO 75 PSIG,ALL BRASS BODY, INLET OPENING y" ` v 00 POSSIBLE, INSTALL PIPING IN FOOD SERVICE AREAS CONCEALED.CONFORM TO MALE NPT, OUTLET y"FEMALE NPT. REFER TO DETAIL ON SHEET P4.0. a - LL LO SINGLE FIXTURE COMBINED FIXTURES HEALTH DEPARTMENT REQUIREMENTS FOR LOCATIONS OF FLOOR SINKS.NO S �.. a: - 1O FIXTURE QUANTITY u o ■ COLD HOT TOTAL COLD HOT TOTAL EXPOSED PEX TUBING IF PEX TUBING IS USED. OK HAND SINK FAUCET: T&S BRASS MODEL#B-1115, BACKSPLASH MOUNTED FAUCET, oo V V)o BRONZE BODY WITH 4" INLET CENTERS, CHROME PLATED BRASS ESCUTCHEON, MODEL > ai C o BEVERAGE DISPENSER 1 1 0 1 1 0 1 ._ c ° aft m�x y M. MAKE COMPLETE, PROVIDE ITEMS AND WORK AS REQUIRED TO COMPLETE THE #131X POLISHED CHROME PLATED SWIVEL GOOSENECK AND B-WH4-C&H WRIST BLADE m ._ o `ALL m ICE MACHINE 2 1 0 1 2 0 2 INSTALLATION OF PLUMBING SYSTEMS TO FIXTURES AND EQUIPMENT: TRAPS, HANDLES. GC'S PLUMBING CONTRACTOR TO FURNISH AND INSTALL FAUCET. t o o- V1 0=! c mIL STRAINERS, GAUGES, GAS AND WATER PRESSURE REGULATORS, FLEXIBLE c��m " a �' i -y ai '0 PASTA COOKER 2 2 0 2 4 0 4 CONNECTIONS, STOP VALVES, UNIONS, ETCETERA. PROVIDE AND CONNECT K1 TWO COMPARTMENT SINK FAUCET: T&S BRASS MODEL#B-0231 SINK MIXING FAUCET 4m, i o v 6 co � PLUMBING PIPE FROM ROUGH-INS TO ITEMS AS SHOWN, SPECIFIED AND WITH 12"SWING NOZZLE.GC'S PLUMBING CONTRACTOR TO FURNISH AND INSTALL °'CO C 0-.00 WATER FILTER 3 1 0 1 3 0 3 REQUIRED. FAUCET. INSTALL KES FURNISHED T&S BRASS MODEL#B-3950 DRAIN LEVERS FOR EACH° Q w ~ N1mr-°o ma 3 COMPARTMENT. C 3C0 3 DISHWASHER 1 0 1.5 1.5 0 1.5 1.5 U 3 N. GC'S PLUMBING CONTRACTOR SHALL PROVIDE 3M FIRE STOPPING MATERIAL AT W m 2 DIPPER WELL 1 1 0 1 1 0 1 ALL CORE DRILLED LOCATIONS. K2 PRE-RINSE UNIT FAUCET: T&S BRASS MODEL#B-0133-B,STANDARD HOSE LENGTH=44". LO GC'S PLUMBING CONTRACTOR TO FURNISH AND INSTALL FAUCET. m HOT FOOD TABLE 1 0 1 1 0 1 1 0. EXISTING CORES SHALL BE FILLED AS REQUIRED. K3 THREE COMPARTMENT SINK FAUCET: T&S BRASS MODEL#B-0231-BST, BACKSPLASH DIRTY DISH TABLE 1 3 3 4 3 3 4 P. PROVIDE VALVE STOPS AT ALL PLUMBING FIXTURE CONNECTIONS. MOUNTED WITH#064X 16"SWING MIXING FAUCET WITH BUILT-IN STOPS, LEVER HANDLES AND y"NPT INLETS.GC'S PLUMBING CONTRACTOR TO FURNISH AND INSTALL FAUCET. HAND SINK 3 1.5 1.5 2 4.5 4.5 6 Q. ALL UTILITY SERVICE LINES, PIPES MAY NOT BE UNNECESSARILY EXPOSED TO INSTALL KES FURNISHED T&S BRASS MODEL#B-3950 DRAIN LEVERS FOR EACH 2-COMP. SINK-PREP 1 3 3 4 3 3 4 INHIBIT CLEANING. COMPARTMENT. 3-COMP. SINK-PREP 1 3 3 4 3 3 4 R. ALL EXPOSED DRAIN PIPES AND CONDENSATE DRAINS IN KITCHEN ARE COPPER O EXPANSION TANK: RHEEM-RUUD MODEL RRT-12 THERM-X-GUARD THERMAL EXPANSION TYPE"M"WITH WALL OR FLOOR SUPPORTS. TANK. MOUNT ON WALL NEAR WATER HEATER. SEE PLAN FOR EXACT LOCATION. REFER BAG-N-BOX 1 1 0 1 1 0 1 TO DETAIL ON SHEET P3.0. S. ALL FLOOR SINKS ARE TO BE PORCELAIN COATED CAST IRON WITH ALUMINUM Revisions ICE TEA DISPENSER 1 1 0 1 1 0 1 DEBRIS BASKETS AND 1/2 COVER GRATES, PASTA COOKERS TO BE PROVIDED OM BRONZE CIRCULATION PUMP: GRUNDFOS#ALPHA 15-55SF,WITH 6.3 GPM @ 6 FEET OF ISSUED FOR LANDLORD REVIEW WITH FULL GRATES. GC'S PLUMBING CONTRACTOR IS TO PROVIDE. HEAD, 115 VOLTS,45 WATTS,SINGLE PHASE, 3250 RPM. MOUNT PUMP NEAR WATER 0 1-21-2015 ECOLAB SYSTEM 4 VARIES VARIES 2 5 5 8 HEATERS IN AN ACCESSIBLE LOCATION. PUMP TO BE ON A TIMECLOCK, REFER TO T. GC'S PLUMBING CONTRACTOR TO PROVIDE ALL FAUCET(S)INCLUDING FAUCET ELECTRICAL FOR ADDITIONAL INFORMATION. ISSUED FOR PERMIT WATER CLOSET 2 3.5 0 3.5 7 0 7 �02-04-2015 FOR THE 3 COMPARTMENT SINK AND ALL OTHER SINKS. LAVATORY 2 .75 .75 1 1.5 1.5 2 N CLEANOUT TO GRADE: CO(TG)-1,J.R.SMITH#4250 GALVANIZED CAST IRON TOP, 2 ISSUED FOR CONSTRUCTION U. GC'S PLUMBING CONTRACTOR SHALL PROFESSIONALLY LABEL ALL WATER VANDAL-PROOF SCREWS, GALVANIZED BODY AND TOP;SEE DETAIL. 02-26-2015 URINAL 0 5 0 5 0 0 0 OUTLETS,VALVES, ELECTRICAL RECEPTACLES, LIGHT SWITCHES, HOT WATER SANITARY REVISIONS SWITCHES AND ALARM LIGHTS,THERMOSTATS AND SENSORS, GAS VALVES, A03-13-2015 JANITOR SINK 1 2.25 2.25 3 2.25 2.25 3 ELECTRICAL PANELS, ELECTRICAL BREAKERS,AND ALL ROOFTOP UNITS, ETC AS HOSE BIBB 0 2.5 0 2.5 0 0 0 DIRECTED BY THE NOODLES COMPANY CONSTRUCTION MANAGER. GAS SCHEDULE TOTAL FIXTURE UNIT COUNT(30 GPM) 42.25 24.75 53.5 V. GC'S PLUMBING CONTRACTOR IS REQUIRED TO"CAMERA"AND"JET"(WATER MARK CFH Q CLEAN)ALL DRAINS UNDERGROUND SEWER LINES, BOTH NEW AND EXISTING; 77 BASED ON 2011 OREGON PLUMBING SPECIALTY CODE THEY ARE TO BE HIGH PRESSURE JET CLEANED AND CAMERA AT THE END OF THE RTU-1 180 Q r PROJECT 24 HOURS PRIOR TO TURN OVER.THE GENERAL CONTRACTOR IS TO SUBMIT TO NOODLES&COMPANY A REPORT FROM THE SUBCONTRACTOR DOING RTU-2 180 Q THE WORK CERTIFYING THAT THE ABOVE WORK HAS BEEN COMPLETED. o M UA-1 269 00 W. GC'S PLUMBING CONTRACTOR SHALL COORDINATE ALL UTILITIES WORK WITH NOODLE AND COMPANY'S COORDINATOR. PROVIDE WORK FOR PLUMBING WATER HEATER 200 ��tD NgQF�c AND GAS SERVICES AS REQUIRED. FORWARD ALL UTILITY INFORMATION c9� 'GINE LID FOR TRANSFER OF SERVICE FROM LANDLORD TO NOODLE AND COOKLINE 535 N KITCHEN EQUIPMENT LIST & CONNECTION SCHEDULE COMPANY. TOTALLOAD 1,364 ����`� T QTY. DESCRIPTION HOT WATER COLD WATER MTG. HT. (AFF WASTE GAS LOAD MTG. HT. (AFF) X. GC'S PLUMBING CONTRACTOR WILL INSTALL A SOLID PVC COVER CAP OVER THE c i # ) QUICK DISCONNECT BACKFLOW PREVENTOR SODA CHASE AT THE BAG IN BOX ENDS OF THE SODA CHASE. GC'S PLUMBING OREGON Cl 212 1 BEVERAGE STATION 3/8"FW 2"TO FS WATTS#SD-3 BACKFLOW PREVENTER BY PC CONTRACTOR WILL DRILL A HOLE IN THE CAP LARGE ENOUGH FOR SODA LINES TOuj ^� BE INSTALLED AND CAULKED AROUND COKE LINES WRAP AFTER THEY HAVE BEENv� 2y��a�'�� Q 212A 1 BEVERAGE DISPENSER 3/8"FW 1"TO FS WATTS#SD-3 BACKFLOW PREVENTER BY PC INSTALLED. G. W_ 213 1 ICE TEA DISPENSER 1/4"FW +12" 2"TO FS WATTS#SD-3 BACKFLOW PREVENTER BY PC 218 1 ICE MACHINE 3/8"FW +80" 1"TO FS WATTS#SD-3 BACKFLOW PREVENTER BY PC Y. GC'S PLUMBING CONTRACTOR SHALL INCLUDE AND PROVIDE ALL GAS,GAS PIPING, El.pi ,4TION DATA AC O,2QLfo U L7 DEVICES, HOSES,WATER,WATER PIPING, ETC.ALL INCLUSIVE FOR ALL OWNER r) 220 2 PASTA COOKER(GAS) 1/2" +24" 1-1/4"TO FS 3/4" 80 +24" DORMONT 1675 48" PROVIDED BY KES SUPPLIED EQUIPMENT. Z Sign re Q 222 1 OPEN BURNERS 3/4" 135 +24" DORMONT 1675 48" 03/13/2015 Z. GC'S PLUMBING CONTRACTOR SHALL INCLUDE THE COST IN HIS BID TO USE 224 1 SOUP WARMERS 1"TO FD LANDLORD'S ROOFER(AND ANY OTHER LANDLORD DESIGNATED CONTRACTORS) Date 06/30/2016 Q 227A/227 2/1 BURNER RANGE(GAS) 3/4" 90/60 +24" DORMONT 1675 48" IF DIRECTED BY NOODLES&COMPANY CONSTRUCTION MANAGER. Expiration Date Z 231 1 HOT FOOD TABLE 1/2" 1"TO FS PROVIDED BY KES.AIR GAP AA. GC'S PLUMBING CONTRACTOR SHALL PROVIDE AND INSTALL A DEDUCT METER ON z 2751 DISHWASHER 3/4" +12" 2"TO FS ATMOSPHERIC VACUUM BREAKER INTEGRAL WITH DISHWASHER THE MAIN WATER SUPPLY TO THE SPACE IF REQUIRED BY LANDLORD. ENGINEER mHEREBY CERTIFY THAT THESE PLANS HAVE BEEN PRE- 2 286 1 WALK-IN COOLER 1"TO FD AB. GC'S PLUMBING CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIALS FOR PARED UNDER MY SUPERVISION AND THAT TO THE BEST 302 1 SAUTE TABLE DIPPER WELL 1/2" +18" 1"TO FS PROVIDED BY KES.AIR GAP ALL REQUIRED PLUMBING FOR NOODLES&COMPANY PROVIDED ICE MACHINE.ALL OF MY KNOWLEDGE,THE SAME COMPLY WITH ALL RULES, ROOF PENETRATIONS AND RE-ROOFING WORK FOR THE ICE MACHINE IS TO BE REGULATIONS AND ORDINANCES OF PORTLAND,OREGON al 342 1 DIRTY DISHTABLE 1/2" 1/2" +18" 2"@+18"AFF WATTS#N9 BACKFLOW PREVENTER BY PC AS REQUIRED BY LOCAL CODE FOR PRE-RINSE SPRAYER 342A. RELATING TO STRUCTURES AND BUILDINGS. PROVIDED BY GC'S PLUMBING CONTRACTOR. dl 350/352 2/1 HAND SINK 1/2" 1/2" +24" 2"@+18"AFF AC. GC'S PLUMBING CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIALS FOR 363 1 2-COMP SINK 1/2" 1/2" +14" 2"@+18"AFF ENGINEER w ALL REQUIRED PLUMBING FOR NOODLES&COMPANY PROVIDED WALK-IN COOLER. 364 1 3-COMP SINK 1/2" 1/2" +14" 2"@+18"AFF WATTS#009 BACKFLOW PREVENTER BY PC AS REQUIRED BY LOCAL CODE FOR CHEMICAL USE. ALL ROOF PENETRATIONS AND RE-ROOFING WORK FOR THE WALK-IN COOLER IS S PLUMBING CONTRACTOR. Drawn By Checked By 490 1 BAG-IN-BOX SYSTEM 1/2" 12"BELOW CLG. WATTS#SD-3 OR WATTS#SS009QT BACKFLOW PREVENTER BY PC AS REQUIRED BY LOCAL CODE. TO BE PROVIDED BY GC' CW SK 0 495 1 WATER SOFTNER 1 1/2" +72" WATTS#L7 BACKFLOW PREVENTER BY PC AD. ALL HOT AND COLD WATER LINES IN ENTIRE PREMISES SHALL BE INSULATED PER Scale Date 498 1 CLEANING SYSTEM 1/2" 1/2" +60" WATTS#009 RPZ BACKFLOW PREVENTER BY PC AS REQUIRED BY LOCAL CODE FOR CHEMICAL USE. PLANS AND SPECIFICATIONS AND/OR PER DIRECTION OF NOODLES&COMPANY rnl CONSTRUCTION MANAGER. 1/4" = V-0" 01-06-2015 499A&499B 1 EA. WATER FILTER 1/2" 12"BELOW CLG. WATTS#L7 BACKFLOW PREVENTER BY PC,VERIFY COKE MACHINE FILTER REQUIREMENTS WITH MANUFACTURER. Job No. 1.THIS SCHEDULE IS A PARTIAL LISTING OF THE EQUIPMENT SUPPLIED BY THE FOOD SERVICE EQUIPMENT CONTRACTOR(FSEC). REFER TO SPEC DRAWINGS FOR A COMPLETE LISTING OF EQUIPMENT,TYPES,SIZES,AND LOCATIONS. PLUMBING CONTRACTOR AE. PROVIDE FIRE STOPPING AT ALL OPENINGS. A ^ A (PC)TO PROVIDE NECESSARY ITEMS TO INSTALL FSEC EQUIPMENT(INCLUDING VALVES, UNIONS, FITTINGS, ETC.)TO MAKE COMPLETE SYSTEM.THIS LISTING DOES NOT SUPERCEDE THE FSEC DRAWINGS. 4 L I D rn 1 - 15 Sheet No. P2 . 0 INSULATION ON WATER PIPING IN PIPE UNIONS, DIELECTRIC IF KITCHEN SHALL BE WASHABLE TYPE REQUIRED FOR DISSIMILAR METALS 00 0 00 00 HOT WATER TO FIXTURES AS 4" PVC INTAKE PIPE, SHOWN ON PLANS c L �mw GAS PIPE FROM 3ACK OF BUILDING, REFER TO PLANS FOR COLD WATER SUPPLY �— PIPE HANGER ROUTED TO NOODLES SPACE, SIZEr\, CONTINUATION FULL PORT BALL SHUT-OFF TO WATER HEATER NEXT TO PIPE TEE ( ) AS SHOWN ON PLAN-USE BLACK VACUUM RELIEF VALVE VALVES TYP PIPE UNION: STEE'_PIPE ROOF ' `c 0 0 o c c �.0 BURNER THERMOSTAT AND DIELECTRIC IF c 0 r C c coo E KT'=RIOR V`/ALL COLD WATER SUPPLY PRESSURE REGULATOR FURNISHED DISSIMILAR METALS c c c c - 0 000 0 WITH WATER HEATER PRESSURE TEST COCK HOT WATER RETURN C��GAS SHUT OFF COCK WELDED STEEL PIPE INCREASER EXPANSION TANK WITH GAS METER-CFH GROUND JOINT UNION POLYPROPYLENE LINING CAPACITY SHOWN DIRT LEG ON PLANS u�6"LONG DIRT LEG BUTYL DIAPHRAGM STRAINER BURNERS/SAUTE/DIPPER WELL STRAILER— CULATI SIZED WITH AGA/CGA TEMPERATURE _RECIRON AIR CHARGING VALVE �,o-�T PUMP STEAM RATING 10%OVER HEATER FILL TANK WITH AIR + = BY GAS COMPANY INPUT PROVIDE A HARD COPPER PRESSURE TO MATCH RELIEF WATER PRESSURE, u BY PLUMBING FLOOR CHECK VALVE �� THEN OPEN VALVE CONTRACTOR EXPANSION TANK VALVE COPPER DISCHARGE LINE. CONNECTION FULL SIZE OF VALVE OUTLET TO END 00 O O O O O O V 2"VIN OVER WASTE RECEPTACLE WITH A 2 CONDITIONS.PIPING NMAKE PIPE SGEMENT AME SIZE AS WN IS ITANK FITTING. OL OW DJUST TO SUIT FIELD i f WALL CLEANOUT HANDHOLE PIPE DIAMETER AIR GAP. a- GRADE OR p MANUFACTURER'S INSTRUCTIONS FOR INSTALLATION PROCEDURE. VERIFY �.�.�+ PAVEMENT W DIPPER WELL GAS FIRED WATER PROVIDE PVC CONDENSATE PIPING PROPER OPERATION WHEN INSTALLED. 1 PER THE MANUFACTURER'S PRESSURE REGULATOR SET AT 2 PSI00-00 HEATER PER SPEC'S ® III ® DIRECTION O EXPANSION TANK INSTALLATION SHALL OCCUR ONLY WHEN THERE ISA SHUT-OFF VALVE FLOOR SINK FINISHED FLOOR BACKFLOW PREVENTION DEVICE INSTALLED WITHIN THE TENANT SPACE CLEANOUT DRAIN VALVE WATER SYSTEM OR BUILDING WATER SYSTEM. VERIFY REQUIREMENTS FOR METERING AND PIPING WITH GAS COMPANY. 11— PROVIDE 6"HIGH CONTRACTOR SHALL PAY ALL GAS COMPANY FEES FOR INSTALLATION. USE WELDED i^ O U CONCRETE BASE 3" PVC EXHAUST PIPE, REFER TO OR SCREWED PIPE AND FITTINGS PER PLUMBING SPECS. U) 19 PLANS FOR CONTINUATION ENDSCLEAO 0 O ENDS OF PIP IN----" REFER TO SPECIFICATIONS AND PLUMBING FIXTURE SCHEDULE. PIPING ARRANGEMENT SHOWN GAS SERVICE w SMALL EXPANSION TANK q" IS SCHEMATIC.ADJUST TO SUIT FIELD CONDITIONS. REFER TO FLOOR PLAN FOR PIPE SIZES. NOT TO SCALE NOT TO SCALE MAINTAIN AIR GAP TWICE PIPE DIAMETER.CUT SET WATER HEATER THERMOSTAT AT 140° FAHRENHEIT. PROVIDE SEISMIC STRAP OR BRACING VENT 7 Q END AT 45°ANGLE TO REDUCE SPLASHING. AND FLEXIBLE CONNECTORS TO WATER AND GAS CONNECTIONS IF/AS REQUIRED BY LOCAL 4" JAUTHORITIES. z 07 DIPPER WELL DETAIL 0- co U Q NOT TO SCALE O GAS WATER HEATER PVC FLUE NOT TO SCALE PRESSURE GAUGE MANUAL BYPASS VALVE O ui (NORMALLY CLOSED-AFTER O 1 1Y2"OUTLET w INSTALLATION) U W Q C SOFT WATER a C• 1Y2" INLET HARD WATER z Cy) G C) PROVIDE 18"X 18"X 12"DEEP ACCESS BOX WITH CLEANOUT BODY 1-1/4" MAINTAIN 48"MIN.CLEARANCE Q6 = N O Q POURED CONCRETE PAD AROUND AND PLUG, SEE DRAIN SCHEDULE 2 COMBUSTION AIR—/ ABOVE ROOF DECK&HIGHEST CLEANOUT ANTICIPATED SNOW LEVEL,EXTEND IU) Q " 0-)36"ABOVE PARAPET ELEVATION IF 1-1/4MANUAL OUTLET VALVE O ' i ' nn (n GRADE CONCRETE PAVING 1-1/4"MANUAL INLET VALVE WITH O 10'-0"OF PARAPET. W 3: � ��V _ 1-1/4" 1-1/4" PROVIDE ONE PIECE 8" MINIMUM J O Z I I� II d a a. a WALL LINE VENT STACK a THREE COMPARTMENT SINK FITTING UNION d a ESCUTCHEON FLASHING m n/ -ISI—ISI—ISI U) o CC LL BY PLUMBER CONT. O 00 G II—III—III a (N Q �• III a =-- a I= EQUIPMENT T 2"V IN WALL ---- I _________�_- BY SOFTENER SUPPLIER(FUTURE) O O J Q G - I � POSITION MVP CONTROLLER SCREEN TO BE ROOF z r- F— M I F I =I I I=I I I— I =III=� CLEANOUTS V _ ACCESSIBLE TO VIEW FOR MAINTENANCE - I III=III =III= III- IN ENDS OF 80 FROM FLOOR ---- ----- t PIPE WITH STAND ------ CLEANOUT NOTE: RISER PROVIDE THICKENED SLAB AT FLOOR I I I I I I ' o °o IN-LINE ARRANGEMENT SHOWN LINE SIZE BALL VALVE FLOOR I I I I 1 I U o ^ o 72" —� CLEANOUT FOR CONCRETE PAVED END-OF LINE SIMILAR EXCEPT WITH AREAS SINK 1 MEDIA 1 I MEDIA I I BRINE I %C y o LONG SWEEP 1/4 BEND FITTING — •_ QUICK CONNECT 4� 1 TANK I I TANK I I TANK i 'O co MAINTAIN AIR GAPI I I I I I H III —III_ III 1- QUICK CONNECTI y TWICE PIPE DIAMETER I I I I I I N o III=III—III III—III=III DIRT LEG AND AT LEAST A ONE I I I I I I i ' c a0 —I=III—III —III—III INCH AIR GAP I I I I I I } o rn FLEXIBLE CONNECTOR 1 I I 1 I I �" U � .o p q I 1 VENT ^ o V (0 E ARRANGEMENT SHOWN IS SCHEMATIC. ADJUST TO SUIT FIELD CONDITIONS OR I I I 1 I I > °' o = °��n —III— —III—III—III CASTER I I I I ER PIPE, FITTINGS I I 8"HIGH STAND co+-•- c �p x y -III—III I I I J I I=I I —III RESTRAIING CABLE AND CONNECTORS OR SI NK CONNECTIONS.ALREMENTS. UTILIZE L EXPOSED PE DWV PPE SHALL BE TYPE a o.c °° V1 0��c ill I ol III= I DWV COPPER. COMBUSTION AIR s COMBINATION'Y'AND 1/8 BE —i —III FLOOR LINE .""` i o H a o QC-4o- 0-.00 STAND FITTING THREE COMPARTMENT SINK DETAIL 8"HIGH STAND oo U WATER SOFTENER �`'�c3 TYPICAL FOOD EQUIPMENT G NOT c TYPICAL CLEANOUT TO GRADE DETAIL QU GAS CONNECTION DETAIL 04. WATER HEATER CONCENTRIC FLUE VENT W �3 NT ®81 NOT TO SCALE NOT TO SCALE 12 S 0 2 NOT TO SCALE o Revisions ISSUED FOR LANDLORD REVIEW 01-21-2015 ISSUED FOR PERMIT 02-04-2015 222 Q ISSUED FOR CONSTRUCTION 2 PSI GAS FROM GAS METER.SEE 02-26-2015 /—SHEET P1.1 AND GAS SERVICE DETAILSANITARY REVISIONS ON THIS SHEET FOR MORE �03-13-2015 INFORMATION 227 Q 90° BEND DIRECTLY OUT OF oSOUP WELL&RUN DRAIN Q 227A 1"(135) LINE DIRECTLY BACK TO LR oREAR SOUP WELLS Q 3/4"(60) LO RTU-2 180 CFH 227A 1"(195) HORIZONTAL 90° BEND TO 3/4"(180) ROOF 1--(90) RUN TOWARDS FRONT OF PROVIDE PRESSURE REGULATOR COUNTER c� VALVE, INLET PRESSURE 2 PSI, 90° BEND DIRECTLY OUT r ,op� ( � J OF SOUP WELL r. PROUTLET PRESSURE 7"W.C.,TOTAL GAS 1-1/4"(285) 90° BEND STRAIGHT DOWN '<�' �R3ii,i; Q LOAD IS 180 CFH. FIELD VERIFY EXACT 220 �� <_;•, W LOCATION. O 1„(90) 65+ c� 1-1/4"(1,364) 220 INSTALL BALL VALVE L p 1-1/4"(375) VERTICALLY Q 1"(629) q 1 1/2"(535) 3/4"(80) TEE DRAIN DIRECTLY ✓ 4r= a�9 " Q ( ) 1 1/2"(455) OUT OF SOUP WELL W 3/4"(180) 1 735 PROVIDE MAXITROL VENT LIMITER 3/4"(80) \_90' BEND STRAIGHT BACKCD ��---�- PRESSURE REGULATOR VALVE, INLET EXPIRATION DATA r E.10.201(b p PRESSURE 2 PSI, OUTLET PRESSURE PROVIDE MAXITROL VENT LIMITER 7"W.C.,TOTAL GAS LOAD IS 200 CFH. ry 3/4"(180) RTU-1 PRESSURE REGULATOR VALVE, INLET FIELD VERIFY EXACT LOCATION. DRAIN LINE TO RUN BEHIND 90° BEND STRAIGHT DOWN Se � 180 CFH ignPRESSURE 2 PSI, OUTLET PRESSURE UNDERSHELVES DOWN 03/13/2015 � 1"(629) 7"W.C.,TOTAL GAS LOAD IS 200 CFH. BELOW COUNTER BASE Date 0 3/4"(180) FIELD VERIFY EXACT LOCATION. 06/30/2016 U) 3/4"(200) 1"(200) Expiration Date--- CD 3/4"(449) Z m vENGINEER 75 MUA-1 DRAIN LINE TO DOWN BELOW I HEREBY CERTIFY THAT THESE PLANS HAVE BEEN PRE- 269 CFH NOTE: COUNTER BASE TO HUB DRAIN PARED UNDER MY SUPERVISION AND THAT TO THE BEST PROVIDE PRESSURE REGULATOR� VALVE, INLET PRESSURE 2 PSI, PITCH ALL DRAIN LINE @ OF MY KNOWLEDGE,THE SAME COMPLY WITH ALL RULES, oI OUTLET PRESSURE 7"W.C.,TOTAL GAS 3/4"(269) 1/4"FOR EVERY 1"FOR REGULATIONS AND ORDINANCES OF PORTLAND,OREGON RELATING TO STRUCTURES AND BUILDINGS. � C`') LOAD IS 180 CFH. FIELD VERIFY EXACT ADEQUATE DRAINAGE ( )I LOCATION. 1" 269 HWH-1 p 200 CFH ENGINEER PROVIDE PRESSURE REGULATOR 10 SOUP WELL DRAIN DETAIL Drawn By Checked By � VALVE, INLET PRESSURE 2 PSI, NTS o OUTLET PRESSURE 7"W.C.,TOTAL GAS CW SK m LOAD IS 269 CFH. FIELD VERIFY EXACT a_I LOCATION. Scale Date rn 1/4" = 1'-0" 01-06-2015 PLUMBING RISER-GAS Job No. 11 0 NTS 14-2115 rn Sheet No. P3 . 0 363 K1 1-1/4"(14.5 WSFU) /a \ 1"(15.5 WSFU) PIPING NOTE BACKFLOW PREVENTER,TYPE AS APPROVED BY LOCAL ' \ / \ / \ \� ALL WATER HAMMER ARRESTORS ARE PDI SIZE'A' COKE MACHINE REQUIREMENTS(TYPICAL) 1"(13 WSFU)UNLESS NOTED OTHERWISE. BOOSTER PUMP 218 y4"497 PRESSURE REDUCING VALVE NOTE / FILTER FOR FREESTYLE 490 COKE MACHINE.PIPING 3/4"CWS WITH SHUT-OFF 3 RISER DIAGRAMS SHOWN HERE IS FOR REFERENCE ONLY.ALL PIPING FITTINGS, ROUTED IN CONDUIT 1-1/4"(17.5 WSFU) / VALVE AND CAPPED FOR FUTURE USE. COORDINATE BOOSTER CONNECTIONS, ETC.SHALL BE INSTALLED IN ACCORDANCE WITH LOCAL CODES. PUMP CONNECTION. '49)'9A 1-1/4"(21.5 WSFU) �� 00D 1-1/4"(31 WSFU) ' / 1-1/2" 3 4.. 4998 1-1/4"(24.5 Yz WSFU) /'" ' \ % /._1001 IF K /\\ ' \ 3/4"(5 WSFU) 350 220 %a" ' 3/4"\ (6.5 WSFU)3/4"(4 WSFU) \ 220 � � / 1 (6.5 WSFU) 3/4"CWS WITH SHUT-OFF ' / \. oo C \� VALVE AND CAPPED FOR 1-1/2" FUTURE USE. W S / \ \ ,� S.� 302 Via" /•" n/ •,tib��S�� �,� Rs \. 11��L.. \\ y„ .� o XF M 3 „ \ U) O K2 / \ /a \ 342 0/ 231 496A � \, W 1-1/4"(24.75 WSFU) \\ /„ / \ 1/2"(.75 WSFU) \• j � 1-1/2"(34.25 WSFU) Y \, K F 4 Q BALANCING 498 \ 352 / / VALVE 0 U) 3/a 496B F K / \" /` z U 350 1 4,. // C O �y 364 K8 / O � 1 " / W D UzM 04 0 BALANCING = N 495 VALVE C/) r--Q V W SEE WATER \ J O z SOFTENER DETAIL \ U) n m Q 2" .i O O /a C F o w.o v cCO o 2" `\> CD 220 E 4" 4" VTR A °o=_�- rn 2.. `. .' I I u o . to OE0 y 0° V rn(00 I 4- c ° um (D o CX ao `f0 m i �t N 1 .f III``� �'�`�\,��'� �.c�\i���'`/ `• -� jIIiI ``iII `�``/���.�\ /' `i'��'' '%I1/e'' � 311 211 Qo 000w,3 2"—\ 4u 3275 E13„ 2"FFCO 211 PLUMBING RISERWATEF � 302 E2 ” 220 E 02 333 NTS / �` '� '' .'� � ' j 2 \\—FORI ~ 218 E2 �'� Y„ DISPENSING .'y '' I 1 ' MACHINE 4" i'� i'� moi' ' 342 D1 \ `�� ���` \ 4" \ ��' / I I I D I \`�� BACKFLOW PREVENTER, 3 2„ / `� ' /1 I TYPE AS APPROVED BY `�`.�`` 3�� \ \� 350 FFCOJ \\� �\ / 4" / I 3" /� i \ �` LOCAL REQUIREMENTS \ I / I �.'I 2 Revisions 2 WCO �' ISSUED FOR LANDLORD REVIEW 4 2 I 2" I SEE DETAIL ON SHEET P3.0 0 01-21-2015 FFCO 2„ 3" CV QISSUED FOR PERMIT 02-04-2015 I� � ISSUED FOR CONSTRUCTION I 2 211 i 1-1/2" 02-26-2015 „ 1 i �� 1 \ 21' i i FFCO � � ��` ' 1 I I SANITARY REVISIONS .� 3 I 2 1 I I 4" / �`�� ��'� .^�� 0 03-13-2015 �% I 1 1 I ` � 364 `• 2"� 1 1 495 E2 G 4 I Q \ \ ` ' I I ' 4" �� 4" I 3" 1 r211 N `�` I D 3�� �� 350 � -,ED PRO F 3" \ \ / Ez 231 WCO \S��c�GIN �`.`` 4" I I Q 65122PE LO i'� �`� 2" \ `� I �`� 2" i' I 0001-1 r211 LO 211 �1-1/2" .1� .¢ Q 1-1/2 4" ���`� 4„ I /�i'I EXPIRATION DiiF' J tic? ,2090I 11 I FFCO U \ �> / E2 224 4" of W �' / 352 \`� �' I 03/13/2015 2.. moi' Date Q ��i' / WCO i' `•C' I 06/30/2016 �' I FFCO ```� Expiration Date on \ \ I N m I ENGINEER / f i'' 1 \J 2 \ 4" moi' 1 1 HEREBY CERTIFY THAT THESE PLANS HAVE BEEN PRE- Z) I \ „ I A �i WCO PARED UNDER MY SUPERVISION AND THAT TO THE BEST d \ / 4 FFCO �' OF MY KNOWLEDGE,THE SAME COMPLY WITH ALL RULES, ,.- REGULATIONS AND ORDINANCES OF PORTLAND,OREGON / I i i 2„ RELATING TO STRUCTURES AND BUILDINGS. N PLUMBING RISER-SANITARY i . ' D I 211 0) 01 NTS ENGINEER 0 3 / Drawn By Checked By 2 I ' CW SK CY) 4" I m PLUMBING CONTRACTOR TO 3�� 1-1/2" Scale Date PROVIDE MINIMUM 1,250 PIPING SLOPE NOTE 4„ ASSHOWN 01-06-2015 GALLON GREASE I Job No. I INTERCEPTOR. OLDCASTLE ALL SANITARY PIPING 2"AND SMALLER SHALL BE INSTALLED WITH A SLOPE OF Ya"PER 3„ \ I 2" 212 c 14-2115 ORCY) APPROVED EQUAL. FOOT.ALL OTHER PIPING LARGER THAN 2"SHALL BE PIPED AT A SLOPE OF Ya"PER WCO rn FOOT. PROVIDE PROPER SLOPE FOR VENT PIPING TO DRAIN BACK TO DRAINAGE •� SYSTEM TO DRAIN ANY ACCUMULATIVE MOISTURE. E2 212A Sheet No. 2 213 P3 . 1