Loading...
Plans (2) MEC2016 - 00225 �S7(' p!"AR 3 0 2016 C,try OV TrGARD BU I LjyjNG I)IVI SION 1 2 3 4 5 6 7 8 9 10 MECHANICAL GENERAL NOTES: 1. PRIOR TO SUBMITTING BID, VISIT THE JOB SITE AND BECOME FULLY ACQUAINTED E WITH THE EXISTING CONDITIONS OF THE PROJECT. REVIEW THE GENERAL NOTES, O 1 SPECIFICATIONS AND OTHER DRAWINGS FOR ADDITIONAL REQUIREMENTS WHICH MAY O N NOT BE SPECIFICALLY CALLED OUT IN THIS PORTION OF THE CONSTRUCTION :3 - O cD ' DOCUMENTS. NOTIFY ARCHITECT, ENGINEER AND/OR OWNER OF CONFLICTS OR W c O O L m DISCREPANCIES PRIOR TO SUBMISSION OF BID. (3 €D O co ' o > Q co I` .L 2. EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND SITE VISITS AND on: Q 3: co co F MAY NOT REFLECT EXACT "AS-BUILT" CONDITIONS. FIELD VERIFY EXISTING �W o 00 '. ' c CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. COORDINATE NEW WORK AND DEMOLITION WITH OTHER DISCIPLINES AND EXISTING CONDITIONS PRIOR TO mJ co N m m CONSTRUCTION. W O co W �3 x "' 00 1 3. COORDINATE THE INSTALLATION OF THE MECHANICAL SYSTEMS WITH OTHER TRADES Z W W a) N N 3 z 2 320 ( Z) TO ENSURE A NEAT AND ORDERLY INSTALLATION. INSTALL DUCTWORK AND PIPING ; m7 N (o co f„ u. 3 AS TIGHT TO STRUCTURE AS POSSIBLE, COORDINATE WITH OTHER TRADES TO AVOID O CONFLICTS. COORDINATE INSTALLATION OF DUCTWORK AND PIPING TO AVOID CONFLICTS WITH ELECTRICAL PANELS, LIGHTING FIXTURES, ETC. ANY MODIFICATIONS l 12X70(E REQUIRED DUE TO LACK OF COORDINATION WILL BE THE RESPONSIBILITY OF THE w CONTRACTOR AT NO EXTRA COST TO THE OWNER. 8"0 4. AVOID DAMAGING EXISTING SURFACES AND EQUIPMENT TO REMAIN FOR NEW -- - - 9 WH-1 20 INSTALLATION DURING WORK. REPAIR DAMAGE CAUSED DURING CONSTRUCTION AT L NO EXTRA COST TO THE OWNER. HENDERSON i4LA11 LCFM 5. ALL MECHANICAL EQUIPMENT SHOWN ON THE MECHANICAL PLANS SHALL BE F97JENGINEERSK PROVIDED BY THE MECHANICAL CONTRACTOR UNLESS OTHERWISE NOTED. I i 1 6. NEW MECHANICAL EQUIPMENT, DUCTWORK AND PIPING ARE SHOWN AT 8345LEN0NDWSURE 300 APPROXIMATE LOCATIONS. FIELD MEASURE FINAL DUCTWORK AND PIPING �IAKS66214 8 -- rL 913 7415000 Fax 913 742 5001 LOCATIONS PRIOR TO FABRICATION AND MAKE ADJUSTMENTS AS REQUIRED TO FIT f, 1 .com THE DUCTWORK AND PIPING WITHIN THE AVAILABLE SPACE. VERIFY THAT FINAL www.bal-ong.com EQUIPMENT LOCATIONS MEET MANUFACTURER'S RECOMMENDATIONS REGARDING 165000MI1 E f 8"0 VAV-1 I SERVICE CLEARANCE AND PROPER AIRFLOW CLEARANCE AROUND EQUIPMENT. ( L'"J�. 1-1 7. REFER TO ARCHITECTURAL DRAWINGS FOR RELATED CONSTRUCTION DETAILS AS fi Z50 2 Ir,€ ____ _ OO APPLICABLE TO THE HVAC SYSTEM. VERIFY CHASES AND PENETRATIONS SHOWN ON (TYP.) a -20 VAV-2 T ARCHITECTURAL DRAWINGS THAT ARE INTENDED FOR DUCTWORK AND PIPING MEET REQUIREMENTS. �,,-;J_j Ff,�_�,-T r�,��its r�,��e,l rr�7,I rrT7�i rr���I rr,�,-E r �,-1 I-r��,-1 rr�f,-1 r,i,-1 rr��,-I I�,�,-T SD-1 8. INSTALL DUCTWORK AND PIPING PARALLEL TO BUILDING COLUMN LINES UNLESS 3 I -j L=___J L_==1 L.=-� L=_�L__J L__1 L-'-1 L _,1 -J L�-� L -�L�-J L6 ---;,€ 250 I OTHERWISE SHOWN OR NOTED. 8"0 r , , ,�, I SD-1 �sl r 1 f,� 250 8"� ��1 �,A� x 9. OVERHEAD HANGERS AND SUPPORTS FOR EQUIPMENT, DUCTWORK AND PIPING SHALL B"0 SD-1 ' ----" LC`y f` N 1 BE FASTENED TO BUILDING JOISTS OR BEAMS. 00 NOT ATTACH HANGERS AND 1 I 1 1 SD-1 250 © i E SUPPORTS TO THE ABOVE FLOOR SLAB OR ROOF. 250 ---------- - - ------------------------- €�€ I i r r----------- � I r,! ;--------------------------------j L. € 10. COORDINATE LOCATION OF EQUIPMENT SUPPORTS WITH LOCATION OF EQUIPMENT l i O -- - j I ACCESS PANELS/DOORS TO ENABLE SERVICE OF EQUIPMENT AND/OR FILTER 1 E ! ----------------------------I I L`'LJ €Q,1 r^t'T 18X14 E i i -- QX-L _-- ! € 14 E "m I REPLACEMENT. 10X10E) 14X10(E) - 14X12(E7L_ L__ O I t r,-,�,p� �n n rr?r?n� € 11. SEAL PENETRATIONS THROUGH THE BUILDING COMPONENTS IN ACCORDANCE WITH I Ir THE CONTRACT SPECIFICATIONS. FIREPROOF PENETRATIONS THROUGH FIRE RATED -----------------€ r� r i € i i i COMPONENTS IN ACCORDANCE WITH U.L. REQUIREMENTS. I I E € I r E i Ir,1 I ,t I ni I i t 6 i ( i i i•'I is 1 € I ------------------- -I E E I r,1 €r_,I L'J i I € t 12. COORDINATE THE EXACT MOUNTING SIZE AND FRAME TYPE OF DIFFUSERS, REGISTERS 1 € 1 I € f € 1 4 I I I LJ L_f, I I I 1 € E I 1 € i t AND GRILLES WITH THE SUPPLIER TO MEET THE CEILING, WALL AND DUCT € € r? t t € I rrs r.n-I rr,6,7, 1 rr, } ,� rf,r�n1 t 1 I I D I O I 101 t I I L==- L-=J L J L _J t c-i I INSTALLATION REQUIREMENTS. - - - - - D 1 1 I i I fr�i Ir�4 € I I { i!.i IC,�i i € I I r �•i If I I--t-E ACFM' Wr,1Ir, t t13. ADJUST LOCATION OF CEILING DIFFUSERS, REGISTERS AND GRILLES AS REQUIRED TOLJ L € € I ! 8"0 ISD-1 6 I i i i - ACCOMMODATE FINAL CEILING GRID AND LIGHTING LOCATIONS. 255i .f 14. LOCATE AND SET THERMOSTATS AT LOCATIONS SHOWN ON PLANS. VERIFY EXACT FeICI rI LOCATIONS WITH ARCHITECT PRIOR TO INSTALLATION. INSTALL DEVICES 48" AFF TO 08"0 11rr� t!.1 fr�E I i ,DI ir,ii n i i t L4 y € t 1 r�€ r,tQ, I , I'1 _i_� f� MEET ADA REQUIREMENTS UNLESS NOTED OTHERWISE ON PLANS. INSTALL WIRING INSD-1 rn € i r, r - IM, _- CONDUIT PROVIDED BY DMSION 26. Z<255 I I LJ L=t LJ L_i 1 1 I I i i W o _-___ _-_ _-_ 15. COORDINATE THE LOCATION AND ELEVATION OF WALL-MOUNTED DEVICES WITH ��- -----__ 1fI_-(_,l €-n_r_,r_,-E rf,r,r,-1 I i r-I or----I r- 1 € , I € L� JLi L -j < € PRESENTATION BOARDS. DISPLAY CABINETS, SHELVES OR OTHER COMPONENTS aXl- yrJ8"0 1 L__ __ J I 8"� Ir,€ SHOWN ON THE ARCHITECTURAL DRAWINGS THAT ARE TO BE INSTALLED UNDER r�SD-1 SD-1 fro, I L---------------r----_--_-_----------------_---J i r,E8"0 OTHER DMSIONS. CONTRACTOR WILL NOT 13E REIMBURSED FOR RELOCATION OF€ _r,n r,n r, i €n1 250 1n1 E I I L_1 Ja L '_J L_._� € 250 I SD-1 WALL-MOUNTED DEVICES CAUSED ETY A LACK OF COORDINATION. RL-----------------------------------InI 1r,I 1 -- ---------� 150 ------------------------------1 16. PROVIDE A MANUAL BALANCING DAMPER IN EACH BRANCH DUCT TAKEOFF FROM i i i i i ii MAIN SUPPLY, RETURN, OUTDOOR AND EXHAUST AUR DUCTS AS SHOWN ON PLANS. a C L_____________________________ f rrt rn r,� € ❑ ❑ i j rrj r,� rrt r,� j € 17. PROVIDE A PREFABRICATED 45 DEGREE, HIGH EFFICIENCY, RECTANGULAR/ROUND W 1 r a L=-� L=.J € 1 i I L_=J L".J BRANCH DUCT TAKEOFF FITTING WITH MANUAL BALANCING DAMPER AND LOCKING QUADRANT FOR BRANCH DUCT CONNECTIONS AND TAKE-OFFS TO INDIVIDUAL A DIFFUSERS, REGISTERS AND GRILLES. a G `,`, D �$ $l? D I,L $$ 18. BRANCH DUCTWORK TO AIR OUTLETS SHALL BE SAME SIZE AS OUTLET NECK SIZE V j ---- -- ---- ---- -- ---- UNLESS OTHERWISE NOTED. 19. CONTRACTOR SHALL FIELD VERIFY THAT THE EXISTING EQUIPMENT INCLUDING W ACCESSORIES IS NOT DAMAGED AND IS IN GOOD WORKING ORDER. REPORT ANY 12 DEFICIENCIES TO THE OWNER OR ARCHITECT. CONTRACTOR SHALL SUBMIT TO THE OWNER AND ARCHITECT A WRITTEN REPORT DESCRIBING TESTS PERFORMED TO W Z cr) VERIFY OPERATION AND RESULTS OF THE TESTS. J Q O N o 1 E 20. INDOOR AIR QUALITY MEASURES: PROTECT INSIDE OF (INSTALLED AND DELIVERED) W (- 04 DUCTWORK AND HVAC UNITS FROM EXPOSURE TO DUST, DIRT, PAINT AND MOISTURE. 3 wt (70 ~ fO REPLACE INSULATION THAT HAS GOTTEN WET AT ANY TIME DURING CONSTRUCTION, V ZQ N DRYING THE INSULATION IS NOT ACCEPTABLE. SEAL ANY TEARS OR JOINTS OF Lo INTERNAL FIBERGLASS INSULATION. REMOVE DEBRIS FROM CEILING/RETURN AIR W -O O rn PLENUM INCLUDING DUST. AN INDEPENDENT, PROFESSIONAL 7 .ZJ Mw = O MECHANICAL FLOOR PLAN 21. AN INDEPENDENT, PROFESSIONAL DUCT CLEANING COMPANY SHALL VACUUM CLEAN W OJ QW W - o 1 / ANY DUCTWORK CONNECTED TO HVAC UNITS AFTER NEW FILTERS ARE INSTALLED AND 1 SCALE: 1/4"=V-0" PRIOR TO TURNING SYSTEM OVER TO THE OWNER. THE INTERNAL SURFACES AND C7 ASSOCIATED COILS OF ANY HVAC UNITS SHALL ALSO BE CLEANED. 0 COE Q Q Z PLAN NOTES: MECHANICAL GENERAL DEMOLITION NOTES: - �� C- J 0 O1 REMOVE EXISTING VAV UNIT AND PROVIDE NEW VAV-1. CONNECT NEW VAV-1 TO 1. PRIOR TO SUBMITTING BID, VISIT THE JOB SITE AND BECOME FULLY ACQUAINTED 19 Z �� W EXISTING 20X16 SUPPLY DUCTWORK AND 14"0 SUPPLY INLET DUCT. HANG VAV WITH THE EXISTING CONDITIONS OF THE PROJECT. REVIEW GENERAL NOTES, m Lo 0� O B UNIT FROM STRUCTURE PER LANDLORDS REQUIREMENTS. REBALANCE UNIT TO SPECIFICATIONS AND OTHER DRAWINGS FOR ADDITIONAL REQUIREMENTS THAT MAY AIRFLOW INDICATED ON SCHEDULE_ FIELD VERIFY EXISTING LOCATION AND NOT BE SPECIFICALLY CALLED OUT IN THIS PORTION OF THE CONSTRUCTION cc) O EL CONDITIONS PRIOR TO SUBMITTING BID. DOCUMENTS. NOTIFY ARCHITECT, ENGINEER OR OWNER, AS DEFINED IN BID Z d O2 REMOVE EXISTING VAV UNIT AND PROVIDE NEW VAV-2. CONNECT NEW VAV-2 TO DOCUMENTS, OF CONFLICTS OR DISCREPANCIES PRIOR TO SUBMISSION OF BID. W a I EXISTING 12X10 SUPPLY DUCTWORK AND 8"0 SUPPLY INLET DUCT. HANG VAV 2. EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND SITE VISITS AND m 3 UNIT FROM STRUCTURE PER LANDLORDS REQUIREMENTS. REBALANCE UNIT TO s MAY NOT REFLECT EXACT "AS-BUILT" CONDITIONS. FIELD VERIFY EXISTING o AIRFLOW INDICATED ON SCHEDULE. FIELD VERIFY EXISTING LOCATION AND CONDITIONS PRIOR TO SUBMITTING FINAL BIDS_ COORDINATE NEW WORK AND I 9 CONDITIONS PRIOR TO SUBMITTING BID. DEMOLITION WITH OTHER DISCIPLINES AND EXISTING CONDITIONS PRIOR TO 1 CONSTRUCTION. ISSUED/REVISED DATE a O3 PROVIDE NEW THERMOSTAT FOR VAV-1. COORDINATE MALL EMS REQUIREMENTS PERMIT SET 02.08.16 WITH LANDLORD PRIOR TO SUBMITTING BID. 3. OWNER RETAINS RIGHTS OF SALVAGE FOR EQUIPMENT AND FIXTURES TO BE BID SET 02.12.16 REMOVED. COORDINATE WITH OWNER THE EQUIPMENT AND FIXTURES TO BE PERMIT RESUBMIT 02.25.16 y O4 PROVIDE NEW THERMOSTAT FOR VAV-2_ COORDINATE MALL EMS REQUIREMENTS SALVAGED AND THE LOCATION FOR STORAGE. AVOID DAMAGE TO SALVAGED a WITH LANDLORD PRIOR TO SUBMITTING BID. EQUIPMENT, FIXTURES AND DEVICES DURING DEMOLITION WORK AND DURING PERMIT REVISION& 03.02.16 a TRANSPORT TO OWNER'S DESIGNATED STORAGE LOCATION. CONSTRUCTION SET c OS REMOVE, CLEAN AND REINSTALL EXISTING DIFFUSER INTO NEW CEILING GRID. FIELD VERIFY EXISTING CONDITIONS PRIOR TO SUBMITTING BID. 4. AVOID DAMAGING EXISTING SURFACES AND EQUIPMENT TO REMAIN FOR NEW © REMOVE EXISTING DIFFUSER AND ASSOCIATED DUCTWORK. INSTALLATION. REPAIR DAMAGE CAUSED DURING WORK AT NO EXTRA COST TO THE OWNER. O7 REMOVE EXISTING DIFFUSER AND REPLACE WITH NEW DIFFUSER. ASSOCIATED 5. SEAL PENETRATIONS THROUGH FLOORS, WALLS, CEILINGS AND ROOFS WHERE DUCTWORK IS EXISTING TO REMAIN. MANUAL BALANCE DAMPER SHALL BE INSTALLED MECHANICAL COMPONENTS ARE REMOVED AND WHERE THE EXISTING PENETRATION m IN BRANCH DUCT AND SHALL BE ACCESSIBLE BY LIFTING OUT SUPPLY DIFFUSER. IS NOT USED FOR THE NEW INSTALLATION. REPAIR DAMAGED SURFACES TO MATCH m A PROVIDE VOLUME DAMPER HANDLES WITH 12" IN LENGTH COLORED RIBBON FOR EASY IDENTIFICATION. FIELD VERIFY EXISTING CONDITIONS PRIOR TO SUBMITTING BID. ADJACENT AREAS OR AS INDICATED ON THE ARCHITECTURAL DRAWINGS. ® ALL PLUMBING FIXTURES IN RESTROOM ARE EXISTING TO REMAIN. THOROUGHLY 6. INSTALL PERMANENT CAPS WHERE DUCTWORK AND PIPING IS REMOVED AND THE INSPECT PLUMBING FIXTURES AND ACCESSORIES PRIOR TO BID. REPAIR OR REPLACE EXISTING TAPS ARE NOT USED FOR THE NEW INSTALLATION. WHERE DUCTWORK AND a ANY DAMAGED OR NON FUNCTIONAL ITEMS. CLEAN FIXTURE TO LIKE NEW CONDITION PIPING ARE REMOVED AND THE EXISTING TAPS WILL BE USED FOR THE NEW� INSTALLATION. INSTALL TEMPORARY CAPS TO PROTECT THE INTERIOR SURFACES REMOVE EXISTING WATER HEATER AND PROVIDE NEW WH-1. RECONNECT EXISTING UNTIL NEW DUCTWORK AND PIPING ARE INSTALLED. MECHANICAFLOOR PLAN w HOT AND COLA WATER PIPE TO NEW WH-1. FIELD VERIFY EXISTING CONDITIONS PRIOR 7. INSPECT EXISTING EQUIPMENT TO REMAIN TO VERIFY THAT EQUIPMENT IS E TO SUBMfTTING BID. OPERATING PROPERLY. NOTIFY OWNER OF DAMAGED AND/OR MALFUNCTIONING 2 J COMPONENTS. M-101 e �a I L. ....._. ...... ... - ......._. - -- ............ - - - -- -- - --- -._.. ............ Ii !! 1 2 3 4 5 6 7 8 9 10 I E MECHANICAL SYMBOLS GRILLE, REGISTER AND DIFFUSER SCHEDULE W : o CD (, NOTE. THIS IS A MASTER LEGEND AND NOT ALL SYMBOLS, ETC. ARE MARK MANUFACTURER MODEL FACE MOUNTING FACE SIZE MAX. PRESS. NOTES D NECESSARILY USED ON THE DRAWINGS. TYPE LOCATION IN DROP IN. W.C.) Q Q ao r HVAC EQUIPMENT do DUCTWORK ABBREVIATIONS o F SD-1 TITUS OMNI PLAQUE CEILING 24 x 24 0.1 A, B, C. D. E. F. G �J o _ NOTE: ALL DUCT DIMENSIONS SHOWN ON DRAWINGS ARE INSIDE DIMENSIONS. AFF ABOVE FINISHED FLOOR MC MECHANICAL CONTRACTOR mW M N SEE SECTION 15250 OF THE SPECIFICATION FOR DUCTWORK TO BAS BUILDING AUTOMATION SYSTEM MIN MINIMUM NOTES: W zTj ... co co o O RECEIVE INSULATION OR LINER. BD BACKDRAFT DAMPER NC NOISE CRITERIA CFM CUBIC FEET PER MINUTE OA OUTSIDE AIR A. NECK SIZE SHOWN ON DRAWINGS. z W W rn m aa)) N (V 3 EXISTING DUCTWORK OR EQUIPMENT TO REMAIN DDC DIRECT DIGITAL CONTROL RA RETURN AIR B. 4-WAY THROW PATTERN UNLESS OTHERWISE SHOWN ON DRAWINGS. p m-2 N � U F IL 3 - EXISTING DUCTWORK OR EQUIPMENT TO BE REMOVED DX DIRECT EXPANSION SA SUPPLY AIR C. BRANCH DUCT SIZE SHALL BE SAME AS NECK SIZE UNLESS OTHERWISE SHOWN ON DRAWINGS. EA EXHAUST AIR SD SMOKE DUCT DETECTOR FFA FROM FLOOR ABOVE TFA TO FLOOR ABOVE D. BAKED ENAMEL FINISH, WHITE TO MATCH CEILING COLOR. BRANCH DUCT WITH 45' RECTANGLE-ROUND BRANCH FFe FROM FLOOR BELOW TFB TO FLOOR BELOW E. PROVIDE NECK FOR DUCT CONNECTION. FITTING AND MANUAL VOLUME DAMPER GPM GALLONS PER MINUTE TYP TYPICAL F_ FRAME TYPE TO MATCH CEILING CONSTRUCTION, COORDINATE WITH ARCHITECTURAL REFLECTED CEILING PLAN. ELBOW WITH TURNING VANES IN WC INCHESOFWATER COLUMN NNN UNLESS NOTED OTHERWISE G. PROVIDE TITUS "TRM" RAPID MOUNT FRAME TO CREATE LAY-IN APPLICATION WHEN INSTALLED IN A HARD CEILING. MAXIMUMMAX MBH 1000 BIL PER HOUR W/O WITHOUTrZiElffilliffEltSK HEIIDERS(M RETURN, EXHAUST, OR OUTSIDE AIR DUCT UP STANDARD MOUNTING HEIGHTS FAN-POWERED VARIABLE AIR VOLUME TERMINAL SCHEDULE (ELECTRIC HEAT) RETURN, EXHAUST, OR OUTSIDE AIR DUCT DOWN MECHANICAL (AFT,AFG, UNLESS NOTED OTHERWISE) MARK ZONE MANUFACTURER MODEL PRIMARY MIN PRIM HEATING COIL FAN SOUND POWER NOTES 8345 LENEXA DRIVE,SUTfE 300 LENEXA,R5 SUPPLY AIR DUCT UP THERMOSTATS (USER ADJUSTABLE) 48" SERVED CFM CFM kW V/PH STAGES CFM HP VPH RADIATED DISCHARGE TEL 913742 5005000 Faxx 91 9137415001 CONTROLS (CENTERUNE) 48" VAV-1 SALES TRNE VCEF-1406 2515 230 14 208/3 12 2285 1/2 208/1 47 31 A - K W w.haT-sey.com L: SUPPLY AIR DUCT DOWN VAV-2 BACK TRNE VCEF-0802 685 200 4.5 208/3 2 485 1/8 115/1 - - A - J 1650000011 E ANNOTATION EQUIPMENT WITH FLEXIBLE DUCT CONNECTION OMODEL NUMBERS SHALL NOT BE CONSIDERED COMPLETE AND MATERIAL SHALL NOT BE ORDERED BY MANUFACTURER AND MODEL NUMBERS ONLY. REVIEW THE COMPLETE DESCRIPTION,l MECHANICAL PLAN CALLOUT NOTES AND SPECIFICATIONS TO DETERMINE THE EXACT MATERIAL AND ACCESSORIES TO BE ORDERED. THE MANUFACTURERS USTED ARE THE BASIS FOR THE DESIGN. c-t� I�jl 10" CSD-1 300 CFM CU MECHANICAL EQUIPMENT DESIGNATION (CONTRACTOR FURNISHED NECK SIZE, TYPE, CFM OF SUPPLY DIFFUSER OR REGISTER 1 AND INSTALLED UNLESS NOTED OTHERWISE) NOTES: I� MANUAL VOLUME DAMPER CONNECTION POINT OF NEW WORK TO EXISTING A PROVIDE INTEGRAL DISCONNECT SWITCH. B.PROVIDE FACTORY INSTALLED CONTROL POWER (CP)TRANSFORMER. COORDINATE PRIMARY POWER WITH ELECTRICAL DRAWINGS. SQUARE TO ROUND TRANSITION e DETAIL REFERENCE UPPER NUMBER INDICATES DETAIL NUMBER C. BOX NOT TO EXCEED SCHEDULED DISCHARGE OR RADIATED SOUND NC LEVEL USING 0.5' PRESSURE DROP. �- DUCT MOUNTED SMOKE DETECTOR M1 LOWER NUMBER INDICATES SHEET NUMBER D. PROVIDE FACTORY-INSTALLED, PRESSURE INDEPENDENT DDC CONTROL PACKAGE RD (SD=SUPPLY/RD=RETURN) E PROVIDE TEMPERATURE SENSOR INLET AND CONTROLS FOR AUTOMATIC CHANGEOVER BETWEEN HEATING AND COOUNG MODE 1 F. PROVIDE BOX WITH EITHER RIGHT HND OR LEFT HND CONFIGURATION AS SHOWN ON DRAWINGS. M1 SECTION CUT DESIGNATION G. FURNISH WITH VAV BOX CONTROLLER AND HIGH SPEED ELECTRONIC ACTUATOR. I FD FIRE DAMPER ® CARBON DIOXIDE SENSOR H.INLET SIZE SHOWN IS THE MINIMUM ALLOWABLE INLET SIZE. NO SMALLER SIZES SHALL BE ACCEPTED. I. PROVIDE FILTER FRAME WITH 1"THROWAWAY FILTERS. FSD FIRE SMOKE DAMPER H® HUMIDITY SENSOR J. MOUNT HEATING COIL ON SUPPLY AIR DISCHARGE DUCT. SMOKE DAMPER © PULL STATION K.MECHANICAL CONTRACTOR SHALL PROVIDE SMOKE DETECTORS IN RETURN AIR DUCT IF NOT ALREADY PRESENT. WIRING BY ELECTRICAL CONTRACTOR. SD VD VOLUME DAMPER S® STATIC PRESSURE SENSOR D MD MOTORIZED DAMPER rTq TEMPERATURE SENSOR lBD BACKDRAFT DAMPER OH HUMIDISTAT t1 OT ROOF THERMOSTAT ELECTRIC REHEAT COIL GRIP LOCK WOVEN NYLON/ t BLOWER SECTION 6" I / JOIST 6" Z z POLYESTER BLEND FLEXIBLE (SEE NOTE t) \ / < ILL s CONNECTION MAXIMUM 6" ALLOW FOR REQUIRED --' 40 o H (SIMILAR TO METAL-FAB BY SUPPLY NEC CLEARANCE. PROVIDE THERMOMETER PROVIDE AUTOMATIC DUCT FASTENER m = m IN TEE FITTING VACUUM RELIEF VALVE DURO DYNE) OVERLAP DUCT VAV BOX WITH INTERNAL METAL BAND OVER INSULATION (TYPICAL) Jo v ABOVE TOP OF TANK WRAP INSULATION AND SEAL - - INSULATION, OTHERWISE OPTIONAL ROUTING IN BOLT AND HOT WATER TO FIXTURES INSULATE EXTERNALLY CONCEALED AREAS NUT HIGH EFFICIENCY TAKEOFF EXTERNALLY INSULATED DUCT J 0 d' ; INSULATED, WITH VOLUME DAMPER AND �¢ Q ; SEE NOTE 4. (MAX. 36"0) DAMPER LOCK WITH EXTENSION tJz ; SHUT-OFF VALVE (TYPICAL)—le COLD WATER SUPPLY �J _ ANGLE OR UNISTRUT < Z C� ) TO WATER HEATER CONCENTRIC SHEET METAL -T FOIL TAPE AT PROVIDE PIPE UNIONS TYPICAL REDUCER, ONE SIZE CONTROL BOX SEE NOTE 5. INSULATION JOINT (TYPICAL) CHECK VALVE LARGER THAN BOX INLET - ABOVE TOP OF TANK (TO FACILITATE REMOVAL OF WATER '-,-COLD WATER BRANCH REQUIRED WITH FLEX ON SHEET METAL HEATER) — TO EXPANSION TANK HIGH PRESSURE SIDE ___J ROUND SUPPLY SCREW SEE NOTE t. -- n J AIR DUCT (MAX. 24"0) PRE-INSULATED FLEXIBLE V PROVIDE DIELECTRIC PIPE — INSTALL ASME MAXIMUM 6" FLEXIBLE 1 DUCT AS REQUIRED, C UNION AT TANK CONNECTION TEMPERATURE AND CONNECTION SEE NOTE 3. pARAI 1 E TO STRUCTURE FASTENER TYPES INSTALL PERMANENTLY FOR CONNECTION OF PRESSURE RELIEF PROVIDE DUCT WRAP DISSIMILAR METALS (TYPICAL)--_T VALVE FURNISHED WITH INSULATION AND SEAL SEALED AND SUPPORTED WATER HEATER TO PREVENT KINKING VOLUME DAMPER HANDLES SHALL BE a! W PROVIDE 12"WIDE x 12"DEEP MINIMUM STRAIGHT LENGTH ROOF AND SHARP TURNS MARKED WITH 12" IN LENGTH COLORED _ HEAT TRAP AT INLET AND CONNECT TO TOP OR OF 3X DUCT DIAMETER RIBBON FOR EASY IDENTIFICATION WHERE W OUTLET (TYPICAL) SIDE OF TANK AS METAL BAND (TYPICAL) APPICABLE. (TYPICAL) Z M REQUIRED FOR MODEL INSULATION l INSULATION AS SPECIFIED BOTTOM OF 'J Q O N 0 ELECTRIC WATER HEATER FURNISHED AS REQUIRED STRUCTURE E LOADS MUST BE a l - PER SPECIFICATIONS AND THUNG WITHIN 6" CEILING DIFFUSER WITH W �❑ N CD SCHEDULE PROVIDE HARD COPPER VOLUME DAMPER, FIRE 3 ey Ur ti N SUPPLY DUCT OF PANEL POINTS DAMPER OR COMBINATION � I INSTALL DRAIN VALVE RELIEF VALVE DISCHARGE FASTENER VOLUME/FIRE DAMPER ZQ U.) r PIPE FULL SIZE OF TWIST STRAP AS SCHEDULED W 0) FURNISHED WITH WATER NOTES: —O O � a HEATER VALVE OUTLET' 16 GA. GALV. STEEL ' _ TERMINATE OVER 1. SUPPORT AIR TERMINAL UNIT, BOTH ENDS WITH MINIMUM 2" WIDE GALVANIZED 22 GA. BAND (2" WIDE) CEILING Z� TER HEATER ON 10 APPROVED RECEPTOR HANGER STRAPS. SUPPORT UNIT WITH SPRING VIBRATION ISOLATORS WITH 0.5 STATIC fn m CONCRETE SET AEQUIPMENT PAD WITH AIR GAP PER DEFLECTION IF INTERNAL FAN SPRING ISOLATION IS NOT PROVIDED. LOCATE W �J Qw W - O PER SPECIFICATIONS PCODE. REFER TO LANS FOR LOCATION FLOOR SUPPORTS AROUND UNIT TO MAINTAIN CLEARANCE FOR ACCESS TO UNIT COMPONENTS ROUND DUCT a V ❑ IL 2. INSTALL BOX NOT MORE THAN 3 FEET ABOVE THE CEILING TO ENABLE ACCESS FOR a o ¢ Z MAINTENANCE. PERPENDICULAR TO STRUCTURE Q REFER TO SPECIFICATIONS, SCHEDULES, AND NOTES FOR MORE INFORMATION. 3. FLEXIBLE CONNECTION SHALL BE ATCO MODEL UPC 017. OR DURO-DYNE INSULFLEX. ��� �j❑ d Q U PIPING ARRANGEMENT SHOWN IS SCHEMATIC. ADJUST TO SUIT FIELD CONDITIONS. NOTES: 1. EXTEND RIGID METAL DUCT SO THAT MAXIMUM FLEXIBLE DUCT LENGTH DOES NOT _ J 4. PROVIDE U CLEARANCE FOR MAINTENANCE UNLESS MORE IS RECOMMENDED E3Y 1.FOR DUCTS LARGER THAN 36"0, USE TWO HANGER RODS, WIRES OR STRAPS EXCEED 5'-0". PROVIDE RIGID 90' ELBOW WHERE REQUIRED TO KEEP FLEXIBLE Z U)U LU VERIFY CONNECTION SIZES AND LOCATIONS WITH WATER HEATER FURNISHED. MANUFACTURER. REFER TO FLOOR PLANS FOR PIPE SIZES AND CONTINUATIONS. PROVIDE SEISMIC 5. PROVIDE MINUMUM 18" CLEARANCE FOR ACCESS TO CONTROL PANEL TO SUPPORT DUCT FROM EACH SIDE. DUCT WITHIN 5'-0" LENGTH LIMITATION_ m �� O S B STRAP OR AND DISCONNECT NG WHEN SWITCH AREQSPECIFIED BBY OCAL Y ELECTRICAL.TIES. POWER WIRING PARALLEL FAN POWERED 00 0 a MOSCAP ELECTRIC REHEAT COIL 2 ROUND DUCT SUPPORT DETAIL LAY-IN CEILING DIFFUSER DETAIL Z U) rn EL 4 ELECTRIC WATER HEATER NO SCALE NO SCALE W Q s NO SCALE m 3 s a ISSUED/REVISED DATE e a PLUMBING FIXTURE SCHEDULE: PERMIT SET 02.08.16 >° BID SET 02.12.16 FIXTURES IN THIS SCHEDULE OR THEIR APPROVED EQUIVALENT ARE PROVIDED BY PERMIT RESUBMIT 02.25.16 THE PLUMBING CONTRACTOR. SUBMIT SHOP DRAWINGS ON EACH OF THESE ITEMS. PERMIT REVISION& 03.02.16 REFER TO SPECIFICATIONS FOR FURTHER INFORMATION AND INSTALLATION CONSTRUCTION SET REQUIREMENTS. VERIFY ROUGH-IN REQUIREMENTS WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS AND INSTALL PER MANUFACTURER'S 6 RECOMMENDATIONS. REFER TO THE ARCHITECTURAL DRAWINGS FOR THE PLUMBING FIXTURE MOUNTING HEIGHTS. WH-1 WATER HEATER: A.O. SMITH # DEL-10, 10 GALLON GLASS LINED STORAGE TANK, ONE 3KW DIRECT-IMMERSION HEATING ELEMEm A VALVE, AND SURFACE-MOUNTED AND1ANODE R GALLONS HOUR RECOVERY ATTA80 DEGREE g TEMPERATURE RISE. SET WATER HEATER OPERATING TEMPERATURE TO 120 "F. ELECTRICAL REQUIREMENTS: 208 VOLT THREE PHASE, 8.34 FULL LOAD AMPS. mHVAC s SCHEDULES & DETAILS E� M-201 ma