Loading...
Plans (15) MEC2016 00158 YlpiAgi (2'qot)L-"E' 91/77 6w &), i"j&'W RECEIVE]) f e 2o 14-oo 15"� NOISIAI0 Ux 107138 (INV011 JO All V) �.�R R 8 2016 9101 S bV` l i i'V Or TIGARD UILDI N B DIVISION A B C 0 E F C H J K L Y N P A I r4 1 K 42 43 44 L ,z H I I KOHRS LONNEMANN HEIL ' ENGINEERS, PSC p MECHANICAUELECTRICAL 4�1ENGINEERS jr$TOCKROOM ' VVWW.KLHENGRS.COM �- 1538 ALEXANDRIA PIKE,SUITE 11 FT.THOMAS, KENTUCKY 41075 11 800-354-9783 859-442-8050 4==Pl 1 - 859-442-8058 FAX NORTH LEXINGTON, KENTUCKY ,� 100 , T ZD-01 s V 1 Saal COLUMBUS,OHIO l S I 230 CFM O O 230 O DAYTON,OHIO ZD-0F O I rie S �& �� NEW YORK, NEW YORK i3 1 $ O REFER TO MASTER CEILING RCP PLAN ON SHEET A-102 FOR COMPLETE CEILING 12"o UP YAN (ete 10 V-01 LAYOUT. 1r.sn 1 � NG 1bk1a SA GENUM DEMOU" NOTES CANDLe IN M t $ REMOVE EXISTING HVAC EQUIPMENT,DUCTWORK,CONTROLS AND ALL A' ACCOUNT IN CLNG SD-21 2 CFM 5 O e O O OTHER ASSOCIATED HVAC EQUIPMENT NOT INTENDED FOR REUSE.FIELD NA1 Mme. ACCOU �1 TM Y� M 50 CFM _ _ - _ H VERIFY PRIOR TO BID. 16 YANKEE CANDLE WAY F � YANKEE CANDLE HAS A NATIONAL ACCOUNT WITH CARRIER CORPORATION FOR SOUTH�,t�lA 01373 T 1 DIRECT PURCHASE OF THE HVAC CONTROLS AND EQUIPMENT.THE GENERAL m CONTRACTOR BID SHALL NOT INCLUDE THE COST OF THE CARRIER EQUIPMENT OR CONTROLS SUPPLIED BY YANKEE CANDLE.UPON BEING SELECTED AS THE STORE#435 ! m GENERAL CONTRACTOR FOR THIS PROJECT,THE GENERAL CONTRACTOR SHALL 1 6 = a HVAC VAV SYSTEM DESIGN LrY 1 QW`1 CONTACT CARRIER'S REPRESENTATIVE,PAUL HIRT(315-432-3653)AND PROVIDE HIM WITH SITE LOCATION INFORMATION AND THE APPROXIMATE DELIVERY DATES ' Sat Sal THE EQUIPMENT SHOULD ARRIVE_THE HVAC EQUIPMENT RESPONSIBILITY WILL ' O 245 XFM o 0 245 CFM O THE TENANT HVAC SYSTEMS HAVE BEEN SIZED FOR A 55"SUPPLY AIR TRANSFER TO THE GENERAL CONTRACTOR UPON YANKEE CANDLE AWARDING TEMPERATURE IN THE LEASE SPACE. CONTRACTOR FIELD VERIFY AND THE CONTRACT FOR THE PROJECT.REFER TO THE SCHEDULE OF OWNER SR-1 8"s Rl�t RR-1 MEASURE THE TEMPERATURE OF THE SUPPLY AIR IN THE LANDLORD'S PROVIDED CARRIER EQUIPMENT ON SHEET M-401 FOR A DESCRIPTION OF THE 100 CFM } MAIN DUCT WITHIN THE LEASE SPACE. CONTRACTOR SHALL FIELD ITEMS AND WHO INSTALLS THEM.MECHANICAL CONTRACTOR SHALL PULL LOW VERIFY THAT THE EXISTING SYSTEM IS CAPABLE OF PROVIDE THE VOLTAGE WIRING AND TERMINATE AS DETAILED ON THE INSTALLATION DRAWING iDESIRED AMOUNT OF AIRFLOW TO THE LEASE SPACE. THIS WORK SHALL PROVIDED WITH THE CONTROL EQUIPMENT.MECHANICAL CONTRACTOR SHALL BE COMPLETED PRIOR TO PURCHASING ANY HVAC EQUIPMENT. CONTACT INSTALL ALL ACCESSORIES PROVIDED.THE MECHANICAL CONTRACTOR SHALL THE ENGINEER OF RECORD IF FIELD CONDITIONS DIFFER OR THE SYSTEM FAX THE STARTUP READINESS FORM TO CARRIER AND SCHEDULE THE VIRTUAL v IS NOT CAPABLE OF MEETING THE DESIGN REQUIREMENTS. STARTUP.MECHANICAL CONTRACTOR SHALL BE ON SITE AT TIME OF VIRTUAL w START-UP.GENERAUMECHANICAL CONTRACTOR WILL PROVIDE 1ST YEAR 8 WARRANTY RESPONSIBILITY. fr Q 1 EM ALTUMTE #1 FELE VER Y ALL COPDITIONS U I= O • YANKEE CANDLE IS INTERESTED IN REUSING AS MUCH OF THE DESIGN DRAWINGS ARE SCHEMATIC.THIS CONTRACTOR SHALL VISIT THE SITE z EXISTING DUCTWORK AS POSSIBLE. PRIOR TO BIDDING OR AWARD OF CONTRACT TO INSPECT EXISTING FIELD O 0 CONDITIONS.THIS CONTRACT SHALL INCLUDE ALL LABOR AND MATERIALS • DURING THE 1ST WEEK OF CONSTRUCTION GC SHALL DOCUMENT NECESSARY FOR FIELD MODIFICATIONS DUE TO EXISTING CONDITIONS. �- MECHANICALPLAN EXISTING DUCTWORK SIZES AND LAYOUT AND FORWARD TOi R Q SC A, CLG.- w 4 = Ir-(r � ENGINEER FOR REVIEW AND ANALYSIS. THE CONTRACTOR SHALL CONTACT THE ARCHITECT,ENGINEER OR OWNER v 'R PRIOR TO BIDDING FOR INTERPRETATIONS AND CLARIFICATIONS OF THE z t;f MECHANICAL ENGINEER TO MAKE FINAL DETERMINATION ON WHAT DESIGN AND INCLUDE IN HIS BID ALL COSTS TO MEET THE DESIGN INTENT. EXISTING DUCTWORK CAN AND CANNOT BE REUSED. CLARIFICATIONS MADE BY THE ARCHITECT,ENGINEER OR OWNER AFTER BIDDING WILL BE FINAL AND SHALL BE IMPLEMENTED AT CONTRACTORS COST. BIDDING CONTRACTORS SHALL HAVE A WORKING KNOWLEDGE OF LOCAL /� �y ya��/ CODES AND ORDINANCES AND SHALL INCLUDE IN THEIR BIDS THE COSTS FOR Q HVAC DUMOW LEGEND BASE WORK INSTALLED IN STRICT ACCORDANCE WITH BASE BID:PRICE SHALL INCLUDE ALL NEW DUCTWORK. GOVERNING CODES,THE PLANS AND SPECIFICATIONS NOT WITHSTANDING. SYMBOL DESCRIPTION THE CONTRACTOR SHALL ALERT ARCHITECT,ENGINEER OR OWNER OF ANY RG RETURN GRILLE BID ALTERNATE#1:SPECIFY A DEDUCT AMOUNT FOR REUSING EXISTING APPARENT DISCREPANCIES BETWEEN GOVERNING CODES AND DESIGN INTENT. 0 _ DUCTWORK EG 0 EXHAUST GRILLE F SR® SUPPLY REGISTER CD® SQUARE CEILING DIFFUSER HVAC eE?BAL NOTES O THERMOSTAT © HVAC TEMPERATURE SENSOR 1. PRIOR TO SUBMITTING BID,THE CONTRACTOR AND HIS SUBCONTRACTORS 13.THE HVAC CONTRACTOR IS RESPONSIBLE FOR COORDINATING BOX-OUT SHALL VISIT THE JOB SITE AND FULLY ACQUAINT ONESELF WITH THE EXISTING LOCATIONS FOR ALL DRYWALL MOUNTED AIR DEVICES WITH GENERAL ZONE DAMPER CONDITIONS OF THE PROJECT. THE CONTRACTORS AND SUBCONTRACTORS SHALL CONTRACTOR AND CEILING FRAMING. SUPPLY DUCT WITH ELBOW TURNED UP BE RESPONSIBLE FOR REVIEW OF THE GENERAL NOTES,SPECIFICATIONS,AND ALL 14.MECHANICAL CONTRACTOR TO PROVIDE TENANT WITH AS-BUILT DRAWINGS OTHER DRAWINGS FOR ADDITIONAL REQUIREMENTS WHICH MAY NOT BE AND SHOP DRAWINGS FOR ALL EQUIPMENT PROVIDED. S SUPPLY DUCT WITH ELBOW TURNED DOWN SPECIFICALLY CALLED OUT IN THIS PORTION OF THE CONSTRUCTION DOCUMENTS. 15.VERIFY THE EXACT MOUNTING FRAME REQUIRED FOR EACH AIR DEVICE. RETURN OR EXHAUST DUCT,ELBOW TURNED UP NOTIFY YANKEE CANDLE CONSTRUCTION MANAGER OF ANY CONFLICTS OR 16.VERIFY POINT OF CONNECTION LOCATIONS AND REQUIREMENTS WITH THE RETURN OR EXHAUST� DUCT,ELBOW TURNED DOWN DISCREPANCIES PRIOR TO SUBMISSION OF BID. LANDLORD'S OPERATIONS MANAGER PRIOR TO BID.2. DRAWINGS FOR HVAC WORK ARE DIAGRAMMATIC,SHOWING THE GENERAL 17.MOUNT DUCTWORK TIGHT AS POSSIBLE TO BOTTOM OF STRUCTURE. ® LOCATION,TYPE,LAYOUT,AND EQUIPMENT REQUIRED. THE DRAWINGS SHALL NOT 18.ALL ROOF PENETRATIONS OR ROOF WORK SHALL BE APPROVED BY LANDLORD. FLEXIBLE DUCTWORK CONNECTION BE SCALED FOR EXACT MEASUREMENT. FIELD MEASURE FOR FINAL DUCTWORK TENANT SHALL CONTRACT WITH LANDLORD'S CONTRACTOR FOR ENGINEERING PRIOR TO FABRICATION AND MAKE NECESSARY ADJUSTMENTS TO FIT THE AND INSTALLATION AT TENANTS EXPENSE. DUCTWORK WITHIN THE AVAILABLE SPACE. FIELD VERIFY FINAL LOCATIONS FOR 19.NOT USED. DUCT WITH MANUAL DAMPER EQUIPMENT. REFER TO ARCHITECTURAL DRAWINGS FOR DIMENSIONS. REFER TO 20.MECHANICAL CONTRACTOR SHALL ENGAGE THE SERVICE OF AN INDEPENDENT, MANUFACTURER'S STANDARD INSTALLATION DRAWINGS FOR EQUIPMENT CERTIFIED AIR/WATER BALANCING COMPANY. THE COMPANY SHALL BE A MEMBER CONNECTIONS AND INSTALLATION REQUIREMENTS. OF AABC OR NEBB. THIS COMPANY SHALL PERFORM THE BALANCING OF ELBOW MATH TURNING VANES 3. INSPECT ALL EXISTING EQUIPMENT INDICATING TO REMAIN,AND REPORT ANY AIRNVATER SYSTEM(S)AND MAKE ANY REQUIRED ADJUSTMENTS TO ENSURE 4 DAMAGE OR REPAIRS REQUIRED. THOROUGHLY WIPE DOWN WITH CLEAN RAGS OR PROPER WORKING ORDEFL UPON COMPLETION,THE BALANCING COMPANY SHALL EXISTING WORK TO REMAIN VACUUM CLEAN SAID EQUIPMENT,INCLUDING BUT NOT LIMITED TO ALL AIR PROVIDE A COMPLETE SYSTEM REPORT. GIVE ONE COPY OF BALANCE REPORT TO MA1rI6 DAA NEW WORK OUTLETS AND INLETS. THE OWNER AND LANDLORDS BUILDING ENGINEER. 4. EXERCISE CAUTION IN PERFORMING THE WORK SO AS NOT TO DAMAGE ANY CONTRACTOR SHALL REPLACE A/C UNIT WITH PLEATED FILT-ER-S#TER EQUIPMENT - CONNECT TO EXISTING EXISTING CONDITIONS OR SYSTEMS THAT ARE TO REMAIN IN PLACE. CORRECT START-UP AND AGAIN BEFORE AIR BALANCE. ANY DAMAGE CREATED BY THIS WORK TO THE SATISFACTION OF THE ARCHITECT 21.PROVIDE CEILING RADIATION DAMPERS FOR ALL DIFFUSERS AND GRILLES PER ICK WE IDCEW= DALE WITHOUT ADDITIONAL COST TO THE OWNER. IMC 607.5,607.6.2;IBC 716.6.2. REFER TO SCHEDULE ON DRAWING M-201 FOR YCC REVIEW 11/20/2015 5. MAXIMUM LENGTH OF FLEXIBLE DUCT TO DIFFUSERS,REGISTER,OR GRILLE ADDITIONAL INFORMATION. SHALL BE 5'-0". 22.PROVIDE AN ENGRAVED PHENOLIC NAME PLATE FOR ROOF MOUNTED LL REVIEW 112511015 6. E,SPACE OKEYED NOTES 7_ EXISTING LITEMS SHOWN ON PLAN ARE PROVIDED FOR COORDINATION NUMBER,ANRK S12ES SHOWN ARE CLEAR INSIDE DIMENSIONS_ EQUIPMENT.D EQUIP ENT DESIGNATIONE PLATE ILETTERNCLUDE YANKEE ING A MINIDLE MUM OF 2"HEIGHT. PURPOSES. THE LOCATION AND ELEVATION OF THESE ITEMS SHALL BE VERIFIED THE NAME PLATE SHALL BE AFFIXED TO THE SIDE OF THE EQUIPMENT FACING PRIOR TO SUBMITTING BID. NOTIFY YANKEE CANDLE CONSTRUCTION MANAGER OF YANKEE CANDLES STOREFRONT. 3 1. COORDINATE THE INSTALLATION OF THE DUCTWORK WITH ALL EXISTING LANDLORD DUCTWORK,SPRINKLER, ANY CONFLICTS OR DISCREPANCIES. 23.ALL MATERIAL SHALL BE NEW AND OF COMMERCIAL GRADE AND BEAR VENT,SANITARY PIPE,ELECTRICAL EQUIPMENT,STRUCTURE,ETC. 8_ THERMOSTATS AND TEMPERATURE SENSORS SHALL BE LOCATED GENERALLY UNDERWRITERS LABORATORY AND UNION LABELS WHERE SUCH LABELING AS SHOWN,HOWEVER THEIR EXACT LOCATION AND COLOR SHALL BE APPLIES. 2. LOCATE SENSORS WHERE SHOWN ON PLANS.SENSOR SHALL CONTROL ZD-1 FOR SPACE CONTROL IN STOCK COORDINATED WITH YANKEE CANDLE CONSTRUCTION MANAGER. MOUNT 24.ALL PLENUMS SHALL BE FABRICATED FROM GALVANIZED SHEET METAL OF THE AREA ALL ROOM SENSORS ARE FURNISHED BY YANKEE CANDLE AND INSTALLED BY THE MECHANICAL THERMOSTATS AT 48"ABOVE FINISHED FLOOR. COORDINATE MOUNTING HEIGHT APPROPRIATE GAUGE. CONTRACTOR 54"ABOVE FINISHED FLOOR.REFER TO M-401 FOR MECHANICAL CONTRACTORS SCOPE OF WORK OF TEMPERATURE SENSORS WITH YANKEE CANDLE CONSTRUCTION MANAGER. 25.WHERE DESIGNATED,BRANCHES FROM MAIN LOW VELOCITY TRUNK DUCTWORK DUN Bf. REVM B>~ FOR THE CARRIER PROVIDED CONTROLS. 9. ALL EXISTING PVC CONDENSATE DRAIN PIPING INSIDE TENANT SPACE SHALL BE SHALL BE FURNISHED WITH SPUTTERS,DAMPERS OR SIMILAR BALANCING DEVICES SMY/JLI MCD/IST REPLACED WITH COPPER PIPING AND MUST HAVE A CLEAN OUT IN THE LINE. IN ACCORDANCE WITH THE STANDARDS OF SMACNA 3. PROVIDE NEW PARALLEL FAN POWERED VAV BOX IN LOCATION SHOWN.MAINTAIN ALL MANUFACTURER REQUIRED 10.PROVIDE STEALTH CEILING ACCESS SYSTEMS WHERE ACCESS PANELS IN GWB 26.ADDITIONAL FIRE DAMPERS SHOULD BE PROVIDED AS REQUIRED BY ANY PR=# CLEARANCES.EXTEND AND CONNECT NEW MEDIUM PRESSURE DUCTWORK BETWEEN NEW VAV BOX AND CEILINGS ARE REQUIRED. PROVIDE WALK PLATFORMS ABOVE,AS REQUIRED. APPLICABLE CODES AND/OR JURISDICTIONAL AUTHORITIES. 7BH4 LANDLORD SUPPLY AIR MAIN.VERIFY LOCATION OF SUPPLY AIR MAIN.FLEX DUCTWORK IS NOT PERMITTED. PROVIDE ACCESS FOR SERVICING ALL HVAC EQUIPMENT,INCLUDING BALANCING 27. SEAL AROUND PIPES AND DUCTS PENETRATING FIRE SEPARATIONS WITH DAMPERS,FIRE DAMPERS,AND SMOKE CONTROL DAMPERS. ACCESS PANELS AND LISTED AND APPROVED FIRE DEAL MATERIAL. ONLY LISTED AND APPROVED swim 2 4. PROVIDE NEW EXHAUST FAN AS SCHEDULED.EXTEND AND CONNECT NEW EXHAUST DUCTWORK TO EXISTING WALKS SHALL BE SHOWN ON ARCHITECTURAL PLANS AND REFERENCED ON SEALANTS AND METHODS FOR THE SPECIFIC USE WILL BE PERMITTED. EXHAUST DUCTWORK AS REQUIRED_FIELD VERIFY EXACT LOCATION AND REQUIREMENTS PRIOR TO BID. MECHANICAL PLANS_ TENANT MUST ENSURE THAT THE CEILING STRUCTURE OR 28.UPON COMPLETION OF THE WORK,THE CONTRACTOR SHALL FULLY PRESSURE MECHANICAL EXHAUST FAN SUPPLIED BY CAPITOL LIGHT AND INSTALLED BY THE GENERAL CONTRACTOR. THE WORK OF ANY OTHER TRADE DOES NOT BLOCK ACCESS TO DAMPERS AND CHECK AND CHARGE THE SYSTEM(IF REQUIRED). EQUIPMENT ABOVE THE CEILING SO THAT PERIODIC MAINTENANCE AND TESTING 29. THE GENERAL CONTRACTOR S TO HAVE THE AIR BALANCE SUB CONTRACTOR ON PLAN LL/�A\N 5. PROVIDE ZONE DAMPER THAT IS COMPATIBLE WITH YANKEE CANDLE PROVIDED ACTUATOR.INSTALL ACTUATOR. CAN BE PERFORMED. SITE TO PERFORM THE AIR BALANCE EITHER THE DAY BEFORE OR THE DAY OF THE REFER TO SHEET M-401 FOR DETAILS. 11.FURNISH THE LANDLORDS ON-SITE REPRESENTATIVE WITH A COPY OF A PUNCH DATE WHEN THE YANKEE CANDLE PROJECT MANAGER WILL BE ON SITE. THE CERTIFIED AIR BALANCING REPORT PREPARED BY AN INDEPENDENT AABC OR NEBB GENERAL CONTRACTOR WILL ASSURE THE AIR BALANCE SUBCONTRACTOR WILL 6. PROVIDE 1"UNDERCUT FROM BOTTOM OF DOOR TO TOP OF FINISHED FLOOR FOR AIRFLOW. CERTIFIED AIR BALANCING CONTRACTOR. TENANT SHALL COMPLETE THE LEAVE A HAND WRITTEN COPY OF THEIR AIR BALANCE THE DAY THE SUB START-UP AND AIR BALANCE REQUEST,ENSURE THAT EQUIPMENT IS READY TO CONTRACTOR PERFORMS THE AIR BALANCE ALONG WITH A REVIEW OF THEIR 7.. ELECTRICAL(MECHANICAL CONTRACTOR TO FURNISH NEW ADDRESSABLE DUCT MOUNTED SMOKE DETECTOR. OPERATE AND CONTACT DIRECTOR OF OPERATIONS WHEN READY FOR START-UP FINDINGS TO ASSURE COMPLIANCE. IF THERE IS AN ISSUE THE GENERAL ELECTRICAUMECHANICAL CONTRACTOR SHALL INSTALL SMOKE DETECTOR IN THE RETURN AIR DUCT_ AND AIR BALANCE OF THE HVAC SYSTEM. CONTRACTOR WILL ASSURE THE AIR BALANCE SUBCONTRACTOR WILL REMAIN ON MECHANICAL CONTRACTOR SHALL PROVIDE WIRING TO FAN INTERLOCK ELECTRICAL CONTRACTOR TO PROVIDE 12.MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF SITE UNTIL THE SYSTEM S E IN COMPLIANCE- WIRING FOR CONNECTION TO REMOTE ANNUNCIATOR.IF EXISTING,VERIFY LOCATION,ORIENTATION AND ROPER ALL TRADES,LANDLORD REQUIREMENTS,CEILING HEIGHTS AND EXISTING 30. ALL MATERIALS EXPOSED WITFBN PLENUMS SHALL BE NON-COMBUSTIBLE OR 1 WORKING CONDITION. STRUCTURAL CONDITIONS PRIOR TO FABRICATION OF ANY DUCTWORK OR SHALL HAVE A FLAME SPREAD INDEX NOT MORE THAN 25 AND A SMOKE-DEVELOPED ORDERING OF ANY EQUIPMENT. INDEX OF NOT OMRE THAN 50 WHEN TESTED IN ACCORDANCE WITH ASMTME E 84 8. PROVIDE NEW DUCT MOUNTED TEMPERATURE SENSOR.INTEGRATE INTO ZONE DAMPER CONTROLLER. mIllm 10 1 A B C D E F 6 H i K L Y N P 4 A B C 0 E F 6 N K L m N P Q K HVAC RESPOIVSBI.ITY SCHEDULE HVA L L CH S> L 46 12 ABBREVIATIONS CONTRACTOR TYPE MOTOR CONTROL TYPE CONTROL TYPE ITEM FURNISHED BY INSTALLED BY REUSE MA REMARKS DC LOCAL DISCONNECT EC ELECTRICAL CONTRACTOR CS COMBINATION STARTER TC TIMECLOCK YCC LL TC YCC TC OTHER EXISTING MC MOTOR CONTROL (POWER) FC FIRE PROTECTION CONTRACTOR MCC MOTOR CONTROL CENTER OCC OCCUPANCY SENSOR SD SMOKE DETECTOR GC GENERAL CONTRACTOR MG MAGNETIC STARTER OR CONTACT BAS BUILDING AUTOMATION SYSTEM KOHRS LONNE IANN HEIL ROOFTOP UNIT EQUIPMENT X CN CONTROLS HC HVAC CONTRACTOR MS MANUAL STARTER LOW LOW VOLTAGE CONTROLS ECONOMIZER X HP HORSEPOWER MFR MANUFACTURER VFD VARIABLE FREQUENCY DRIVE LINE LINE VOLTAGE CONTROLS ENGINEERS, PSC BHP BRAKE HORSEPOWER PC PLUMBING CONTRACTOR MSR MANUAL STARTER W/ RELAY RUNE REVERSE ACTING LINE VOLTAGE STAT MECHANICAUELECTRICAL ROOF CURB x EX EXISTING OR OWNER OR OTHERS MAN MANUAL ENGINEERS FLA OPERATING FULL. LOAD AMPS FA FIRE ALARM WWW.KLHENGRS.COM ROOF CURB ADAPTOR X MCA MINIMUM CIRCUIT AMPACITY SCP SMOKE CONTROL PANEL ROOFING X OCP OVER CURRENT PROTECTION INT INTEGRAL TO EQUIPMENT 1538 ALEXANDRIA PIKE,SUITE 11 CID CMI� AND PLUG ICO CARBON I ONOXI FT.THOMAS,KENTUCKY 41075 11 ROOF CANT STRIPX MARK DESCRIPTION LOCATION STATUS VOLTS PHASE EM ERG BHP HP HTG KW WATTS FLA MCA OCP FED FROM DC TYPE DC FURN DC INST DC WIRE MC TYPE MC FURN MC INST MC WIRE CN TYPE CN FURN CN INST CN WIRE SD TYPE $00-354-9783 ROOF CURB LEVELINGX EF-1 EXHAUST FAN RESTROOM NEW 120 1 90 EC EC EC MG MFR MFR MFR LINE EC EC EC 859-442-8050 DIFFUSERS AND GRILLES MC MC V-01 VAV BOX 208 1 1/4 5 EC EC EC MG MFR MFR MFR LOW HC HC HC DUCT $59-442-$058 FAX LEXINGTON,KENTUCKY WALL FIRE DAMPERS X COLUMBUS,OHIO HVAC EXHAUST FAN SCHEDULE DAYTON,OHIO COMB.FIREISMOKE DAMPERS X MARK DESCPJPTION LOCATION STATUS MFGR MODEL VOLTS PHASE WEIGHT EMERG CFM I ESP(IN) BHP HP MOTOR TYPE WATTS I FAN RPM I ACCESS FLA OCP NEW YORK,NEW YORK DUCTWORK MC MC EF-1 I EXHAUST FAN RESTROOM NEW GROAN 1696 1120 1 1 1 180 0.2 1 1 1 190 VAV BOXES YCC MC 10 UNIT HEATER x HVAC VAV BOX SCHEDULE *CARRIER MODEL 45M SCHEDULE DAMP R Z NE YANPNU� O E CONDENSATE PIPING X SYSTEM STATUS SIZE MAX CFM MIN CFM HMIN CFM MBH GPM EAT LAT EWT LWVOLTS PHASE HP HTG KW SYSTEM SIZE MAX CFM MIN CFM HMIN CFM MBH GPM VOLTS PHASE HP HTG KW CANDL.1 T DUCT SUPPORTS MC MC V-01 NEW 12 1200 600 600 16 0.0 55 81 0 0 208 1 114 5 ZD-01 10"P) 1250 100 0 KEE CANDLE CO. SEISMIC BRACING MC MC YM 16 YANKEE CANDLE WAY CARRIER TEMP CONTROL SYSTEM YCC MC REFER TO M401 HVAC VENTILATION SCHEDULE ROOMNUM 101 102 103 HVAC ACCESSORIES SWTH DEERFIELD,MA 01373 EQUIPMENT AND CONTROL START-UP MC REFER TO M401ACCESSORIES_ ROOMNAME SALES AREA STOCKROOM RESTROOM MOTOR OPERATED DAMPER X SYSTEM 1 1 1 1.MOTOR DAMPER 5.INTAKE HOOD 9.ACCESS DOOR 13.FACE/BYPASS DAMPER 17.DUCT FLANGES 21.ECON POWERED EXHAUST STORE#435 2.ECONOMIZER 6.VIBRATION ISOLATION 10.FLEX CONNECTIONS 14.CONDENSATE PUMP 18.BASE RAIL 22_ECON BAROMETRIC RELIEF 9 DUCT MOUNTED SMOKE DETECTOR EC/MC EC/MC ZONE 1 1 1 3.ROOF CURB 7.FLAT FILTER 11.MOUNTING COLLAR 15.MOTOR GUARD 19.HUMIDIFIER 23.HEAT RECLAIM COIL ZONE DAMPERS MC MC REFER TO M401 AREA 981 225 38 4.SMOKE DETECTOR 8.FILTER/MIXING BOX 12.HOT GAS BYPASS 16.GREASE TRAP 20.CO2 SENSORS Ct.NGHT 0 0 0 QD. ZONE DAMPER ACTUATOR YCC MC REFER TO M401 AER CHCS 0 0 0 TOILET EXHAUST FANS CL GC WIRED BY EC OA CHGS 0 0 0 _ TOILET EXHAUST DUCTWORK MC MC PEOPLE DES 15 1 0 TOILET EXHAUST ROOF CURB X PEOPLE RED 15 1 0 AIR BALANCE REPORTOA PER 7.5 0 0 W MC Cc 8 AS-BUILT DRAWINGS MC OA SOFT 0.12 0.12 0 I I REQ SUP 929 196 50 1ST YR LABOR WARRANTY CARRIER EQUIP MC ACT SUP 950 200 50 Q 1 ST YR PARTS WARRANTY CARRIER EQUIP YCC REQ OA 223 47 12 fZ) man ■ �� �+ '■ C ACT OA 228 48 12 V (+�- RE�7I'�SBI 1 i �7�Vi.ES IMEND AV CODED MITES ACT RET 950 200 0 V MC=MECHANICAL CONTRACTOR LL=LANDLORD ACT EXH 0 0 80 CARRIER=HVAC SUPPLIER RC=ROOFING CONTRACTOR CRITICAL 0.3031 0.17 a n O GC=GENERAL CONTRACTOR TC=TENANT CONTRACTOR PRESSURE E E N cr 7 EC=ELECTRICAL CONTRACTOR *** ALL ROOFING WORK SHALL. BE PERFORMED BY THE PCT OPERABLE 0.0000 0.0000 0.0000 Q YCC=STORE DESIGN AND CONSTRUCTION LANDLORDS ROOFING CONTRACTOR AT THE TENANTS EXPENSE. z CL=CAPITOL LIGHT _ NATURAL VENTILATION AIR DISTRIBUTION DEVICES (BASIS OF DESIGN: TITUS*) Q TES:1.SYMBOL KEY-FIRST LETTER: S-SUPPLY R-RETURN E-EXHAUST 5. FINISH- SECOND LETTER. D-DIFFUSER R-REGISTER G-GRIU.E 'A" METALESCENT ALUM. BAKED ENAMEL 2.CATALOG NUMBERS REFER TO TINS AIR DEVICES. 'B' ETCHED FINISH WITH CLEAR FINISH OR ANODIZED -- 'C' #26 STANDARD WHITE GC TO FIELD PAINT TO MATCH CEIUNG OR WALLS 6 3.1.2,3. AND 4-WAY AIR DEVICES ARE DETERMINED BY -W #84 STANDARD BLACK GC TO FIELD PAINT T4 MATCH CEILING OR WALLS DIRECTIONAL ARROWS ON DRAWINGS. 4.DAMPERS SHALL BE OPERABLE FROM FACE 6. BORDER STYLE- "A" OPPOSED BLADE 'A" SURFACE MOUNTED "B" RADIAL OPPOSED BLADE "8' LAY IN MOUNTING 'C' BUTTERFLY 'C" LAY-IN PANEL. PROVIDE TITUS MODEL ## XY-13363 FRAME FOR PLASTER CEIUNG MOUNTING. SIZE MOUNTING MATERIAL ACCESSORIES BORDER SYMBOL CATALOGS MOD. NECK SIDE- CELL- DUCT STEEL ALUM. FINISH DPR. STYLE REMARKS WALL I G SD-1 TDC-AA 24'x24' 10"o ! • A B B 5 SD-2 TDC-AA 12"x12" 6"0 • • A B B SR-1 30ORS 10"x6" 10"x6" • ! A A A RR-1 350F 24'x24" ! • A B B TG-1 350RS 36"x10" 36"xi O" i • A A A *INSTALLED SPECIFICATION SHALL BE METAL-AIRE OR TITUS 4 DRAWL DATE: REV.1 ISSN/DESCLIPTION DATE YCC REVIEW 11/2011015 3 WAYM BY: REIAEWFD Br t SMY/JLI MGD/JST PROECT# 17684 SI#ET TITLE 2 MECHANICAL SCHEDULES SLEET f M �2011 A 8 C 0 E F 6 H i K L M N P 0 A 8 C D E F 0 H K L M N PE itrrQ 74= K L 12 H KOHRS LONNEMANN HEIL ENGINEERS, PSC MECHANICAL/ELECTRICAL ENGINEERS VWWV.KLHENGRS.COM 1538 ALEXANDRIA PIKE,SUITE 11 FT_THOMAS,KENTUCKY 41075 11 800-3549783 859-442-8050 859-442-8058 FAX LEXINGTON,KENTUCKY COLUMBUS,OHIO DAYTON,OHIO NEW YORK,NEW YORK YANF\,%, 10 CMDLe YANKEE CANDLE CO. 16 YANKEE CANDLE WAY SOUTH DEEMELD,FAA 01373 STORE#435 9 BEAM CLAMP(MAX' WEIGHT 500 LBS_) TOP CHORD 2x2x16 GA.ANGLE TOP CHORD OF JOISTS. OF JOISTS. 8 12"CONTINUO "DIA CONTINUOUS 0 KEYED NOTES: W US /2THREADED ROD. 2. RETURN TUBE. ic 3 W_ THREADED ROD. ETAL JOIST ETAL M 1. DUCTWORK T ST O 3l I"MACHINE BOLT 3. SMOKE DETECTOR.4. SAMPLING TUBE. 2 (D 0 1"X 16 GA MIN(DUCTS OVER 2 3Q.FT.)MAX.700 �^. T METAL STRAP LBS.1"X 18 GA MIN(DUCTS U ER 2 SQ.Ff.)MAX. GENERAL NOTES: 0 KEYED NOTES: 0 CC0 420 LBS.FOR DUCTS OVER 49"1 ADE,TURN METAL 7 STRAP UNDER BOTTOM OF DU AND FASTEN A REFER TO MANUFACTURER 2_ DAMPER • • • • • • • • • • RECOMMENDATION FOR SMOKE 3. GALVANIZED THREADED ROD(CONNECT TO V en DETECTOR MOUNTING STRUCTURE) T Nmor 4 LOCAITON. PROVIDE STRAIGHT ..... RUN UP AND DOWNSTREAM OF SAMPLING TUBE PER NOTE: MANUFACTURER'S DISTANCE B TWEEN REQUIREMENTS. DUCTWORK SUPPORT DETAIL DUCT HANG RS SHALL `� NOT TOS ALE BE IN ACCO DANCE FOOT=166 Les R WITH THE R LES OF THE DUCT SIZE RECTANGULAR DUCTS ALUMINUM MIN.B AGENCIES VING 36"DIA MAX ROUND DUCT SUPPORT DETAIL MAX_SIDE INCHES MIN.GALV.SHT.GAUGE &S GAUGE JURISDICTI N. 6 THROUGH1226 T T SCALE 26 (0.0221N.) 24 (0.0201N.) 13 THROUGH 30 24 (0.028 IN.) 22 (0.025 IN.) SPIRAL SEAM ROUND DUCTS 31 THROUGH 54 22 (0.034 IN.) 20 (0.032 IN.) DUCT STEEL MIN. LONGITUDINAL SEAM 55 THROUGH 84 20 (0.040 IN.) 18 (0.040 IN.) DIAMETER INCHES GALV.SHT. DUCT STEEL MIN. FITTINGS STEEL MIN. OVER 84 18 (0.052 IN.) 16 (0.051 IN.) THROUGH 12 GAUGE GALV.SHT.GAUGE GALV.SHT.GAUGE 13 THROUGH 18 28 (0.019 IN.) 26 (0.022 IN_) 26 (0.022 IN.) 19 THROUGH 28 26 (0.022 IN.) 24 (0.028 IN.) 24 (0.028 IN.) 29 THROUGH 36 24 (0.028 IN.) 22 (0.034 IN.) 22 (0.034 IN.) 37 THROUGH 52 22 (0.034 IN.) 20 (0.040 IN.) 20 (0.040 IN.) 20 (0.040 IN.) 18 (0.052 IN-) 18 (0.052 IN.) 5 (233113.00-10 DUCT SUPPORT DETAIL E230:50(0.00):-02 DUCT MOUNTED SMOKE DETECTOR 230000.00ZONE DAMPER SCALE: NONESCALE: NONE SCALE: NONE GENERAL NOTES: VAV 0KEYED NOTES: I. PROVIDE SPLITTER DAMPER TERMINAL DEVICE 4 (SD)AT ALL MAIN BRANCH AIR FLOW 1. 20 GAUGE DOUBLE SHEET METAL TAKEOFFS AIR FOIL FULL DEPTH OF MAIN 4 2_ PROVIDE MANUAL VOLUME DUCT UP TO 12"WIDE BRANCHES & ol 2 4 i$GAUGE ON WIDER BRANCHES g DAMPERS AT ALL BRANCH U 2. MAIN DUCT 7 4 TAKEOFFS z 3. GALVANIZED 3116"ROD I ; 3. PROVIDE MINIMUM 3 TIMES 4. VENTLOCK NO.600-3 DAMPER 3 STRAIGHT INLET DIAMETER °° BLADE,BRACKET&LOCKING .. .�� DRAWO DME TO ALL VAV TERMINAL MVD BRANCH CD(CEILING 1 BALL JOINT WITH 114"Q1 O 2 DEVICES ��) 4. DAMPER NOT REQUIRED AT v NJ GALVANIZED OPERATOR PAD s 1omwim TERMINAL DEVICE TAKEOFF MAIN BRANCH MVD L/ `FLOW FLOW 5. BRANCH MAIN DUCT / �� 5. TE MANUAL DAMPERS 6. DOUBLE THICKNESS TURNING NSUTATION YCC REVIEW 112012015 VANES(TYPICAL) jQ� 7 SHALL BE LOCATED IN AN MVD SD 7. 3"RADIUS MINIMUM '-` � �! ACCESSIBLE CEILING. PROVIDE ACCESS PANEL AS BRANCH RR(RETURN 8 eg!C4 MAIN REQUIRED MVD REGISTER) DUCT TEE {�KEYED NOTES: GENERAL NOTES: � O UCTT 3 MVD 2 1. INSULATED INLET DUCT MAXIMUM FLEX DUCT A MAINTAIN 36"CLEARANCE MINIMUM TO BRANCH LENGTH OF 24"TO HARD DUCT CONNECTION DISCONNECT AND CONTROL PANEL.. 2 TO VAV BOX MAINTAIN ALL MANUFACTURERsR inBRANCH ER(E�IAUST LOW FLOW 3. ACTUATOR B. OMIT2. VAV BOX OMMENDED FLEXDUC OND�ISTRIBUTIONSYSTEMSGENERAL NOTES: (SUppLY REGI) zREGISTER) 4. GALVANIZED THREADED ROD(CONNECT TO THAT PENETRATE 1-HR FIRE BARRIERS. 1. OMIT FLEX DUCT ON DISTRIBUTION �YN 8� 8MVD STRUCTURE) REFER TO ARCHITECTURAL PLANS FOR SYSTEMS THAT PENETRATE 1-HR FIRE SMY/JLI MCDIJST 5. ELECTRIC HEATING COIL SECTION LOCATIONS OF FIRE BARRIERS. /� BARRIERS.REFER TO ARCHITECTURAL 3 4 6. OUTLET CONNECTION,PROVIDE SUFFICIENT 0 KEYED NOTES: PLANS FOR LOCATIONS OF FIRE BARRIERS. PST Ik STRAIGHT LENGTH TO ASSURE EVEN AIR 1. MAXIMUM LENGTH OF INSUL_FLEX DUCT 6. SECURE TO CEILING PER MANUFACTURER'S 17684 FLOW OVER HEATING COIL MAIN BRANCH 7 EQUALS 5 FEET.FLEX NOT PERMITTED IN RECOMMENDATIONS AND PER CEILING FINISH. SHEET TITLE BRANCH 7_ SHEET METAL DUCT VAV 80X,MINIMUM INACCESSIBLE CEILINGS PROVIDE GRID CUPS PER MFG'R REQUIREMENTS. 2 1 LENGTH E 3 TIMES INLET DUCT DIAMEPROVIDED, ER 2. INSULATED DUCT,COLLAR AND DIFFUSER BY PROVIDE FRAMING FOR DRYWALL MECHANICAL SD MVD 8. DISCONNECT SWITCH,FACTORY PROVIDED, HVAC CONTRACTOR INSTALLATION. SD LD AIR 3� MOUNTEDRED,AND PROVIDE CLEARANCEINSTALL ABOVE ACCESSIBLE DETAILS 3. SCOOP 7. HANGER,SECURE TO STRUCTURE AND DETAILS FLOW CEILING OR PROVIDE ACCESS PANEL_ 4_ SPIN IN FITTING WITH MANUAL VOLUME DUCTWORK (UNC DIFRISER) 5 DAMPER 8. PEEL BACK INSULATION AND PROVIDE STRAPPING 5. INTERNAL BUTTERFLY DAMPER FOR AND SHEET METAL SCREWS AT FLEX CONNECTION TO DRYWALL APPLICATIONS ONLY. - DUCT.THEN PROVIDE STRAPPING AROUND W DUCT MAIN DUCT MAINAIR LOVv MAIN BRANCH (PROVIDE KEY FOR ADJUSTMENT) INSULATI9. SUPPORTFN. LEXTO PREVENT COLLAPSING DIFFUSER INSTALLATION (TYPICAL) SST# MANUAL DAMPER DETAIL VAV BOX WITH ELECTRIC HEAT 1 233300.00-01 SCALE: NONE 233613.00-04 SCALE: NONE 233713.00-04 SCALE: NONE M �202 A IB C 0 E F 0 H J K L Y N P Q A I B I C I D I E I F I 6 I H I of I K I L I Y ft I P I 0 HVAC &%CMATM ==;�JK Division 23-HVAC SPECIFICATION complete submittals.Complete submittals of each type are required. Partial Except when:specifically indicated otherwise above,the Installation of Metal Ductwork manufachur es installation instructions. 12 23 05 01.00-Common Requirements for HVAC submittals will be rejected.Where a section requires a product data HVAC/Temperature Control Contractor shag provide all electrical work as General: Assemble and install ductwork in accordance with recognized Location: Install each unit level and accurately in position indicated in (� General submittal,al product data for that section shalt be supplied together,at one required for all temperature control related wiring(i.e.conduit,raceway, industry practices which wig achieve air-tight(5%leakage for systems rated relation to other work;and maintain sufficient clearance for normal service E9= H General Provisions of the Contract including General and Supplementary time,as one complete submittal.Do not send hall the product data as one outlet boxes,junction boxes,wiring,etc.)ih accordance with Electrical 3"and under 1%for systems rated over 3")and noiseless(no objectionable and maintenance,but in no case less than that recommended by Conditions and General Requirements apply to work of this section. submittal and the other half as a separate one.When resubmittal is required Specifications requirements. All conduit shall be 3/4"minimum. noise)systems,capable of performing each indicated service. Install each manufacturer_ KOHRS LONNEMANN HEIL Scope (e.g.Revise and Resubmit)the revised submittal shag be more complete, Coordinate all thermostattsensor locations in field(case by case)with run with minimum number of joints.Align ductwork accurately at Field Quality Control The base bid includes furnishing all materials,labor,tools,and equipment more accurate and more contract-compliant than its needed predecessor. Architect Owner and Electrical Contractor to ensure that they are placed in connections,within 1/8"misalignment tolerance and with internal surfaces Upon completion of installation and prior to initial operation,test and ENGINEERS, PSC and the performance of all work required to install a complete heating and The submittal number(for each section and type)shag increment for each locations that will not interfere with furniture,equipment,artwork,wall-bung smooth.Support ducts rigidly with suitable ties,braces,hangers and demonstrate that air terminals,and duct connections to air terminals,are air conditioning system as outlined herein. subsequent submittal(00-Original submission,01-First Resubmission,02 specialties,room finishes,etc. All thermostatlsensor wall locations indicated anchors of type which will hold duds true-to-shape and to prevent buckling. leak-tight MECHANICAL/ELECTRICAL Guarantee -Second Resubmission,etc...).Resubmittals shag include a copy of the on HVAC drawings are schematic only and must be verified case-by-case Support vertical duds at every floor. Repair or replace air terminals and duct connections as required to eliminate ENGINEERS The contractor shall provide a guarantee in written form stating that all work reviewers comments supplied with the prior submittal rejection and shall be prior to rough-in. Sealing:Seal all longitudinal seams,S's and drives and all pints with mastic leaks,and retest to demonstrate compliance. VWWV.KLHENGRS.COM under this section shall be free of defective work,materials,or parts for a amended with a description of the specific action taken to comply with the All electrical worts as described in this specification shall be per the latest or cement install according to SMACNA standards. Cleaning 1538 ALEXANDRIA PIKE,SUITE 11 period of one year from the date of owner's final acceptance and shall repair, reviewers comments.The abs_ence of this on resubmittal is cause for edition of the National Electrical Code(NEC)and per applicable state and Balancing Dampers:The sheet metal contractor shall be fully responsible for Clean exposed factory-finished surfaces. Repair any marred or scratched FT_THOMAS,KENTUCKY 41075 11 revise or replace at no cost to the owner any such defects occurring within rejection. local codes. installing balancing dampers it the ductwork,(whether shown on the surfaces with manufacturers touch-up paint] the guarantee period. Contractor shall also state in written form that any Name electronic files to match the submittal ID and cover sheet The Where`free-air'installation methods(either exposed above the ceifings,in drawing or not)it order to arrive at the intended air flow.The balancing 800-354-9783 items or occurrences arising during the guarantee period will be attended to electronic file name of submittals shall match the submittal ID included on bridle rings or in cable trays)are permitted under Electrical Specifications sub-contractor shall provide direction and assistance in determining 23 3713.00-Diffusers,Registers and Louvers 859-442-8050 in a timely manner and will in no case exceed four(4)working days from the submittals cover page.For example:The originaltfrst product data above ceilings,provide plenum-rated cables wherever plenum ceilings(if locations where dampers are required.Additional dampers,if required shag Ceiling Air Diffusers 859-442-8058 FAX date of notification by owner. submittal far Section 234116 would be labeled as"234116.00-PD4X';the any)exist and install as defined under Electrical Specifications.Instal low be installed at no additional cost to the owner. Diffuser Faces: t LEXINGTON, KENTUCKY Quality Assurance fust resubmittal of same shall be labeled'234116.00-PD-01".The voltage circuits,located in concrete slabs and masonry walls,in inaccessible Wag Penetrations: Seal and pack around all duds and piping sleeves which Square: Square housing,core of square concentric louvers,square or round Provide a complete installation in conformance with the following standards. originatlfirst shop drawings submittal file for the same section would be locations,or exposed in occupied areas,in electrical conduit regardless of pass through walls that extend to bottom side of structure and rated walls. dud connection. COLUMBUS,OHIO ASHRAE:American Society of Heating,Refrigerating and Air Conditioning labeled'234116.00-SD-00";the first resubmittal of same shall be labeled what wiring methods are permitted under Electrical Specifications. Field Fabrication: Complete fabrication of work at project as necessary to Diffuser Mountings: DAYTON,OHIO Engineers '234116.00SD-01'. Where cable trays or bridle rings are provided by the electrical contractor for match shop4abricated work and accommodate installation requirements. Surface Mount Diffuser shag have rolled edge below finished ceiling for NEW YORK,NEW YORK NFPA National Fre Protection Association Use of Electronic Drawings from the Owner's Design Team low voltage cables,these raceways may be utilized for control wiring by this Routing: Locate ductwork runs,except as otherwise indicated,vertically and surface mounting or diffuser shall be furnished with accessory plaster frame. SMACNA:Sheet Metal and Air Conditioning Contractors National Pian drawings for the Project were created with AutoCAD. contractor(provide special color coded jackets,label cable jackets per horizontally and avoid diagonal runs wherever possible.Run ductwork in Lay4n: Diffuser housing sized to fit between ceiling exposed suspension tee Association. If expressly permitted by the Owner and the terms of the Contract,editable Electrical Specifications and group control wiring cables together). Provide shortest route which does not obstruct useable space or block access for bars and rest on top surface of tee bar. r Statewide Building Code electronic versions of standard-scale,AutoCAD-based plan drawings may conduit drops from cable baylbridle ring paths to wall outlet boxes and servicing building and its equipment Hold duds dose to warts,overhead Diffuser Dampers: 10 Permits,Fees,inspections,Laws and Regulations be made available for the creation of shop and as-built drawings. equipment unless directed otherwise under Electrical Specifications. construction,columns,and other structural and permanent enclosure Opposed Blade Dampers:Multiple opposed blade dampers connected to YM e Permits and fees of every nature required in connection with this work shag Due to the proprietary nature of internal design systems,editable Regardless of permitted methods in Electrical Specifications,all elements of building. Limit clearance to 112"where furring is shown for linkage adjustable from face of diffuser with key. I 4 K...e be obtained and paid for by this contractor who shall also pay for all the native-software versions of some drawings,including but not limited to cables/wiring installed concealed by gypsum board,masonry or other enclosure or concealment of duds,but allow for insulation thickness,if any. Integral. Combination volume control and pattern adjustment for linear CMDLe installation fees and similar charges. Laws and regulations,which bear system diagrams and details will not be made available in an editable form. inaccessible materials in walls or above ceilings shall be installed in conduit, Where possible,locate insulated ductwork for 1"clearance outside of diffusers. upon or affect the various branches of this work shall be complied with by In these cases,electronic versions of the drawings may be made available 314"minimum. insulation.Wherever possible in finished and occupied spaces,conceal Fire Damper:Combination adjustable opposed blade damper and fusible this contractor and are hereby made a part of this contract All work,which only in PDF,JPG or similar non-editable electronic form,at the sole All conduit,bridle rings,raceway,outlet boxes,etc necessary for complete ductwork from view,by locating in mechanical shafts,hollow wag link fire damper with UL approved link and assembly designed to meet YANKEE CANDLE CO. such laws require to be inspected,shall be submitted to the proper public discretion of the Design Professional. operational installation of control wiring shag be provided(furnished and construction or above suspended ceilings. Do not encase horizontal runs it requirements of NFPA 90A � 16 YANKEE CANDLE WAY official for inspection and a certificate of final approval must be furnished. The Request Drawings form can be accessed,filled out and submitted at the installed)by the temperature control contractor in sWd compliance with solid partitions,except as specifically shown. Diffuser Acoustic Performance:NC less than or equal to 30 -- SOUTH DEERFIELD,IAA 01373 Work in Existing Spaces following intemet address(scroll down to bottom of home page): Electrical Specifications documents. Coordinate all work with all other Coordinate layout with suspended ceiling and fighting layouts and similar Diffuser Accessories:Plaster Ring:Perimeter ring designed to ad as plaster General: Care shall be taken when working in existing spaces so as not to httpJtwww.klhengrs.com. applicable trades including the electrical contractor. finished work stop and diffuser anchor. damage existing wags and ceilings where work is being perfoppSpaces:performed. 23 05 29.00-Hangers and Supports for HVAC Piping and Equipment Provide all required conduit work to and between equipment in a manner Electrical Equipment Spas: Do not route ductwork through transformer Diffuser Finishes:White Enamel:Semi-gloss white enamel prime finish. STORE#435 Ceilings: Where work is being performed above ceilings,and the General compliant with that described above(i.e.between VAV boxes,to boilers, vaults and their electrical equipment spaces and enclosures. Manufacturer_ Subject to compliance with requirements,provide diffusers of 9 architectural drawings do not indicate ceiling modifications by the general Support all ductwork and equipment by hangers or brackets. Furnish starters,condensing units,etc.as applicable). Penetrations: Where duds pass through interior partitions and exterior one of the following: contractor,it shag be the responsibility of this contractor to remove and structural steel members where required to support piping and equipment install control wiring without spfices between terminal points,color-coded. walls,and are exposed to view,conceal space between construction Metal-Aire-Supply diffuser'5000 series,Titus Products Div. replace existing ceilings where work is being performed. in those instances, No portion of piping or valves shall be supported by equipment Install in neat workmanlike manner,securely fastened. Instal in accordance opening and duct or dud insulation with sheet metal flanges of same gage ff III all repair and installation of new grid,ceiling panels,etc shag be the Ductwork-Support by means of hangers as follows: with National Electrical Code and per Electrical Specification& as dud.Overlap opening on 4 sides by at least 1-1/2". Fasten to dud and Ceiling and Wag Registers&Grilles responsibility of this contractor_ Match existing finishes. Dud Width Hanger Size and Type Max_Spacing Install circxuits over 25 volt with color-coded No.12 wire in electrical metallic substrate. Steel Construction:Manufacturer's standard stamped sheet steel frame and Walls&Floors: it shall be the responsibility of this contractor to patch 30 or less (#16 gage) 8 tubing,per Electrical Specifications. Install circuits under 25 volt with All motor operated dampers shall be low leakage with edge and blade seats. adjustable blades. (D. existing wags and floors and match existing finishes where work is being A pair of hangers shall be located at every transverse joint and elsewhere color-coded No.18 wire with 0.031"high temperature(I 05 degs.F)plastic Damper manufacturers are subject to specification compliance.Provide Register Dampers: removed or installed and patching is being performed,unless noted according to the table. insulation on each conductor and plastic sheath over all. Install electronic products by one of the following: Opposed Blade:Adjustable opposed-blade damper assembly,key operated WJ otherwise on the architectural drawings. 23 0713.00-Duct Insulation circuits with color-coded No.22 wire with 0.023"polyethylene insulation on Greenheck Fan Corporation from face of register. Tests and Adjustments Al liners,insulation and adhesives shall have a flame spread index not more each conductor with plastic-jacketed copper shield over all. Nailor Industries Register and Grille Finishes: No duds,fixtures or equipment shall be concealed or covered until they than 25 and a smoke developed index of not more than 50.insulation shaft Smoke Detector Ruskin Company Register and Grille Finishes:White Enamel:Semi-gloss white enamel prime have been inspected and approved by the Architect and the inspector who have a minimum installed thermal resistance value of R6 or code minimum, Ali dud smoke detectors will be furnished by electrical contractor,installed Young Regulator Company finish. t shall be notified by the contractor when the work is ready for inspection. whichever higher. by the HVAC contractor,and wired by the electrical contractor per local Coordination: Coordinate dud installations with installation of accessories, Register and Grille Acoustic Performance:NC less than or equal to 30 W 8 Work shall be completely installed,tested and leak tight before inspection is Rigid Fiberglass Ductwork Insulation:Glass fibers bonded with a codes. HVAC contractor will interlock fan with smoke detectoo dampers,cog frames,equipment,controls and other associated work of Manufacturer_ Subject to compliance with requirements,provide diffusers of required. All tests shall be repeated to the satisfaction of those making the thermosetting resit. Comply with ASTM C 612,Type IB,without facing and Motor Operated Dampers ductwork system. one of the following: I im ,.r inspection. with vapor barrier all-service jacket manufactured from kraft paper, All fresh air intakes and exhaust louvers shall have motor operated dampers. Installation of Dud Liner Metal-Aire-return type-RH series . < project conditions reinforcing scrim,aluminum foil,and vinyl film. Dampers shall be low leak with blade and edge seals. Motor operated General: Install dud finer in accordance with SMACNA HVAC Dud Titus Products Div. Z) Where new HVAC systems are required to be connected to existing HVAC Flexible Fiberglass Ductwork Insulation:Glass fibers bonded with a dampers shall provided,installed and wired by the mechanical contractor Construction Standards.Size of ductwork shown on the drawings is free net systems,it is the contractor's responsibility to verify the location,size, thermosetting resin. Comply with ASTM C 553,Type 11,without facing and unless otherwise noted. Provide all necessary transformers,contactors, area,outside dimension of duds will need to be increased if lined dud is TESTING,ADJUSTING,AND BALANCING C3 pressure,condition,and they shag verify that the existing HVAC system is with vapor barrier all-servioe jacket manufactured from kraft paper, controls and wiring for interlocking equipment to motor operated dampers. used. Final system testing,balancing and adjustments shall be performed by a t1 indeed the correct and appropriate HVAC system before any work is done. reinforcing scrim,aluminum foil,and vinyl film. Store internally lined ductwork up off of the floor.Protect internally fined contractor certified by the national environmental balancing bureau(NEBB) V) 0 Provide all necessary camera scoping and dye testing as necessary. If Vapor Barrier Material for Ductwork: Paper-backed aluminum-foil,except as ZONE DAMPERS: ductwork from water and dust"Butter the leading edge of all internal duct or associated air balance council(AABC). Tests shall not be perfumed by Z .. there is any need for concern,if it is determined that the existing HVAC otherwise indicated;strength and permeability rating equivalent to On a cal for cooling from the storage space sensor,if the duct mounted tiring with the manufacturees recommended adhesive. installing company. Test and balance contractor shag perform test readings ki system is not a correct or appropriate HVAC system or not connected to a factory-applied vapor barriers on adjoining ductwork insulation,where supply air temperature sensor senses the air is below 65°F,the motor inspect and repair all damaged lining prior to installation of ductwork. on all fans,units coils,etc. And adjust equipment to deliver specified correct or appropriate HVAC system,if the condition of the existing HVAC available;with following additional construction characteristics: operated damper shall modulate open_if the dud mounted supply air Installation of Flexible Duds amounts of air. A certified air balance report shag be submitted on certified c 7 system is not viable for re-use,or any other condition that would not allow High Puncture Resistance: Low vapor transmission(for ducts in exposed temperature sensor senses the supply air is above 75'F,the motor operated Maximum Length: For any dud run using flexible ductwork,do not exceed 'NEBB'or AABC'form. Reports submitted on non certified or customized 4 the proper functioning of the new HVAC system,the contractor shag notify areas:Mach.Rooms,etc.) damper shag modulate to minimum position. 5'-0"extended length.Installation shag have smooth full radius turns down reports will not be accepted. The report shall include at a minimum all air ,R the engineer in writing immediately via RFI and wait for direction before Moderate Puncture Resistance: Medium vapor transmission(for duds in On a call for heating from the storage space sensor,if the duct mounted to diffuser. supply,return and exhaust quantities;fan and unit test readings; entering a)- (D proceeding. concealed areas). supply air temperature sensor senses the air is below 6WF,the motor Installation not permitted above inaccessible ceilings. equipment and leaving equipment air temperatures;the report shag include - • Z Interruption of Existing HVAC Services: Do not interrupt service to facilities Al ductwork shall be insulated except operated damper shall modulate to minimum position.If the duct mounted Access Panels all nameplate data of installed equipment The air balance contractor should occupied by Owner or others unless permitted under the following conditions Double wag ductwork supply air temperature sensor senses the supply air is above 75`F,the Furnish all access panels required for proper servicing of equipment expect to follow up and perform air balance requirements for all out of design - and then only after arranging to provide temporary service according to Fabric ductwork motor operated damper shall modulate open. Provide access panels for all concealed valves;vents,controls and deanout and non functional seasonal systems. Three copies of the final compilation - r A ducts requirements indicated: Metal with dud finer of sufficient thickness to comply with energy code. - doors,and sprinkler devices required by NFPA:Provide frame as required of data shag be submitted to the ownericonstruction project manager for V�1 Notify,Architect Construction Manager,and Owner no fewer than seven Factory insulated flexible ductwork 23 31 13.00-Metal Duds for finish.Furnish panels to General Contractor_ Exact locations to be evaluation and approval before final completion of the project Report shall days in advance of proposed interruption of service. Factory insulated plenums and casings Ductwork Materials approved by the Architect, Minimum size to be 12"x 12",units to be 16 be bound and include the store name,mag name,space number,and city 0 Do not proceed with interruption of service without Arrhiteds written Flexible connectors Exposed Ductwork Materials:Where ductwork is indicated to be exposed to gauge steel,locking device shag be screwdriver cam blocs, where testing and balance has been performed. Ai dancing shall be 3: permission. ._ Vibration control devices view in occupied spaces,provide materials which are free from visual TESTING,ADJUSTING,AND BALANCING performer(with a 98%accurate air velocity meter. Air flows shag be [Seismic Bracing Factory insulated access panels and doors imperfections including pitting,seam marks,roller marks,stains and Final system testing,balancing and adjustments shag be performed by a balanced to within plustminus 10%of design requirements. The air balance 6 Provide seismic bracing of mechanical components where required by code. Supply ductwork exposed in conditioned spaces excluding mechanical discoloration,and other imperfections,including those which would impair contractor certified by the national environmental balancing bureau(NEBB) report should include data and course of action required if system can not be Quality Assurance roams,server rooms and electric equipment rooms painting. Exposed ductwork which is to be painted shag have paint grip or associated air balance council(AABC). Tests shag not be performed by balanced within 10%of design requirements_ The owner must receive the The contractor shag provide seismic restraint systems to meet total design Toilet exhaust,general exhaust and return ductwork in an insulated joist or applied. installing company. Test and balance contractor shall perform test readings air balance report no later then 15 days from the store tumover date. Ag lateral force requirements for support and restraint of piping,ductwork, attic space. Sheet Metal: Except as otherwise indicated,fabricate ductwork from on all fans,units coils,etc. And adjust equipment to deriver specified bearings shag be fined up. Bearings that have dirt or foreign material in equipment and other similar systems and equipment where required by the galvanized sheet steel,lock forming quality;with G 90 zinc coating and mil amounts of air_ A certified air balance report shall be submitted on certified them shall be replaced with new bearings without additional cost to the �i4h' 41 applicable building code. CENTRAL AiR TERMINAL UNITS phosphatized for exposed locations.Minimum gauge shall be 24. 'NEBB'or'AABC'form. Reports submitted on non certified or customized owner. Seismic Bracing and Support of Systems and Components ZONE DAMPERS: Miscellaneous Ductwork Materials reports will not be accepted. The report shall include at a minimum all air All thermostats and control devices shall be adjusted to operate as intended, Seismic restraint designer shall coordinate all attachments with the structural Owner to provide low voltage actuator and controls. Mechanical contractor Volume Dampers: Provide volume dampers in all branch ducts or as supply,return and exhaust quantifies;fan and unit test readings; entering coordinate with Yankee Candle's project manager. Coordinate startup with >= engineer of record. Provide engineered stamped and signed drawings of to provide damper and all necessary wiring,transformers,contactors as required for balancing to required air flows, equipment and leaving equipment air temperatures;the repot shall include ALC.Adjust bumers,pumps,fans,etc for proper and efficient operation, seismic design. required to interlock equipment to the zone damper.Provide all 120 power Fittings:Provide radius type fittings fabricated of multiple sections with all nameplate data of installed equipment The air balance contractor should Certify to Y.C.0 construction project manager that all adjustments have been wiring as required for transformers and temperature control panels. TCC maximum 15 deg.change of direction per section.Unless specifically expect to follow up and perform air balance requirements for all out of design made and that system is operating satisfactorily. Adjust all air devices to Seismic restraint designer shall provide visual inspection after installation shall connect to existing spare at electrical panel board and provide proper detailed otherwise,use 45 deg_laterals and 45 deg.ebows for branch and non functional seasonal systems. Three copies of the final compilation supply the amount of air shown on the drawings. Further adjustments shall 5 and approve installation of seismic design components. circuit breaker per NEC and label panel board accordingly. Route all low takeoff connections. Where 90 deg.branches are indicated,provide conical of data shall be submitted to the owner/construction project manager for be made to obtain uniform temperature in all spaces. Calibrate,set,and voltage wiring to zone dampers,controllers and thermostats for complete type tees. evaluation and approval before final completion of the project. Report shag adjust all automatic temperature controls. Check proper sequencing of all Design analysis shall include calculated dead loads,static seismic loads, operation. Dud Sealant Non-hardening,non-migrating mastic or liquid elastic sealant, be bound and include the store name,mail name,space number,and city interlock systems,and operation of all safety controls. Ali adjustments shalt and capacity of materials utilized for the connection of the equipment or Install owner provided temperature sensor(s)with connections to Rooftop type applicable for fabricationrnstallatim detail,as compounded and where testing and balance has been performed. Air balancing shall be be by general contractor at no additional cost to Yankee Candle Company. system to the structure. unit control panel.Sensor(s)shalt have setpoint adjustment capability, recommended by manufacturer specifically for sealing joints and seams in performed with a 98%accurate air veWty meter. Air flows shat)be override feature,and communications jack. ductwork, balanced to within plustminus 10%of design requirements. The air balance . Analysis shall detail anchoring methods,bolt diameter,and embedment Dud Cement Non-hardening migrating mastic or liquid neoprene based report should include data and course of action required if system can not be depth. 23 09 93.00-Sequence of Operations for HVAC Controls ceement,type applicable for fabricationlinstagation detail,as compounded balanced within 10%of design requirements. The owner must receive the and recommended by manufacturer specifically for cementing fitting air balance report no later then 15 days from the store turnover date. All All seismic restraint devices shag be designed to accept without failure the VAV Boxes components,or bngitudinal seams in ductwork_ bearings shall be lined up. Bearings that have dirt or foreign material in forces calculated per the applicable building code. Provide low voltage DDC controller,transformer,differential pressure Ductwork Support Materials:Except as otherwise indicated,provide them shag be replaced with new bearings without additional cost to the transmitter,actuator and wiring for VAV box with electric reheat hot-dipped galvanized steel fasteners,anchors,rods,straps,trim and angles owner. Friction from gravity loads shalt not be considered resistance to seismic Temperature Controls Contractor shall field or factory mount controller at for support of ductwork All thermostats and control devices shag be adjusted to operate as intended, 4 forces. their expense.TCC shall provide all 120 power wiring as required for Flexible Duds coordinate with Yankee Candle's project manager. Coordinate startup with transformers and temperature control panels. TCC shag conned to existing Either spiral-wound spring steel with flameproof vinyl sheathing,or ALC.Adjust burners,pumps,fans,etc.for proper and efficient operation. I1RAW DATE: Fire protection systems shall meet the requirements of NFPA-13 and spare at electrical panel board and provide proper circuit breaker per NEC corrugated aluminum.Unless specifically mentioned,the maximum length of Certify to Y_C_C construction project manager that all adjustments have been _ NFPA-14 for the building seismic requirements.] and label panel board accordingly. TCC shall route all low voltage wiring to flex dud on the supply equals 5 feet Flex is not allowed for return,relief or made and that system is operating satisfactorily. Adjust all air devices to VAV boxes,controlleand thermostats for complete operation. VAV box exhaust applications.The flexible ducts indicated for use in the HVAC. supply the amount of air shown on the drawings. Further adjustments shag rs REV.# ME/MSMFM I DATE 23 05 03.00-submittals for HVAC manufacturer shalt furnish flow ring,Y:"round damper shaft for direct system shall conform to the requirements of UL 181 for Class 0 or Class 1 be made to obtain uniform temperature in all spaces. Calibrate,set,and General mounting of actuator,and control enclosure. flexible air duds and shall be so identified. adjust all automatic temperature controls, Check proper sequencing of all i YCC REVIEW 11/2012015 Where submittals are required by the Contract Documents,they shall be Fan-Powered VAV-Parallel/Variable Flow Where installed in unconditioned spaces other than return air plenums, interlock systems,and operation of all safety controls_ Al adjustments shall prepared and supplied in accordance with the Contract Documents. In Provide 2-staged,electric reheat coil. provide 1"thick 1-112 lb.continuous flexible fiberglass sheath with vinyl be by general oDntuactDr at no additional cost to Yankee Candle Company. addition to Division 01,the Contractor is advised to review and comply with On a call for cooling,electric reheat cont shag de-energize and fan shall vapor barrier jacket the requirements articulated within each Division and within each section of de-energize.On a further call for cooling,modulate the primary air damper Installation is not permitted above drywall ceilings and inaccessible ceilings. [23 36 00.00-Air Terminal Units that Division. open to satisfy room temperature. Fabrication Fan Powered Terminals 3 Some Divisions may include a divisi xr-specific"Submittal Requirements for On a call for heat,VAV primary air damper shag modulate down to minimum Shop fabricate ductwork it 4,8,10 or 124t lengths,unless otherwise Fan Section: Provide galvanized steel plenum,acoustically tined,housing ."section. Where this section exists,it articulates additional requirements setpoint position.On a further call for heating,energize the fan.On a further indicated or required to complete nuns. All ductwork shag be Pittsburgh forward curved fan with belt or direct driven permanent split capacitor motor. for submittals that apply to the work of that Division. call for heating,electric reheat wit shall be staged on. Construction with a minimum of thickness of 24 gauge.In addition,ductwork Provide velocity sensor ring and damper with jack shaft The following requirements help to identify,track and keep the project Provide supply air temperature sensor tied to BAS. used in systems over 3"W.G.shag have cold sealant applied Shop Provide air filter and back-draft damper. organized for all parties involved. They are necessary to ensure a timely During un-occupied mode VAV boxes shag be capable of stroking fully fabricate ductwork of gauges and reinforcement complying with SMACNA Provide control-powered transformer for each box.At installers option,ship I turnaround and an appropriate technical review. Submittals that do not dosed for temperature control. "HVAC Dud Construction Standards". controls to box manufacturer for factory mounting.All shipping costs shall be conform to the administrative requirements are rejected and returned, Toilet Exhaust Fans (Manual) tined Duct borne by the temperature contra contractor,box manufacturer is responsible DRAIN BY: REtADFD Or without technical review. Exhaust fans shag be controlled by local manual switch fumished,installed Fabricate ductwork with dud liner in each section of duct where indicated. for mounting. SMY/JLIMCD/JST Requirements and wired by electrical contractor. When activated,exhaust fan motor laminate finer to internal surfaces of dud in accordance with instructions by Provide the following type of coil: Supply submittals for each section:Submittals shall be supplied on a damper shall open and fan shalt start manufacturers of fining and adhesive,and fasten with mechanical fasteners. Electric Heating Coils: Provide heating coils constructed of electric I PROM# section-by-section and type-by-type basis.For exempt-,independent (Indicated by EC on HECS schedule)] Duct fuer to be 3-ib density for acoustic requirements 1"thick or as noted. resistance elements in galvanized steel casing with control box and 17684 product data submittals shall be furnished for each section that requires Controls Size of ductwork shown on the drawings is free net area,outride dimension factory-wiring. Provide overtemperature protection and UL-fisfing as duct product data submittals.Independent shop drawing submittals shall be Electrical contractor will provide power wiring. HVAC contractor shall of duds will need to be increased if Bred dud is used. heater. SHEET ITILE 2 famished for each section that requires shop drawings.Refer to the provide all the low voltage wiring of HVAC units and controls,thermostats Size of ductwork shown on the drawings is free net area,outside dimension Manufacturer: Subject to compliance with requirements,provide air MECHANICAL specifications for identification of which submittals are required for the and controllers. Thermostat shall be by the manufacturer of the HVAC unit of ducts will need to be increased if fired dud le used. terminals of one of the following: .- project Separate PDF file packages shag be supplied for each section,for (heattwol/auto/off)with night setback. Provide plastic protective cover for all Dud Liner. Fibrous glass of thickness indicated.34b density.All liners, Anemostat Products Div.,Dynamics Corp.of America. each submittal type,where electronic submittals are required.Each PDF thermostats. insulation and adhesives shag have a flame spread index not more than 25 Canes Co. SPECIFICATION S shall represent a single standalone submittal. Low Voltage Thermostats and a smoke developed index of not more than 50. E.H_Price Separately bound and identified submittals shag be provided where Low voltage thermostats shall be fumished,installed and wired by the HVAC Duct Liner Adhesive Enviro-Tec hardcopies are required. contractor.The electrical contractor shall provide 4'square x 1-IIT deep Dud liner Fasteners: Comply with SMACNA HVAC Dud Construction Krueger Include a transmittal:Transmittals shall enumerate each submittal for each wag outlet boxers(with single-gang rings)for all thermostatstsensors. The Standards. Titus Products Div.,Philips Industries,Inc. section of each type and iteration. electrical contractor shall provide one 314'empty conduit from each Double Wal Duds Carrier Corp_,Sub.of United Technologies Corp. Include cover sheet t titre page:The cover street shag include the information thermostatlsensor location,turned out above accessible ceilings(in joist Exposed round and rectangular ductwork and fittings shall be manufactured Trane(The)Co. identified in the contract documents_ It shag be included as the first page of space or against overhead slabldeckj. The HVAC/Temperature Control or shop-fabricated double wall a minimum G-90 galvanized steel ductwork MetalAire SHEET# each electronic and/or hardcopy document-based submittal.An editable and Contractor shall provide all other necessary conduit,raceway and wiring with 1"fiberglass insulation between the solid outer shelf and perforated Tuttle&Bailey 1 printable PDF form created with editable fields and specification compliant related work Conduit shag be identified in ceiling cavity and shag be inner liner.All duds and fittings shag be construction for SMACNA's latest Inspection . appearance is available from KLH upon request It is also downloadable provided with sweep bends,bushings and dragline. standards.All gaskets shalt be UL fisted to conform to ASTM E84-91a and Examine areas and conditions under which air terminals are to be innstalled. from the KLH website at www.klhengrs.com. The HVAC/Temperature Control Contractor shall coordinate with the NFPA 90A. Do not proceed with work until unsatisfactory conditions have been Include an index.The index shag enumerate the contents of the submittal. General Contractor to ensure thermal envelope is maintained at these Manufacturers.Subject to compliance with requirements,provide ductwork corrected in manner acceptable to Installer. Include checklists:Where checklists are included with the specifications, locations, of one of the following:United-McGills K-27,Lindab Safe,Semw or Installation M �301 complete and include them within the appropriate submittal.Supply General Control bluing Requirements and installation Methods approved equal. General: Install air terminals as indicated,and it accordance with A B C D E F 6 H I J K L N H P 0 A B c 0 E F G H d K L Y N p Q K 12 H KOHRS LONNEMANN HEIL ENGINEERS, PSC MECHANICAUELECTRICAL ENGINEERS VWVW.KLHF-NGRS.COM 1538 ALEXANDRIA PIKE,SUITE 11 FT.THOMAS,KENTUCKY 41075 11 800-354-9783 859-442-8050 �.�S 859-442-8058 FAX <=LANDLORD PRIMARY SUPPLY AIR LEXINGTON,KENTUCKY 1 MECHANICAL CONTRACTOR SHALL INSTALL ALL OWNER COLUMBUS,OHIO FURNISHED WAC EQUIPMENT AND CONTROLS PER THE DAYTON,OHIO OWNER—FURNISHED EMS EQUIPMENT SCHEDULE THIS SHEET. THIS NEW YORK,NEW YORK INCLUDES ANY FIELD INSTALLED ACCESSORIES. THE CONTRACTOR IS RESPONSIBLE FOR THE PROPER INSTALLATION OF THE WAC VAV- 1 EQUIPMENT, ACCESSORIES AND CONTROL WIRING IN ACCORDANCE IER 45M WITH DRAWINGS. THE MECHANICAL CONTRACTOR WILL BE YANF\ll WR RESPONSIBLE FOR PROPER TERMINATION OF CONTROLS AND PERFORMING A REMOTE SITE STARTUP WITH AUTOMATEDLOGIC (ALC). CANDL.qu 2. CONTRACTORS SHALL REVIEW DETAILED INSTALLATION INSTRUCTIONS AND CONFIRM INSTALLATION LOCATIONS FOR ALL YANKEE CANDLE CO. WAC EQUIPMENT, DUCTWORK, DIFFUSERS, CONTROLS ETC. WITH 16 YANKEE CANDLE WAY PPJMARY 100THE GENERAL CONTRACTOR SUPERINTENDENT AND YCC PROJECT SOUTH DEERFIELD,MA 01373 0 suppLy SAM MANAGER DURING THE FIRST WEEK OF CONSTRUCTION (AFTER DEMO AMAM L 600-1200 CFM > WORK IS COMPLETE). THE PURPOSE IS TO VERIFY ALL WORK CAN STORE#435 BE INSTALLED AS PER THE DRAWINGS. FAILURE TO MENTION ANY 9 PRI13 13 SPECIFIC ITEM OR DEVICE DOES NOT RELIEVE THE MECHANICAL MARY--/ FILO*--/ , SUPPLY P F)Ly__/ CONTRACTOR OF THE RESPONSIBILITY FOR INSTALLING OR PROVIDING SUCH DEVICES OR ITEMS IN ORDER TO ACHIEVE THE 111R SENSOR PICKUP '-ZN341 v+ AIR SENSOR N.O.� STOCK INTENT OF THE DRAWINGS AND SPECIFICATIONS. W DESIGN CRITERIA 'K NO. ITEM VALUE VALUE DESCRIPTION 3. MECHANICAL CONTRACTOR SHALL PERFORM THE STARTUP OF X 14 THE CONTROLS WITH ALC VIA REMOTE SITE CONNECTION. ALL 1 WAC RAJ. CONTROL ITEMS MUST BE COMPLETED ON THE START-UP READINESS FORM SCOPE MONITOR ONLY PROVIDED BY ALC BEFORE REMOTE STARTUP. ALLOW 2-3 DAYS EMS- ms-1 EMS- MS-10 2 AMBIENT INCLUDED LEAD TO SCHEDULE THE STARTUP. STARTUP OF THE WAC EQUIPMENT AND CONTROLS SHALL BE COMPLETED BY MECHANICAL LIGHT x NOT USED =maw w CONTRACTOR ADVANCE OF THE SCHEDULED PROJECT PUNCH_DATE. 3 EMS YES. REUSE EQUIP. REMODEL x NO, PROVIDE NEW4. THE FOLLOWING ITEMS MUST BE COMPLETE BEFORE A w ym REIL U. REQ*D FINISHED CEILING—; COMPLETE CONTROLS START—UP CAN BE PERFORMED: - EMS PANEL INSTALLED RED r X NO, NEW - SENSORS AND CONTROLS INSTALLED AND TERMINATED - POWER TO THE EMS PANEL AND ALL WAC EQUIPMENT - ALL EMS WIRING INSTALLED AND TERMINATED - ALL UNIT ACCESSORIES INSTALLED AND WIRED. u z 0 EMS CABLE LEGEND - WORKING YCC LAN CONNECTED TO EMS PANEL 1h, 0 Er 7 CONTACT ALC AT 678-797-5060 IF,YOU HAVE ANY QUESTIONS ON < TAG EMS # CABLE DESCRIPTION HOW TO PERFORM THESE TASKS OR E-MAIL w (D (D YANKEECANDLESUPPORTOAUTOMATEDLOGIC.COM FOR PDF z_ F- 1 EMS-1 22/2 COMMUNICATION REPLACEMENT CONTROL DRAWIAVAILABLE NGS AND SCHEDPRIULING. EMS r--EMS-4 1--EMS-5 CONTROL DRAWINGS ARE 10 DAYS OR TO EQUIPMENT DEUVr:.f;ff. 2 EMS-2 22/2 SUPPLY AIR TEMP j < 5. MECHANICAL CONTRACTOR SHALL VERIFY ALL EMSP LIGHTING 0 CONTACTOR FUNCTIONS, TEST STORE PERSONNEL OVERRIDE 'f ammms" 3EMS-3 22/2 - PRIMARY AIR TEMP . BUTTONS, OBSERVE CKTS UNDER CONTROL AND BE PREPARED TO 6 4 EMS-4 22/8 SALES SPACE SENSOR REPORT ANY DEFICIENCY TO THE GENERAL CONTRACTOR. 6. AIR BALANCE CONTRACTOR SHALL COORDINATE WITH ALC WHEN SPACE SPACE �RACEWAY STUB UP 8' AIR BALANCING THE SYSTEM. THIS INCLUDES BUT NOT LIMITED TO 5 EMS-5 -22/2 STORAGE SPACE SENSOR SENSOR T SENSOR AFF OR AS RE 'D BY SETTING UP MINIMUM OUTSIDE AIR DAMPER REQUIREMENTS FOR WSALES STORAGE ANY EMS CONTROLLED DAMPER. TAB SHALL CALIBRATE ALL REO'D lo EMS-10 -22/2 ZONE DAMPER NEC FLOW SET-POINTS K-FACTORS REMOTELY W/ ALC. ALLOW 2-3 DAYS LEAD FOR SCHEDULING. >= 7. FINAL ACCEPTANCE OF THIS CONTROL SYSTEM WILL NOT BE APPROVED UNLESS THE ABOVE PROCEDURE IS FOLLOWED AND OWNER-FURNISHED EMS EQUIPMENT SCHEDULE DOCUMENTED. ALC CHECKOUT OR STATUS REPORTS SHALL BE ISSUED TO YCC NEXT BUSSNESS DAY AND CONTROL NUMBER IS PARTY MS-2 ISSUED BY YCC. IF ALL ITEMS ARE NOT COMPLETED NTRACTOR. QTY. DESCRIPTION PARly INSTALL FTmsTCANDLE WILL NOT APPROVE FINAL PAYMENT TO THECO 1 EMS PANEL '3.02 ALC EMSP-3.02 ELEC 8. GC/MECHANICAL CONTRACTOR WILL PROVIDE 1ST YEAR WARRANTY RESPONSIBILITY (LABOR ONLY) FOR THE HVAC 1 EMSP GATEWAY/LTG-CONTR ALC ME812U-LGR 15 EQUIPMENT AND CONTROLS. 9. ALC SHALL PROVIDE THE EMS PANEL PRE-WIRED AND — EMSP TERMINAL BLOCK KIT ALC 1300-KIT-1 MECH PROGRAMMED. THE ETHERNET CONNECTION IS BY THE "LAN" CONTRACTOR. MOUNT EMS PANEL AS CLOSE TO ELECTRICAL 4 1 VAV CONTROLLER ALC ZN341v+ MECH (D PANEL BOARDS AS POSSIBLE OR AS INDICATED IN ELECTRICAL OMWA DAM I MT SHEETS..M, 1 RS SPACE SENSOR ALC RS-BASE MECH (D 10. ELECTRICAL CONTRACTOR SHALL PROVIDE RACEWAY PER NEC REV.I ME DMWM UM TO SALES LIGHTS AND STOREFRONT LIGHTS/SIGNS. 1 STORAGE SPACE SENSOR BAPI ALC/10k-2-R MECH YCC RE\nEW 1112012015 11. ELECTRICAL CONTRACTOR SHALL PROVIDE RACEWAY PER NEC FER PEF1 BRA OM PCRITS. BDSALIGHTSAND STOREFRONT LIGHTS/SIGNS2 DUCT TEMP SENSOR (PA/SA) BAPI ALC/lOk-2-D-8 MECH MT NCHUEMS PANEL POWER 1 DAMPER ACTUATOR BELIMO LF24-US MECH 12. NOT USED. f%l 1 ENSORs D INSTALLASSIATED2 ACTIVE NETWORK TERMINATOR ALC BT485 MECH IN THE DUCTWORK AS SHOWN. MOUNT SPACE SENSORS EMS PANEL IN LOCATIONS SHOWN ON SHEET M-101. 24VAC CONTROL 1 LOW-VOLTAGE CABLE, 22/2 22/2-CL2P MECH TRANSFORMER PROVIDED SHALL BE PROVIDEDI W/ VAV BOX. MANY. REVOM ar f%l HI 24"H X 24"W CONTROL POWER BY OTHERS. SMY/JLI MCD/JST 1 LOW-VOLTAGE CABLE, 22/8 22/8-CL2P MEC14. ZONE DAMPER MUST BE A NORMALLY OPEN (N.O.) ACTUATOR MuTt TO OPEN WITHOUT 24VAC AND CLOSE WHEN ENERGIZED WITH 17684 INDICATES AN EXISTING OWNER-FURNISHED PART TO BE REUSED. 24VAC. SEE SHEET M-101 FOR LOCATION(S). THIS DAMPER SHM'AU 2 SHALL BE COMMANDED BASED ON HVAC/DAT SENSOR AND STOCKROOM TEMP SENSOR. MECHANICAL 15. EMSP GATEWAY/LTG-CONTR ALC ME812U-LGR IS FACTORY CONTROLS INSTALLED IN THE EMS PANEL 16. MECHANICAL CONTRACTOR IS RESPONSIBLE FOR INSTALLING TEMPERATURE CONTROL SYSTEM WIRING AND DEVICES AS PROVIDED BY YCC AND DIRECT PURCHASE FROM CARRIER/ALC. THIS DRAWING IS PROVIDED FOR BID PURPOSES, DETAILED CONTROL DRAWINGS FOR THIS PROJECT WILL BE PROVIDED WITH THE CONTROL DEWCES, YC-0435 YC-0435-M4-vl-(VAV_PF-RS-ZD).dwg CCB 11/17/2015 3:40 PM M �401 B c 0 E F 0 N i K I L I 11 I N I p 1 0 A B C D E F G H } K L W N P Q ......... Plans reference ion: Plans reference pagiti'section; �nnonoum � L 12 0 4. Hydronc systems .The heating of Ondds that have been pmvbusy mechanically cooled and the coding of fluids tnah have been Carwric R r�fm�*r fust b e met b y torn systaM to which the � � ! 1 previously y heated are it d in accordance with Sextons 503.4.9.1 through 509.4.3„3. >1 »t t-3 a�scribetle: �✓�1�1�rh�rl;.`�Software Version �.�.�.(} p 1, et t�rg and cQu�mg�� s are d�mnined in wham the pocedtree oiled in the - r coP� ASHRJW Standard . '° 'w '� n ' b'a'�r°"ed�c procedure. KOHRSLONNEMANN HEIL Mechanical Compliance Certificate ea# ❑S. Three-pipe sysarm.Hydrorkc system that use a common return system for bath hot wra ter and ciAW water are not In stalled. p 2- Equifxnent and system siz%Healing and coo&q equiparent and Wsterns capacity do not exceed Sha leads caculaled in amordafm ENGINEERS, PSC we section 503.21. Plans reference mon: (8): MECHANICAUELECTRICAL ❑8. Tvia-ppe changeover ayswi.System that use a common distributian system to supply bath heated and dded water we designed ❑ R"tilred standby equipment and system provided with controls nerd devices that allowsuch stems or equipment to cue ENGINEERS when the Primary equipment is not operating.- to allow a dead band between r#satgevvsr hum erne mode to tilt rdreir;ane prawtled wdh corntrols teed menti allowoPeracort in one - W W W,KLHENGRS.COM Section 1: Project information mode for at least 4 hours before dwi&V over W ther ower mate;and are WwAdiiif with 0ontrols that Ow Posting and coding istipply ❑ Wililpla units of the»eon type with combined capacifies excesdirg to coign ioad and{riled with controls that temperatures at the changeover point. have the capabifty to sequence the operation of each unit basad on bad. 1538 ALEXANDRIA PIKE,SUiTE 11 Energy Code:2014 Oregon Energy Efficiency Specialty Code t releremco�; Pests reference pmt: FT.THOMAS,KENTUCKY 41075 11 Project Title:Yankee Care-Rasa Park Mal Project TyW-Aitera l n "` ❑7. Hydronl c(water loop)heat pump v Hydrom heat pump syrsl ems oompty with Sections 503.4.3.8.1 through 503.4.3..9.9. ❑3. HVAC EgLwT d Psrlonnanee Roquiro rents.Reported have been mated and rated b agree with the app5cable test Coristrucfion Site: Owner/Agent DesignorXont r 800-354-9783 2-8050 Yankee Candle SM Plans ratarence pagameeft': exp,the n+rocedure The �t eNi�cy ratings are supported��abyaPPr man progrartm Der,t tiro rartificaiyon program 859-"2-058 FAX Ran Ptsk ball 8. Temperature- d ba+d_ hit pxrErbps corrneeted to a x drrmmom sheat pump realer loop hwitn xwrhtrai for treat Q 4. Themrostafic C The supply tat hearting and cooling energy to each zone is rolled by individual otic controls til Pittsburgh,PA © and heat teat addbon have controls that are capable of providinga heat puny waw supply temperature ratur a dead band of at least 20`F respond o temffrerashra w6tntrh the zone. �N COLUTON,MBUS, KENTUCKY , HI between iron of hr�refection and thea addition by the central ddb. Plane��: COLUMBUS,OHIO Vis): DAYTON,ONTO Section 2: General information p 5 Head pump supplementary heat.Heat pumps having electric resistance treat have controls that exempt dbrrhg defrost NEW YORK,NEW YORK ❑ Where a system bop temperature optimb ation controller is i:staled and eats detemniee the most eft operating tempensf re Tigsrd,Oregon based an reallime conditions of demand and capadty.bead bands d less Oman 2(rF shall be pe mmttted. Prevent supplerm>entaryr heat operation when the treat pump can meet the heotang be! 8teldnD Location(tor weather data) Climate Zurha: 4c plans Plane r� dsrr: ❑6. Set point andap mil 6. used to both heating and ox&e zonae Srerer ie controls provide a lomperalure ripe 10 Section 3: Mechanical Systema List (�9- H and Boling Wailer Pump torrlid.Wath dmudatiar systems serving healingr•coil(s))or cooling coil(o)have controls t had lack out or deadband of 9least ST(22*C)wWd n whir the of heating and coding sleepy to the mne is of being ctaf off or YAN ea tramp operation rbderm itmere as no demand.The pompe will shat oft based on the outsda air tank out d to a minimurn. K..e fir s): £xcspds) (3 industrial A and ctxtroi pp Thermostats res4trfrtng manual change esrrx between trea2lrrg and txbatlrng modes. CANIDLe I V-01(MulCooling. each-he}: Pians reference page.^ on: Plane mforernce pagwseroan: Coding:t each-Other,Capacity.29�nfim,Aa-Cooled Condenser,Rs Economizer Farr System. FAN SYSTEM 1-Complianciii(intoner nameplate HP method):Pawn ❑ 10.P-e quire mens For Complex rn adrenic l System Servtrg Wffpb Zones. p 7- Opti men Start Controls.Each WAC"vent has coreda that vary the start-up foe of the syr le just moat the temperature set YANKEE CANDLE CO. Fares: Point at 11m d Y 8NKM 1YANKEE CAlNDLE WAY Complex syslemms mum zones comply with Serbatn1503.4.5.1 bough 5(X3.4.5.4 AdflGexelly,apply air system I SqCt D,MA 01 Y FAV t Supply,Single-Zone VAY,12M�0.1 maw elan hp multiple Plane reference pagelsee�on: sxxnes are VAV�which are�and d belthy}�to redduoe primary sit to each Section : Requirements Checklist 73 the ftlu ro of�that is r�rs,r otedt+ c�d as pmt het ug dar�dt,and modulate wlow between de&wW and fed heangkowing. ❑ Off-hour controls.Each programrr stem war� tn�are crrrrtro�d by either an aulomratic tar a code or �n(s1: STORE*435 /n Ow AAV**W requinirrmft k avhk dlikAbowe kbn*requkwitertis chat Ore applicant teas not acfsnorvkdgedas Fane molt Checkmarka ❑ Zones where special pressuirizaborl relationships at cress-contamination niquiremeeft are such thea VAV systems are ❑ Zoon that will be operated contirluously, 9 PdenA*requirom encs Met Hit app>Tbant andewsrfexgss are reset or excep4sd chem vw ❑ Zones whh a fluff HVAC load demand not exceeding 6.8(10 Stift(2 k"and hmft a ready accessible we uual stUM switCc ttre plawAloares iM mquirement can the ved&Ad as bift salrsfied p Zorhes or supply air system where at least 75 percent of the energy for reheats ng or for providing warm air In mixing system is Pkrns reference�` Requir'enwili#S Cif c To:V-01 : primed from a sits-raoovefed orar�s�oneW soup U 1. Energy reeo+rayr ventilation system Individual fear systems than have bulb a deign supply air capacity of 5.000 cdtn orgreater and a ❑ 7anes where special tumidity levels are required th sally process need. p 9. Shutoff damfrar controls.t3olth outdoor air supply and esdiaust are egtiged with not lest than Class h motorized darripers. QD. mininwm oudada air supply of 70 percent or greater of ins design supply air qty have an energy recovery system. 0 Zones with a peak supply air quarafty at 300 dm or less and where the low rata ks lees brash 10 parwit of the Intal tan system ExcispliWs): Ems)_ supply(airsow rate. ❑ Gravity dampers slid be permitted for outside air intake or exhaust arffovs of 300 dm orless. ❑ W%m energy rect wry systems we prohibited by the International Mem Cin&. ❑ Zones where the vokrhhe of or am be fithealed,facoded or wed is no greater than the volume of afaide air required to meet Plans requirements ed W. ddcmbh Ll Systems serving that are not wooled acrd are tested to less then 60°F ❑ Zones or supply air system with U�c and h�controls capable of mg in sequence tt o supply of heating LI 10 Freeze Protection and snow melt system contrds.Freeze protection syr,such as head trarirrp of outdoor pipirgi acrd heat E3VVtere more than 60 pear of the outdoor cheating energy le provided tram alte-reca Bred or site solar energy(. and coding energy to to zones)and which aha capable of pnivoinfing reheating.recooling,mixing or simultaneous supply of air exchangers,including set regutatirg heat Use%include autornatc c onfrois capable of shutting off the system when outdoor or ❑ Type 1 klich n exert hoods. that has beery previosly cooled. tennpardtres(treat code critents. ❑ CoMV system in climates,with a 11e1eer1 W0111V ddesllin wet-brA6 ternperatue iesis than 64`F(18-C) g ❑ Systems re+gtiring detrsrnidGuadioru teat�iotr serisgle orgy r�prray t wrapped sound oma dxhofirg Doti when the Plan "�� = Plans reference mon: evaporative Doll is food L earn of ftne exhaust air stream. 11.E d pn systems Zones wit fait process to a err humidity requirements are seroed by ❑ s exhausting ionic,flammable.paint exhaust,corrosive fumes,or duct ❑ 1t.;supgil duct variable air supply ar a(YAV}�torrrrihasi devices VAV systems use terminal devicaes kat oma ❑ ua�pty of prtr�y supply air incites relneatirg or recoding takes Plaza• separate air distributim rislarris from O'wnse serving muss requiring eat+exmrrfurt condMons;a"'rtckrde snpQierrhertfary contrmhi ❑ Laboratory tams hood s}ra wrhs the include eluaipytrrg teattiees. provistions so lead the Primary system maybespeefficallycortircillad fomfor cot purposes only. Plans refenenoe pe ooh: U $)• [503.2.4.8+1 Zones requrrrg only c omlort heave or c o siort eroding Mare served by a syste,n pry used for process Places reference e on: ❑ 1-Supplymair temperature reset carats 1411AG system serving mApie zones including Dedicated Outside Ar System rtcitdde and hurnklity control. that /� /'"� p Z Complex System.Mochaniow system not covered by section 506.3 corn*to sections SM4.1-506.4.6. Ezoautomatically ecuppiy nc temperature 1n to building inerts or b outdoor air V gpOars(s): Pians rderermra pagom: V) Plans reference pa ction: 0 Sysbernsthalpmentiel ng,recookV or mixing of hued and cooled supply air. p 9 Varlabie air vokrrre tarn oo*oL kWNWui i VAV fans nddh moksrs o t 10 hp or greater are drivenkorttroled in itre rn ww>r specified bye Obis ❑ 75 pero m orf the energy fur rate ng is from skis reaawered or site solar energy sources. U z to"%- section. 7 :c ref" r ri Project Title~Yankee Candle-Rom Park Mal Repot dam:11117115 Prajerd Tdo:Yankee Carmtfle-Ross Park Man Report dada:11/17115 Project Tnlle:Yankee Gamete-Rosa Pak tuleli Report data:1 t/17115 Data llerbahe:Gil 7000-17 k17600-17 11768XVitiled DataiEnergyC4mp6ancakYC#865 Co nCherizcdc Page 1 of 6 Data filename:G t1700b179MU7600-176WI 768dtProject Data3EnergyCA:impawrrarlYC thBBFb CoraChecic,cscx Page 2 of 6 t:3aia 6terenhe:Gt17000.17917600-176i178841Project YC f665 CarrrCtsecccdc Page 3 of B M1�_ U) ❑ 12 HURWItyr ootUOL t a system is equipped with a meaals b add or remove nnobdre to mei>tain specific humidify leads Ina zone or ❑2LI-figh-pressure duct systems.Dorcas deskjted 10 operate at high-prtesure are Insulated will seated in accordance with Section 506.2.7. zones,a hurnift control device s provided. In addition,ducts and plenums are Wak4ested Inaccordance with the SMACNA MVAC Air Duds Leakage Ted MaPlans� f'lsre reler+ernce ptrgeyeerfioum: Plans rcterencca (1 1rtdilr coffr&Where a humidity control device elders ft is set to p►e+V tfe use of fuel or d eevicity to Wad,"rive ❑23.P hg rrsdation.AN pig spm+xun6>ior�bg system(lhct pinfox water g heat systems, water,reldgermht,and bane Section 5: Compliance Statement9.Hrr humidity midity ki excess of 30 permit.Where a humidify cortral device is used for detwrridAcation,it is set to preverrt the use of fossil!reel ta�e9 syr and stean pwq)ae insulated as t�Fed by this isecom Compliance�The mechanical ateratian ptojec#represented h tis doxxrmermt Is coktsisterrt with the bra'tdk+9 or electricity to red"rr�dave Mumidityr be,-no 80 pervent ❑24.Ak system balart�rg Each supply air oft and zone terry"device is equipped with mearn for air b la ci g h accordance with the F s): reqrirornerfs 4*IMC 603.17.Discharge dampen; to modt#fe airlwr are Pfd an constant volume tiers and variable speefficallim and other calculations suited with this pearl appkatiom The proposed medratical atteratfon projed has been dared (3 How.Process need%ardriv+es,museums.critical ecuiprnerrL and other norr oo mlod sons web specillchumidity volume fare with ttotot 10 hotseporer. to meet the 2014 Oregon Ertergyr Effl&wcy Specialty Code.Moa 8.requirements in COMdock Version 4.03.0 and to comply with the requirements outside this range. t hockiisL marhdattoryr tmhquremew�a In tins Requiremerft PIN*rete ppm: Plate reference pagakedior ❑25.Hy ironic system bal rsdng.lrdividuai hydronic healing aid cooling cols are equipped with nimns for balancing and prom"tact U 14.FknWity oantrol.Where a humidity control dericneo a ista it is snit to maintain a deadband of at West 10%relative hwr* tty where no connections. l+ -Tdfe Signature Daily active humidification on dehumidification takes place. Exraspdatts): plans relenarmce papirsecdow - p Heaimg fordshumidificalkin is provided nntth heat reatvery or heat pumping and the nuichaarlcal coag system etTgaencyr is 10 0 25.lAas�The co sb uclimt documents squat that an operating and m�m�be provided tion the burg ounce by tors p percent leen required in sseclton 5063.3,HVAC Section �: Poet Construction Compliance Statement equornenl Performance roWrements. med contractor-See long b for ❑ HVAC rexxhrd*mwigs of irewWWvmt" _ systarn capacities,calibratiun inkimaltim std performairm data foreach egrdpmo3 Plasms reference pageoirsection, Plans reference provided Wthe owner. S 15.Ventilation.Ventilation,either hoer natural or meth rdeal,is provided in accordance with Chapter 4 of the Intematierrai Mechanical Code, ❑ ❑ Winona�verdttatiohn is -- 0 27.Ar Symon Design and Cared.Each HVAC system having a tubo tat system rth�r naumthptafar hp exceeding 5 hp moact the provisions HVAC 08M doarmerxs for al medmanidel equipment and syrstem provided b the osrrrber by The esontractor. prod,the sY has the try th reduce the o0ldoor ar supply to tree min m mquired by of Sections 503210.1 through 503.2.102- Chapter p Written HVAC g asci operations report provided to the awrher. 4 of the l>ternational Mechanical Code. Pleas rsfieranxe pagwucoow The above pdsct coon requirements hraule coiled. . Plans reference paogefsdedlont: ❑�fan icer vwe r horsepEach NVAC system at fear system design conditions does not exceed ire allowable fan system motor LI 16.Demand (DCV}.DCV is required br spaces 50 than 0 ft2 for skm nple aystes and s;paCes larger Oran 150112 hp(Option 1)at tam system bhp(Option 3)as shown and calutated in requirement distalls. PrincipalMechanical Designer-Name s;gnatrre Date for multiple Wits systems. �Sk CKs): U System;with energy recover} complying with Section 503,28 ❑ mita and laboratory systems Mat rflize Nor control devices an exhaust arrdfor return to maintain spaCo pressure rslalks ships U Spam less than 750 tt2(69-7 m2)where an occuponty sensor aims the tab td,tip Ore ventilation damper,or doses the necessary for occupant him and safety or erwronmertaf coli "be permitted to use variable vokrrns tarn Pawner zone darmrpsr wharh the space Is u noccupled. ❑ individual exhaust ust Lays with motor narnisoas horsepower of 1 hp,or le5s.. Pians relererce pageVseetior: Plats reference pagelsesliorr: 4 p 17.Kt tern hoodL iGtdmen makeup hs provided as regL&d by the Oregon tnd9thaueal Spdhri'atty Code. ❑29.1611thlor narrieplato hors"mOiber.For each tarn,to std tar mow is no tie►than the first available now stze geese►than the brake Exaep9mi(s): horsepovior lamp)- DRA1iN6 DAX p Where hoods are used to exhaust varldaion sit tnd would otherwise be exhausted by tan systems. Ere torr js). p 1(itc hen e> system that include exhaust air recovery complying with section 5032.6- Q For cel lm that sole,t on at Ste(het av8ft�ta lnotempt a int lit 1 is Alnta hnx�partrsr Yua1B a Mtam0pllted rating Mt19di 50 permeant or the binp selection orf forger rnaarneplete mouton size le a6owed. In# WE/DBOPUM DATE Plans reference p2gefsectlon: ❑ For lam 6 bhp and larger,where the ikct no"maior larger than the bhp has a nameplate rating within 30 percent of the bhp, U 18.F.nclosed parierg garage vertliFation comiras In Group S-2,endosdmd Padang garages used krsitrrng or hang aulamobilesiamploys selection of the next lager nameplate motor size is allowed. YCC REVIEW 11/20/2015 artormatic carton moradde aerwing devices. Plans relonince per : Plans reference page/section, ❑SILarge Volume Fan System Fan systems over 8.000(7 m3,%)tin without direct expansion coling cob lhet serve single zones r -----T-- Ll 19.Duct and plenum insulation and are li g.A6 supply and return air ducts mrd planurre are Insulated with the wed koufaton.When alifltrw based an spare hung and coding detmarrd-A ted eroux or variable frequency strive re iti es aktow 10 a limited within a building ing envelops assembly,the duct or Plenum is separated from the bonding extenior or unconditioned or exempt min 60 Pdhtcerrt at peak ahftw of minimum ventilation air recce as nw#*ed by Chapter 4 of the International Mechanical 3 spaces by a minmrn of R-8 insulation.All ducts,air handers and Mer boxes are seaoted.Joints and seams comply with Section 60&9 Code'wheiever is of the knlernatkirad Mechanical laude:. Vis)- Fx Wtkir4s): U System where the funct n of the supply air is ler purposes other than Wirperalunt control,such as maattaining sp Kiic humidity p Where khcaded whin explipilionL L-mis or supplying an exhaust system. U When the design temperature datenhgrsdoe between to interior acrd emxlerior d the duct or plenum does not exceed 15T(M Plans reference fir. U eft.Lowvrosrsure duct s ystemmre.Ai longitudinal and verse ,sem anti of bw�pressure supply aril rebrm eiwft axe ©s1_Afi air equipncrit and airy sift with erect mon cooling ends coding capeoityat AA conditions gloater ter than DRAIM BY: iiElEtIED ft secxaraly fastened and sealed with welds,gaskets,maks(adhealm), systems or tapes Installed in or equal to 110,tleo BUM that save single zones gore t"supply tan operation controlled according to code spectre rsgtirermonts S MYIJ LI MGD/.l ST accordance with to manufaetdree's rias instructions. �= scop s)- t3 System where the function of the supply sit Is far purposes mVhor than temperatum control,such as nnavntxri*V specific h PROJECT it U Continuously welded and looking type lora nal joints;and seams on ducts operating 4 static pressimm less than 2 inches wog. is,- or supp"M an em haust syslem. fe y 17684 Planes inference pagelseclion: SHEEP 1111.E 2 Plane reference � n: 21.iAectiunh sea due# AO drx#s and rxurre b nhetf 0=Swim far p ivh�ed terminal uri fan Fan motors for seem fantpo d thrrrnil units aha motors ❑ w �- Pte dee 1pmed operate um P are trialed and std i n arxo�rce and have a minkn rn mentor effidency cl'70 percent when rated in accordiance with NEMAStandard Mori 1-2006 at tui load rahMEC LJ I CA� with Section 503.8.7.Pressure spehcitic b the duct system are dearly indicted an the construction docuunremts. conditions. Plans reference pion: t reference pagaisection: ._ ENERGY 0 33.Hot Gas Bypass Limitatiorl.For cooling system-c--240 k8tuft masrimnrn hal Vas bypass capacity a no more it=50%lotal cooling capacity- COMPLIANCE Project Tdw Yankee Candle-Ross Pak Mall Report data:11117115 Prqea T Yankee Candle-Ross Pak hthi %UT# 1 Data Rename:GA17000.179t3 I7600.17a99t17M4Froject D;AMEnerM6Ccmp6ancd1%YC no C rnChedLeck Page 4 of a Data ldenamw G%l700o-1799 17600-17t�'t1�Dat ffxergytiConp 1anael't'C tali ComCtedt.shdc Report tea:1 f T11S Data T Yankee Canetti- Pak tniall Report data:11 s of 5 pars off 8 Data 6{ername:Gi17o0o-179�'xt7`ath0-f7�rt7884tProjetx DataiFrmergytComplaneaeiYC i8B5 CornClredtodc Pagesols at a A B C 0 E F G N J K L M N P 0