Loading...
Plans (7) MEC2015 - 00663 SEE'S CANDIES PREFERRED VENDORS HEALTH DEPARTMENT NOTES THE OPERATION OF THIS RETAIL CANDY STORE INCLUDES NO HEATING/REHEATING,NO COOKING/BAKING/FRYING,NO GLAZING/ 3-COMP SINK SUPPLIER: FLOORING SUPPLIER: TOASTING IN THIS ESTABLISHMENT.ALL FOOD PRODUCTS ARE MANUFACTURED OFF-SITE AND DELIVERED IN PRE-PACKAGED BOXES SURFAS JJJ FLOORING FOR SALE TO THE PUBLIC FOR OFF-SITE CONSUMPTION.ALL PRODUCTS REQUIRE NO REFRIGERATION OR FREEZING. ATTN: FRANK CASARES ATTN: JIM JEFFRIES 8825 NATIONAL BLVD. 4831 PASSIONS BLVD,UNIT A FOOD PRODUCTS AVAILABLE FOR PUBLIC HANDING REMAIN SEALED IN THE ORIGINAL FACTORY WRAPPING.A BULK CANDY DISPLAY IS SA CULVER CITY,CA 90232 PICO RIVERA,CA 90660 PROVIDED AT THE SALES COUNTER WITH NSF APPROVED SNEEZE GUARDS AND PROTECTIVE SHIELDING. P: 310-559-4770 EXT: 214 P: 562-692-9008 EXT: 123 ALL HAND SINKS AND THREE-COMPARTMENT SINKS ARE NSF APPROVED AND ADA COMPLIANT,DISH WASHING FACILITIES ARE PROVIDED IN THE WORK ROOM AREA FOR THE CLEANING OF CUTTING BOARDS AND KNIVES ONLY,AS USED TINf � SEE'S CANDIES REQUIRED SUPPLIERS SEP 292015 A CITY OF TIGARD A R DUNNAGE SHELVING SUPPLIER: LOCKER SUPPLIER: WIRE SHELVING SUPPLIER: BUILDING DIVISION MASONWAYS INDESTRUCTIBLES SALSBURY ENGINEERED STORAGE SYSTEMS, INC. 4 6 1 F R O M R 0 A D 580 VILLAGE BLVD, #330 ATTN: FABBY VELASQUEZ ATTN:CRAIG PARAMUS , N 1 0 7 6 5 2 WEST PALM BEACH,FL 33409 1010 E 62ND STREET 1038 W.KIRKWALL RD 9 7 3 2 5 3 9 3 9 3 T E L P: 800-837-2881 LOS ANGELES,CA 90001 AZUSA,CA 91702 9 7 3 2 5 3 9 3 9 0 F A X FAX: 800-693-7745 P: 323-846-6800 P: 626-961-0961 FAX: 626-330-2235 W W W . S A R G A R C H . C O M CROWN MOLDING SUPPLIER: DOUBLE ACTING SWING DOOR: WASHINC.7TON SQUAREANDERSON MOLDING ELIASON CORP. ARCHITECTURAL SEAL ATTN:TONY 9229 SHAVER 1126 9585 S W. WASH I N G T O N S Q. R D. 11266 WASHINGTON PLACE KALAMAZOO,MI 49024 CULVER CITY,CA 90230 P: 800-828-3655 P: 310-313-1400 (LWP-6 36"X 80"PER SEE'S SPEC.) PORTLAND OR . 97223 FAX: 310-390-6300 SPACE # H - 15 CC) DE R EVI EW P ROJ ECT Di RECTORY APPLICABLE CODES:ALL WORK UNDER THIS CONTRACT SHALL COMPLY WITH THE PROVISIONS OF THE SPECIFICATIONS&DRAWINGS,AND SHALL SATISFY ALL APPLICABLE CODES,ORDINANCES,AND REGULATIONS OF ALL GOVERNING BODIES INVOLVED.ANY CITY OF TIGARD MODIFICATIONS TO THE CONTRACT WORK REQUIRED BY SUCH AUTHORITIES SHALL BE AT THE EXPENSE OF T.G.C.,ALL PERMITS AND LICENSES NECESSARY FOR THE PROPER EXECUTION OF THE WORK SHALL BE SECURED AND PAID FOR BY THE CONTRACTOR INVOLVED. STORE ADDRESS: LANDLORD-TENANT COORDINATOR: TENANT: ARCHITECT: BUILDING DEPT: APPLICABLE CODES INCLUDE BUT ARE NOT LIMITED TO THE FOLLOWING: WASHINGTON SQUARE MACERICH CO. SEE'S CANDIES SARGENTI ARCHITECTS CITY OF TIGARD,OREGON REVIEWED FOR CODE COMPLIANCE 9585 SW.WASHINGTON SQ. RD. 401 WILSHIRE BLVD 3423 S. LA CEINEGA BLVD 461 FROM ROAD,2ND FL. 13125 SW HALL BLVD. Approved.- r APPLICABLE CODES: OCCUPANCY LOAD: FIRE RESISTANCE DATA: PORTLAND OR.97223 SANTA MONICA,CA SUITE 700 LOS ANGELES,CA.90016 PARAMUS,NJ 07652 TIGARD OR.97223 BUILDING: 2014 OREGON STRUCTURAL SPECIALTY CODE -TENANT SPACE SEPARATIONS...................................1 HR SPACE#H-15 PHONE: 424-229-3655 CONTACT: RICHARD ESCALANTE TEL: (973)253-9393 PHONE: 503-718-2426 PLUMBING: 2014 OREGON PLUMBING SPECIALTY CODE -INTERIOR EXIT EGRESS CORRIDOR............................1 HR C A.OCCUPANCY LOAD(TABLE 1004.1.1) CONTACT: ERIC FONG TEL: 310-287-4616 FAX: (973)253-9390 permit#: CONSULTANTS MECHANICAL: 2014 OREGON MECHANICAL SPECIALTY CODE SALES AREA: 736 S.F./30 PER PERSON =24 PERSONS -COLUMNS............................... FAX: 310-842-4436 PRINCIPAL ARCH: ROBERT J.SARGENTI JR. 0 HR Address.- EMAIL: rsargenti@sargarch.com ELECTRICAL: 2014 OREGON ELECTRICAL CODE WORK ROOM: 478 S.F./300 S.F. PER PERSON = 2 PERSONS -INTERIOR BEARING WALLS.......................................0 HR PROJECT ARCH: CHRISANTHA SIMOLARIS Suite#: ACCESSIBILITY: 2009 ICC/ANSI A117.1 -NON-BEARING WALLS WITHIN SPACE........................0 HR EMAIL: csimolahs@sargarch.com FIRE: 2014 OREGON FIRE CODE TOILET ROOM: 77 S.F./30 PER PERSON =3 PERSONS -BEAMS,GIRDERS,TRUSSES,&ARCHES.....................0 HR Br. Date-. L ENERGY: 2014 ENERGY EFFICIENCY SPECIALTY CODE TOTAL OCCUPANT LOAD: 29 PERSONS -ROOF/CEILING CONSTRUCTION...............................0 HR LANDLORD: LANDLORD-MALL MANAGER ENGINEER: MACERICH CO. MACERICH CO. KLH ENGINEERS B.NUMBER OF EXITS REQUIRED(TABLE 1021.1): 1 PLUMBING CODE: 401 WILSHIRE BLVD CONTACT:THOMAS RANDALL CONTACT:ADAM PULSKAMP OFFICE COPY OCCUPANCY: C.NUMBER OF EXITS PROVIDED: 1 SANTA MONICA,CA SUITE 700 PHONE:503-639-8865 �f vv A.PLUMBING CODE(TABLE 2902.1) PHONE: 859-547-0205 D.MINIMUM EXIT PASSAGEWAY WIDTH PROVIDED: 44"MIN PHONE:424-229-3655 EMAIL: THOMAS.RANDALL@MACERICH.COM USE GROUP: M-MERCANTILE WITH BUSINESS&STORAGE E.MAXIMUM LENGTH OF EXIT TRAVEL REQUIRED(TABLE 1016.1): 75 FT. WATER CLOSET: REQUIRED: 1 PROVIDED: 1 / \ LAVATORY: REQUIRED: 1 PROVIDED: 1 CONSTRUCTION CLASSIFICATION: 2B FULLY SPRINKLERED F.MAXIMUM LENGTH OF EXIT TRAVEL PROVIDED: 53'-8" FT. MOP SINK: REQUIRED: 1 PROVIDED: 1 CONSTRUCTION DRINKING FOUNTAIN: REQUIRED: 0 PROVIDED: 0 SYMBOLS S11 KEY PLAN EGRESS PLAN DRAWING INDEX A.B. ANCHOR BOLT IN. INCH A ARCHITECTURE ISSUE CURRENT NEW PARTITION TYPE,SEE A.C.T. ACOUSTIC CEILING TILE INSUL. INSULATION ee1) DATE REVISION DATE DATE ISSUE DB DETAIL SHEET FOR DEFINITION A/C AIR CONDITIONING INT. INTERIOR A.D. AREA DRAIN INV. INVERT 1 T1.0 TITLE SHEET 07/27/15 09/24/15 07/27/15 BID PERMIT OF WALL TYPE ADJ. ADJUSTABLE JT. JOINT CANDIES A.F.F. ABOVE FINISH FLOOR ]ST. JOIST WASHINGTON 2 Tl.l SPECIFICATIONS 07/27/15 09/03/15 08/04/15 LANDLORD REVIEW A ALUM. ALUMINUM K.P. KICK PLATE ADJACENT NEW ANGLED PARTITION TYPE, T1,2 SPECIFICATIONS 07/27/15 04/03/15 D109/03/15 CONSTRUCTION SET A.T.ATALUMINUMTHRESHOLD LAM, LAMINATED SQUARE TENANT SEE DETAIL SHEET FOR B.B. BALL BEARING LAV. LAVATORY H- 15 SPACE 2ND EXIT ROUTE DEFINITION OF WALL TYPE BLDG. BUILDING LH. LEFT HAND 9585 SW TOWARDS REAR: 4 T2.0 RESPONSIBILITY,DOOR&HARDWARE,FINISH SCHEDULES 07/27/15 09/03/15 A 09/22/15 CONSTRUCTION REV BLK_ BLOCK L.L. LANDLOD B G. BLOCKING L.P. LOW POINT WASHINGTON SQUARE DISTANCE 38'-0" 5 T2.1 RESPONSIBILITY,DOOR&HARDWARE,FINISH SCHEDULES 07/27/15 09/03/15 09/24/15 CONSTRUCTION REV EXISTING PARTITION TO REMAIN BM. BEAM LT.WT. LIGHT WEIGHT ROAD BOT. BOTTOM MACH. MACHINE PORTLAND, OR 97223 6 T3.0 GENERAL ACCESSIBILITY GUIDELINES 07/27/15 09/03/15 CAB. CABINET MAX. MAXIMUM CEM. CEMENT MECH. MECHANICAL r ee'"vyadF - w. 7D10 DEMOLITION PLAN AND NOTES 07/27/15 04J24/15 C.I. CAST IRON MFG. MANUFACTURER # NEW DOOR AND FRAME.SEE C.I.T. CAST IRON THRESHOLD M.H. MAN HOLE o° - °k�,n 8 F1.0 FIXTURE PLAN,FIXTURE LEGEND&GENERAL NOTES 07/27/15 09/24/15 SCHEDULE SHEET FOR DOOR CL CENTER LINE MIN. MINIMUM 5 ` ® b 01 n ° - SW WasM�"tcn Sny3 end_F s-a.,vh SCHEDULE. CLG. CEILING MISC. MISCELLANEOUS , ,..-.., ® [° 9 A1.0 CONSTRUCTION PLAN,PARTITIONS TYPES&GENERAL NOTES 07/27/15 09/24/15 COHC CONCEALED OVERHEAD M.P. MOP PLATE U CLOSER M.O. MASONRY OPENINGws sl- The D.*S,me- 10 AZ.O REFLECTED CEILING PLAN,LEGEND,&NOTES 07/27/15 09/2415 COL COLUMN N.C. NON-COMBUSTIBLE "�'�"�° NEW ELIASON DOOR SEE SCHEDULE CONC. CONCRETE N.I.C. NOT IN CONTRACT 01 SHEET FOR DOOR SCHEDULE COND. CONDITION h ii A2.1 REFLECTED CEILING DETAILS 07/27/15 09/03/15 CONT. CONTINUOUS NO. NUMBER Sw�« CONST. CONSTRUCTION N.T.S. NOT TO SCALE _ 12 A3.0 FINISH PLAN,DETAILS&GENERAL NOTES 07/27/15 09/24/15 C.T. CERAMIC TILE O.A. OVERALL 0fe,1eH� , O.C. ON CENTER ❑ DET. DETAIL ODOUTSIDE DIAMETER a 13 A4.0 INTERIOR ELEVATIONS 07/27/15 09/03/15 EXISTING DOOR AND FRAME DIA, . . DIAMETER e O1 DIM. DIMENSION O.H.C. OVERHEAD CLOSER e� ® EXTERIOR 14 A4.1 INTERIOR ELEVATIONS 07/27/15 09/24/15 OPENING DISP. WALL MOUNTED OPNG. DETAIL NO. PL. PROPERTY LINE T ,e Sw-Ad 15 A4.2 TOILET ROOM ELEVATIONS&DETAILS 07/27/15 09/03/15 DISPLAY BOARD N11111m,L L_ z" �. � D.F. DRINKING FOUNTAIN PLUMB. PLUMBING PLYWD. PLYWOOD _. _. ___.. . �_; ...K�.... D.L. DEAD LOAD 16 A5.0 STOREFRONT ELEVATIONS&SECTIONS 08/04/15 09/03/15 P.G.B. PAINTED GYPSUM BOARD P,". 1 REVISION DN, DOWN +�c rR�s,m, Q wT PROJECT NAME DETAIL PT. PAINT erdKseeit A1.0 CLOUD D.O. DO OVER(REPEAT) e "" 17 A6.0 SECTION&DETAILS 07/27/15 09J03/15 ( I DTL DETAIL P.V.C. POLYVINYLCHLORIDE d,„r�A„,r ♦���.I ia,,ya"e°ce Ca t.M.W.,ld NaAer DWG, DRAWING P•WD. PAINTED WOOD ween« aeTw 3 18 A6.1 FIXTURE DETAILS 07/27/15 09/03/15 DWG.NO. R.A. RETURN AIR R.C.P. REINFORCED CONCRETE PIPE d �s!'mr�^sn are Rd svovr a„�r EA, EACH P, ��� �,� � st EXIT ROUTE ELEV. ELEVATION REINF. REINFORCE(ED)(ING) $ Pqd TOWARDS FRONT: M E C A N I C A L SECTION NO. ELECT. ELECTRIC(AL) R.H. RIGHT HAND a °eK, p N Seers LiuokCentM Ca( Qi REVISION EQ. EQUAL R.O. ROUGH OPENING x DISTANCE 53'-8" 20 M1.0 MECHANICAL PLANS 07/27/15 09/22/15 ee7s 1 SECTION E.W.C. ELEC.WATER COOLER R.O.W. RIGHT OF WAY ADJACENT A1.0 EXH. EXHAUST S.C. SOLID CORE a ` `j 1 dtnp,t.r d wea,dcda_ri DWG.NO. EXIST. EXISTING S.C. SCHEDULE TENANT 21 M2.0 MECHANICAL SCHEDULES 07/27/15 09/22/15 EXP. EXPOSED SHT. SHEET 22 M2.1 SCHEDULES DETAILS 07/27/15 09/22/15 F.C. FIXTURE CONTRACTOR SIM. SIMILAR s reareaataoa � CANDIES ELEVATION N0. F.D. FLOOR DRAIN SPEC. SPECIFICATIONS x oeE„m«. 23 / / &.�«�««<,e�, i�,r,.s M3.0 MECHANICAL SPECIFICATIONS 07 27 15 09/22/15 FIN. FINISH SQ. SQUARE r, P�64M 1 ELEVATION MARK FL FLOOR STL. STEEL LOCATION A1.0 STRUCT. STRUCTURAL 24 M4.0 MECHANICAL ENERGY COMPLIANCE 07/27/15 09/22/15 F.O.C. FACE OF CONCRETE STD. STANDARDWAS H I N GTO N SQUARE DWG.NO. F.O.M. FACE OF MASONRY SUSP, SUSPENDED ELECTRICAL FT. FEET TEL. TELEPHONE GA. GAUGE 25 E1.0 ELECTRICAL LIGHTING PLAN 07/27/15 09/03/15 1 PARTITION TYPE OR VERTICAL ELEVATION GALV. GALVANIZED T.G.C. TENANT GENERAL CONTRACTOR L ATI P L A N 9585 SW WASHINGTON SQUARE ARCH.NOTE G.C. GENERAL CONTRACTOR T.&G. TONGUE&GROOVE 26 E2.0 ELECTRICAL POWER PLAN 07/27/15 09/22/15 PORTLAND, OR 97223 G.I. GALVANIZED IRON THK. THICKNESS P-I FINISH TYPE GYP GYPSUM BOARD T.O. TRIMMED OPENING 27 E3.0 ELECTRICAL RISER&SCHEDULES 07/27/15 09/22/15 H.B. HOSE BIBB T. TENANT O KEY NOTE H.C. HOLLOW CORE T/ TOP ���S 95 85 SW FIXTURE NUMBER HOW. HARDWARE TYP. TYPICAL WASHINGTON 28 E4.0 ELECTRICAL SPECIFICATIONS 07/27/15 09/03/15 PROJECT INFORMATION HGT. HEIGHT U.L UNDERWRITERS LABORATORY AND I ES SQUARE ROAD 29 E5.0 ELECTRICAL SPECIFICATIONS 07/27/15 09/03/15 Ol DOOR NUMBER ® WINDOW TYPE H.B. HOSE BIBB U.O.N. UNLESS OTHERWISE NOTED DATE: 05/28/2015 H.C. HOLLOW CORE V.I.F. VERIFY IN FIELD H- 15 SPACE PLUMBING ELEVATION HOW. HARDWARE V.C.T. VINYL COMPOSITION TILE 9585 SW WASHINGTON DESIGNATION HGT. HEIGHT VERT. VERTICAL SQ. 30 P1.0 PLUMBING PLANS 07/27/15 PROJECT N0. 150128'003 H.M. HOLLOW METAL V.W.C. VINYL WALL COVERING PORTLAND, OR 97223 INTERIOR ELEVATION HORIZ. HORIZONTAL WSCT. WAINSCOT 31 P2.0 PLUMBING DETAILS 07/27/15 AREA: 1!260 SF. - - INTERIOR ELEVATION AX. a�.. X. HTG. HEATING „y �� , W.C. WATER CLOSET DWG.N0. PROFILE TYPE HVAC. HEATING,VENTILATING& WWF WELDED WIRE FABRIC AIR CONDITIONING W/ WITH ti' 32 P3.0 PLUMBING SPECIFICATIONS 07/27/15 ELEVATIO REFER TO SHEET A3.0 FOR ON N0. HT. HEIGHT MORE INFO T I.D. INSIDE DIAMETER a ' ',, STRUCTURAL DRAWN BY: JG/PA/RA/NP e. 33 S-1 GSN PLAN&DETAILS 09/03/15 REVIEWED BY: SKS/CS LANDLORD REQUIRED CONTRACTORS K SHEET TITLE ROOFING: FIRE ALARM: SPRINKLER: FACADE REPAIR: ' " THLE SHEET CONTRACTOR CONTRACTOR CONTRACTOR CONTRACTOR PHONE: PHONE: PHONE: PHONE: AREA O F STC R E CONTACT: CONTACT: CONTACT: CONTACT: f SQUARE FOOTAGE BREAK DOWNS TITLE NUMBER AREA AREA % 4 SALES AREA 736 SQ FT 57% DEFERRED SUBMITTALS WORKROOM 478 SQ FT 37% PLEASE NOTE:"THE FOLLOWING PERMIT APPLICATIONS WILL BE SUBMITTED UNDER SEPARATE COVER: TOILET ROOMS 77 SQ FT 06% LEGEND: -SIGNAGE DRAWINGS TOTAL 1291 SQ FT STOREFRONT GRAPHICS 100°k OF -FIRE ALARM -SPRINKLER T100 9 A � SA oRES ROOMI : .. .. — �� :. : ..: .. ._ .. 4 6 1 F R 0 ABOV CLNG M R 0 A D 8"o SA l l 8"0 SA l r ... ¢ PARAMOS N ] 07652 9 7 3 2 5 3 9 3 9 3 T E L SD 1 - - -- - — - SD-1 > 150 CFM 150 CFM 9 7 3 2 53 9 3 9 0 F A X 4 sal WWW . SARGARCH . COM 150 CFM 150 CFM l ARCHITECTURAL SEAL 8"0 I I SALES AREA o1 00 sD•1 — x ,`(( t PR CO 150 CFM RG-1 1pqFM 8"o SA 8"0 SA SD-1 145 CF SD-I 150 CFM o I I 8"0 SA j y SD-1`T' I, U --- 150 CFM j 8"o SAT l 8"o SA _ (PIRATIONDATE �+ T2� SD-1 a - — -- 150 CFM o 6 " O 3 RTU-11 V-01 T T 3/4" V-01 1 3/4" . CD CONSULTANTS ABOVE CLNG DSO l V-01 RTU-1 5 ON ROOF 4 2 SA co s"o SA KOHRS LONNEMANN HEIL x S451 0 ' ENGINEERS, PSC 45 CF jj / oSA MECHANICAUELECTRICAL ENGINEERS WWW.KLHENGRS.COM —— so 1 — 1538 ALEXANDRIA PIKE,SUITE 11 FT.THOMAS,KENTUCKY 41075 RG-1 2 800-354-9783 859-442-8050 859-442-8058 FAX DATE ISSUE DB HVAC GENERAL NOTES: 07/27/15 BID/PERMIT 08/04/15 LANDLORD REVIEW A. RECTANGULAR RETURN AIR AND SUPPLY AIR DUCTWORK SHALL BE WRAPPED.ANY Q 09/03/15 CONSTRUCTION SET HVAC VAV SYSTEM DESIGN CRITERIA RECTANGULAR DUCTWORK ABOVE A CEILING SHALL NOT BE LINED IN LIEU OF EXTERNAL INSULATION. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.IN GENERAL,HOLD Q 09/22/15 CONSTRUCTION REV DUCTWORK TIGHT TO UNDERSIDE OF STRUCTURE UNLESS OTHERWISE NOTED OR REQUIRED BY THE TENANT HVAC SYSTEMS HAVE BEEN SIZED FOR A 55°SUPPLY AIR TEMPERATURE IN THE LEASE FIELD CONDITIONS. SPACE. CONTRACTOR FIELD VERIFY AND MEASURE THE TEMPERATURE OF THE SUPPLY AIR IN THE B. CONICAL BELLMOUTH FITTINGS WITH MANUAL BALANCING DAMPER TO BE USED FOR ALL ROUND LANDLORD'S MAIN DUCT WITHIN THE LEASE SPACE. CONTRACTOR SHALL FIELD VERIFY THAT THE BRANCH TAPS ABOVE ACCESSIBLE LAY-IN CEILINGS. CONICAL BELLMOUTH FITTINGS WITHOUT EXISTING SYSTEM IS CAPABLE OF PROVIDE THE DESIRED AMOUNT OF AIRFLOW TO THE LEASE SPACE. MANUAL BALANCING DAMPERS TO BE USED FOR ALL ROUND BRANCH TAPS ABOVE INACCESSIBLE THIS WORK SHALL BE COMPLETED PRIOR TO PURCHASING ANY HVAC EQUIPMENT. CONTACT THE DRYWALL CEILINGS WITH BALANCING REQUIRED WITHIN 2 FT.OF DIFFUSER WITH PLASTER FRAME. ENGINEER OF RECORD IF FIELD CONDITIONS DIFFER OR THE SYSTEM IS NOT CAPABLE OF MEETING THE DESIGN REQUIREMENTS. C. FLEX DUCT SHALL BE LIMITED TO 5'-0"IN LENGTH,NO DUCT BOARD ALLOWED,WIDTH OF DUCT SUPPORTS SHALL BE 2"WIDER THAN THE DUCT. D. THE HVAC CONTRACTOR IS RESPONSIBLE FOR COORDINATING BOX-OUT LOCATIONS FOR ALL DRYWALL MOUNTED AIR DEVICES WITH GENERAL CONTRACTOR AND CEILING FRAMING. E. MECHANICAL CONTRACTOR TO PROVIDE TENANT WITH AS-BUILT DRAWINGS,ALL EQUIPMENT GENERAL DEMOLITION NOTE SHOP DRAWINGS,INFORMATION ON THERMOSTATS,CONTROL WIRING DIAGRAMS AND OTHER PERTINENT INFORMATION AT COMPLETION OF PROJECT. MECHANICAL CONTRACTOR TO REMOVE DUCTWORK, HANGERS, INSULATION, AIR DEVICES, F. MECHANICAL CONTRACTOR IS TO PROVIDE AND INSTALL FIRE-RATED PIPE SLEEVES AND SEALS CONTROLS, MISCELLANEOUS HVAC EQUIPMENT,ETC... NOT INTENDED FOR REUSE. ON ALL EXISTING OR NEW PIPING THAT PENETRATES A FIRE-RATED PARTITION,WHERE REQUIRED BY CODE. G. MECHANICAL CONTRACTOR IS TO PROVIDE AND INSTALL FIRE DAMPERS ON ALL EXISTING OR NEW DUCTWORK THAT PENETRATES A FIRE RATED PARTITION,WHERE REQUIRED BY CODE. FIELD VERIFY ALL CONDITIONS H. SEE ARCHITECTURAL DRAWINGS FOR CEILING HEIGHTS. PROJECT NAME I. CONTRACTOR SHALL VERIFY SUFFICIENT SPACE TO RUN DUCTWORK,AND SHALL IDENTIFY ANY OBSTRUCTIONS THAT COULD HINDER THE ROUTING OF THE DUCTWORK. DESIGN DRAWINGS ARE SCHEMATIC. THIS CONTRACTOR SHALL VISIT THE SITE PRIOR TO BIDDING OR AWARD OF CONTRACT TO INSPECT EXISTING FIELD CONDITIONS. THIS CONTRACT SHALL INCLUDE ALL J. THIS CONTRACTOR SHALL ENSURE THAT ALL EQUIPMENT, PIPING AND DUCTWORK,NOT SHOWN LABOR AND MATERIALS NECESSARY FOR FIELD MODIFICATIONS DUE TO EXISTING CONDITIONS. TO REMAIN IS FULLY REMOVED AND NOT ABANDONED. ee7s THE CONTRACTOR SHALL CONTACT THE ARCHITECT, ENGINEER OR OWNER PRIOR TO BIDDING FOR K. IT IS REQUIRED THAT THE MECHANICAL CONTRACTOR MUST VISIT THE JOB SITE TO BECOME INTERPRETATIONS AND CLARIFICATIONS OF THE DESIGN AND INCLUDE IN HIS BID ALL COSTS TO MEET FAMILIAR WITH MAJOR ITEMS SUCH AS STRUCTURAL ELEMENTS, PLUMBING LOCATIONS AND MECHANICAL PLAN THE DESIGN INTENT. CLARIFICATIONS MADE BY THE ARCHITECT, ENGINEER OR OWNER AFTER BIDDING ELECTRICAL RUNS.ADDITIONALLY MECHANICAL CONTRACTOR SHALL VERIFY EXACT LOCATIONS WILL BE FINAL AND SHALL BE IMPLEMENTED AT CONTRACTORS COST. AND DIMENSIONS OF SUCH ITEMS AS HVAC UNITS, DUCTWORK, ETC. PRIOR TO BID,AND CONTACT CANDIES THE OWNERS CONSTRUCTION REP./ARCHITECT/ENGINEER AND REPORT ANY DIFFERENCES/ SCALE: 1/4' = 1'-W BIDDING CONTRACTORS SHALL HAVE A WORKING KNOWLEDGE OF LOCAL CODES AND ORDINANCES DISCREPANCIES IN THE DRAWINGS FOR A DECISION LOCATION AND SHALL INCLUDE IN THEIR BIDS THE COSTS FOR ALL WORK INSTALLED IN STRICT ACCORDANCE NORTH WITH GOVERNING CODES, THE PLANS AND SPECIFICATIONS NOT WITHSTANDING. THE CONTRACTOR L. ALL MATERIALS EXPOSED WITHIN PLENUMS SHALL BE NON-COMBUSTIBLE OR SHALL HAVE A WASHINGTON SHALL ALERT ARCHITECT, ENGINEER OR OWNER OF ANY APPARENT DISCREPANCIES BETWEEN FLAME SPREAD INDEX OF NOT MORE THAN 25 AND A SMOKE-DEVELOPED INDEX OF NOT MORE GOVERNING CODES AND DESIGN INTENT. THAN 50 WHEN TESTED IN ACCORDANCE WITH ASTME E 84. SQUARE 9585 SW WASHINGTON SQUARE PORTLAND, OR 97223 SPACE# -1 O KEYED NOTES: HVAC SYMBOLS LEGEND PROJECT INFORMATION 1. PROVIDE AND BALANCE NEW PARALLEL FAN POWERED VAV BOX AS SCHEDULED. EXTEND AND SYMBOL DESCRIPTION DATE: 05/28/2015 CONNECT 10"NECK TO LANDLORD PROVIDED SUPPLY AIR STUB IN. FIELD VERIFY EXACT SIZE AND LOCATION PRIOR TO BID. EXISTING WORK TO REMAIN PROJECT NO. 150128-003 2. EXISTING EXHAUST FAN TO REMAIN. RE-INSTALL AND RELOCATE IN NEW CEILING GRID.BALANCE AREA: 1 260 SF. TO SCHEDULED AIRFLOW.CLEAN AND VERIFY PROPER OPERATION. REPLACE AS REQUIRED. EXISTING WORK TO BE REMOVED r 3. PROVIDE NEW BUILDING STANDARD THERMOSTAT IN LOCATION SHOWN ON PLAN.TENANT MUST CONNECT TO MALL'S EXISTING ENERGY MANAGEMENT SYSTEM.COORDINATE WITH LANDLORD NEW WORK DRAWN BY: SH/DS FOR ALL CONTROLS REQUIREMENTS.GENERAL CONTRACTOR MUST CONTACT LANDLORD'S DESIGNATED TENANT COORDINATION CONTRACTOR FOR PURCHASE AND INSTALLATION OF REVIEWED BY: LF/MD NECESSARY CONTROLS AND CONNECTION TO MAIN CONTROL PANEL AT GENERAL RR RETURN REGISTER CONTRACTOR'S EXPENSE. 4. PROVIDE A 1"SPACE BETWEEN THE BOTTOM OF THE DOOR AND TOP OF FINISHED FLOOR TO SD CEILING DIFFUSER SHEET TITLE ALLOW FOR AIRFLOW. 5. PROVIDE AND BALANCE NEW ROOFTOP UNIT AS SCHEDULED. PROVIDE NEW MANUFACTURER'S BRANCH TAKEOFF ` -� ROOF CURB. MAINTAIN ALL CODE AND MANUFACTURER REQUIRED CLEARANCES. OUTSIDE AIR M HANICCAL PLANS INTAKE SHALL BE LOCATED A MINIMUM OF 10'-0"FROM ANY FLUE OR BUILDING EXHAUST.ALL DUCT WITH MANUAL DAMPER ROOF WORK TO DONE BY A LANDLORD APPROVED ROOFING CONTRACTOR AT THE GENERAL CONTRACTOR'S EXPENSE. 6. PROVIDE NEW PROGRAMMABLE THERMOSTAT IN LOCATIONS AS INDICATED ON PLANS. ELBOW WITH TURNING VANES TITLE NUMBER THERMOSTATS SHALL BE SAME MANUFACTURER AS ROOFTOP UNIT. COORDINATE EXACT LOCATION WITH TENANT,OR TENANT'S REPRESENTATIVE,PRIOR TO INSTALLATION.WIRE TO ® FLEXIBLE DUCTWORK CONNECTION ROOFTOP UNIT PER MANUFACTURER'S PRINTED INSTRUCTIONS. 2 �— VV=01 DUCT MOUNTED SMOKE DETECTOR(HARD WIRE INTERLOCK TO FAN MOTOR BY E.C.)FURNISHED BY E.C., INSTALLED BY M.C. OTHERMOSTAT 1 no r HVAC ELECTRICAL COORDINATION SCHEDULE (HECS) ABBREVIATIONS CONTRACTOR TYPE MOTOR CONTROL TYPE CONTROL TYPE DC LOCAL DISCONNECT EC ELECTRICAL CONTRACTOR CS COMBINATION STARTER Tc TIMECLOCK MC MOTOR CONTROL (POWER) FC FIRE PROTECTION CONTRACTOR MCC MOTOR CONTROL CENTER OCC OCCUPANCY SENSOR SO SMOKE DETECTOR GC GENERAL CONTRACTOR MG MAGNETIC STARTER OR CONTACT SAS BUILDING AUTOMATION SYSTEM CN CONTROLS HC HVAC CONTRACTOR MS MANUAL STARTER LOW LOW VOLTAGE CONTROLS HP HORSEPOWER MFR MANUFACTURER VFD VARIABLE FREQUENCY DRIVE LINE LINE VOLTAGE CONTROLS SHP BRAKE HORSEPOWER PC PLUMBING CONTRACTOR MSR MANUAL STARTER W/ RELAY RUNE REVERSE ACTING LINE VOLTAGE STAT EX EXISTING OR OWNER OR OTHERS MAN MANUAL FLA OPERATING FULL LOAD AMPS FA FIRE ALARM MCA MINIMUM CIRCUIT AMPACITY SCP SMOKE CONTROL PANEL OCP OVER CURRENT PROTECTION INT INTEGRAL TO EQUIPMENT CP CO AND PLUG a I I MARK DESCRIPTION LOCATION STATUS VOLTS PHASE EMERG BHP HP HTG KW WATTS FLA MCA OCP FED FROM DC TYPE DC FURN DCINST DC WIRE MC TYPE MC FURN MC INST MC WIRE CN TYPE CN FURN CNINST CN WIRE SO TYPE AHAg %FA RXS ,gpk RTU-1 ROOFTOP UNIT ROOF NEW 208 1 0.32 0.5 3.8 45.6 50 FUSE EC EC EC MG MFR MFR MFR LOW HC HC HC DUCT SMOKE �2\ --T---T-7.33 -T----T--_1-717= MG MFR MFR 7HC ��C 4 6 1 F R 0 M ROA D V-01 3 SMOKE EP�ro;z HVAC VENTILATION SCHEDULE PARAMOS , NJ 07652 9 7 3 . 2 5 3 9 3 9 3 TE L ROOMNUM ROOMNAME SYSTEM ZONE AREA CLNGHT AIR CHGS OACHGS PEOPLE DES PEOPLE RED OA PER OA SOFT REQ SUP ACT SUP REQ OA ACT OA ACT RET ACT EXH CRITICAL PRESSURE PCT OPERABLE NATURAL VENTILATION 9 7 3 . 2 53 939 0 F A X 100 SALES AREA 1 1 653 0 0 0 10 10 7.5 0.12 5% 600 137 138 600 0 0.3183 E 0.0000 WWW . SARGARCH . COM 1101 WORKROOM 1 1 432 0 0 0 2 2 0 0.06 287 290 66 67 290 a 0.1103 E 0.0000 1102 RESTROOM 1 .1 .68 .0 .0 .0 .0 .0 .0 .0 .0 .0 0 .0 .0 .80 .0 N .0.0000 ARCHITECTURAL SEAL HVAC EXHAUST FAN SCHEDULE MARK I DESCRIPTION ILOCATION ISTATUS JMFGR I MODEL I VOLTS IPHASE IWEIGHT EMERG CFM ESP(IN) BHP HP MOTOR TYPE WATTS FAN RPM ACCESS FLA OCP EF-1 I EXHAUST FAN ------ IRESTROOM 1EXISTING JEX JEX 1120 111 lao I N Le JEX 1 180 1 EX1 HVAC VAV BOX SCHEDULE (BASIS OF DESIGN: TITUS DTClP 04-10 - PARALLEL FAN POWERED VAV W/ ELEC. HEAT) SYSTEMSTATUS SIZE MAX CFM MIN CFM I HMIN CFM JMBH GPM JEAT ILAT JEWT JLWT VOLTS �PHASE HTG KW I I I I V-01 INEW 110 1880 L400 1208 13 1400 19 10.0 155 177 10 10 1.33 13 HVAC LOAD SCHEDULE MARK CROOF JCWALL JCPART CGLASS CSOLAR CLIGHTS ICEOUIP 1CPSENS ICSSENS JCFAN COAS ICTSENS CPLAT ICOAL ICTLAT CTOT HROOF HWALL HPART HGLASS JHSLAB HSPACE IHOA HTOT VAV 0.0 10.0 10.0 10.0 10.0 15.0 11.3 12.9 19.3 10.4 12.3 120.5 12.4 10.0 12.4 122.9 10.0 10.0 10.0 10.0 11.1 11.1 111.0 1121 vcp HVAC EQUIPMENT SCHEDULE AIR DISTRIBUTION DEVICES (ALL TITUS) CONSULTANTS MARK RTU-1 DESCRIPTION ROOFTOP UNIT NOTES: 1. SYMBOL KEY- FIRST LETTER:S-SUPPLY R-RETURN E-EXHAUST S. FINISH- K SECOND LETTER:D-DIFFUSER R-REGISTER C-GRILLE "A"METALESCENTALUM.BAKED ENAMEL LOCATION ROOF "Er ETCHED FINISH WITH CLEAR FINISH OR ANODIZED 2.CATALOG NUMBERS REFER TO TITUS AIR DEVICES. "C*#25 STANDARD WHITE L STATUS NEW 3.1,2,3,AND 4-WAY AIR DEVICES ARE DETERMINED BY "D"STANDARD OFF WHITE FINISH G.C.TO FIELD PAINT MFGR CARRIER DIRECTIONAL ARROWS ON DRAWINGS. TO MATCH CEILING OR WALLS R@H 4. DAMPERS SHALL BE OPERABLE FROM FACE 6. BORDER STYLE- MODEL 5GV`T-A30 *A"OPPOSED BLADE "A"SURFACE MOUNTED KOHRS LONNEMANN HEIL u MIN EER 'B"RADIAL OPPOSED BLADE "B*LAY IN MOUNTING-C'LAY-IN PANEL,PROVIDE TITUS MODEL#XY-13363 ENGINEERS, PSC MIN COP "C"BUTTERFLY FRAME FOR PLASTER CEILING MOUNTING. MECHANICAUELECTRICAL ENGINEERS VOLTS 208 SIZE MOUNTING MATERIAL ACCESSORIES BORDER WWW.KLHENGRS.COM SYMBOL CATALOG# FINISH REMARKS . . PHASE 1 MOD. NECK SIDE- CEIL- DUCT STEEL ALUMDPREQUAL FIRE STYLE 1538 ALEXANDRIA PIKE,SUITE 11 WALL ING GRID DPR. WEIGHT 346 FT.THOMAS,KENTUCKY 41075 800-354-9783 EMERG SD-1 TMS 24"x24" 8" C 8 B 859-442-8= 859442-8M FAX CFM 890 ESP(IN) 0.4 RG-1 350RL 24"x24" - C B B OACFM CO2CFM 0 GENERAL CONTRACTOR TO CONFIRM AVAILABILITY WITHIN CONSTRUCTION SCHEDULE. DATE ISSUE DB 07/27/15 BID/PERMIT BHP 0.32 HP 0.5 08/04/15 LANDLORD REVIEW MOTOR TYPE ODP Q 09/03/15 CONSTRUCTION SET FAN RPM A 09/22/15 CONSTRUCTION REV COND GPM CLG MBH 21 CLG SENS 18 MAT CLG DB 76 MAT CLG WB 65 LAT DB 55 LAT WB 54 CLG GPM 0.00 CW EWT CW LWT HTG MBH 2 HTG GPM 0.00 HWEWT HW LWT GAS HTG IN(MBH) PROJECT NAME GAS HTG OUT(MBH) MIN GAS PRESSURE(IN WC) MASGAS PRESSURE(IN WC) ee7s HTG KW 3.8 ACCESS 2,3,4,10,23 FLA CAND I ES MCA 45.6 OCP 50 LOCATION DOMESTIC WATER WASHINGTON 2 SQUARE 9585 SW WASHINGTON SQUARE PORTLAND, OR 97223 SPACE#H-15 -PROJECT INFORMATION DATE: 05/28/2015 PROJECT NO. 150128-003 AREA: 1,260 SF. DRAWN BY: SH/DS REVIEWED BY: LF/MD SHEET TITLE MECHANICAL SCHEDULB TYLE NUMBER 2a0 - - - ---_-_-- --------------------------- ------ 0 KEYED NOTES: GENERAL NOTES: 1. ROOFTOP AIR CONDITIONING A- CONTRACTOR SHALL PROVIDE CURB TO BEAM CLAMP(MAX TOP CHORD 2x2x16 GA.ANGLE TOP CHORD OF JOISTS. UNIT LOCATE A MINIMUM OF MAINTAIN 10"MINIMUM ABOVE FINISHED ROOFING WEIGHT 500 LBS.) =- 10'-0"FROM EDGE OF ROOF SYSTEM. PROVIDE ADDITIONAL BLOCKING AS OF JOISTS. 2. CANVAS FLEXIBLE REQUIRED TO ACCOMMODATE ROOF INSULATION CONNECTION THICKNESS. Mimi I 3. 1"ACOUSTICALLY LINED B. FINAL LOCATION AND STRUCTURAL 1/2"DIA.CONTINUOUS OF DUCTS VERIFICATION BY OTHERS. 1/2"CONTINUOUS THREADED ROD. 4. 4X4 ANGLE FASTENED TO ROOF DECK AND STRUCTURAL f THREADED ROD. METAL JOIST METAL JOIST SYSTEM PROVIDE SUPPORTS 318'MACHINE BOLT AS REQUIRED 5. FACTORY FABRICATED, 4 6 1 FROM ROA D INSULATED ROOF CURB(BY PARA M US NJ 0 7 6 52 SAME MFG'R AS UNIT) Q 9 73 . 2 5 3 9 39 3 T E L 6. FASTEN CURB TO DECK 7. INSULATED RADIUSED ELBOW I-X 16 GA.MIN(DUCTS OVER 2 SO.FT.)MAX 700 9 7 3 . 2 5 3 9 39 0 FAX 8. SECURE TO CURB eo METAL STRAP LBS.I-X 18 GA.MIN(DUCTS UNDER 2 SO.FT.)MAX. WWW . SARGARCH . COM 9. WOOD NAILER 420 LBS.FOR DUCTS OVER 49"WIDE,TURN METAL 10. CURB TYPE AND FLASHING 13 STRAP UNDER BOTTOM OF DUCT AND FASTEN PER ROOFING 9 10 ARCHITECTURAL SEAL MANUFACTURER'S REQUIREMENTS.FLASH UP a OVER OVER WOOD NAJLOR. 11. CANT STRIP e F_ 12. ROOF DECK,CUT OPENING NOTE: ► FOR DUCT PENETRATIONS 4 DISTANCE BETWEEN ONLY 2 2DUCTWORK SUPPORT DETAIL DUCT HANGERS SHALL 13. CONDENSATE TRAP-SEE BE IN ACCORDANCE MAX WEIGHT PER CONDENSATE DRAIN'l RAP NOT TO SCALE WITH THE RULES OF THE DUCT SIZE FOOT=16 LBS. DETAIL RECTANGULAR DUCTS ALUMINUM MIN.B AGENCIES HAVING W DIA.MAX ROUND DUCT SUPPORT DETAIL 14. HIGH WATER ALARM IN MAX SIDE INCHES MIN.GALV.SHT.GAUGE &S GAUGE JURISDICTION. CONDENSATE DRAIN PAN. THROUGH 12 26 (0.022 IN.) 24 (0.020 IN.) NOT TO SCALE WIRE TO BREAK 24 VOLT 13THROUGH 30 24 (0.028 IN.) 22 (0.025 IN.) SPIRAL SEAM ROUND DUCTS CONTROL POWER IN THE CASE 31 THROUGH 54 22 (0.034 IN.) 20 (0.032 IN.) DUCT STEEL MIN. LONGITUDINAL SEAM OF A HIGH WATER EVENT. 55THROUGH 84 20 (0.040 IN.) 18 (0.040 IN.) DIAMETER INCHES GALV.SHT. DUCT STEEL MIN. FITTINGS STEEL MIN. OVER 8418 (0.052 IN.) 16 (0.051 IN.) THROUGH 12 GAUGE GALV.SHT.GAUGE GALV.SHT.GAUGE czsa 13THROUGH 18 28 (0.019 IN.) 26 (0.022 IN.) 26 (0.022 IN.) 19 THROUGH 28 26 (0.022 IN.) 24 (0.028 IN.) 24 (0.028 IN.) SEP 29 THROUGH 36 24 (0.028 IN.) 22 (0.034 IN.) 22 (0.034 IN.) 37 THROUGH 52 22 (0.034 IN-) 20 (0.040 IN.) 20 (0.040 IN.) 20 (0.040 IN.) IS (0.052 IN.) 18 (0.052 IN.) 237433.00-05 ROOF CURB AND MOUNTING 23311300-10 DUCT SUPPORT DETAIL CONSULTANTS . SCALE: NONE SCALE: NONE K L 2 4 6 H KOHRS LONNEMANN HEIL 24"MIN V 7 ENGINEERS, PSC MECHANICALIELECTRICAL ENGINEERS WVVW.KLHENGRS.COM 0 KEYED NOTES: y 1538 ALEXANDRIA PIKE,SUITE 11 x 5 FT.THOMAS,KENTUCKY 41075 1. DUCTWORK. 800-354-9783 2. RETURN TUBE. 859-442-8050 3. SMOKE DETECTOR. 3 859-442-8058 FAX 4. SAMPLING TUBE. 3 2 0 KEYED NOTES: GENERAL NOTES: 1. INSULATED INLET DUCT WITH MAXIMUM FLEX DUCT A OMIT FLEX DUCT ON DISTRIBUTION DATE ISSUE DB LENGTH OF 24" SYSTEMS THAT PENETRATE 1-HR FIRE 2. PARALLEL FAN POWERED VAV BOX BARRIERS.REFER TO ARCHITECTURAL 07/27/15 BID/PERMIT GENERAL NOTES: 3. CONTROL PANEL-PROVIDE 36"HORIZONTAL CLEARANCE PLANS FOR LOCATIONS OF FIRE BARRIERS. TO SIDE OF BOX.PROVIDE ACCESS PANEL BELOW IF 08/04/15 LANDLORD REVIEW A REFER TO MANUFACTURER 1 1 6"MIN ABOVE INACCESSIBLE CEILING 09/03/15 CONSTRUCTION SET 0 RECOMMENDATION FOR SMOKE 4. GALVANIZED THREADED ROD(CONNECT TO STRUCTURE) DETECTOR MOUNTING I PROVIDE 1"SPRING VIBRATION ISOLATORS &T LOCAITON. PROVIDE STRAIGHT 5. RETURN AIR INLET 09/22/15 CONSTRUCTION REV RUN UP AND DOWNSTREAM OF6. OUTLET CONNECTION,PROVIDE SUFFICIENT STRAIGHT SAMPLING TUBE PER LENGTH TO ASSURE EVEN AIR FLOW OVER HEATING COIL MANUFACTURER'S 7. ELECTRIC REHEAT COIL SECTION REQUIREMENTS. 8, FAN 9. SHEET METAL DUCT INTO VAV GENERAL NOTES 0 KEYED NOTES: 3 TIMES INLET DUCT DIAMETER BOX MINIMUM LENGTH OF A- OPENING SIZE: 1. 10 ACOUSTIC LINING I2cI2 RG=12x12 DUCT 2- 1202 RG OR 24x24 RG(UNLESS OTHER WISE 2424 RG=24x18 DUCT NOTED) B. x+y DIMENSIONS SHALL BE DETERMINED 3. OPENING SAME SIZE AS RG NECK FROM FLOOR PLANS - PARALLEL FAN POWERED VAV BOX W 2 230500.00-02 DUCT MOUNTED SMOKE DETECTOR 233713.00-13 PLENUM RETURN AIR GRILLE 233613.00-02 REHEAT PROJECT NAME SCALE: NONE SCALE: NONE SCALE: NONE K=MINIMUM OF 10 CAP M=1/2"PLUS MAXIMUM TOTAL STATIC GENERAL NOTES: �ENERAL NOTES: VAV 0KEYED NOTES: PRESSURE PIPE FULL SIZE A. LOCATE TRAPS SO AS TO BE ACCESSIBLE 1. PROVIDE SPUTTER DAMPER TERMINAL DEVICE I ecs CAP OFAIRUNITDRAIN FOR CLEANING (SD)AT ALL MAIN BRANCH AIR FLOW 1. 20 GAUGE DOUBLE SHEET METAL CONNECTION B. CONDENSATE PIPING SHALL GRADUALLY TAKEOFFS AIR FOIL FULL DEPTH OF MAIN 4 SLOPE DOWN FROM DRAIN TRAP 2. PROVIDE MANUAL VOLUME DUCT UP TO 12"WIDE BRANCHES CANDIES C. CONFIRM TRAP REQUIREMENTS WITH ol 2 18 GAUGE ON VVI DER BRANCHES 3 EQUIPMENT MANUFACTURER DAMPERS AT ALL BRANCH 2. MAIN DUCT TAKEOFFS z D. REFER TO SPECIFICATIONS FOR < 3. GALVANIZED 3/16"ROD LOCATION FLOW 3. PROVIDE MINIMUM 3 TIMES w I. MATERIAL AND INSULATION 4. VENTLOCK NO.600-3 DAMPER SEE NOTE 2 REQUIREMENTS STRAIGHT INLET DIAMETER MVD BLADE,BRACKET&LOCKING WASH INGTO TO ALL VAV TERMINAL CD(CEILING N DEVICES F-1 I BRANCH I I DIFFUSER) BALL JOINT WITH 1/4"0 2 SQUARE M VERIFY WITH AHJ 4. DAMPER NOT REQUIRED AT oe _j AIR AIR GALVANIZED OPERATOR PAD 9585 SW WASHINGTON SQUARE MAIN BRANCH MVD 5. BRANCH MAIN DUCT TERMINAL DEVICE TAKEOFF FLOW FLOIA 6. DOUBLE THICKNESS TURNING NSULATION PORTLAND, OR 97223 5, ALL MANUAL DAMPERS VANES(TYPICAL) /-071 SPACE#H-1 5 CAP SHALL BE LOCATED IN AN MVD7. 3*RADIUS MINIMUM ACCESSIBLE CEILING. 177-77 77!! PROVIDE ACCESS PANEL AS BRANCH RR(RETURN MAIN PROJECT INFORMATION AIR UNIT CASING REQUIRED REGISTER) DUCT TEE SUPPLY POSITIVE PRESSURE -RPE FULL SIZE MVE) MVD DUCT DATE: 05/28/2015 OF AIR UNIT DRAIN CONNECTION BRANCH v (2X41.44 44447yzzyzl_.lYyyyzy 2 EXHAUST CAP z PROJECT NO. 150128-003 H (I-FOR EACH I-OF MAXIMUM NEGATIVE T < I AIR AIR GENERAL NOTES: cr STATIC PRESSURE)+I* SR Ill BRANCH ER( FLOW FLOW AREA: 1,260 SF. J=HALF OF H (SUPPLY REGISTER) z I I __m REGISTER) H+J+PIPE DIAMETER+INSULATIO L H 5 1. OMIT FLEX DUCT ON DISTRIBUTION L N MVD SYSTEMS THAT PENETRATE 1-HR FIRE BARRIERS.REFER TO ARCHITECTURAL DRAWN BY: FLOW 0- 0 KEYED NOTES: PLANS FOR LOCATIONS OF FIRE BARRIERS. REVIEWED BY: SH/DS LF/MD SEE NOTE 2 1 1. MAXIMUM LENGTH OF INSUL.FLEX DUCT 6. SECURE TO CEILING PER MANUFACTURER'S MAIN BRANCH BRANCH 7 EQUALS 5 FEET.FLEX NOT PERMITTED IN RECOMMENDATIONS AND PER CEILING FINISH. INACCESSIBLE CEILINGS PROVIDE GRID CLIPS PER MFG'R REQUIREMENTS. SHEET TITLE 2. INSULATED DUCT,COLLAR AND DIFFUSER BY PROVIDE FRAMING FOR DRYWALL SD MVD HVAC CONTRACTOR INSTALLATION. w 3. SCOOP 7. HANGER,SECURE TO STRUCTURE AND AIR UNIT CASING SD w AIR 4. SPIN IN FITTING WITH MANUAL VOLUME DUCTWORK (LINEAR DIFFUSER) DAMPER 8. PEEL BACK INSULATION AND PROVIDE STRAPPING MECHANICAL DErAlLS NEGATIVE PRESSURE 5. INTERNAL BUTTERFLY DAMPER FOR AND SHEET METAL SCREWS AT FLEX CONNECTION TO DRYWALL APPLICATIONS ONLY. DUCT.THEN PROVIDE STRAPPING AROUND NOTE:OUTDOOR UNITS AND UNITS LOCATED IN UNCONDITIONED SPACES WHICH PROVIDE COOLING IN THE <_AIR DUCT MAIN DUCT MAIN ALP,__ (PROVIDE KEY FOR ADJUSTMENT) INSULATION. TME NUMBER WINTER MUST HAVE HEAT TRACE ON CONDENSATE PIPING. FLOW FLOW MAIN BRANCH 9. SUPPORT FLEX TO PREVENT COLLAPSING GOND. DRAIN TRAPOSITIVE & N[ GATl VE MANUAL DAMPER DETAIL DIFFUSER INSTALLATION (TYPICAL)232113.23-05 SCALE: 233300.00-01 SCALE: NONE 233713.00-04 SCALE: NONE M-2. 1 - - - - I __ - I M - _ -------__ Division 23-HVAC SPECIFICATION provide proof of having successfully completed at least five projects of similar size and scope. Sheet Metal: Except as otherwise indicated,fabricate ductwork from galvanized sheet steel,lock forming quality;with G 90 zinc Steel Construction:Manufacturer's standard stamped sheet steel frame and adjustable blades. ___ - --- The air balancing contractor shall include the additional cost to change every fan factory installed sheave,pulley and/or belt of in coating and mill phosphatized for exposed locations.Minimum gauge shall be 24. Register Dampers: — --- -- . 23 05 01.00-Common Requirements for HVAC order to obtain the design air flows. Opposed Blade:Adjustable opposed-blade damper assembly,key operated from face of register. _ Miscellaneous Ductwork Materials ---- General Renovations: In areas where existing HVAC equipment is being utilized,balancing contractor shall include the cost to pre-check Register and Grille Finishes: __- each equipment air flows,serving the area of work,prior to demolition,and re-check and adjust each air handler after new Volume Dampers: Provide volume dampers in all branch ducts,or as required far balancing to required air flows. g _._._ __ __ General Provisions of the Contract including General and Supplementary Conditions and General Requirements apply to work of this construction. Air flows of existing air handlers serve existing spaces shall be similar after project is complete. Fittings:Provide radius type fittings fabricated of multiple sections with maximum 15 deg.change of direction per section.Unless Register and Grille Finishes:White Enamel:Semi-gloss white enamel prime finish. - - section. g g specifically detailed otherwise,use 45 deg.laterals and 45 deg.elbows for branch takeoff connections. Where 90 deg.branches are Register and Grille Acoustic Performance:NC less than or equal to 30 _ _ - ------ — Performing Testing,Adjusting and Balancing indicated,provide conical type tees. Manufacturer. Subject to compliance with requirements,provide diffusers of one of the following: - _-- — ____ - — Scope Perform testi and balancing procedures on each system identified,in accordance with the detailed procedures outlined in the -. ---- -- ------ __-- The base bid includes furnishing all materials,labor,tools,and equipment and the performance of all work required to install a g P P Duct Sealant: Non-hardening,non-migrating mastic or liquid elastic sealant,type applicable for fabricationrnstallationctetail,as Anemostat Products Div.,Dynamics Corp.of America. _ _ complete heating and air conditioning system as outlined herein. referenced standards. compounded and recommended by manufacturer specifically for sealing joints and seams in ductwork Metal-Aire -- Cut insulation,ductwork,and piping for installation of test probes to the minimum extent necessary to allow adequate performance of Dud Cement:Non-gardening migrating mastic or liquid neoprene based cement,type applicable for fabricationfins#allation detail,as Titus Products Div.,Philips Industries,Inc. --.__... _ --- _ _____- - Guarantee procedures. compounded and recommended by manufacturer specifically for cementing fitting components,or longitudinal seams in ductwork. Tuttle and Bailey. ___. ---- - ---- -__---- —-1_- The contractor shall provide a guarantee in written form statin that all work under this section shaft be free of defective work, Patch insulation,ductwork,and housings,using materials identical to those removed. -- P g 9 9 Ductwork Support Materials: sept as otherwise indicated,provide hot-dipped galvanized steel fasteners,anchors,rods,straps,trim 2 - ----- ----- materials,or parts for a period of one year from the date of owner's final acceptance and shall repair,revise or replace at no cost to Seal ducts and piping,and test for and repair leaks. and angles for support of ductwork. - --- — --- the owner an such defects occurring within 23 74 33.00-Packaged Outdoor Rooftop Units — --- __ ---- y d g the the guarantee period. Contractor shall also state in written form that any items or Seal insulation to re-establish integrity of the vapor barrier. 9 O P _ .�.,._ Flexible Duds occurrences arising during the guarantee period will be attended to in a timely manner and will in no case exceed four(4)working i Mark equipment settings,including damper control positions;valve indicators,fan speed control levers,and similar controls and Warrant -- days from date of notification by owner. Either spiral-wound spring steel with flameproof vinyl sheathing,or corrugated aluminum.Unless specifically mentioned,the Y - __ devices,to show final settings. Mark with paint or other suitable,permanent identification materials. maximum length of flex duct on the supply equals 5 feet.Flex is not allowed for return,relief or exhaust applications.The flexible Warrant on Compressor and Heat Exchanger Provide written warranty,signed b manufacturer,agreeing to replace/repair,within -- -- ---- gt PP Y q pp Y P 9 Y 9 Y g 9S Quality Assurance Retest,adjust,and balance systems subsequent to significant system modifications,and resubmit test results. ducts indicated for use in the H.V.A.C.system shall conform to the requirements of UL 181 for Class 0 or Class 1 flexible air duds warranty period,compressors and heat exchangers with inadequate and defective materials and workmanship,including leakage, MKOMP� - Provide a complete installation in conformance with the following standards. and shall be so identified. breakage,improper assembly,or failure to perform as required;provided manufacturer's instructions for handling,installing, --- — — ---.- ­___­ ASHRAE: vide07 in 0-Dud Insulation " protecting,and maintains units have been adhered to during warrant period. Replacement:is limited to component replacement ASHRAE:American Society of Heating,Refrigerating and Air Conditioning Engineers supply, ductwork. AN finers,insulation and adhesives shall have a flame spread index not more Where installed in unconditioned spaces other than return air plenums,provide 1 thick 1-112 Ib.continuous flexible fiberglass sheath P ng, n9 n9 Y Pe P P P Provide insulation on all concealed su NFPA National Fire Protection Association than 25 and a smoke developed index of not more than 50.Insulation shall have a minimum installed thermal resistance value of R6 with vinyl vapor barrier jacket. only,and does not include labor for removal and reinstallation. SMACNA Sheet Metal and Air Conditioning Contractors National Association, or code minimum,whichever higher. Installation is not permitted above drywall ceilings and inaccessible ceilings. Warranty Period: 5 years from date of owner acceptance. 4 6 1 F R 0 M R 0 A D Statewide Building Code Rigid Fiberglass Ductwork insulation:Glass fibers bonded with a thermosetting resin. Comply with ASTM C 612,Type IB,without Fabrication Rooftop Heat Pump Units P A R A M U S , N 3 0 7 6 5 2 - IMC:International Mechanical Code facing and with vapor barrier all-service jacket manufactured from kraft paper,reinforcing scrim,aluminum foil,and vinyl film. Shop fabricate ductwork in 4,8,10 or 12-ft lengths,unless otherwise indicated or required to complete runs. All ductwork shall be Unit Casing: Panels are of 20-gauge steel,cleaned,phosphatized and coated with resin primer and baked enamel finish. 9 7 3 . 2 Jr 3 . 9 3 9 3 T E L Flexible Fiberglass Ductwork Insulation:Glass fibers bonded with a thermosetting resin. Comply with ASTM C 553,Type 11,without Pittsburgh Construction with a minimum of thickness of 24 gauge.in addition,ductwork used in ems over 3"W.G.shall have cold Access doors provide access to unit controls,filters,indoor coil,supply air fans and optional economizer supply/return air dam ers. Permits,fees,Inspections,Laws and Regulations g 9 u9 systems P PP Y PP 9 7 3 2 Sc 3 9 3 9 0 FAX facing and with vapor barrier all-service jacket manufactured from kraft paper,reinforcing scrim,aluminum foil,and vinyl film. sealant applied. Shop fabricate ductwork of gauges and reinforcement complying with SMACNA'HVAC Duct Construction inside air section is completely insulated with fireproof,permanent,odorless,glass fiber material. Ail removable panels and access - Permits and fees of every nature required in connection with this work shall be obtained and paid for by this contractor who shall also WWW . S A R G A R C H . C O M - pay for all the installation fees and similar charges. Laws and regulations,which bear upon or affect the various branches of this Vapor Barrier Material for Ductwork: Paper-backed aluminum-fall,except as otherwise indicated;strength and permeability rating Standards". doors have neoprene gaskets to prevent Leakage. The unit base pan is insulated with polyurethane foam insulation. work shall be complied with b this contractor and are Laws a made a art of this contract. ALL work,which such laws require to be equivalent to factory-applied vapor barriers on adjoining ductwork insulation,where available;with following additional construction Knockouts are provided for utility and control connections. Drain connections are provided to accommodate indoor and outdoor coil P Y Y P Q Lined Duct water runoff. Lifting lugs are provided as an integral part of the unit. characteristics: inspected,shall be submitted to the proper public official for inspection and a certificate of final approval must be furnished. Fabricate ductwork with duct liner in each section of dud where indicated. Laminate liner to internal surfaces of dud in accordance ARCHITECTURAL SEAL High Puncture Resistance: Law vapor transmission(for duds in exposed areas:Mech.Roams,etc.) Compressor: All units have hermetically seated,high efficiency reciprocating compressors designed for heat pump duty. Work in ExistingSpaces with instructions by manufacturers of lining and adhesive,and fasten with mechanical fasteners.Dud liner to be 3-ib density for P Moderate Puncture Resistance: Medium vapor transmission(for ducts in concealed areas}. acoustic requirements 1"thick or as notedSize of ductwork shown on time drawings is free net area,outside dimension of duds will Compressors are equipped with over temperature,over current and high pressure controls. Crankcase heaters are standard. . General: Care shall be taken when working in existing spaces so as not to damage existing walls and ceilings where work is being Refrigerant Circuit: All units have expansion devices to provide proper refrigerant flow control in both heating and cooling. Heavy performed. need to be increased if lined duct is used. ap Insulation shall have a minimum thickness as required by Code. duty,high capacity solenoid type reversing(four-way)valve is standard to provide automatic refrigerant cycle changeover. Size of ductwork shown on the drawings is free net area,outside dimension of duds will need to be increased if lined dud is used. Ceilings: Where work is being performed above ceilings,and the architectural drawings do not indicate ceiling modifications by the All insulation and adhesives shall have a flame spread index not more than 25 and a smoke developed index of not more than 50. Condenser Coit: Outdoor costs are loll designed for heat um application with wide) spaced,ora finned surface and PI Dud Liner. Fibrous lass of thickness indicated.3-lb density.All liners,insulation and adhesives shall have a flame read index not Y g pump PP Y P wavy-finned t N - general contractor,it shall be the responsibility of this contractor to remove and replace existing ceilings where work is being g Y• � staggered row nipper tubing. 318-such OD seamless copper tubing is mechanically bonded to aluminum fins. Each cost is factory � 't�� Ott"' performed. In those instances,all repair and installation of new grid,ceiling panels,etc shall be the responsibility of this contractor. 2 23 09 93.00-Sequence of Operations for HVAC Controls more than 25 and a smoke developed index of not more than 50. pressure and leak tested. ti 6ZWE Match existing finishes. Packaged Rooftop Unit Dud Liner Adhesive Evaporator Coil: Door coils are 3/84nch OD seamless copper tubing mechanically bonded to aluminum fins and are factory Walls&Floors: It shall be the responsibility of this contractor to patch existing walls and floors and match existing finishes where 1Startup Dud Liner Fasteners: Comply with SMACNA HVAC Duct Construction Standards. pressure and leak tested. work is being removed or installed and patching is being performed,unless noted otherwise on the architectural drawings. Condensate Pan:Provide double sloped drain an.Provide high condensate switch in rima condensate n to de-energize ize unit - The unit shall operate on a 7 daylnight programmable thermostat. Installation of Metal Ductwork � P t primary � g Demolition During startup,the fan shall run with the dampers in the full recirculation position. Provide occupied changeover sequence with upon detection of high condensate Levels in primary condensate pan. General: Assemble and install ductwork in accordance with recognized industry practices which will achieve airtight(5%leakage for Condenser Fan: Direct drive,statically and dynamically balanced propeller fans are used. All fans are weatherproof and UL listed w - Any Equipment to be demolished shall also include the demolition of any and all ductwork,piping etc serving or served by the optimum start function. When the return air temperature reaches occupied setpoint(adjustable),the minimum outside air damper systems rated 3"and under;l%for systems rated over 3")and noiseless(no objectionable noise)systems,capable of performing t+ equipment,all accessories,air devices,wiring,gas piping,venting,control wiring and power wiring associated with the equipment. shall open to the controlled minimum outdoor air position. for outdoor use. Permanently lubricated motors have busff-in thermal overload protection. _ each indicated service. Install each run with minimum number of joints.Align ductwork accurately at connections,within 1/8" Evaporator Fan: Belt-driven,farward-ccurved,centrifugal type fans equipped with an adjustable motor sheave are standard. Fan and Demolition shall be coordinated with all trades.All materials shall be turned over to the owner or disposed at the owner's direction. 2. Supply Fan Control misalignment tolerance and with internal surfaces smooth.Support duds rigidly with suitable ties,braces,hangers and anchors of Flflt -- motor bearings are permanently Lubricated. Motor has bu'slt-in overload protection. Fan drive components are mounted on Contractor is responsible for reclaiming any refrigerant in association with the demolition in accordance with all local,state and The supply fan speed shall be constant,run continuously during unoccupied mode and set to the required CFM. type which will hold ducts true-to-shape and to prevent buckling. Support vertical duds at every floor. CAtE. " federal regulations. 3. Space Temperature Control Sealing:Seal all longitudinal seams,S's and drives and all joints with mastic or cement.Install according to SMACNA standards. mbber4n-shear isolators to reduce noise and vibration. Any roof or wall penetration shall be patched watertight to the satisfaction of the architect. Provide local wall mounted room temperature thermostat with digital display of room temperature and se int +/-deg.F. Balancing Dampers:The sheet metal contractor shall be full responsible for installing balancing dampers in the ductwork, whether Defrost Control: The demand defrost system compares precise temperature difference between the outdoor ambient:temperature V�P Z ass P 9 sP Y Pe tP° ( 9 P Y P 9 g P (whether Tests aril Adjustments adjustable),and override feature. shaven on the drawing or not)in order to arrive at the intended air flaw.The balancing sub-contractor shall provide direction and and outdoor coil fin surface temperature to assess outdoor coil heat transfer capacity. Solid-state comparator and defrost logic circuitry activates the reverse cycle defrost strictly on a demand bases to eliminate unnecessary defrost cycling. Logic circuitry has an No ducts,fixtures or equipment shall be concealed or covered until they have been inspected and approved by the Architect and the 4. Economizer Control assistance in determining locations where dampers are required.Additional dampers,if required shall be installed at no additional integral time override to reverse defrost cycle#o r maximum of 8 minutes. inspector who shall be notified b the contractor when the work is read for inspection. Dry Bulb Controlled Economizer Operated to automatically use outdoor air for'free cooling"when outdoor air temperature and is at cost to the owner. t� Y Y P Filters: 14rich throwaways are standard. Work shag be completely installed,tested and leak tight before inspection is required. All tests shall be repeated to the satisfaction of acceptable levels. Automatically modulated outdoor and return air dampers maintain proper discharge air temperature into the Wall Penetrations: Seal and pack around all ducts and piping sleeves which pass through walls that extend to bottom side of CONSULTANTS conditioned space. Adjustable minimum position control is standard. structure and rated walls. Outside Air Options: those making the inspection. P j Poe No Economizer. 5, Cooling Control Field Fabrication: Complete fabrication of work at project as necessary to match shop-fabricated work and accommodate installation K 23 05 03.00-submittals for HVAC Dry Bulb Controlled Economizer: O erated to automaticall use outdoor air for"free cool', "when outdoor air tem rature and is at Cooling shall be controlled to maintain space temperature setpaint.On a call for cooling the heating shall be off.On a further colt for requirements. P Y n9 pe General cooling,enable the economizer mode.On a further call for cooling,disable the economizer mode and the mechanical cooling shall be Routing: Locate ductwork runs,except as otherwise indicated,vertically and horizontally and avoid diagonal runs wherever possible. acceptable levels. Automatically modulated outdoor and return air dampers maintain proper discharge air temperature into the staged on.Provide Low Ambient Controls for operation down to-20 degrees F. Run ductwork in shortest route which does not obstruct useable space or block access for servicing building and its equipment. Hold conditioned space, Adjustable minimum position control is standard.Economizer shall have powered relief. __ Where submittals are required io the Contract Documents,they shag be prepared and supplied in accordance with the Contract duds close to walls,overhead construction,columns,and other structural and permanent enclosure elements of building. Limit Accessories:Electric Supplemental Heaters: SI•ide-in heater module mounts in unit discharge air passage, H Documents. In addition is Division that the Contractor is advised to review and comply with the requirements articulated within each 6. Heating Centro) Curb:Provide insulated roof curb under unit,constructed in accordance with NRCA Standards.Provide seat strip between curb and Division and within each section of that Division. Heating shag be controlled to maintain space temperature setpoint. On a call fon heating,the mechanical cooling shall be off.Ona clearance to 12"where furring is shown for enclosure or concealment of duds,but allow for insulation thickness,if any. Where P KOH RS LON NEMAN N H EIL Some Divisions may include a division-specific Requirements for...'section. Where this section exists ' articulates further call for heating,the economizer mode shall be disabled.On a further call for heating the heat pump then electric heat shall be possible,locate insulated ductwork for 1"clearance outside of insulation.Wherever possible in finished and occupied spaces, unit,and wood nailer for lashing. y pe q n it a additional requirements for submittals that apply to the work of that Division. staged on. conceal ductwork from view,by locating in mechanical shafts,hollow wall construction or above suspended ceilings. Do not encase Low Ambient Control:Provide head pressure control,designed to operate at temperature down to 0 deg F(-18 deg.C). Provide for ENGINEERS, PSC The following requirements help to identify,track and keep the project organized for all parties involved. They are necessary to 7. Smoke Detector horizontal runs in solid partitions,except as specifically shown. all units without economizers MECHANtCAtJELECTRICAL ENGINEERS Coordinate layout with suspended cells and lighting layouts and similar finished work. Thermostat: Provide thermostat assembly for 7 day/night setback staged heats and cools with manual or automatic changeover Y Pe n9 9 i g Y Y9 n9 n9 9 ensure a timely turnaround and an appropriate technical review. Submittals that do not conform to the administrative requirements When the smoke detector is alarmed,the system shall be alarmed and the air handler shall fail safe with manual reset. WWW.KLHENGRS.COM Electrical Equipment Spaces: Do not route ductwork through transformer vaults and their electrical equipment spaces and on standard subbase. are rejected and returned,without technical review. 8. Unoccupied Mode enclosures. Hail Guards:Provide hail guards around the condenser coil to protect the condenser Ins against hail. Requirements During the unoccupied mode of operation,the RTU shall go into night setback mode. 1538 ALEXANDRIA PIKE,SUITE 11 eq Penetrations. Where duds pass through interior partitions and exterior walls,and are exposed to view,conceal space between Manufacturer Subject to compliance with requirements,provide rooftop units of one of the following: Ff.THOMAS,KENTUCKY 41075 PPM PP Ytype-by-type p , 9. Ni nt Setback/Shutdown g ng gage P opening Y Aaon 800.354.9783 Su submittals for each section:Submittals shall be supplied on a section-by-section and basis.For example, g construction opening and dud or duct insulation with sheet metal flanges of same a e as dud.Overta o ens on 4 sides b at independent product data submittals shall be furnished for each section that requires product data submittals.Independent shop At night setback/shutdown the RTU shall go to fail safe position.Fail safe position is defined by the following:The supply fan is off, least 1-1/2". Fasten to duct and substrate. 859-442-8050 P P q p p p Carrier Air Conditioning; Div.of Carrier Corp. drawing submittals shall be furnished for each section that requires shop drawings.Refer to the specifications for identification of the outdoor air intake damper is closed,the heating is off and the mechanical cooling is off.The supply fan shall cycle in conjunction All motor operated dampers shall be low leakage with edge and blade seals.Damper manufacturers are subject to specification 859-442-8058 FAX with either the heatin or coolin s tem to maintain aminimum/maximums ace tem nature de endin on time season. Trane Co. which submittals are required for the project.Separate PDF file packages shall be supplied for each section,for each submittal type, 9 9 Ys P Pe P 9 compliance. Provide products by one of the fallowing: Bryant where electronic submittals are required.Each PDF shall represent a single standalone submittal. Greenheck Fan Corporation Lennox Separately bound and identified submittals shall be provided where hardcopies are required. VAV Boxes Nailor Industries Include a transmittal:Transmittals shall enumerate each submittal for each section of each a and iteration. Provide low voltage DDC controller,transformer,differential pressure transmitter,actuator and wiring for VAV box with electric reheat. Daikin type g P 9 Ruskin Company DATE ISSUE DB Include cover sheet/title page:The cover sheet shall include the information identified in the contract documents. It shall be Temperature Controls Contractor shall field or factory mount controller at their expense.TCC shall provide all 120 power wiring as Examination BID PERMIT P 9 Young Regulator Company 07/27115 / included as the first page of each electronic and/or hardco document-based submittal.An editable and printable PDF form created required for transformers and temperature control panels. TCC shall conned to existing spare at electrical panel board and provide P g PY P Coordination: Coordinate dud installations with installation of accessories,dampers,coil frames,equipment,controls and other Examine areas and conditions under which rooftop units are to be installed. Do not proceed with work until unsatisfactory conditions with editable fields and specification compliant appearance is available from KLH upon request. It is also downloadable from the proper circuit breaker per NEC and label panel board accordingly. TCC shall route all low voltage wiring to VAV boxes,controllers associated work of ductwork system. have been corrected in manner acceptable to Installer. 08/04/15 LANDLORD REVIEW KLH website at www.klhengrs.cam. and thermostats for complete operation. VAV box manufacturer shall furnish flow ring, /� round damper shaft for direct mounting of actuator,and control enclosure. Installation Q 09/03/15 CONSTRUCTION SET Include an index:The index shall enumerate the contents of the submittal. Installation of Dud Liner � - Provide wall mounted temperature sensors with digital display of room temperature,setpoint,discharge CFM and discharge air General: Install rooftop units in accordance with manufacturer's installation instructions. Install units plumb and level,firmly Include checklists:Where checklists are included with the specifications,complete and include them within the appropriate submittal. P ( ) g P y P P g g General: Install dud liner in accordance with SMACNA HVAC Dud Construction Standards.Size of ductwork shown on the Supply temperature with connections to BAS panel.Sensor(s)shall have setpoint adjustment capability(+A 3 deg.F.adjustable from drawings is free net area outside dimension of ducts will need to be increased if lined duct is used. anchored in locations indicated,and maintain manufacturers recommended clearances. 09/22/15 CONSTRUCTION REV pp y complete submittals:Complete submittals of each type are required. Partial submittals will be rejected.Where a section 9 requires a product data submittal,all product data for that section shall be supplied together,at one time,as one complete submittal. setpoint determined by BAS),override feature(2 hours,adjustable thru BAS),and communications jack for connection of palmtop Store internally lined ductwork u off of the floor.Protect internal) lined ductwork from water and dust."Butter the leadingedge of all The rooftop unit(s)shall be installed a minimum of 10'-0'from any roof edge regardless of location indicated on plans,unless a Q P P PP 9 Do not send half the product data as one submittal and the other half as a separate one.When resubmittal is required(e.g.Revise computer. internal dud lining with the manufacturers recommended adhesive. g screen wall or railing is installed per the local building code.See the architectural plans for coordination. and Resubmit)the revised submittal shall be more complete,more accurate and more contract-compliant than its rejected Fan-Powered VAV-Parallel/Variable Flow Inspect and repair all damaged lining prior to installation of ductwork. Support: Install and secure roof curb to roof structure,in accordance with National Roofing Contractors Association(NRCA) predecessor.The submittal number(for each section and type)shall increment for each subsequent submittal(00-Original Provide staged,electric reheat coil. installation recommendations and shop drawings. Install and secure rooftop units on curbs and coordinate roof penetrations and submission,01-First Resubmission,02-Second Resubmission,etc...).Resubmittals shall include a copy of the reviewers On a call for cooling,electric reheat coil shall de-energize and fan shall de-energize.On a further call for cooling, Installation of Flexible Ducts flashing. comments supplied with the prior submittal rejection and shall be amended with a description of the specific action taken to comply modulate the primary air damper open to satisfy room temperature. Maximum Length: For any duct run using flexible ductwork,do not exceed 5'-0"extended length.Installation shall have smooth full Condensate Piping: Provide Type L copper condensate piping with trap. with the reviewers comments.The absence of this on resubmittal is cause for rejection. On a call for heat,VAV primary air damper shall modulate down to minimum setpoint position.On a further call for radius turns down to diffuser. Electrical Connections: Refer to Section 16142-Electrical Connections for Equipment for final connections to equipment and Name electronic files to match the submittal ID and cover sheet:The electronic file name of submittals shall match the submittal ID heating,energize the fan.On a further call for heating,electric reheat coil shall be staged on. Installation not permitted above inaccessible ceilings. installation of loose shipped electrical components. included on the submittals cover page.For example:The original/first product data submittal for Section 234116 would be labeled as Provide supply air temperature sensor tied to BAS. Access Panels Demonstration __ "234116.00-PD-00';the first resubmittal of same shall be labeled'234116.00-PD-01'.The originallfirst shop drawings submittal file During un-occupied mode VAV boxes shall be capable of stroking fully closed for temperature control. Furnish all access panels required for proper servicing of equipment. Provide access panels for all concealed valves,vents,controls Start-Up Services: - for the same section would be labeled"234116.00-SD-00";the first resubmittal of same shall be labeled"234116.00-SD-01'. and cleanout doors,and sprinkler devices required b NFPA Provide frame as required for finish.Furnish panels to General Toilet Exhaust Fans � (EXISTING) P Q YPa Provide the services of afactory-authorized service representative to start-up rooftop units,in accordance with manufacturer's written I _ Use of Electronic Drawings from the Owners Design Team Contractor. Exact locations to be approved by the Architect. Minimum size to be 12"x 12',units to be 16 gauge steel,locking device start-upinstructions. Test controls and demonstrate compliance with requirements. Replace damaged Plan drawings for the Project were created with AutoCAD. Exhaust fans shalt be controlled by local manual switch furnished,installed and wired by electrical contractor. When activated, �p be screwdriver cam locks. and a uh rent P Q P g or malfunctioning controls exhaust fan motor damper shall open and fan shall start Q P If expressly permitted by the Owner and the terms of the Contract,editable electronic versions of standard-scale,AutoCAD-based (Indicated by EC on HECS schedule) 23 36 00.00-Air Terminal Units Training of Owners Personnel plan drawings may be made available for the creation of shop and as-built drawings. Provide services of manufacturers service representative to instruct Owners personnel in operation and maintenance of rooftop Due to the proprietary nature of internal design systems,editable native-software versions of some drawings,including but not limited Controls Fan Powered Terminals P P P P to system diagrams and details will not be made available in an editable form. In these cases,electronic versions of the drawings Electrical contractor will provide power wiring. HVAC contractor shall provide all the low voltage wiring of HVAC units and controls, Fan Section: Provide galvanized steel plenum,acoustically lined,housing forward curved fan with belt or direct driven permanent units. Training shall include start-up and shut-down,servicing and preventative maintenance schedule and procedures,and may be made available only in PDF,JPG or similar non-editable electronic form,at the sole discretion of the Design Professional. thermostats and controllers. Thermostat shall be by the manufacturer of the HVAC unit(heat/cool/auto/off)with night setback. split capacitor motor.Provide velocity sensor ring and damper with jack shaft. troubleshooting procedures plus procedures for obtaining repair parts and technical assistance. Review operating and maintenance The Request Drawings form can be accessed,filled out and submitted at the following intemet address(scroll down to bottom of 2 Provide plastic protective cover for all thermostats. Provide air fitter and back-draft damper. data contained in the Operating and Maintenance Manuals specified in Division One. home page): http://www,klhengrs.com. Low Voltage Thermostats Provide control-powered transformer for each box.At installers option,ship controls to box manufacturer for factory mounting.All Schedule training with Owner,provide at least 7-day prior notice to the Architect/Engineer. PROJECT NAME 23 05 29.00-Hangers and Supports for HVAC Piping and Equipment Low voltage thermostats shall be furnished,installed and wired by the HVAC contractor.The electrical contractor shall provide 4" shipping costs shall be borne by the temperature control contractor,box manufacturer is responsible for mounting. square x 1-12'deep wall outlet boxes(with single-gang rings)for all thermostats/sensors. The electrical contractor shall provide Provide the following type of coil: General one 314'empty conduit from each thermostat/sensor location,turned out above accessible ceilings(in joist space or against Electric Heating Coils: Provide heating coils constructed of electric resistance elements in galvanized steel casing with control box Support all ductwork and equipment by hangers or brackets. Furnish structural steel members where required to support piping and overhead slab/deck). The HVAC/Temperature Control Contractor shall provide all other necessary conduit,raceway and wiring and factory-wiring. Provide over-temperature protection and UL-listing as dud heater. _ equipment. No portion of piping or valves shall be supported by equipment. related work. Conduit shall be identified in ceiling cavity and shall be provided with sweep bends,bushings and dragline. Manufacturer. Subject to compliance with requirements,provide air terminals of one of the following: Ductwork-Support by means of hangers as follows: The HVACffemeAnemostat Products Div.,Dynamics Corp.of America. ee7s = Dud Width Hanger Size and Type Max.Spacing pre# rtContractor hcoordinate with the General Contractor tthermal limaintained ue Control Conracor sall coornae we eneraonracor o ensure ermaenvelope s mananeat Carnes Co. these locations. 30 or fess (#16 gage) 8 E.H.Price A pair of hangers shall be located at every transverse joint and elsewhere according to the table. Temperature Sensors tied to BAS Enviro-Tec 23 05 93.00-Testing,Adjusting and Balancing for HVAC Sensors shall be furnished,installed and wired by the Temperature Control Contractor.The electrical contractor shall provide 4" Krueger CAND I E S square x 1-12"deep wall outlet boxes at 54"above finished floor(with single-gang rings)for all thermostats/sensors. The electrical Titus Products Div.,Philips Industries,Inc. General contractor shall provide one 314"empty conduit from each thermostat/sensor location,turned out above accessible ceilings(in joist LOCATION space or against overhead slab/deck. The Temperature Control Contractor shall Carrier Corp.,Sub.of United Technologies Corp. Test,adjust,and balance the following mechanical systems: P g ) Pe provide all other necessary conduit,raceway and wiring related work. Conduit shall be identified in ceiling cavity and shall be provided with sweep bends,bushings and dragline. WASHINGTON Supply air systems,all pressure ranges including variable volume and double dud systems Trane�a)Co.The HVACfrem erature Control Contractor shall coordinate with the General Contractor to ensure thermal envelope MetalAire SQUARE Return air systems. p pe is maintained at Exhaust air systems. these locations. Tuttle&Bailey 9585 SW WASHINGTON SQUARE Verify temperature control system operation. General Control Wiring Requirements and Installation Methods Inspection PORTLAND, OR 97723 Test systems for proper sound and vibration levels. Except where specifically indicated otherwise above,the HVAC/Temperature Control Contractor shall provide all electrical work as Examine areas and conditions under which air terminals are to be installed. Do not proceed with work until unsatisfactory conditions required for all temperature control related wiring(.e.conduit,raceway,outlet boxes,junction boxes,wiring,etc.)in accordance with have been corrected in manner acceptable to Installer. Quality Assurance Electrical Specifications requirements. All conduit shall be 314'minimum. Installation Codes and Standards: Coordinate all thermostatlsensor locations in field(case by case)with Architect.Owner and Electrical Contractor to ensure that they PROJECT INFORMATION - AABC: "National Standards for Total System Balance". are laced in Locations that will not interfere with furniture, General: Instal!air terminals as indicated,and in accordance with manufacturers installation instructions. Y p equipment,artwork,wall-hung specialties,room finishes,etc. All Location: Install each unit level and accurately in position indicated in relation to other work;and maintain sufficient clearance for ASHRAE:ASHRAE Handbook,2011 Applications,Chapter 38,Testing,Adjusting,and Balancing. thermostat/sensor wall locations indicated on HVAC drawings are schematic only and must be verified case-by-case prior to rough-in. DATE; 055128/2015 Submittals applicable electrical work as described in this specification shall be per the latest edition of the National Electrical Code(NEC)and per normal service and maintenance,but in no case less than that recommended by manufacturer. applicable state and focal codes. Field Quality Control Certified Reports:Submit testing,adjusting,and balancing reports bearing the seal and signature the Test and Balance Engineer. Where-free-air'installation methods(either exposed above the ceilings,in bridle rings or in cable trays}are permitted under Upon completion of installation and prior to initial operation,test and demonstrate that air terminals,and dud connections to air PROJECT NO. 150128-003 The reports shall be certified proof that the systems have been tested,adjusted,and balanced in accordance with the referenced Electrical Specifica#ions above ceilings,provide plenum-rated cables wherever plenum ceilings(if any)exist and install as defined terminals,are leak4ight. standards;are an accurate representation d how the systems have been installed;area true representation of haw the systems are under Electrical Specifications.Install low voltage circuits,located in concrete slabs and mason walls,in inaccessible locations,or AREA: 1 250 SF. operating at the completion of the testing,adjusting,and balancing procedures;acct are an accurate record of all final quantities P g �` Repair or replace air terminals and dud connections as required to eliminate leaks,and retest to demonstrate compliance. w measured,to establish normal operating values of the s exposed in occupied areas,in electrical conduit regardless of what wiring methods are permitted under Electrical Specifications. pe ng systems. Follow the procedures and format specified below: Where cable tri or bridle rings are provided b the electrical contractor for low vol Cleaning Final Report:Upon verification and approval prepare final reports,type written,and organized and formatted as specified below. P Y voltage cables,these raceways may be utilized for Clean exposed facto fintstmed surfaces. Repair an marred or scratched surfaces with manufacturers touch-up Submit 2 complete sets of final report to the owner. control wiring by this contractor(provide special color coded jackets,label cable jackets per Electrical Specifications and group Po factory-finished P Y P Paint• DRAWN BY: SH/DS Report Format:Report forms shall be those standard forms prepared b the referenced standard for each respective item and stem control wiring cables together). Provide conduit drops from cable tray/bridle ring paths to wall outlet boxes and equipment unless 23 3713.00-Diffusers,Registers and Louvers REVIEWED BY: LF/M D R P Y sP Y directed otherwise under Electrical Specifications_ to be tested,adjusted,and balanced. Regardless of permitted methods in Electrical Specifications,all cables/wiring installed concealed by gypsum board,masonry or Ceiling Air Diffusers Qualifications other inaccessible materials in walls or above ceilings shall be installed in conduit,314'minimum. Diffuser Faces: SHEET TITLE The contractor shall procure the services of an independent Balance and Testing Agency,approved by the Engineer,and a member All conduit,bridle rings,raceway,outlet boxes,etc.necessary for complete operational installation of control wiring shall be provided Square: Square housing,core of square concentric louvers,square or round dud connection. I - of Associated Air Balance Council(AABC)or NEBB,which specializes in the balancing and testing of heating,ventilating and air (furnished and installed)by the temperature control contractor in strict compliance with Electrical Specifications documents. Diffuser Mountings: conditioning systems,to balance,adjust and test all air and waters systems and equipment as herein specified.All work b this Coordinate all work with all other applicable trades including the electrical contractor. ���� Ys eQ p P Y Lay-In: Diffuser housing sized to fit between ceiling exposed suspension tee bars and rest on top surface of tee bar. agency shall be done under direct supervision of a qualified heating and ventilating Engineer employed by this agency. All Provide all required conduit work to and between equipment in a manner compliant with that described above(i.e.between VAV Diffuser Dampers: SEECHANI �� instruments used by this agency shall be accurately calibrated and maintained in good working order. boxes,to boilers,starters,condensing units,etc.as applicable). Opposed Blade Dampers: Multiple opposed blade dampers connected to linkage adjustable from face of diffuser with key. Sequencing and Schedule install control wiring without splices between terminal points,color-coded. Install in neat workmanlike manner,securely fastened. � g n9 Diffuser Acoustic Performance:NC Less than or equal to 30 n9 ng Install in accordance with National Electrical Code and per Electrical Specifications. Diffuser Accessories:Plaster Ring:Perimeter ring designed to act as plaster stop and diffuser anchor. Test,adjust and balance air conditioning systems during summer season and heating systems during winter season,including at _ least a period of operation at outside conditions within 5 deg F wet bulb temperature of maximum summer design condition,and Install circuits over 25 volt with gator-coded No.12 wire in electrical metallic tubing,ger Electrical Specifications. Install circuits under within 10 deg F dry bulb temperature of minimum winter design condition. Take final temperature readings during seasonal 25`rolt with color-coded No.18 wire with 0.031'high temperature(105 degs.F)plastic insulation on each conductor and plastic Diffuser Finishes:White Enamel:Semi-gloss white enamel prime finish, TITLE NUMBER _ operation. sheath over all. Install electronic circuits with color-coded No.22 wire with 0.023'polyethylene insulation on each conductor with Manufacturer. Subject to compliance with requirements,provide diffusers of one of the following: Check all fifters for cleanliness,provide new as required. Check dampers(volume and fire)for correct and locked positron,and plastic-jacketed copper shield overall. Anemostat Products Div.,Dynamics Corp.of America. temperature control for completeness of installation before starting fans. Place outlet dampers in full open position. lubricate all 23 31 13.00-Metal Ducts Metat-Aire Titus Products Div.,Philips Industries,Inc. motors and bearings. Check fan beg tension. Gfan rotation. Ductwork Materials Tuttle and Bailey_ M-380 Air balance and testing shall not begin until the systeyste m has been completed and is in full working order. The Contractor shall put al heating,ventilating and air conditioning systems and equipment into full operation and shall continue the operation of same during Expos Ductwork Materials:Where ductwork is indicated to be exposed to view in occupied spaces,provide materials which are Price each working day of testing and balancing. The contractor shall submit within 30 days after receipt of contract,8 copies of submittal tree from visual imperfections including pitting,seam marks,roller marks,stains and discoloration,and other imperfections,including Celli and Waft Registers&Grilles data for the testing and balancing of the air conditioning,heating,and ventilating systems. The Air Balance and Testing Agency shall those which would impair painting. Exposed ductwork which is to be painted shall have paint grip applied. n9 9 L] Systems exhausting toxic,flammable,paint exhaust,corrosive fumes,or dust the volume of air that is reheated/recooledtmixed in peak heating demand,and modulate airflow between deadband and full L3 Laboratory fume hood systems that include qualifying features. heating/cooling. COMcheck Software Version 4.0.1 Plans reference page/section: Plans reference pagelsection: Requirements Specific To:V-01 1I.Single duct variable air volume(VAV)systems,terminal devices.Single duct VAV systems use terminal devices capable of reducing the Mechanical Compliance Ceftificate E] 1. Energy recovery ventilation systems. Individual fan systems that have both a design supply air capacity of 5,000 dm or greater and a supply of primary supply air before reheating or recoding takes place. -- minimum outside air supply of 70 percent or greater of the design supply air quantity have an energy recovery system. Plans reference page/section: Exception(s): [3 Where energy recovery systems are prohibited by the International Mechanical Code. .41 12.Supply-air temperature reset controls.HVAC systems serving multiple zones,including Dedicated Outside Air Systems include contrds L3 Systems serving spaces that are not cooled and are heated to less than 60°F. that automatically reset the supply-air temperature in response to representative building loads,or to outdoor air temperature. P-M Where more than 60 percent of the outdoor heating energy is provided from site-recovered or site solar energy. Plans reference page/section: Section 1: Project Information 0 C] Type I kitchen exhaust hoods. L3 13.Heat Recovery For Pooll/SpalHottubs.Heated indoor swimming pools,spas,or hot tubs with water surface area greater than 200 sf El Cooling systems in climates with a 1-percent cooling design wet-bulb temperature less than 64°F(i8°C).Energy Code:2014 Oregon Energy Efficiency Specialty Code provide for energy conservation by an exhaust air heat recovery system that heats ventilation air,pool water,or domestic hot water per Project TrIle: LI Systems requiring dehumidification that employ series-style energy recovery coils wrapped around the cooling coil when the requirement details. Project Type:Alteration evaporative coil is located upstream of the exhaust air stream. Exception(s): Construction Site: Owner/Agent: Destner/Contractor. L3 Systems exhausting toxic,flammable,paint exhaust,corrosive fumes,or dust. E] Pods,spas,or Hot tubs that include system(s)that provide equivalent recovered energy on an annual basis through one of 0 Laboratory fume hood systems that include qualifying features. the following methods:(1)heated by renewable energy,(2)dehumidification heat recovery,(3)waste heat recovery,or(4)a 4 6 1 F R 0 M R 0 A D Plans reference page/section: combination of these system(s)sources meeting requirement details. P ARAMUS , N 1 0 765 2 Section 2: General Information jr 2. Complex Systems.Mechanical systems not covered by section 503.3 comply to sections 503.4.1-503.4.6. Plans reference page/section: 9 7 3 2 5 3 9 3 9 3 T E L 9 7 3 2 5 3 9 3 9 0 FA X Building Location(for weather data): Portland,Oregon Plans reference page/section: Generic Requirements: Must be met by all systems to which the requirement is applicable: WWW . SARGARCH COM Climate Zone: 4c: E] 3. Variable air volume fan control.Individual VAVfans with motors of 10 hp or greater are driven/ccritrolled in the manner specified bythis ✓ 1. Calculation of heating and cooling loads.Design loads are determined in accordance with the procedures described in the section. ASHRAE/ACCA Standard 183.Alternatively,design loads have been determined by an approved equivalent computation procedure. ARCHITECTURAL SEAL Section 3: Mechanical Systems List Plans reference page/section: ,1( 2. Equipment and system sizing.Healing and cooling equipment and systems capacity do not exceed the loads calculated in accordance Quantity System Type&Description ❑ 4. Hydronic systems controls.The heating of fluids that have been previously mechanically cooled and the cooling of fluids that have been with Section 503.2.11. 1 RTU-1 (Single Zone): previously mechanically heated are limited in accordance with Sections 503.4.3.1 through 503.4.3.3. Plans reference page/section: PR11 Heating:I each-Central Furnace,Electra Capacity=13 k8tulh Plans reference page/section: No minimum efficiency requirement appries V/ 3. HVAC Equipment Performance Requirements.Reported efficiencies have been tested and rated in accordance with the applicable test Nk Cooling:I each-Single Package DX Unit Capacity=28 kBtu/h,Air-Cooled Condenser,Air Economizer 05. Three-pipe system.Hydronic systems that use a common return system for both hot water and chilled water are not installed. procedure.The efficiency has been verified through certification under an approved certification program or,if no certification program U7M'p ZAN Proposed Efficiency=14.20 SEER Required Efficiency=13.00 SEER Plans reference page/section: exists,the equipment efficiency ratings are supported by data furnished by the manufacturer. Fan Systern: FAN SYSTEM I I RTU-1-Compliance(Brake HP method):Passes ✓ 4. Thermostatic Controls.The supply of heating and coding energy to each zone is controlled by individual thermostatic controls that Faris: ❑ 6. Two-pipe changeover system.Systems that use a common distribution system to supply both heated and chilled water are designed respond to temperature within the zone. to allow a dead band between changeover from one mode to the other:are provided with controls that will allow operation in one W FAN I Supply,Constant Volume,890 CFM,0.5 motor nameplate hp.0.3 brake hp mode for at least 4 hours before changing over to the other mode;and are provided with controls that allow heating and cooling supply Plans reference page/section: ILI 1 V-01(Allultipte-Zone): temperatures at the changeover point. ✓ 5. Heat pump supplementary heat.Heat pumps having supplementary electric resistance heat have controls that,except during defrost, Heating:I each-Other,Electric,Capacity=10 kBtu/h Plans reference page/section: prevent supplementary heat operation when the heat pump can meet the heating load. No minimum efficiency requirement applies Fan System: FAN SYSTEM 2-Compliance(Motor nameplate HP method) Passes E] 7. Hydronic(water loop)heat pump systems.Hydronic heat pump systems comply with Sections 503.4.3.3.1 through 503.4.3.3.3. Plans reference page/section: Fens: Plans reference page/section: V( 6. Set point overlap restriction.Where used to control both heating and coding,zone thermostatic controls provide a temperature range SEP 2 8 SO FAN 2 Supply,Constant Volume,880 CFM.0.3 motor nameplate hp or deadband of at least 5°F(2.8°C)within which the supply of heating and cooling energy to the zone is capable of being shut off or L] S. Temperature dead band.Hydronic heat pumps connected to a common heat pump water loop with central devices for heat rejection reduced to a minimum. and heat addition have controls that are capable of providing a heat pump water supply temperature dead band of at least 20°F Section 4: Requirements Checklist between initiation of heat rejection and heat addition by the central devices. Plans reference page/section: CONSULTANTS Exception(s): 7. Optimum Start Controls.Each HVAC system has controls that very the start-up time of the system to just meet the temperature set [3 Where a system loop temperature optimization controller is installed and can determine the most efficient operating temperature In the fbAbiving requirements,blank checkboxes Adentify requirenients that the applicant has not acknowledged as being met.Cheduriarks based on realfime conditions of demand and capacity,dead bands of less than 20°F shall be permitted. point at time of occupancy. K identify requirements that ft applicant acknowledges are met or excepted Cram compliance.Plans reference pagev6-ection'idenfifies where in fheplans&pecs The requkerrwit can be verified as being satisfied. Plans reference page/section: Plans reference page/section: L Requirements Specific To:RTL14 : Lj 9. Heating and Cooling Water Pump Control.Water circulation systems serving heating cocks)or cooling coil(s)have controls that lock out 8. Off-hour controls.Each zone Is provided with thermostatic setback controls that are controlled by either an automatic time dock or H 1. Equipment meets minimum efficiency. Single Package Unit 13.00 SEER pump operation when there is no demand.The pumps will shut off based on the outside air lock out temperatures. programmable control system. 2 Newly purchased equipment meets the efficiency requirements. Exception(s): ✓ Plans reference page/section: KOHRS LONNEMANN NEIL ❑ 3. Energy recovery ventilation systems.Individual fan systems that have both a design supply air capacity of 5,000 cfm or greater and a C] Industrial process and hurnidity control process. ENGINEERS, PSC minimum outside air supply of 70 percent or greater of the design supply air quantity have an energy recovery system. V�f 9. Shutoff damper controls.Both outdoor air supply and exhaust are equipped with not less than Class I motorized dampers. Exception(s): Plans reference pagelsection: Plans reference page/section: MECHANICAUELECTRICAL ENGINEERS Where energy recovery systems are prohibited by the International Mechanical Code. ✓ IO.Requirements For Complex Mechanical Systems Serving Multiple Zones. WWVV.KLHENGRS.COM ❑ Systems serving spaces that are not cooled and are heated to less than 60°F. Complex systems serving multiple zones comply with Sections 503.4.5.1 through 503.4.5.4 Additionally,supply air systems serving ✓ 10.Freeze Protection and Snow melt system controls.Freeze protection systems,such as heat tracing of outdoor piping and heat 1538 ALEXANDRIA PIKE,SUITE 11 exchangers,including self-regulating heat tracing,include automatic controls capable of shutting off the systems when outdoor air FT.THOMAS,KENTUCKY 41075 Where more than 80 percent of the outdoor heating energy is provided from site-recovered or site solar energy. multiple zones are VAV systems which are designed and capable of being controlled to reduce primary air supply to each zone, temperatures meet code criteria. 800-354-9783 Q Type 1 kitchen exhaust hoods. Plans reference page/section: 859-442-8050 ❑ Cooling systems in climates with a 1-percent cooling design wet-bulb temperature less than 64F(18°C; 859-442-8058 FAX C] Systems requiring dehumidification that employ series4tyle energy recovery coils wrapped around the cooling coil when the V/ I I.Separate air distribution systems.Zones with special process temperature requirements and/or humidity requirements are served by evaporative coil is located upstream of the exhaust air stream. separate air distribution systems from those serving zones requiring only comfort conditions;or shall include supplementary control provisions so that the primary systems may be specifically controlled for comfort purposes only. DATE ISSUE DB Project Title- Report date. 09/21/15 Project Title: Report date: 09/21/15 Project Title: Report date: 09/21/15 07/27/15 BID/PERMIT Data filename:GVl7OOO-l79Ml7300-173=17330%Project DatakEnergy%Compliance120I50901-HP-COMCHECKcck Page I of 6 Data filename:G.\17000-17999\17300-17399\17330\Project Data\EnergXompliance120150901-HP-COMCHECKcck Page 2 of 6 Data filename:G.X17000-179MI7300-17399Xl7330\Project Data\Energy\Compliance120150901-HP-COMCHECKcck Page 3 of 6 08/04/15 LANDLORD REVIEW A 09/03/15 CONSTRUCTION SET Plans reference pagetsecticn: f 24Air system balancing.Each supply air outlet and zone terminal device is equipped with means for air balancing In accordance with the El HVAC record drawings of the actual installation,system capacities,calibration information,and performance data for each equipment 09/22/15 CONSTRUCTION REV requirements orf IMC 603.17.Discharge dampers intended to modulate airflow are prohibited on constant volume fans and variable provided to the owner. C] 12.Humidity control.If a system is equipped with a means to add or remove moisture to maintain specific humidly levels in a zone or volume fans with motors 10 horsepower. 13 HVAC O&M documents for all mechanical equipment and system provided to the owner by the mechanical contractor. zones,a humidity control device is provided, Plans reference pagetsection: L3 Written HVAC balancing and operations report provided to the owner. Plans reference page/section: Ll 25.Hydronic system balancing.Individual hydronic heating and coding coils are equipped with means for balancing and pressure test The above post construction requirements have been completed. ❑ 13.Humidity control.Where a humidity control device exists it is set to prevent the use of fossil fuel or electricity to produce relative connections. humidity in excess of 30 percent.Where a humidly control device is used for dehumidification,it is set to prevent the use of fossil fuel Plans reference page/section. Principal Mechanical Designer-Name Signature Date or electricity to reduce relative humidity below 60 percent. Exception(s): ✓ 26.Manuals.The construction documents require that an operating and maintenance manual be provided to the building owner by the 0 Hospitals,process needs,archives,museums,critical equipment,and other non-comfort situations with specific humidity mechanical contractor.See long description for specifications. requirements outside this range. Plans reference pagetsectiow. Plans reference page/section: ✓ 27Air System Design and Control-Each WAC system having a total fan system motor nameplate hp exceeding 5 hp meets the provisions ❑ 14.Humidity control.Where a humidity control device exists it is set to maintain a deadband of at least 10%relative humidity where no of Sections 503.2.10.1 through 503.2.10.2. active humidlilcation or dehumidification takes place. Exception(s): Plans reference pagetsection: L3 Heating for dehumidification is provided with heat recovery or beat pumping and the mechanical cooling system efficiency is 10 ✓ 28ANowable fan floor horsepower.Each WAC system at fan system design conditions does not exceed the allowable fan system motor percent higher than required in section 503.2.3,HVAC equipment performance requirements. nameplate hp(Option 1)or fan system bhp(Option 2)as shown and calulated in requirement details. Plans reference pagel§ecticn: Plans reference page/section: PROJECT NAME ✓ 15.Ventilation.Ventilation,either natural or mechanical,is provided in accordance with Chapter 4 of the International Mechanical Code. OF 29.Motor nameplate horsepower.For each fan,the selected fan motor is no larger than the first available motor size greater than the brake Where mechanical ventilation is provided,the system has the capability to reduce the outdoor air supply to the minimum required by horsepower(bhp). Chapter 4 of the International Mechanical Code. Plans reference page/section: Plans reference page/section: L3 16.Demand controlled ventilation(DCV).DCV is required for spaces larger than 500 111:2 for simple systems and spaces larger than ISO lt2 E3 30.1-arge Vdume Fan Systems.Fan systems over 8,000(7 m3/s)cfm without direct expansion cooling coils that serve single zones reduce for multiple zone systems. airflow based on space thermostat heating and cooling demand.A two-speed motor or variable frequency drive reduces airflow to a ee7s Exception(s): maximum 60 percent of peak airflow or nnininnurn ventilation air requirement as required by Chapter 4 or the International Mechanical (3 Systems with energy recovery complying With Section 503.2.6Code,whichever is greater. C] Spaces less than 750 fit(69.7 m2)where an occupancy sensor turns the fan off,closes the ventilation damper,or closes the Exception(s): CAND I ES [3 Systems where the function of the supply air is for purposes other than temperature control,such as maintaining specific humidly zone damper when the space is unoccupied. levels or supplying an exhaust system. Plans reference page/section: Plans reference pagetsection: LOCATION LJ 17.Kitchen hoods.Kitchen makeup is provided as required by the Oregon Mechanical Specialty Code. 31 All air-conditioning equipment and air-handing units with direct expansion cooling and a coding capacity at ARI conditions greater thart WASHINGTON Exception(s): ✓ or equal to I 10,000 Btulh that serve single zones have their supply fan operation controlled according to code specific requirements. SQUARE [3 Where hoods are used to exhaust ventilation air that would otherwise be exhausted by other fan systems. 9585 SW WASHINGTON SQUARE Cj Kitchen exhaust systems that include exhaust air energy recovery complying with section 503.2.6. Plans reference pagetsection: PORTLAND, OR 97223 Plans reference pagelsection: ✓ 32.Series fan-powered terminal unit fan motors.Fan motors for series fan-powered terminal units are electronicalty-commutated motors SPACE#H-1 5 and have a minimum motor efficiency of 70 percent when rated in accordance with NEMA Standard MG 1-2006 at full load rating L] 18.Enclosed parking garage ventilation controls.In Group S-2,enclosed parking garages used for storing or handing automobiles employs conditions. automatic carbon monoxide sensing devices. PROJECT INFORMATION Plans reference page/section: Plans reference page/section: ✓ 33.Heating outside a building Systems installed to provide heat outside a building are radiant systems.Such heating systems are DATE: 05/28/2015 ✓ 19.Duct and plenum insulation and sealing.All supply and return air ckicts and plenums are insulated with the specified insulation.When controlled by an occupancy sensing device ore timer switch,sothat the system is automatically deenergized when no occupants are located within a building envelope assembly,the duct or plenum is separated from the building exterior or unconditioned or exempt present spaces by a minimurn of R-8 insulation.All ducts,air handlers and filter boxes are sealed.Joints and seams comply with Section 603.9 PROJECT NO. 150128-003 of the International Mechanical Code. Plans reference pagelsecticn: ✓ 20.1-ow-pressure duct systems.All longitudinal and transverse joints,seams and connections of low-pressure supply and return ducts are rl 34.Hot Gas Bypass Limitation.For cooling systems 240 kBtulh,maximum hot gas bypass capacity is no more than 50%total coding AREA: 1,260 SF. securely fastened and sealed with welds,gaskets,mastics(adhesives),mastic-plus-embedded-fabdc systems or tapes installed in capacity accordance with the manufacturer's installation instructions. Plans reference page/section: Plans reference page/section: DRAWN BY: SH/DS Ll 21.Medum-pressure duct systems.All ducts and plenums designed to operate medium-pressure are insulated and sealed in accordance REVIEWED BY: LF MD with Section 503.2.7.Pressure classifications specific to the duct system are clearly indicated on the construction documents. Section 5: Compliance Statement Plans reference page/section: SHEET TITLE Con bnce Statement: The proposed mechanical alteration project represented in this document Is consistent with the building plans, (3 22.High-pressure dud systems.Ducts designed to operate at high-pressure are Insulated and sealed in accordance with Section 503.2.7. specifications and other calculations submitted with this permit application.The proposed mechanical alteration project has been designed In addition,ducts and plenums are leak-tested in accordance with the SMACNA HVAC Air Duct Leakage Test Manual. to meet the 2014 Oregon Energy Efficiency Specialty Code,Chapter 8.re OMcheck Version 4.0.1 and to comply with the MECHAIN CAL ENERGY Plans reference page/section: mandatory requirements in the Requirements Checklist.✓ 23.Piping Insulation.All pipes serving space-conditioning systems(hot water piping for heat systems,chilled water,refrigerant,and brine Robert A. Lonnemann, P.E. C*MPUANa piping systems,and steam piping)are Insulated as specified by this section. Name-Tffle Signature k Date TITLE NUMBER Section 6: Post Construction Compliance Statement Project Title: Report date: 09/21/15 Project Title: Report date: 09121/15 Project Title: Report date:09121/15 Data filename:GA17000-17999X17300-17399\17330\Project Data\Energy\Compliance\20150901-HP-COMCHECKcck Page 4 of 6 Data filename:G:\17000-17999\17300-17399\17330\Pr4ect Data\En ergy\Cmpliance\20150901-HP-COMCHECKcck Page 5 of 6 Data filename:G:\17000-17999\17300-17399\17330\Project Data\EnergyXCornpliance\20150901-HP-COMCHECK.cck Page 6 of 6 M-4v0 2