Plans (5)MEC2015-00577 GENERAL DIVISION 15 NOTES PRE-BID INSTRUCTIONS: 1. CONTRACTOR SHALL VISIT SITE PRIOR TO BID AND CAREFULLY EXAMINE THE EXISTING CONDITIONS. CONTRACTOR SHALL NOT BE ALLOWED EXTRA COST DUE TO FAILURE TO VISIT SITE OR TO INQUIRE WITH OWNER AND DESIGN PROFESSIONALS AS TO CLARIFICATIONS OF DISCREPANCIES AND UNKNOWNS. 2. CONTRACTOR SHALL REVIEW ENTIRE SET OF DRAWINGS AND SPECIFICATIONS TO DETERMINE THE SCOPE OF WORK. CONTRACTOR SHALL BE RESPONSIBLE FOR INFORMATION ON ALL OTHER CONSTRUCTION DOCUMENTS INCLUDING ARCHITECTURAL AND ELECTRICAL DRAWINGS. EXTRA COST SHALL NOT BE ALLOWED DUE TO FAILURE TO REVIEW ENTIRE SET OF DRAWINGS AND SPECIFICATIONS. 3. DATA PRESENTED ON THE DRAWINGS ARE AS ACCURATE AS PRELIMINARY SURVEYS AND PLANNING CAN DETERMINE, BUT ACCURACY IS NOT GUARANTEED AND FIELD VERIFICATION OF ALL DIMENSIONS IS DIRECTED. SPECIFICATIONS, DISTANCES AND LEVELS WILL BE GOVERNED BY ACTUAL FIELD CONDITIONS. REVIEW ARCHITECTURAL AND ELECTRICAL PLANS AND ADJUST WORK TO CONFORM TO ALL CONDITIONS SHOWN THEREON. ACTUAL QUANTITY AND LOCATION OF DEVICES MAY VARY BASED ON CONDITIONS ENCOUNTERED DURING ORIGINAL CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR REMOVING OR REUSING EXISTING DEVICES. UNUSED EXISTING DEVICES, ASSOCIATED WIRING, CONDUIT AND FITTINGS SHALL BE REMOVED. 4. CONTRACTOR SHALL REFERENCE SPECIFICATIONS FOR CONSTRUCTION MATERIALS AND INSTALLATION PROCEDURES. THE SPECIFICATIONS ARE PART OF THE CONSTRUCTION DOCUMENTS. IN THE EVENT OF CONFLICT BETWEEN SPECIFICATIONS AND DRAWINGS, SUCH CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF ARCHITECT / ENGINEER FOR RESOLUTION. THESE DOCUMENTS ARE DIAGRAMMATIC AND DO NOT NECESSARILY SHOW MATERIALS FOR COMPLETE INSTALLATION. PROVIDE COMPLETE COMPLIANT AND OPERATIONAL SYSTEMS: 1. DRAWINGS AND SPECIFICATIONS HAVE BEEN PREPARED TO COMPLEMENT EACH OTHER. PROVIDE ITEMS SHOWN ON ONE AND NOT THE OTHER AS THOUGH SHOWN AND CALLED OUT IN BOTH. IF AN APPARENT CONFLICT EXISTS WITHIN THE CONSTRUCTION DOCUMENTS, PRESUME TO PROVIDE THE MORE COSTLY CHOICE, AND REQUEST CLARIFICATION FROM ARCHITECT / ENGINEER IN WRITING. 2. PROVIDE, LABOR, MATERIALS, EQUIPMENT, FEES, AND PERMITS NECESSARY TO CONSTRUCT A COMPLETE, OPERATIONAL SYSTEM FOR THE ENTIRE PROJECT AS SHOWN ON THESE CONSTRUCTION DOCUMENTS. 3. CONSTRUCTION DOCUMENTS PRESENT THE GENERAL DESIGN, ARRANGEMENT AND EXTENT OF SYSTEMS. COMPLETE DETAIL IS NOT PRESENTED. DRAWINGS ARE DIAGRAMMATIC. BECAUSE OF THEIR SMALL SCALE, THEY DO NOT SHOW EVERY OFFSET, BEND OR ELBOW NECESSARY FOR THE COMPLETE INSTALLATION. PROVIDE SYSTEMS COMPLETE AND OPERATIONAL AND IN COMPLIANCE WITH DESIGN INTENT. OBTAIN PERMISSION FROM ENGINEER PRIOR TO MAKING MAJOR DEVIATIONS FROM CONSTRUCTION DOCUMENTS. EXAMPLES OF MAJOR DEVIATIONS ARE CHANGES IN COMPONENT SIZES, WEIGHTS, QUANTITIES, OR MATERIALS. 4. INSTALL EQUIPMENT IN STRICT ACCORDANCE WITH THE EQUIPMENT MANUFACTURER'S WRITTEN RECOMMENDATIONS. PROVIDE FITTINGS AND OTHER SIMILAR DEVICES AND ACCESSORIES REQUIRED FOR A COMPLETE, WORKABLE INSTALLATION. 5. REPAIR OR REPLACE PARTS OF THIS WORK THAT FAIL, ARE UNFIT, OR BECOME DAMAGED DURING CONSTRUCTION WITH NO CHANGE TO THE CONTRACT PRICE. PAY FEES: 1. OBTAIN AND PAY FOR ALL PERMITS AND INSPECTIONS REQUIRED FOR THE ELECTRICAL WORK; ARRANGE FOR INSPECTIONS REQUIRED FOR THE ELECTRICAL WORK; FURNISH A CERTIFICATE OF FINAL INSPECTION AND APPROVAL BY ENFORCEMENT AUTHORITIES. 2. WHEN ADJUSTMENTS, ALTERATIONS, OR CHANGES TO THE PROJECT ARE REQUIRED TO ACCOMMODATE PRODUCTS OTHER THAN "BASIS OF DESIGN", PAY ENGINEERING/DESIGN FEES REQUIRED TO MAKE SUCH ADJUSTMENTS, ALTERATIONS, OR CHANGES (INCLUDING BUT NOT LIMITED TO MECHANICAL, STRUCTURAL SUPPORT, AND CHANGES TO ACCOMMODATE MAINTENANCE NEEDS AND DESIGN INTENT). 3. PAY PROFESSIONAL ENGINEERING AND DESIGN FEES ASSOCIATED WITH CONTRACTOR -INITIATED CHANGES OCCURRING AFTER SEALED CONSTRUCTION DOCUMENTS ARE SUBMITTED FOR APPROVAL TO AUTHORITY HAVING JURISDICTION. 4. PAY PROFESSIONAL ENGINEERING FEES ASSOCIATED WITH CONTRACTOR'S FAILURE TO FOLLOW SUBMITTAL REQUIREMENTS. MAKE SUBMITTALS: YlTTAL :: 1. INDIVIDUAL SUBMITTALSARE RE T 0 BE PREPARED ELECTRONICALLY C LLY IN PDF FORMAT. ELECTRONIC FILES SHALL BE ORIGINAL VENDOR -PREPARED ELECTRONIC FILES AND NOT SCANNED COPIES OF CATALOG PAGES OR FACSIMILES. INDIVIDUAL EQUIPMENT ITEMS SHALL BE TAGGED WITH EQUIPMENT IDENTIFIERS AS SHOWN ON THESE DRAWINGS. ILLEGIBLE ELECTRONIC FILES ARE SUBJECT TO "REVISE AND RESUBMIT" ACTION. 2. INCLUDE WITH SUBMITTALS SPECIFIC WRITTEN NOTICE OF EACH VARIATION A SUBMITTAL HAS FROM THE REQUIREMENTS OF CONSTRUCTION DOCUMENTS. ENGINEER'S S REVIEW OF SUBMITTALS SHALL NOT RELIEVE CONTRACTOR FROM RESPONSIBILITY FROM COMPLIANCE WITH CONSTRUCTION DOCUMENTS UNLESS THE ENGINEER HAS SPECIFICALLY ACCEPTED THE VARIATION IN WRITING. 3. SUBMIT SUBSTITUTION REQUESTS FOR APPROVAL. SUBSTITUTED EQUIPMENT SHALL MEET OR EXCEED STANDARDS SET BY ITEMS SPECIFIED. 4. SUBMIT A SCHEDULE OF CONSTRUCTION DOCUMENT CHANGES REQUIRED DUE TO 1) DIFFERENCES (BETWEEN PRELIMINARY DESIGN DATA AND SUBMITTAL DATA) IN "BASIS OF DESIGN" EQUIPMENT OR 2) SUBSTITUTED EQUIPMENT FOR REVIEW PRIOR TO INITIATING WORK. WHEN ADJUSTMENTS, ALTERATIONS, OR CHANGES TO THE PROJECT ARE REQUIRED TO ACCOMMODATE SUBSTITUTED PRODUCTS, PAY ENGINEERING/DESIGN FEES REQUIRED TO MAKE SUCH ADJUSTMENTS, ALTERATIONS, OR CHANGES. 5. SUBSTITUTION REQUESTS SHALL SHOW ENERGY CONSERVATION FEATURES OF SUBSTITUTED EQUIPMENT EQUAL OR EXCEED THAT OF SPECIFIED EQUIPMENT. KEEP RECORDS: 1. DURING CONSTRUCTION, MAINTAIN A SET OF AS -BUILT, REDLINED, RECORD DRAWINGS AT THE PROJECT SITE. RECORD ALL CHANGES FROM, BUT NOT LIMITED TO, ADDENDA, CHANGE ORDERS, SUPPLEMENTAL INSTRUCTIONS, AND DESIGN CLARIFICATIONS. RECORD CHANGES IN LAYOUT, ROUTING, EQUIPMENT, COMPONENTS, AND ACCESSORIES. RECORD CHANGES DUE TO CHANGES IN SUPPLIED EQUIPMENT. AFTER ENGINEER'S FINAL INSPECTION PROVIDE RECORD DRAWINGS TO ENGINEER. 2. AT COMPLETION OF PROJECT PROVIDE NEW PANEL DIRECTORIES INDICATING WHICH BREAKERS ARE NOW SPARE. INCLUDE LISTING OF BREAKERS FROM OLD PANEL DIRECTORIES FOR CIRCUITS NOT DISTURBED. CONSULT WITH OWNER FOR CIRCUITS NOT ADEQUATELY MARKED. DEFINITIONS: 1. ACTION SUBMITTALS: WRITTEN AND GRAPHIC INFORMATION REQUIRING DESIGN PROFESSIONAL'S RESPONSIVE ACTION. ACTION SUBMITTALS INCLUDE PRODUCT DATA, SHOP DRAWINGS, SAMPLES, PRODUCT SCHEDULE OR LIST. 2. INFORMATIONAL SUBMITTALS: WRITTEN INFORMATION NOT REQUIRING DESIGN PROFESSIONAL'S RESPONSIVE ACTION. SUBMITTALS MAY BE REJECTED FOR NOT COMPLYING WITH REQUIREMENTS. INFORMATION SUBMITTALS INCLUDE COORDINATION DRAWINGS, WELDING CERTIFICATES, QUALIFICATION DATA, INSTALLER CERTIFICATES, MANUFACTURER CERTIFICATES, PRODUCT CERTIFICATES, MATERIAL CERTIFICATIONS, MATERIAL TEST REPORTS, PRODUCT TEST REPORTS, FIELD TEST REPORTS, OPERATION AND MAINTENANCE DATA, MANUFACTURER'S INSTRUCTIONS, MANUFACTURER'S FIELD REPORTS, INSURANCE CERTIFICATES AND BONDS, MATERIAL SAFETY DATA SHEETS AND RECOMMENDED SPARE PARTS LISTS. 3. FURNISH: OBTAIN AND DELIVER TO ON-SITE STORAGE IN ORIGINAL FACTORY PACKAGING. 4. INSTALL: UNPACK, MOVE TO FINAL LOCATION, MAKE CONNECTIONS, AND PLACE INTO FINAL SERVICE ACCORDING TO PROCEDURES IDENTIFIED IN PART 3 OF APPLICABLE SECTION(S). 5. PROVIDE: FURNISH AND INSTALL, COMPLETE AND READY FOR THE INTENDED USE. PROTECT: 1. PROTECT EXISTING STRUCTURES AND EQUIPMENT DURING THE EXECUTION OF THIS CONTRACT. 2. REPAIR AREAS AFFECTED BY WORK TO THEIR ORIGINAL CONDITION OR BETTER. COORDINATE, 1. PRIOR TO ORDERING, FABRICATING, OR INSTALLING WORK, COORDINATE WORK WITH WORK OF OTHER SUBCONTRACTORS AND WITH CONTRACTORS HIRED DIRECTLY BY THE OWNER. WHERE CONFLICTS OCCUR, RESOLVE THEM PRIOR TO FABRICATION AND INSTALLATION. 2. DURING INSTALLATION, RESOLVE CONFLICTS AND MAKE CHANGES RESULTING FROM LACK OF CONTRACTOR COORDINATION WITH NO CHANGE TO THE CONTRACT PRICE. 3. NOTIFY THE ENGINEER IN WRITING OF EXISTING CONDITIONS DIFFERING FROM THOSE SHOWN IN CONTRACT DOCUMENTS. THE ENGINEER WILL EVALUATE THE DIFFERENCES, AND IF NECESSARY, REDESIGN FOR THE CONDITIONS FOUND. 4. DO NOT SCALE OFF CONSTRUCTION DOCUMENTS. COORDINATE INSTALLATION WITH FIELD CONDITIONS. 5. WHERE BUILDING ELEMENTS (FOR EXAMPLE, DOOR FRAMES, PORTIONS OF WALLS, PORTIONS OF FLOORS, ETC.) HINDER REMOVAL OF EXISTING OR INSTALLATION OF NEW EQUIPMENT, REMOVE AND REPLACE SUCH ELEMENTS. UPON SUBSTANTIAL COMPLETION, ENSURE BUILDING ELEMENTS MATCH THEIR ORIGINAL CONDITIONS. PROVIDE SERVICEABILITY: 1. PROVIDE CEILING ACCESS PANELS TO ENABLE ACCESS TO EQUIPMENT REQUIRING SERVICE OR OPERATION. COORDINATE LOCATION OF ACCESS PANELS AND DOORS FOR ITEMS THAT ARE BEHIND FINISHED SURFACES OR OTHERWISE CONCEALED. 2. PROVIDE SERVICE CLEARANCES AROUND EQUIPMENT AS RECOMMENDED BY EQUIPMENT MANUFACTURER. ADDRESS PENETRATIONS: 1. IN FIRE RATED BARRIERS, PROVIDE FIRE STOPPING ASSEMBLIES LISTED BY A RECOGNIZED INDEPENDENT TESTING LABORATORY AND MATCHED TO FIELD CONDITIONS. MAINTAIN FIRE RATING OF SURFACE PENETRATED. CONTROL QUALITY: 1. RECORD ALL DRAWING MODIFICATIONS AND SPECIFICATION MODIFICATIONS IN ADDENDUM(S) ON THE APPROPRIATE DRAWING(S) AND IN THE APPROPRIATE SPECIFICATION SECTION(S), RESPECTIVELY. 2. TAKE RESPONSIBILITY FOR EQUIPMENT CHECK-IN, SAFEKEEPING, AND DAMAGE PREVENTION. 3. UNSPECIFIED EQUIPMENT OR SYSTEMS SHALL BE REPRESENTED BY DULY AUTHORIZED DISTRIBUTORS WITH SERVICE DEPARTMENTS REGULARLY ENGAGED IN THE MAINTENANCE AND INSTALLATION OF THESE SYSTEMS AND EQUIPMENT. SUCH SERVICE DEPARTMENTS SHALL REGULARLY STOCK STANDARD REPLACEMENT PARTS AND EQUIPMENT AND SHALL BE LOCATED WITHIN A REASONABLE DISTANCE FROM THE INSTALLATION SITE. 4. WHENEVER A MATERIAL, ARTICLE, OR PIECE OF EQUIPMENT IS IDENTIFIED ON THE DRAWINGS BY REFERENCE TO MANUFACTURERS, VENDORS NAMES, TRADE NAMES, CATALOG NUMBERS, OR THE LIKE, IT IS SO IDENTIFIED FOR THE PURPOSE OF ESTABLISHING A STANDARD. MATERIALS, ARTICLES, OR PIECES OF EQUIPMENT FROM OTHER MANUFACTURERS OR VENDORS, WHICH WILL ADEQUATELY PERFORM THE DUTIES IMPOSED BY THE GENERAL DESIGN, WILL BE CONSIDERED EQUALLY ACCEPTABLE PROVIDED THEY ARE OF EQUAL SUBSTANCE, APPEARANCE, AND FUNCTION. CLOSEOUT: 1. GUARANTEE SYSTEMS (PARTS AND LABOR) FOR A MINIMUM PERIOD OF ONE YEAR AFTER THE DATE OF SUBSTANTIAL COMPLETION. 2. PROVIDE OPERATING AND MAINTENANCE MANUALS IN PDF FORMAT. MANUALS SHALL INCLUDE, BUT ARE NOT LIMITED TO, PRODUCT DATA SHEETS, SHOP DRAWINGS, WIRING DIAGRAMS, OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT, ACCESSORIES LIGHTING FIXTURES OCCUPANCY CONTROLS AND RECOMMENDED SPARE PARTS ARTS LISTS. 3. IMMEDIATELY BEFORE TURNING SYSTEMS OVER TO OWNER, DEMONSTRATE FULL AND PROPER SYSTEMS OPERATIONS TO ENGINEER AND OWNER. IMMEDIATELY BEFORE DEMONSTRATION, PROPERLY AND FULLY RE -LUBRICATE EQUIPMENT. 4. UPON COMPLETION OF WORK, REMOVE ALL SURPLUS MATERIALS AND RUBBISH. MAKE REQUIRED PATCHING AND REPAIRS OF OTHER TRADES' WORK THAT YOU DAMAGED. LEAVE THE PREMISES IN A CLEAN AND ORDERLY CONDITION. SPECIFICATIONS DIVISION 15 - MECHANICAL MECHANICAL GENERAL REQUIREMENTS 1. DESCRIPTION OF WORK: THE WORK DESCRIBED HEREIN SHALL INCLUDE ALL THE WORK INDICATED ON THE DRAWINGS, SPECIFIED AND/OR REQUIRED FOR A COMPLETE AND OPERATING PROJECT. A. THE INSTALLATION MA LA AND MATERIALS LS FURNISHED SHALL BE IN ACCORDANCE WITH THE LATEST TO H ADDITION THE D INTERNATIONAL MECHANICAL CODE, INTERNATIONAL PLUMBING CODE, AND CODES AND STANDARDS HAVING JURISDICTION. ANY REQUIREMENTS IN EXCESS OF CODE REQUIREMENTS AND PERMITTED UNDER THE CODE SHALL TAKE PREFERENCE. ALL MATERIALS SHALL BE AS SPECIFIED OR AS APPROVED EQUAL. 2. RELATED DOCUMENTS: DRAWINGS AND GENERAL PROVISIONS OF CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND DIVISION 16 SPECIFICATION SECTIONS, APPLY TO THIS SPECIFICATION. 3. CODES AND PERMITS: ALL WORK SHALLE A B INSTALLED IN ACCORDANCE WITH LOCAL CODES. ALL FEES AND PERMITS SHALL BE PAID BY THE CONTRACTOR. 4. WORKMANSHIP: ALL MATERIALS SHALL BE INSTALLED IN ACCORDANCE WITH ACCEPTED GOOD PRACTICE OF THE INDUSTRY. 5. COORDINATION: COORDINATE THE MECHANICAL WORK WITH THE WORK OF ALL OTHER TRADES. 6. DIMENSIONS: VERIFY ALL DIMENSIONS AND CONDITIONS IN THE FIELD. 7. CUTTING AND PATCHING: PERFORM CUTTING AND PATCHING IN ACCORDANCE WITH THE GENERAL SPECIFICATIONS. 8. STORAGE: STORE PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS WITH SEALS AND LABELS INTACT AND PROTECT UNTIL INSTALLED. STORE IN LOCATION DESIGNATED BY THE OWNER. 9. PROTECTION OF EQUIPMENT: PROTECT EQUIPMENT FROM DAMAGE, SOILING, MARRING, BENDING OR STRESSING. PROVIDE PROTECTION ADEQUATE TO SERVE THE PURPOSE AND IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. 10. MATERIALS AND EQUIPMENT: MATERIALS AND EQUIPMENT SHALL BE NEW AND UNUSED. 11. PAINTING: TOUCH UP FACTORY PAINT FINISHES. 12. ACCESSIBILITY: ALL VALVES, CONTROLS AND EQUIPMENT ITEMS SHALL BE ACCESSIBLE FOR OPERATION, MAINTENANCE AND REPAIR. 13. INSTALLATION: INSTALL ALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND AS SPECIFIED. A. PIPING AND EQUIPMENT SHALL BE SECURELY SUPPORTED BY MEANS OF HANGERS, ANCHORS AND SUPPORTS. PROVIDE FOR PIPING EXPANSION. ANCHORS SHALL PROPERLY DISTRIBUTE STRESSES. 14. QUALITY ASSURANCE: EQUIPMENT AND INSTALLATION SHALL COMPLY WITH LOCAL AND NATIONAL BUILDING CODES, LOCAL UTILITY REGULATIONS AND ASHRAE, ASME, ASTM, ARI, UL AND NFPA STANDARDS. 15. CLEANING: CLEAN ALL PIPING, DUCTWORK, FIXTURES, FINNED ELEMENTS, EQUIPMENT AND SYSTEMS. 16. SYSTEM TESTING AND OPERATION: TEST SYSTEMS FOR PROPER OPERATION AND OPERATE TO THE SATISFACTION OF THE OWNER. 17. GUARANTEE: ALL MATERIAL AND WORKMANSHIP SHALL BE GUARANTEED FOR ONE YEAR FROM DATE OF OWNER ACCEPTANCE, UNLESS OTHERWISE INDICATED. NG. VENTILATION AND AIR CONDITION PLUMBING 1. SLEEVES: PROVIDE #22 GAGE GALVANIZED IRON PIPE SLEEVES FOR PIPING THROUGH WALLS AND FLOOR, PACK WITH NON -ASBESTOS ROPE AND FILL WITH EXPANDO NON -SHRINKING CEMENT. 2. ESCUTCHEONS: PROVIDE EXPOSED PIPING, BOTH BARE AND COVERED, WITH CP CAST BRASS ESCUTCHEONS WHERE PASSING THROUGH FLOORS, CEILINGS, WALLS OR PARTITIONS. 3. HANGERS AND SUPPORTS: SUPPORT HORIZONTAL DRAINAGE PIPING AT LEAST EVERY 5 FEET OR AT EVERY HUB, COPPER TUBING EVERY 7 FEET AND STEEL PIPE EVERY 10 FEET WITH "CLEVIS" HANGERS AND INSULATION PROTECTION SHIELDS. PIPING SHALL NOT BE SUPPORTED FROM BRIDGING OR OTHER PIPING. ONLY SUPPORT FROM TOP FLANGES OF BEAMS AND TOP CHORDS AT PANELS OF JOIST AND TRUSSES. PROVIDE SWAY AND SEISMIC BRACING WHERE REQUIRED BY CODES. 4. TEST: TEST PIPING AND PROVE TIGHT FOR AT LEAST TWO HOURS IN ACCORDANCE WITH REQUIREMENTS OF AUTHORITIES HAVING JURISDICTION AND/OR AS SPECIFIED. TEST SHALL BE PERFORMED IN THE PRESENCE OF OWNER'S REPRESENTATIVE AND LOCAL INSPECTOR. TEST SHALL BE REPEATED IF NECESSARY UNTIL FINAL APPROVAL OF SYSTEM IS OBTAINED. 5. STERILIZATION OF DOMESTIC WATER SYSTEM: BEFORE BEING PLACED IN SERVICE, ALL WATER LINES SHALL BE CHLORINATED TO THE SATISFACTION OF THE ARCHITECT OR LANDLORD'S REPRESENTATIVE, IN ACCORDANCE WITH A.W.W.A. SPECIFICATION C651-05. 6. SLOPE WASTE LINES 2 INCHES AND SMALLER NOT LESS THAN 1/4 INCH PER FOOT. SLOPE LARGER MAINS NOT LESS THAN 1/8 INCH PER FOOT. 7. INSTALL A CLEANOUT AT BASE OF EACH SOIL STACK, AT EACH CHANGE IN DIRECTION, AT INTERVALS NOT OVER 50 FEET AND ELSEWHERE AS SHOWN ON DRAWINGS OR REQUIRED BY LOCAL CODE. CLEANOUTS SHALL NOT BE INSTALLED IN PUBLIC AREAS WITHOUT SPECIFIC PERMISSION BY TENANT'S CONSTRUCTION MANAGER. MATERIALS 1. DRAINAGE AND VENT PIPING: EXTRA HEAVY HUB AND SPIGOT CAST IRON SOIL WITH RUBBER GASKETS CONFORMING TO ASTM C564. NO -HUB CAST IRON TO HAVE HEAVY DUTY, TYPE 304 STAINLESS STEEL COUPLINGS CONFORMING TO ASTM A 666. 2. WATER PIPING BELOW SLAB: TYPE K HARD COPPER TUBING, WITH CAST BRONZE OR WROUGHT COPPER SOLDER JOINT FITTINGS USING 95-5 SOLDER. WATER PIPING ABOVE SLAB: TYPE L HARD COPPER TUBING USING SILVER SOLDER. ALL WATER SUPPLY PIPING TO CONFORM TO NSF/ANSI 61 AND ASTM B 75, ASTM B 88, ASTM B 251, OR ASTM B 447. ALL PIPE FITTINGS SHALL CONFORM TO ASSE 1061, ASME 8 16.15, ASME B 16.18, ASME B 16.22, ASME B 16.23, ASME B 16.26, AND ASME B 16.29. INSULATION 1. ALL HOT AND COLD WATER PIPING AND FITTINGS SHALL BE INSULATED WITH 1" THICK (MAX CONDUCTIVITY 0.27 BTU PER INCH/H*WvF)RIGID FIBERGLASS WITH VAPOR BARRIER UNIVERSAL JACKET PASTED WITH VAPOR BARRIER CEMENT. VAPOR BARRIER NOT REQUIRED ON HOT WATER PIPING. 2. ALL ADA CONFORMING, WHEELCHAIR ACCESSIBLE LAVATORY P -TRAP AND ANGLE VALVE ASSEMBLIES TO BE COVERED WITH THE MOLDED, ANTIMICROBIAL TRUBRO, INC "LAV -GUARD" UNDERSINK PROTECTIVE PIPE COVER MODEL #103. SPECIFIC PLUMBING SPECIFICATIONS 1. INSTALL NEW ONLY IF EXISTING DOES NOT MEET CURRENT ADA/CABG-ANSI (AS APPLICABLE) STANDARDS, OR IS DAMAGED, NOT IN WORKING ORDER OR NOT EXISTING AS APPLICABLE. 2. IT IS THIS CONTRACTOR'S RESPONSIBILITY TOPPLY HANDICAPPED SU TOILET FIXTURES IF REQUIRED BY CODE OR NOTED ON THE DRAWINGS, UTILIZING THE SPECIFICATION ABOV GE AS A STANDARD AND MEETING CODE REQUIREMENTS. SPACING OF FIXTURES TO BE COORDINATED WITH THE GENERAL CONTRACTOR AS WELL AS THE PLUMBING INSPECTOR'S REQUIREMENTS. LANDLORD'S CRITERIA 1. THE PLUMBING CONTRACTOR IS TO BECOME FAMILIARIZED WITH LANDLORD'S CRITERIA FOR THIS LOCATION AND INCLUDE ANY WORK REQUIRED OF THIS CRITERIA, WHICH IS NOT SPECIFICALLY NOTED IN THESE DRAWINGS AND SPECIFICATIONS. 1. DUCTWORK: FABRICATE DUCTWORK IN ACCORDANCE WITH SMACNA TABLE 1-4, 1 INCH STATIC PRESSURE, POSITIVE AND NEGATIVE. DIMENSION FOR LINED DUCTWORK IS INSIDE CLEAR. INSULATED FLEXIBLE DUCTWORK MAY BE INSTALLED AT DIFFUSER CONNECTIONS, 6'-0" LONG MAXIMUM AND SHALL BE RATED AT 3 INCH W.C. MINIMUM. INSTALL DUCTWORK IN ACCORDANCE WITH SMACNA, NFPA 90 AND ASHRAE STANDARDS. 2. DUCTWORK ACCESSORIES: COMPLY WITH ASHRAE AND SMACNA INSTALLATION STANDARDS. PROVIDE VOLUME DAMPERS, STANDARD TURNING VANES, ACCESS DOORS, FLEXIBLE CONNECTIONS, TRANSITIONS, OFF -SETS AND ELBOWS FOR A COMPLETE OPERATING SYSTEM. 3. DUCT LINER: FIBROUS GLASS, 1/2 INCH THICK AND COMPLY WITH THE "THERMAL INSULATION MANUFACTURES ASSOCIATION" (TIMA) AHC -101. INSTALL PER SMACNA STANDARDS. ALL NEW RECTANGULAR SUPPLY AIR DUCTWORK AND RETURN AIR DUCTWORK. 4. DIFFUSERS, REGISTERS, GRILLES, & DAMPERS: ALL DIFFUSERS AND GRILLES SHALL HAVE A BAKED ENAMEL OFF-WHITE FINISH, EXCEPT AS NOTED. PROVIDE A BUTTERFLY DAMPER IN EACH DIFFUSER SUPPLY DUCT. PROVIDE A VOLUME DAMPER AT EACH NEW GRILLE. EQUIPMENT SHALL BE AS SPECIFIED OR AN APPROVED EQUAL. FRAME TYPES SHALL BE FIELD VERIFIED. PROVIDE GASKETS. ACCEPTABLE MANUFACTURERS: CARNES, KRUEGER, TUTTLE & BAILY AND TITUS. 5. HANGERS AND SUPPORTS: HANG AND SUPPORT DUCTWORK IN ACCORDANCE WITH SMACNA STANDARDS 6. DUCT INSULATION: PROVIDE 1-1/2 INCH, 3/4 LB. DENSITY BLANKET INSULATION ON ALL ROUND SUPPLY AIR DUCTWORK. PROVIDE ALL PURPOSE JACKET WITH VAPOR BARRIER. 7. TESTING AND BALANCING: BALANCE AIR SYSTEMS TO CFM VALUES INDICATED. MAKE FINAL BALANCING FOR PERSONAL COMFORT CONDITIONS. PROVIDE TAB REPORT TO OWNER. GENERAL MECHANICAL FLAG NOTE 19 FIELD DISCONNECTION FIELD CONNECTION EO-# EQUIPMENT MARK NUMBER (WITHOUT ELECT. CONNECTION) EQ EQUIPMENT MARK NUMBER (WITH \ImL/ELECT. CONNECTION) ...EXISTING WORK (LIGHT) / NEW WORK (BOLD) HVAC - AIR SIDE SYMBOL SYMBOL DESCRIPTION (1 . LINE) (2 - LINE) 1 Q_, S 1 p^ ROUND DUCT SIZE - DIAMETER 10 610/6 RECTANGULAR DUCT SIZE - 1ST NUMBER IS DIMENSION OF SIDE SHOWING 10/6 10/6 FLAT -OVAL DUCT SIZE - 1ST NUMBER IS DIMENSION OF SIDE SHOWING SPLITTER r TRANSITION - SIZE CHANGE (RECTANGULAR, ROUND, OR FLAT -OVAL) 5--�� TRANSITION - RECTANGULAR TO ROUND, OR RECTANGULAR TO FLAT -OVAL RECTANGULAR DUCT TAKE -OFF 45' S -VIII --S �III� FLEXIBLE DUCT CONNECTION SIZE TYPE -- XXX CFM ODIFFUSER (CEILING MOUNTED) O ® O RISER OR END OF DUCT - SUPPLY AIR (SA) SIZE TYPE XX CFM RETURN OR EXHAUST REGISTER OR GRILLE CEILING MOUNTED RISER OR END OF DUCT - RETURN AIR (RA) OR EXHAUST AIR (EA) VOLUME DAMPER OT THERMOSTAT PLUMBING pa,co Y III AUG 2 4 2015 CITY ov, i 16PAD BUILDING 1)1VIS10N CITY OF TIGARD REVIEWED FOR CODE COMPLIANCE Approved: OTC: [ I Permit #: (' j -Of X5 71 Address: Z w to Suite #: 12 By: Date: a1� (5 OFFICE COPY DATE: SANITARY DRAIN (ON THIS LEVEL) FM SANITARY FORCE MAIN DRAIN ----S - - - - SANITARY DRAIN (BELOW THIS LEVEL) --------- VENT LINE - - COLD WATER (POTABLE) ------- HOT WATER SUPPLY (110' F) --------- HOT WATER RETURN (110' F) CHECK VALVE CLEAN OUT 122" FD -1 FLOOR DRAIN SIZE - TYPE u4" VTR SANITARY VENT THRU ROOF ON RISER pa,co Y III AUG 2 4 2015 CITY ov, i 16PAD BUILDING 1)1VIS10N CITY OF TIGARD REVIEWED FOR CODE COMPLIANCE Approved: OTC: [ I Permit #: (' j -Of X5 71 Address: Z w to Suite #: 12 By: Date: a1� (5 OFFICE COPY DATE: VALVES AND FITTINGS JOB NO: SYMBOL DESCRIPTION SYMBOL DESCRIPTION m SHUTOFF VALVE --4- CONCENTRIC REDUCER N CHECK VALVE ECCENTRIC REDUCER O BA ANCM VALVE 3 CAP DV THi07111NG VALVE =1 BUSHING DAC QUICK CONNECT -1 HOSE COUPLING / THREADS 2 -WAY CONTROL VALVE -Ili- UNION J -WAY CONTROL VALVE -I f- ORIFICE PLATE PRESSURE REDUCING VALVE © EXPANSION JOINT L �I RELIEF VALVE SEE SPECS FOR SLEEVE BALL VALVE G 080* DOWN OR AWAY �- FLEXIBLE CONNECTION l Y TO FLOOR DRAIN pa,co Y III AUG 2 4 2015 CITY ov, i 16PAD BUILDING 1)1VIS10N CITY OF TIGARD REVIEWED FOR CODE COMPLIANCE Approved: OTC: [ I Permit #: (' j -Of X5 71 Address: Z w to Suite #: 12 By: Date: a1� (5 OFFICE COPY DATE: 08/18/2015 JOB NO: 395-007 SCALE: AS NOTED CHECKED: 08/18/2015 © 2015 A&E NATIONAL, INC. THESE PLANS ARE COPY RIGHTED AND ARE SPECIFICALLY PROVIDED FOR USE OF THE OWNER AND DESIGNED FOR CONSTRUCTION BY A & E NATIONAL, INC. AND ARE INTENDED FOR NO OTHER PURPOSE. PERMISSION FOR USE OF THIS DOCUMENT IN PART OR WHOLE WITHOUT WRITTEN CONSENT OF A & E NATIONAL, INC. IS PROHIBITED. r� A & E NATIONAL, INC. A & E NATIONAL, INC. 1812 NORTH 203rd STREET ELKHORN, NE 68022 PH: 402-614-4434 FAX: 402-614-4431 COD W � w cum;mW y W d 3cp � Z COD 0 � J • CD O W i ROBERT FECHTMEISTER' • OMAHA, NEBRASKA 5412 � 8-18-1 5 WASHINGTON SQUARE 9642 SW WASHINGTON SQ. RD TIGARD, OR 97223 SPACE G12 SUBMITTAL OWNER REVIEW 08/11/2015 PERMIT SET 08/18/2015 GENERAL MECHANICAL NOTES, SPECS, & SYMBOLS SHEET NUMBER SERVICE CORRIDOR 0 X ['> 1 MECHANICAL PLAN M 1.0 SCALE: 114" = 1'-O" ADJACENTTENANT SPACE MALLCOMMON ___............_____..................... AREA GENERAL NOTES: 1. ANY EXISTING CONDITIONS INDICATED ARE BASED ON INFORMATION PROVIDED BY OTHERS AND POSSIBLE LIMITED FIELD VERIFICATION. THE CONTRACTOR SHALL ADJUST FOR ACTUAL FIELD CONDITIONS AT NO ADDITIONAL EXPENSE TO THE OWNER. 2. THE CONTRACTOR SHALL VISIT THE PROJECT SITE, REVIEW EXISTING CONDITIONS AGAINST THE PLANS, AND FAMILIARIZE HIMSELF WITH THE WORK PRIOR TO BIDDING AND START OF THE WORK. 3. CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH LANDLORD'S TENANT CRITERIA MANUAL INCLUDING MALL MANAGEMENT'S RULES AND REGULATIONS. 4. LIGHT -LINED ITEMS ARE EXISTING TO REMAIN, WITH REQUIREMENTS AS NOTED. HEAVY -LINED ITEMS INDICATE NEW WORK AS INDICATED. 5. SEE ALSO SYMBOLS, NOTES AND ABBREVIATIONS SHEET. 6. COORDINATE DUCT, DIFFUSER, GRILLE, REGISTER, AND DAMPER LOCATIONS WITH STRUCTURAL, ELECTRICAL AND ARCHITECTURAL. 7. DUCT SIZING IS CLEAR INSIDE DIMENSIONS. 8. INSULATED FLEXIBLE ROUND DUCT SHALL NOT EXCEED 5'0" IN TOTAL LENGTH. 9. PROVIDE VOLUME DAMPER FOR EACH SUPPLY AND RETURN, AND INSTALL FOR ACCESSIBILITY THROUGH CEILING AWAY FROM OBSTRUCTIONS. 10. EXISTING VAV BOX TO REMAIN. CONTRACTOR RESPONSIBLE FOR INSPECTION AND TESTING OF EXISTING HVAC EQUIPMENT AND CONTROLS. CONTRACTOR WILL TAKE RESPONSIBILITY FOR UNITS AND CONTROLS AND REPORT ANY PROBLEMS ALONG WITH COST OF REPAIR. ALL REUSED EQUIPMENT MUST BE REFURBISHED TO "LIKE NEW" CONDITION. 11. VERIFY SMOKE EVAC REQUIREMENTS AND UPGRADES REQUIRED WITH MALL ENGINEER. 12. SEAL OFF AND PROTECT ALL HVAC DUCTWORK FOR RE -USE TO PROTECT FROM CONSTRUCTION DUST. DEMOLITION NOTES: 1. MODIFY AND/OR REMOVE SUPPLY, RETURN AND RESTROOM EXHAUST DUCTWORK AS NECESSARY TO PROVIDE SYSTEM AS SHOWN. FLAG NOTES: 1. PROVIDE NEW 7 -DAY PROGRAMMABLE T -STAT, HONEYWELL PRESTIGE IAQ 2.0 WITH EQUIPMENT INTERFACE MODULE AND TOTAL CONNECT COMFORT SERVICES. PROVIDE ACCESSORY HONEYWELL PORTABLE COMFORT CONTROL REM5000R1001. 2. ESTIMATED LOCATION OF EXISTING VAV BOX UNIT. FIELD VERIFY. 3. ESTIMATED LOCATION OF DUCT TRUNK. FIELD VERIFY. 4. LANDLORD'S OUTSIDE AIR SUPPLY CONNECTION TO EXISTING VAV BOX. FIELD VERIFY. SET DAMPER TO MIN 500 CFM. 5. SYSTEM IS PLENUM RETURN 6. EXISTING RESTROOM EXHAUST FAN TO REMAIN. DIFFUSER, REGISTER AND GRILLE SCHEDULE D-1: 24"X24", STEEL CONSTRUCTION, RECESS MOUNT, ROUND NECK WITH OUTLETS AS SHOWN, HORIZONTAL 4 -WAY, 3 -CONE. PAINT TO MATCH CEILING IN RETAIL AREA ONLY. COORDINATE WITH PAINTING CONTRACTOR. EXAMPLE: TITUS TMS. G-1: 24"X24", STEEL BORDER, ALUMINUM GRID, EGGCRATE RETURN. PAINT TO MATCH CEILING. COORDINATE WITH PAINTING CONTRACTOR. EXAMPLE: TITUS 55R. DATE: 08/18/2015 JOB NO: 395-007 SCALE: AS NOTED CHECKED: 08/18/2015 © 2015 A&E NATIONAL, INC. THESE PLANS ARE COPY RIGHTED AND ARE SPECIFICALLY PROVIDED FOR USE OF THE OWNER AND DESIGNED FOR CONSTRUCTION BY A& E NATIONAL, INC. AND ARE INTENDED FOR NO OTHER PURPOSE. PERMISSION FOR USE OF THIS DOCUMENT IN PART OR WHOLE WITHOUT WRITTEN CONSENT OF A & E NATIONAL, INC. IS PROHIBITED. r� A $ E NATIONAL, INC. A & E NATIONAL, INC. 1812 NORTH 203rd STREET ELKHORN, NE 68022 PH: 402-614-4434 FAX: 402-614-4431 r O ROBERT FECHTMEISTER, • OMAHA, NEBRASKA 5 1 �O i� 8-18-1 5 WASHINGTON SQUARE 9642 SW WASHINGTON SQ. RD TIGARD, OR 97223 SPACE G12 SUBMITTAL OWNER REVIEW 08/11/2015 PERMIT SET 08/18/2015 MECHANICAL PLAN SHEET NUMBER �'J U) U) r= —0 W C C.) W h CWLa W 3cp d U) Q � � CD o � Wzoo 3 r O ROBERT FECHTMEISTER, • OMAHA, NEBRASKA 5 1 �O i� 8-18-1 5 WASHINGTON SQUARE 9642 SW WASHINGTON SQ. RD TIGARD, OR 97223 SPACE G12 SUBMITTAL OWNER REVIEW 08/11/2015 PERMIT SET 08/18/2015 MECHANICAL PLAN SHEET NUMBER �'J LAV d SERVICE CORRIDOR /I 2" 1-1 /2„ 4" I „I I/ - 1/z i 2" I ,I 2 I SS=3 2 FS -1 ' I I �ms-1 1 s -lel VACUUM RELIEF VALVE / FULL SIZE TEMPERATURE PRESSURE RELIEF VALVE, DRAIN PER LOCAL CODE & LANDLORD'S / PP CRITERIA, TO NEAREST INDIRECT WASTE RECEPTOR OR APPROVED DRAIN. 3/4" 1 PROVIDE STEEL SUPPORT STRUCTURE FOR WATER / SWH MV -1 \7 _ HEATER TO MOUNT ABOVE MOP SINK. 1 \ 1/2" COORDINATE WITH MOP RACK. / I PROVIDE A WATER TIGHT, GALVANIZED STEEL PAN, ' MIN 2" DEEP X 24 GA., BELOW WATER HEATER.\4" � 1/2"I / 1 " MIN DIA DRAIN PER LOCAL CODE AND 1 ET -1 3 4' LANDLORD'S CRITERIA, TO NEAREST INDIRECT 4� 11/2 \4 WASTE RECEPTOR OR APPROVED DRAIN. //� 1/2" SS=3 �I 13/4 SS2 �/2„ 1 ` WC MS -1 / 1�0/ LAV ' 7 ' MALL COMMON AREA FIRE SUPPRESSION NOTES: 1. MODIFY EXISTING SPRINKLER SYSTEM INFRASTRUCTURE FOR FULLY SPRINKLERED SPACE IN COMPLIANCE WITH REQUIREMENTS OF THESE CONSTRUCTION DOCUMENTS, NFPA 13, APPLICABLE CODES, LANDLORD'S DESIGN CRITERIA, AND AUTHORITIES HAVING JURISDICTION. 2. TENANT'S SPRINKLER DESIGN IN REMODEL AREAS SHALL BE BASED UPON A DUAL SOURCE OF SUPPLY, ORDINARY HAZARD PIPE SCHEDULE OR HYDRAULICALLY CALCULATED SYSTEM AS OUTLINED IN NFPA PAMPHLET #13 AND LANDLORD'S INSURANCE CARRIER'S REQUIREMENTS. 3. COORDINATE WITH ARCHITECTURAL, MECHANICAL AND ELECTRICAL WORK. ELECTRONIC DRAWINGS MAY BE REQUESTED FROM ARCHITECT. 4. SUBMIT APPROVED SPRINKLER PIPING DRAWINGS (WORKING PLANS, PREPARED ACCORDING TO NFPA 13, THAT HAVE BEEN APPROVED BY AUTHORITIES HAVING JURISDICTION, INCLUDING HYDRAULIC CALCULATIONS, IF APPUCABLE.) 5. SPRINKLER SHOP DRAWINGS AND SUPPORTING CALCULATIONS MUST BE SUBMITTED TO AND APPROVED BY LANDLORD'S INSURANCE CARRIER. CONTACT THE CENTER'S ON-SITE REPRESENTATIVE FOR LANDLORD'S INSURANCE CARRIER PLAN REVIEW CONTACT, MAILING ADDRESS AND SUBMITTAL REQUIREMENTS. 6. VERIFY WITH MALL OPERATIONS MANAGER REGARDING TENANT SPRINKLER INSTALLATION. 7. TENANT IS LIABLE FOR COMPLIANCE WITH ALL REQUIREMENTS OF LANDLORD'S FIRE PROTECTION ENGINEERS DURING ORIGINAL CONSTRUCTION AND ALL SUBSEQUENT INSPECTIONS. 8. COORDINATE WORK WITH OTHER TRADES. COSTS FOR REWORK CAUSED BY LACK OF COORDINATION WITH OTHER TRADES SHALL BE BORNE BY THE CONTRACTOR. 9. EXISTING SPRINKLER SYSTEM SHALL BE MODIFIED TO MEET THE NEEDS OF THE STORE, 10. EXISTING SPRINKLER HEADS ARE LOCATED AT 16' AFF IN THE STOCK ROOM AND 11'-10" IN THE SALES AREA. 11. ALL EXISTING SPRINKLER HEADS SHALL BE REPLACED WITH FULLY RECESSED PENDENT TYPE HEADS COVERED WITH METAL PLATES FINISHED TO MATCH ADJACENT CEILING SURFACE. 12. IN THE RETAIL AREA, NEW SPRINKLER HEADS SHALL BE LOCATED IN THE CENTER OF THE NEAREST CEILING TILE. COORDINATE HEAD HEIGHT WITH ARCHITECTURAL DRAWINGS. 13. EMPLOY LANDLORD'S APPROVED CONTRACTOR FOR ALL SPRINKLER WORK. GENERAL NOTES: 1. ANY EXISTING CONDITIONS INDICATED ARE BASED ON INFORMATION PROVIDED BY OTHERS AND POSSIBLE LIMITED FIELD VERIFICATION. THE CONTRACTOR SHALL ADJUST FOR ACTUAL FIELD CONDITIONS AT NO ADDITIONAL EXPENSE TO THE OWNER. 2. THE CONTRACTOR SHALL VISIT THE PROJECT SITE, REVIEW EXISTING CONDITIONS AGAINST THE PLANS, AND FAMILIARIZE HIMSELF WITH THE WORK PRIOR TO BIDDING AND START OF THE WORK. 3. LIGHT -LINED ITEMS ARE EXISTING TO REMAIN, WITH REQUIREMENTS AS NOTED. HEAVY -LINED ITEMS INDICATE NEW WORK AS INDICATED. 4. SEE ALSO SYMBOLS, NOTES AND ABBREVIATIONS SHEET. 5. COORDINATE FINAL LOCATION OF EQUIPMENT TO COMPLY WITH LOCAL CODES AND HEALTH -DEPARTMENT AND CITY REQUIREMENTS. 6. PROVIDE CLEANOUTS IN ACCORDANCE WITH THE REQUIREMENTS OF APPLICABLE CODES. LOCATE FLOOR CLEANOUTS OUT OF TRAFFIC AREAS. 7. EQUIPMENT AND INSTALLATION SHALL MEET NATIONAL SANITATION FOUNDATION (NSF) STANDARDS OR EQUIVALENT. 8. IN ACCORDANCE WITH WRITTEN INSTRUCTIONS PUBLISHED BY THE PLUMBING AND DRAINAGE INSTITUTE (PDI), PROVIDE WATER HAMMER ARRESTORS (SHOCK ABSORBERS) AT PIPE LOCATIONS NEAR FLUSHOMETER VALVES AND ELSEWHERE AS SHOWN. WATER HAMMER ARRESTORS SHALL COMPLY WITH PUBLISHED PDI NOMENCLATURE. 9. INSTALL 4 -INCH AND LARGER SANITARY PIPING AT 1/8 -INCH PER FOOT SLOPE; INSTALL SMALLER SIZES AT %-INCH PER FOOT SLOPE. INSTALL VENT PIPING SO IT WILL DRAIN. 10. COORDINATE EXACT LOCATION OF FIXTURES AND DRAINS WITH ARCHITECTURAL DRAWINGS. 11. PROVIDE 4 -INCH MINIMUM VENT THRU ROOF. INCREASE VENT TO 4 -INCH TWELVE INCHES BELOW ROOF INSULATION IN CLIMATES WHERE WINTER TEMPERATURES ARE EXPECTED TO FALL BELOW 33 DEGF. 12. DEAD END PIPES ARE PROHIBITED. (DEAD-END PIPES ARE BRANCHES LEADING FROM A DRAIN, VENT OR POTABLE -WATER PIPE AND TERMINATING AT A DEVELOPED LENGTH OF 2 FEET OR MORE BY MEANS OF A PLUG, CAP OR OTHER CLOSED FITTING.) 13. PIPE AND FITTINGS EXPOSED TO VIEW IN FINISHED SPACES SHALL BE CHROME PLATED BRASS. 14. COMPLY WITH THE LATEST ADOPTED INTERNATIONAL PLUMBING CODE WHEN SIZING TRAP ARMS ON COMBINATION WASTE AND VENT SYSTEMS. DRAWINGS INDICATE THE WASTE LINE SIZE AND THE SIZE OF THE TRAP REQUIRED. 15. ALL WORK SHALL COMPLY WITH THE LATEST CITY PLUMBING CODE AND ALL OTHER APPLICABLE CODES IN THIS JURISDICTION. 16. TENANT MUST X-RAY SLAB PRIOR TO PERFORMING ANY SLAB PENETRATIONS. LANDLORD AUTHORIZED X-RAY CONTRACTORS INFORMATION WILL BE AVAILABLE ON THE LIST OF "RULES AND REGULATIONS" FOR GENERAL CONTRACTORS WHEN THEY ARRIVE AT SITE. DEMOLITION NOTES: 1. REMOVE AND DISPOSE OF ITEMS INDICATED TO BE DEMOLISHED. BEFORE REMOVAL, COORDINATE WITH THE OWNER WHICH ITEMS THE OWNER WISHES TO KEEP. COORDINATE DELIVERY OF OWNER'S CHOSEN ITEMS TO OWNER. DISPOSE OF ITEMS THE OWNER DOES NOT CHOOSE TO KEEP. 2. PROTECT EXISTING STRUCTURES AND EQUIPMENT THROUGHOUT THE DURATION OF THE WORK. 3. COORDINATE DEMOLITION WORK SO THAT ELECTRICAL CONNECTIONS ARE REMOVED PRIOR TO MECHANICAL DEMOLITION. 4. REPAIR AREAS AFFECTED BY DEMOLITION TO THEIR ORIGINAL CONDITION OR BETTER. 5. REMOVE EXISTING INSTANTANEOUS WATER HEATER. 6. REMOVE ANY EXISTING SUPPLY PIPING NOT PART OF THE NEW PROJECT. FLAG NOTES: 1. EXISTING 4" SANITARY LINE. FIELD VERIFY LOCATION AND DIRECTION OF FLOW. 2. CONNECT NEW SANITARY PIPING TO EXISTING. FIELD VERIFY LOCATION. 3. CONNECT NEW VENT PIPING TO EXISTING. FIELD VERIFY LOCATION. 4. INSTALL UNDER SINK LITTLE GIANT DRAINOSAUR WRSC-6 1/3 HP WITH 3.5 GAL BASIN, 115V. 5. ROUTE FORCE MAIN DRAIN UP THROUGH DEMISING WALL ABOVE CEILING. ROUTE HORIZONTAL PIPE ABOVE CEILING TO BACK WALL, SLOPED APPROPRIATELY TO DRAIN TO THE BACK. 6. EXISTING LANDLORD CW SUPPLY. FIELD VERIFY LOCATION. 7. CONNECT NEW CW PIPING TO EXISTING FIELD VERIFY LOCATION. 8. NEW WATER HEATER ABOVE MOP SINK. LOCATION SHOWN FOR CLARITY. SEE RISER DIAGRAM FOR WATER HEATER CONNECTIONS. 9. PLUMBING PUMP WITH 6' CORD. COORDINATE LOCATION WITH NEW ELECTRICAL OUTLET. 10. CONNECT NEW HOT WATER LINE TO EXISTING RESTROOM SINK. PLUMBING FIXTURE SCHEDULE SWH-1: COMMERCIAL GRADE, 30 GAL, DUAL 450OW ELEMENTS (9 KW TOTAL), NOT TO EXCEED 36" IN HEIGHT, 208V/3PH. MIN. EF OF 0.93 PER DOE 10 CFR PART 430. MUST MEET STANDBY LOSS REQUIREMENTS OF DOE & ASHRAE/IESNA 90.1. EXAMPLE: AMERICAN WATER HEATER LDCE32-30L. MS -I FIXTURE - UNIT SHALL HAVE OUTSIDE DIMENSIONS OF 24"X 24"X 10". THE MOLDING SHALL BE DONE IN MATCHED METAL DIES UNDER HEAT AND PRESSURE RESULTING IN A ONE-PIECE HOMOGENEOUS PRODUCT. THE UNIT SHALL HAVE 10"HIGH WALLS NOT LESS THAN 1"WIDE. EXAMPLE: FLORESTONE MODEL MSB 2424. FAUCET - POLISHED CHROME, BRASS -BODIED, 8" -SPREAD, WALL MOUNTED WITH INTEGRAL STOPS, INTEGRAL VACUUM BREAKER, WALL SUPPORT FOR SPOUT, LEVER HANDLES, 3/4" HOSE THREAD SPOUT OUTLET WITH PAIL HOOK ON END OF SPOUT. SPOUT OUTLET SHALL BE ABOUT 9 INCHES FROM WALL. EXAMPLE: AMERICAN STANDARD 8344. DRAIN - BRASS, INTEGRAL WITH FIXTURE. PROVIDE CHROMED -BRASS, NICKEL -BRASS, ALUMINUM, OR STAINLESS-STEEL STRAINER. CONNECTION SIZE AS INDICATED ON DRAWINGS. TRIM - INTEGRAL, GALVANIZED -STEEL TILING FLANGES ON SIDES ADJACENT TO WALLS. STAINLESS-STEEL CAP ON DROPPED LIP. FIXTURE - POLISHED BRASS, SELF -RIMMING, 15X15X5-3/4 COUNTER -MOUNTED. TRIM - P -TRAP, DRAIN GRID. EXAMPLE: WHITEHAUS POLISHED BRASS DROP-IN ENTERTAINMENT SINK, BELLACOR NUMBER 787814. FAUCET - DUAL -HANDLE, ADA -COMPLIANT FAUCET WITH 5 -1/2 -INCH GOOSENECK SWING SPOUT, 2.2 GPM BAR SINK FAUCET. EXAMPLE: KOHLER REVIVAL K-16112-4PB, POLISHED BRASS. S=2: FIXTURE - 16 -GAUGE STAINLESS TYPE 304 STEEL, PUNCHED (NOT WELDED) 3 -COMPARTMENT, 18" X 24" X 14" DEEP BOWLS, LEFT DRAINBOARD. EXAMPLE: REGENCY MODEL 60OS3182418. FAUCET - WALL MOUNT PRE -RINSE COMMERCIAL FAUCET, TWO -HOLE DUAL HANDLE, ADD-ON FAUCET WITH 10 -INCH SWING SPOUT, FLEXIBLE GOOSENECK WITH COMPACT SPRING, 24" STAINLESS STEEL HOSE, 1.42 GPM SPRAY VALVE. EXAMPLE: T&S MODEL MPZ-BWLN-08 MODIFIED WITH 062X FOR 12" SWING SPOUT. S-3: FIXTURE - 18 GAUGE STAINLESS TYPE 304, 19X23, WALL MOUNTED, ADA COMPLIANT, FULLY BOTTOM COATED. EXAMPLE: ELKAY WCL19230SDC. FAUCET - RESTRICTED SWING GOOSE NECK SPOUT WITH AERATOR AND 5" WRIST BLADE HANDLES. EXAMPLE: LKD232SBH5C (FURNISHED WITH SINK) SEAT - WHITE, SOLID PLASTIC, OPEN FRONT, ELONGATED, COVERLESS SEAT WITH INTEGRALLY MOLDED BUMPERS AND STAINLESS STEEL, SELF SUSTAINING CHECK HINGE. TRIM - CLOSET BOLT CAPS FS -1: 2" FLOOR SINK WITH BOTTOM OUTLET, 12"X12"X6" WITH CAST IRON GRATE EXAMPLE: JOSAM 49300. PP -1: TACO PLUMB N PLUG MODEL 003-BC4-8PNP WITH DIGITAL TIMER, 6' CORD. REFERENCE ONLY NOT APPROVED WITH THIS PERMIT MV --1• WATTS SERIES MMV MIXING VALVE, 3/4" LINE SIZE. MIXING VALVE SHALL CONFORM TO ASSE 1017, ASSE 1069 & ASSE 1070. ET -1: EXPANSION TANK, AMTROL THERMAL EXPANSION TANK MODEL ST. -5. VALVES: GATE VALVE WATTS SERIES B-3000, CHECK VALVE WATTS SERIES B-5000, BALL VALVE WATTS SERIES B6080 OR B6081 FULL PORT. ALL VALVES 1/2" TO 2" BRONZE BODY. VALVES SHALL CONFORM TO NSF/ANSI 61. RELIEF VALVE: WATTS REGULATING CO. MODEL 10L. T&P RELIEF VALVE SHALL CONFORM TO ANSI Z21.22. DATE: 08/18/2015 JOB NO: 395-007 SCALE: AS NOTED CHECKED: 08/18/2015 © 2015 A&E NATIONAL, INC. THESE PLANS ARE COPY RIGHTED AND ARE SPECIFICALLY PROVIDED FOR USE OF THE OWNER AND DESIGNED FOR CONSTRUCTION BY A & E NATIONAL, INC. AND ARE INTENDED FOR NO OTHER PURPOSE. PERMISSION FOR USE OF THIS DOCUMENT IN PART OR WHOLE WITHOUT WRITTEN CONSENT OF A & E NATIONAL, INC. IS PROHIBITED. r� A $ E NATIONAL, INC. A& E NATIONAL, INC. 1812 NORTH 203rd STREET ELKHORN, NE 68022 PH: 402-614-4434 FAX: 402-614-4431 r U RDBERT FECHTMEISTERa • OMAHA, NEBRASKA Z 5 1 � 8-18-1 5 WASHINGTON SQUARE 9642 SW WASHINGTON SQ. RD TIGARD, OR 97223 SPACE G12 SUBMITTAL OWNER REVIEW 08/11/2015 PERMIT SET 08/18/2015 PLUMBING PLANS SHEET NUMBER P1.0 COD CIO W � Gim W h W 3 � v COO)o a � Q COD W � 3 � 3 r U RDBERT FECHTMEISTERa • OMAHA, NEBRASKA Z 5 1 � 8-18-1 5 WASHINGTON SQUARE 9642 SW WASHINGTON SQ. RD TIGARD, OR 97223 SPACE G12 SUBMITTAL OWNER REVIEW 08/11/2015 PERMIT SET 08/18/2015 PLUMBING PLANS SHEET NUMBER P1.0