Plans (3) M. -EC2015 -00227 FIRE PROTECTION GENERAL NOTES 1. PROVIDE ALTERATIONS AND MODIFICATIONS AS NECESSARY TO FURNISH 14. AUTOMATIC SPRINKLERS SHALL BE OF THE OPERATING TEMPERATURE AS AND INSTALL COMPLETE FIRE PROTECTION SYSTEM PER NFPA#13.THE REQUIRED BY THE LOCATION WITH SPECIAL REGARD FOR HEATING UNITS. 4 PRESSURE REDUCING SYSTEM SHALL COMPLY WITH ALL REQUIREMENTS OF LOCAL,STATE AND SPRINKLER PIPING SHALL ROUTE AROUND,PROVIDE PROPER CLEARANCES, VALVE.SET TO 60 PSI FEDERAL AUTHORITIES AND LANDLORD'S INSURING AGENCY. AND AVOID CONFLICT WITH BUILDING EQUIPMENT AND SYSTEMS. T, L1Y OF �4' F 2. ALL WORK SHALL BE IN ACCORDANCE WITH THE RULES AND.REGULATIONS 15. ALL PIPING SHALL BE ROUTED IN THE SUSPENDED CEILING SPACE, BU1L��Np�� OF THE LOCAL FIRE PROTECTION DISTRICT AND WATER DEPARTMENT. CONCEALED IN WALLS AND BEHIND FIXED FURNISHINGS,UNLESS 1 342 K2 , OTHERWISE INDICATED.ALL PIPING EXPOSED TO VIEW SHALL BE ROUTED AS 1 BALANCING I " 3. ALL AUTHORITIES HAVING JURISDICTION SHALL BE NOTIFIED AT LEAST HIGH AS POSSIBLE AND TIGHT TO THE UNDERSIDE OF THE STRUCTURE- 21 i a96A K3 364 D ( �. VALVE THREE(3)WORKING DAYS PRIOR TO COMMENCEMENT OF WORK', J I 16. REFER TO ARCHITECTURAL DRAWINGS OR CONSULT ARCHITECT FOR EXACT 4. PROVIDE AN AUTOMATIC WET PIPE SPRINKLER SYSTEM INCLUDING PIPING, LOCATION OF FIXTURES,EQUIPMENT,ETC.AND FINAL FINISHED ELEVATIONS _ — �. I ( - HANGERS,VALVES,ALARMS,SUPPORTS AND SPRINKLER HEADS, PRIOR TO ANY INSTALLATION WORK. DISHWASHING 4968 NECESSARY AND AS REQUIRED FOR INSTALLATION OF COMPLETE AND 1 275 5 APPROVED FIRE PROTECTION SYSTEMS. 17. EXISTING SYSTEMS THAT REQUIRE RELOCATION AND SERVE EXISTING HWR —t— FIXTURES OR EQUIPMENT OR AREASTHAT MUST REMAIN ACTIVE,SHALL BE b — - --- 7� — ' HWS— -}+� -- i 5. WORK SHALL BE PERFORATED BY AN APPROVED AUTOMATIC FIRE. RELOCATED DURING OWNER SCHEDULED SHUT-DOWNS.TEMPORARY 4 - - _ - CWS` - --+i HB I PROTECTION SPRINKLER CONTRACTOR. SHOP DRAWINGS AND CONNECTIONS AND EXTENSIONS OF REQUIRED SYSTEMS SHALL BE N /r 4 I CALCULATIONS SHALL BE PREPARED BY A REGISTERED PROFESSIONAL PROVIDED AS NEEDED AND AT THE CONTRACTOR'S EXPENSE. 1 �) I � _ w G C u� f i I{'� ENGINEER, APPROVED CONTRACTOR AND THE CONTRACTOR'S REGISTERED ENGINEER SHALL BE LICENSED WITH THE PROPER AUTHORITIES FOR THE 18. CONTRACTOR SHALL VISIT THE SITE AND DOCUMENT EXISTING CONDITIONS - LOCATION OF THIS PROJECT. WITHIN THE LIMITS OF DEMOLITION,PRIOR TO START OF ANY WORK. N "y FORWARD TO ARCHITECT/ENGINEER FOR REVIEW,ONE(1)COPY OF 363 6. PROVIDE A COMPLETE WET PIPE SPRINKLER SYSTEM FOR ALL AREAS,' EQUIPMENT AND SYSTEMS BEING REMOVED BY DEMOLITION WORK AND NEW I I a o o c a n o n, 350 op00 UNLESS OTHERWISE INDICATED OR REQUIRED FOR FREEZE PROTECTION. INSTALLATION WORK. LIMITS OF DENOLITION AREA SHALL BE AS INDICATED 0 ON DRAWINGS PREPARED BY THE ARCHITECTURAL CONSULTANT. 3 �+ � µk F K JI i I 7. SPECIAL CONSIDERATION SHALL BE GIVEN TO AREAS THROUGHOUT THE I- o•• , (90 ` 227 3 W JfJI BUILDING SUCH AS DROPPED SOFFITS,LIGHTING SOFFITS AND RECESSED 19. CARFULLY REVIEW THE INTERIOR DESIGN,ARCHITECTURAL,STRUCTURAL 497 r i n/ STORAGE RACKS THAT NECESSITATE ADDITIONAL SPRINKLER HEADS. AND ELECTRICAL DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL ITEMS ! ('"/,�'-' I� I /'/// " ' " " . ` ' "CFH)'" -- 222 3 { LL TO BE REMOVED,RELOCATED,OR ACCOMMODATED;INCLUDE ALL COSTS IN •+N-�+,- 220 3 , �� v 3/4" (135 CFH) ---/� 8. RUN PIPING HORIZONTALLY AND AT RIGHT ANSLES TO WALLS AND'CEILINGS, BASE BID FOR THIS WORK. I _ 6 1 KITCHEN/PREP 1" CENTER SPRINKLER HEADS IN BOTH HORIZONTAL DIRECTION WITH RESPECT 218 ; I (80 CFH) !1 - I Q TO CEILING COMPONENTS,SUCH AS CEILING GRID,LIGHT FIXTURES,HVAC 20. NEW OR EXISTING EQUIPMENT SHALL NOT BE LOCATED ABOVE I 3 r � t J � DIFFUSERS AND SPEAKERS OR AS DIRECTED BY OWNER'S REPRESENTATIVE. UNACCESSIBLE CEILINGS. PROVIDE LOCATION OR RELOCATION OF ! OPP\ 352 I EQUIPMENT TO AREAS ABOVE ACCESSIBLE CEILINGS AND RECONNECT } I y — d i D W 9. FIRE PROTECTION SYSTEM SHOP DRAWINGS SHALL INCLUDE SEPARATE AND EQUIPMENT TO SYSTEMS. { 9i F K COMPLETE REFLECTED CEILING PLANS INDICATING LOCATION OF EACH _ _ I L _ _ _ WIW ___ -_____ __ __ \ _ ________ -__ _ SPRINKLER HEAD AS WELL AS PIPING LAYOUTS. 21. DRAINING AND REFILLING OF SYSTEMS AS REQUIRED FOR DEMOLITION B ', 1� \� 'e z ANWOR NEW INSTALLATIONS WORK SHALL BE THE RESPONSIBILITY OF THIS \ ` 10. PROVIDE MAIN DRAINS AND AUXILIARY DRAINS WHERE NECESSARY, CONTRACTOR. I WOM S a i1 11. PROVIDE TEST CONNECTIONS AT MOST REMOTE POINT OF MAIN PORTION OF 22. ALL SPRINKLERS IN CEILINGS SHALL BE CONCEALED FLUSH PLATE TYPE OF - 1 EACH SPRINKLER SYSTEM. WHATEVER TYPE AND FINISH APPROVED BY INTERIOR DESIGNER AND i 1 O° I I O OWNER.ALL SPRINKLERS IN OPEN CEILING AREA SHALL BE UPRIGHT TYPE (TYPICA 231 fl O �" I NCIN 212 _I 12. LAYOUT THE SPRINKLER PIPING SO THAT THERE IS A MINIMUM SEPARATION AND FINISH APPROVED BY INTERIOR DESIGNER&OWNER.EXACT LOCATIONS ��� ""' -- - _ OF 12'BETWEEN THE CEILING HEIGHT AND THE BOTTOM OF THE SPRINKLER OF EACH AND EVERY SPRINKLER WILL BE APPROVED BY INTERIOR DESIGNER —CWS- VA z U) V E A 212A Z M PIPE OR ROUTE PIPING AROUND LIGHT FIXTURES TO AVOID CONFLICTS. AND OWNER. SUBMIT PRODUCTS MND SPRINKLER LOCATIONS TO INTERIOR --- !f+ ----••—HWS—••—•• -•-------•--I I Q DESIGNER AND OWNER FOR APPROVAL PRIOR TO SHOP DRAWING PROCESS. CWS - - -"---R ti-� - I 06 = N 13. FIRE PROTECTION CONTRACTOR SHALL FIELD VERIFY EXACT REQUIREMENTS 1 HW R ! 1 `^ (D (-_ CL FOR BUILDING REGARDING PIPE SIZES,ADAQUATE PRESSURES,SERVICE , v; j ORDER/TO GO !!1444 o i- ♦tt z LOCATIONS;ZONING AND SUBMIT SHOP DRAWINGS TO THE AUTHORITIES .t I , 1 17 p L O _ W I" (D FOR APPROVAL PRIOR TO FABRICATION OR INSTALLATION OF FIRE PROTECTION WATER SERVICE AND SYSTEMS. I '-� 213 J O Z N T �; t P ..-..._..•.—. L.L. Q m .. 7 B I I 0 Op -�... D a — Q PLUMBING PLAN NOTES i ; O NZ , P CL O Q F11 DOMESTIC WATER:CONNECT NEW 1-1/:."WATER LINE TO LANDLORD PROVIDED 18 PROVIDE WATER CONNECTION TO PASTA COOKERS 12"AFF.PROVIDE f WATER SUPPLY WITH SHUT-OFF VALVE IN THIS AREA,FIELD VERIFY EXAOT SIZE' DISCONNECT,DORMANT MODEL#71-1114-0B,COORDINATE WITH NOODLES AND LOCATION,FIELD VERIFY SUB-METER AND WATER METER LOCATIONS. PROJECT MANAGER FOR REQUIREMENTS PRIOR TO INSTALLATION. f �LE PROVIDE NEW PRESSURE GAUGE ON MAIN WATER LINE AND AFTER WATER ( I TT3IRI LJJDINING B I i SOFTENER.CONTRACTOR SHALL MAKE NECESSARY CONNECTIONS AS REQUIRED. , 19 DROP 1-1/4"COLD WATER PIPING WITH BYPASS VALVE FOR FUTURE WATER , I T am t) •o o o d o_ PROVIDE WATER PRESSURE TEST AND GPM TEST(MIN.35 GPM)AND NOTIFY SOFTENER.SEE DETAIL ON SHEET P3.0.CONTRACTOR TO PERFORM WATER 8 0 I I - --- �u <o°• CONSTRUCTION MANAGER WITH RESULT.PROVIDE AND ADJUST PRESSURE PRESSURE TEST AND WATER QUALITY TEST AND NOTIFY CONSTRUCTION REGULATOR TO-SET AT 60 PSI. - MANAGER WITH THE REPORT.WATER SOFTENER IS REQUIRED IF THE WATER 1 TL•---•-- -•-1 ! -�-- a QUALITY IS HIGHER THAN 6 GRAINS PER GALLON.1-112"COLD WATER PIPING 499A (D y n- ❑2 PROVIDE NEW WATER HEATER HERE PER THE DETAIL.SEE SHEET P3.0.CHECK CONNECTION MAY BE REQUIRED DEPENDING ON THE WATER PRESSURE,CONSULT "�0' '"�-' � WITH NOODLES CONSTRUCTION MANAGER PRIOR TO BID/PURCHASE ON FINAL WITH CONSTRUCTION MANAGER. n APPROVED WATER HEATER SPECIFICATIONS. 4990 \ ' 436 �' °z' =s'1 ( „�-,o 20 CONTRACTOR TO PROVIDE STANDOFF FOR WATER,GAS,ETC,PIPING BEHIND g /l ❑ COOKING APPLIANCE GAS PIPE SUPPLY,REFER TO"COOKING APPLIANCE•GAS COOK LINE AND ALL PIPING SHALL TURN AND BEND AS SOON AS IT COMES OUT ; ••--»»---------- y o e o , $ PIPE"DETAIL ON SHEET P4.0. !" THE WALL IN CLEAN AND NEAT MANNER. I ` DII®A �, 1 O o El GAS SHUT-OFF VALVE:.FURNISHED BY KITCHEN HOOD SUPPLIER AND INSTALLED 21 AREA FOR ELECTRICAL EQUIPMENT.PIPING SHALL NOT CROSS WI i HIN THIS AREA. ( - - 'y I Q.m d r ` J BY PC INTERCONNECT TO HOOD FIRE SUPPRESSION SYSTEM BY FPC. "t 1; to _— �.• i V o ,; 22 PROVIDE COLD WATER SUPPLY TO ECOLAB VICTORY SYSTEM.STUB LINE AT 60" "495• z 6 ❑5 GASRIPING STUBBED THROUGH THE ROOF,SEE SHEET MP1.0.FOR GAS PIPING _ A.F.F.WITH HORIZONTAL LEAVE TOWARDS ICE MACHINE/DRAIN BOARD.INSTALL I I _ `'�'' _ V Q a c.. ROUTED ON ROCK PER MANUFACTURER RECOMMENDATIONS,AND PROVIDE BACKFLOW PREVENTION A --I7 - �i -- - -----�- - - - �- -- - -- --� -- ° ' r - ; mull AS REQUIRED BY AUTHORITY HAVING JURISDICTION.PROVIDE WITH 3/8" ET `�-' � r ''� `° C+5 i ENTRY © PROVIDE "VALVED CW LINE TO THE PASTA COOKERS-ROUTE REINFORCED FOOD. THREADED ANGLE STOP. }� ! ♦ - _ - GRADE PLASTIC FILTERED WATER TUBING AND QUICK DISCONNECT PROVIDED BY � �.� ti I� �" ' KITCHEN EQUIPMENT SUPPLIER. 23 TRAP PRIMERIVALVES TO BE IN AN ACCESSIBLE SPACE ABOVE CEILING,IF NOT ❑ -� (200 CFH) PROVIDE 1 -- A MINIMUM 12"x12"ACCESS PANEL,OR LARGER IF REQUIRED TO ! - 1" ❑7 ROUTE REINFORCED.FOOD GRADE PLASTIC FILTERED WATER TUBING TO ADEQUATELY ACCESS THE TRAP PRIMERIVALVES. .__.-_ _ •__. ._-. ;_.._„-. ____ BEVERAGE DISPENSER.REFER TO BEVERAGE STATION DETAIL ON SHEET P4.0. �I L 24 OFFSET PLUMBING PIPING AS REQUIRED TO AVOID STRUCTURAL ELEMENTS AND 2 J ❑ PROVIDE A REDUCED PRESSURE/DOUBLE CHECK BACKFLOW PREVENTER OR AS . OTHER PIPING IN WALL. REQUIRED FOR THE WATER SUPPLY LINES.THE RELIEF VALVE SHALL DRAIN- ' INDIRECTLY TO THE FLOOR SINK/DRAIN WITH AN AIR GAP OF TWICE THE PIPE 25 PROVIDE WATTS#L7 BACKFLOW PREVENTER OR CITY APPROVED AT WATER DIAMETER.REFER TO"KITCHEN EQUIPMENT LIST&CONNECTION SCHEDULE"FOR- SOFTENER AND WATER FILTER. (r SEASONAL PA710 I MODEL AND TYPE.NO COPPER TUBING IN THE SYSTEM DOWNSTREAM OF THE 17 498 i 114 BACKFLOW PREVENTER TO PRECLUDE THE POSSIBILITY OF COPPER POISONING. 26 PROVIDE PRESSURE REDUCING VALVE,WATTS 3/425AUB-Z3. ji— I Revisbns ❑ 9 CONNECT'XCW LINE TO NEW FILTER FOR ICE DISPENSING MACHINES AND TEA 27 ALL PLUMBING PIPING SHALL BE COORDINATED WITH JOISTS,JOIST WEBBING,AND ISSUED FOR LANDLORD REVIEW BREWER TO BE SUPPLIED BY KITCHEN EQUIPMENT SUPPLIER.PROVIDE STAINLESS WITH OTHER DISCIPLINES PRIOR TO INSTALLATION. \y ��,'"""x�� 01.21.2015 STEEL BACKFLOW PREVENTER AT WATER SUPPLY. + 1, v..r�� , I Q ISSUED FOR PERMIT 28 314'CWS DOWN IN WALL AND TURN 90°AND OUT THE WALL 12"A.F.F.WITH �•^ r'�� " f 02-042015 10 PROVIDE X'VA VED FILTERED LINE TO BAG•N-BOX BOOSTER PUMP SYSTEM AND _._.._-____ _.._. _-.._._...._._.,.._...,„, „,"_..,..,._..,.,.,..� .� �.m ........_.._ __ _.��___.._ •._- ._ _ _-_..,....--_-_ -_ ___._- FREESTYLE COKE MACHINES,SEE SHEET P1.0 FOR CONDUIT ROUTING.PROVIDE ESCUTCHEON,SHUT-OFF VALVE,FOR USE WITH FUTURE WATER TEMPERING KIT. ------------•---- -_�.__,-___-._-...._..__-__._.._.__- _. .�--f _ �,__./ ISSUED FOR CONSTRUCTION STAINLESS STEEL BACKFLOW PREVENTER AT WATER SUPPLY VERIFY AND _ 28 ALL PIPING INSTALLATION SHALL NOT OBSTRUCT THE OPERATIONS OF THE WATER 02.26.2015 COORDINATE ALL REQUIREMENTS FOR SODA DISPENSING SYSTEM WITH SOFTENER AND SHALL NOT INTERFERE ACCESS TO CONTROL BLOCK. Q MANUFACTURER PRIOR TO INSTALLATION.ROUTE PIPING IN SODA CONDUIT TO , COKE MACHINE OR AS DIRECTED BY MANUFACTURER. 30 PROVIDE 1/2"VALVED CW AND HW LINE WITH MIXING VALVE LOCATED RIGHT ❑11 1/2"FW WATER FOR ICE MACHINE ON TOP OF FREESTYLE COKE MACHINE. BELOW CEILING AND SET'i O 70°F FOR FUTURE ECOLAB QUAT SANITIZER ABOVE _ - ____.-____�_______---.-.-..__. _ _._�._._ _ __—_•_ _._.. _.. _ -_.,...__ __.,,-___._,__.___ _._-a _ Y_____ -.__ _-— __�,.. ------ SINK,STUB LINE AT 60"A.F.F.WITH HORIZONTAL LEAVE TOWARDS PRE-RINSE --_ --J—� Q 12 GAS LINE ROUTED IN LOW WALL TO SERVICE GAS EQUIPMENT, - SINK/DISHWASHER.PC TO PROVIDE BFP IF NOT SUPPLIED BY CHEMICAL SUPPLIER. PROVIDE WITH THREADED 3/8'ANGLE S OP. 13 ALL PIPING AND ASSOCIATED PLUMBING EQUIPMENT FOR SODA SYSTEM SHALLBE 31 ROUTE CW,HW,AND FW PIPING CONCEALED UNDER FLOOR SLAB OR IN LOW WALL INSTALLED BY A STATE LICENSED PLUMBER. AS REQUIRED PER FIELD CONDITIONS.PROVIDE WATER TIGHT PIPING. 14 ROUTE 1/2"CW WATER LINE TO SERVE DIPPER WELL. - D, 32 VERIFY IN FIELD FUNCTIONALITY OF EXISHONG HOSE BIBS.IF HOSE BIBBIS IN PLUMBING PLAN -WATER AND GAS v PROPER WORKING ORDER,ADDITIONAL HOSE BIBS NEED NOT BE PROVIDED. ch 15 PROVIDE 1/2"VALVED HW LINE FOR FUTURE ECOLAB SCOUT ABOVE SINK,STUB . NORTH • NOTIFY CONSTRUCTION MANAGER WITH RESULTS PRIOR TO BID. � LINE AT 60"A.F.F.WITH HORIZONTAL LEAVE AWAY FROM PRE-RINSE 1/4'a 1'-0" SINK/DISHWASHER.INSTALL APPROVED BACKFLOW PREVENTER;RPZ BACKFLOW 33 LOW PRESSURE GAS SYSTEM AFTER MAXITROL VENT LIMITER PRESSURE :n PREVENTER WATTS#009 OR AS REQUIRED BYAJTHORITY HAVING JURISDICTION, REGULATOR.INLET PRESSURE 2 PSI:OUTLET PRESSURE 7"W.C.FIELD VERIFY PLAN N PC TO PROVIDE BFP IF NOT SUPPLIED BY CHEMICAL SUPPLIER.PROVIDE WITH EXACT LOCATION AND LENGTHS. THREADED 3/8"ANGLE STOP. N ®PROVIDE NEW GAS PIPING ROUTED FROM KEW/EXISTING GAS METER LOCATED IN - A 16 DISHWASHER ELECTRICAL ACCESS SHALL BE LOCATED IN OPEN AREA FOR EASY REAR OF SPACE.TOTAL GAS SYSTEM IS 1,364 CFH AND SIZED AT 200'DEVELOPED ACCESS AND NOT IN AGAINST WALL-COORDINATE WITH ELECTRICAL DRAWINGS. LENGTH WITH 2 PSI PRESSURE AND A 1 PSI PRESSURE DROP.CONTACT GAS 17 PROVIDE A WATTS MODEL#N9-CD FIELD TESTABLE DUAL CHECK-VACUUM COMPANY FOR NEW GAS SERVICE LOADS.FIELD VERIFY EXACT LOCATION.NOTIFY CITY OF TIGARD ARCHITECT/ENGINEER IF DIFFERENT PRESSURE IS PROVIDED. ' Z BREAKER OR AHJ APPROVED ON FAUCET OUTLET,ALSO PROVIDE DEDICATED 1/2" 1 REVIEWED FOR CODE COMPLIANCE 4 CW AND HW LINE WITH POWERS E480 THERMAL MIXING VALVE LOCATEDRIGHT 35 PROVIDE PIPING AND FITTINGS ON GAS PIPING INSTALLED UNDERGROUND AS W BELOW CEILING,SET WATER TEMPERATURE TO 70"F FOR OPTIMAL CHEMICAL REQUIRED BY LOCAL CODES.PROVIDE PROTECTIVE COATING AND WRAPPING ON Approved: t(ate F. MIXING.STUB OUT WALL O 60"A.F.F.FOR FUTURE ECOLAB OAS(�5-PROVIDE GAS PIPING.UNDERGROUND GAS PIPING SHALL BE INSTALLED WITHIN CONDUIT OF OTC: L WATTS#009 RPZ BACKFLOW PREVENTER OR CITY APPROVED AT CHEMICAL SCHEDULE 40 STEEL OR AS REQUIRED BY LOCAL AUTHORITY. Permit#S / L��� STATION.PROVIDE WITH THREADED 318'ANGLE STOP. Address: 10718-Sto 6 ff_11;Q qq o #C (ZJ l� COORDINATE ALL HAND SINK FAUCETS WITH GENERAL Suite Z S'PLUMBING PLAN DEMOLITION NOTES B Date: ENGINEER m CONTRACTOR.DISCARD ALL HAND SETS THAT ARE PROVIDED WITH IHEREBY CERTFYTHAT THESE PLANS RAVE MEN PRE- BOWLS AND PROVIDE NEW HAND SINK FAUCET PER THE ��/r m PAREeuwEEOGE,TE SWECOMYW TOTHEULsr SPECIFICATION LISTED ON P2.0. REMOVE ALL EXISTING PLUMBING RELATED FIXTURES,EQUIPMENT, 2((/�(/I/ /u {/ /(y/[U� aFurroialtFoaE THE SANEwrwtYtxTH uLR RULES, a PIPING,ETC.NOT TO BE UTILIZED IN THE COMPLETED REMODEL REGL A70MANDORaruNCESOFPORTAW,OREGON WORK.FIELD VERIFY EXISTING CONDITIONS PRIOR TO BID. RELAUNGTG STRUCTURES AND BUILDINGS. r FURNISH AND INSTALL BRAIDED STAINLESS STEEL FAUCET CONTRACTOR SHALL REMOVE ALL EXISTING DRAINS;CUT AND CAP OFFICE COPY 0)I CONNECTORS AT ALL EXPOSED FLEXIBLE HOSE LOCATIONS AT ACTIVE MAIN. ENGINEER w EXCEPT AT EQUIPMENT PROVIDED BY KES. o, Drawn By Checked By 'v THE GENERAL CONTRACTOR AND PLUMBING CONTRACTOR MUST CW SK FIELD DETERMINE REQUIRED DEMOLITION AND RELOCATION OF Scale Date 0- CONTRACTOR SHALL PROVIDE ALTERNATE BID FOR ZURN REX EXISTING PLUMBING ITEMS INCLUDING SANITARY PIPING PRIOR TO rnI TUBING SYSTEM ON THE DOMESTIC WATER SYSTEM INCLUDING BID. 1/4"=l'-O" 01-06-2015 ° ALL THE FITTINGS,MANIFOLDS,REGULATORS,SUPPORTS,ETC. SEE MP SHEET FOR REX TUBING SYSTEM SPECIFICATIONS. Job;�4 2115 o PLUMBING CONTRACTOR SHALL PROVIDE ALTERNATE BID FOR JAY R.SMITH QUAD CLOSE TRAP SEAL AS OPPOSED TO TRAP PRIMERS m IF LOCAL CODE PERMITS THE USE OF TRAP SEAL TRAP SEALS ARE Sheet No. TO BE INSTALLED PER MANUFACTURER RECOMMENDATIONS. P1 . 1 INSULATION ON WATER PIPING IN PIPE UNIONS,'TIELECTRIC IF KITCHEN SHALL BE WASHABLE TYPE REQUIRED FOR DISSIMILAR METALS _ HOT WATER TO FIXTURES AS 4"PVC INTAKE PIPE, SHOWN ON PLANS GAS PIPE FROM BACK OF BUILDING, COLD WATER SUPPLY PIPE HANGER • REFER TO PLANS FOR ��� ROUTED TO NOODLES SPACE,SIZE CONTINUATION FULL PORT VALVES(TYBALL SHUT-OFF TO WATER HEATER NEXT TO PIPE TEE AS SHOWN ON PLAN-USE BLACK VACUUM RELIEF VALVE 'PIPE UNION: - STEEL.PIPE ROOF 1� BURNER THERMOSTAT AND DIELECTRIC IF COLD WATER SUPPLY 1 PRESSURE REGULATOR FURNISHED DISSIMILAR METALS EXTERIOR WALL o 1' WITH WATER HEATER PRESSURE TEST COCK HOT WATER RETURN fa 0/,GAS SHUT-OFF COCK WELDED STEEL PIPE INCREASER EXPANSION TANK WITH GAS METER-CFH 1 GROUND JOINT UNION POLYPROPYLENE LINING CAPACITY SHOWN DIRT LEG ON PLANS 6"LONG DIRT LEG BUTYL UIhPHRAGM STRAINER BURNERS/SAUTE/DIPPER WELL STRAINER el 1 i RECIRCULATION SIZED WITH AGA/CGA TEMPERATURE AIR CHARGING VALVE PUMP STEAM RATING 10%OVER HEATER FILL TANK WITH AIR -� BY GAS COMPANY INPUT PROVIDE A HARD COPPER PRESSURE TO MATCH ' RELIEF WATER PRESSURE, BY PLUMBING FLOOR CHECK VALVE THEN OPEN VAWE CONTRACTOR -T" EXPANSION TANK VALVE COPPER DISCHARGE LINE. O QO pO OO O O CONNECTION FULL SIZE OF VALVE OUTLET TO END00 1 00 O PIPING ARRANGEMENT SHOWN IS SCHEMATIC.ADJUST TO SUIT FIELD V 2"V IN OVER WASTE RECEPTACLE WITH A 2 CLEANOUT HANDHOLE PIPE DIAMETER AIP. CONDITIONS. MAKE PIPE SAME SIZE AS TANK FITTING.FOLLOW i GRADE OR'6 Ea f WALL ETR GAMANUFACTURER'S INSTRUCTIONS FOR INSTALLATION PROCEDURE.VERIFY S-4+ PAVEMENT W PROVIDE PVC CONDENSATE PIPING PROPER OPERATION WHEN INSTALLED. DIPPER WELL - r1„ GAS FIRED WATER PER THE MANUFACTURER'S PRESSURE REGULATOR SET AT 2 PSI ® Ill / o HEATER PER SPEC'S EXPANSION TANK INSTALLATION SHALL OCCUR ONLY WHEN THERE IS A SHUT-OFF VALVE O ` DIRECTION FLOOR SINK CLEANOUT FINISHED FLOOR DRAIN VALVE WATERS STEM OR BUILDINGBACKFLOW ON WATERCE INSTALLED WATER SYSTEM. VERIFY THE TENANT SPACE VERIFY REQUIREMENTS FOR METERING AND PIPING WITH GAS COMPANY. PROVIDE 6"HIGH CONTRACTOR SHALL PAY ALL GAS COMPANY FEES FOR INSTALLATION.USE WELDED ��I—/� Q ACONCRETE BASE 3"PVC EXHAUST PIPE,REFER TO - OR SCREWED PIPE AND FITTINGS PER PLUMBING SPECS. VJ 0 CLEANOUTS IN IX 44 PLANS FOR CONTINUATION ENDS OFPPE REFER TO SPECIFICATIONS AND PLUMBING FIXTURE SCHEDULE.PIPING ARRANGEMENT SHOWN 03 SMALL EXPANSION TANK GAS SERVICE w MAINTAIN AIR GAP TWICE PIPE DIAMETER.CUT 4^ IS SCHEMATIC.ADJUST TO SUIT FIELD CONDITIONS.REFER TO FLOOR PLAN FOR PIPE SIZES. NOT TO SCALE 0 1 NOT TO SCALE END AT 45°ANGLE TO REDUCE SPLASHING. / SET WATER HEATER THERMOSTAT AT 140°FAHRENHEIT.PROVIDE SEISMIC STRAP OR BRACING VENT 7 Q 4"J AND FLEXIBLE CONNECTORS TO WATER AND GAS CONNECTIONS IF/AS REQUIRED BY LOCAL GI• D AUTHORITIES. Q 0 DIPPER WELL DETAIL D- U V Q NOT TO SCALE OS GAS WATER HEATER cc nN/ NOT TO SCALE PRESSURE GAUGE MANUAL BYPASS VALVE PVC FLUE G O L.L P (NORMALLY CLOSED-AFTER O )--- uj w 1Y"OUTLET INSTALLATION) CWC SOFT WATER 1-114" 1Yx"INLET HARD WATER �xZ Cf) C C) / MAINTAIN 48"MIN.CLEARANCE 0J = N 0 Z COMBUSTION AIR— ABOVE ROOF DECK 6 HIGHEST 1-1/4"MANUALOUTLETVALVE ANTIC IFATED SNOW LEVEL,EXTEND COQ 0) 36°ABOVE PARAPET ELEVATION IF rr nn (n 1-1/4"MANUAL INLET VALVE WITH IN 10'•0'OF PARAPET. W V WALL LINE 1-1/4" 1-1/4" 8"MINIMUM J 0 Z PROVIDE ONE PIECE THREE COMPARTMENT SINK FITTING UNION VENT STACK f ESCUTCHEON FLASHING � (n � CmC / - BY PLUMBER CONT. O CO G EQUIPMENT BY SOFTENER SUPPLIER(FUTURE) r Q T 2"V IN WALL O N (' J Q �—G I� M POSITION MVP CONTROLLER SCREEN TO BE ROOF z 1 f- Q- Q CLEANOUTS V - ACCESSIBLE TO VIEW FOR MAINTENANCE IN ENDS OF 80"FROM FLOOR -� PIPE WITH STAND -- - CLEANOUT ------- LINE ---- c o LINE SIZE BALL VALVE - FLOOR 2,. FLOOR I I Ij U SINK MEDIA MEDIA f BRINE t a c a i a*�C.0 QUICK CONNECT 4" TANK TANK I TANK '�-_-O s MAINTAIN AIR GAP I I --a QUICK CONNECT TWICE PIPE DIAMETER I• I � N'^c DIRT LEG AND AT LEAST ONE I I no='e:o INCH AIR GAP FLEXIBLE CONNECTOR I I j j _+-.--' 0 ur c VENT o O A CASTER ARRANGEMENT SHOWN IS SCHEMATIC.ADJUST TO SUIT FIELD CONDITIONS OR I I a MEET LOCAL CODE REQUIREMENTS. UTILIZE TYPE DWV COPPER PIPE,FITTINGS 1 8"HIGH STAND a RESTRAIING CABLE AND CONNECTORS FOR SINK CONNECTIONS.ALL EXPOSED PIPE SHALL BE TYPE _Q U yi`^ ` Ar DWV COPPER. / �-COMBUSTION AIR ' FLOOR LINE / .0 e„v OV THREE COMPARTMENT SINK DETAIL STAND—/ U allo� $ TYPICAL FOOD EQUIPMENT GAS CONNECTION DETAIL NOT TO SCALE //�� WATER SOFTENER pill O$ NOT TO SCALE OT NOT TO SCALE 02 WATER HEATER CONCENTRIC FLUE VENT W NOT TO SCALE AIV Revisions ISSUED FOR LANDLORD REVIEW 01.21.2015 ISSUED FOR PERMIT 02-04-2015 2Y2 ISSUED FOR CONSTRUCTION 2 PSI GAS FROM GAS METER.SEE 02.26.2015 (SHEET P1.1 AND GAS SERVICE DETAIL Q ON THIS SHEET FOR MORE / INFORMATION 227 Q a 90°BEND DIRECTLY OUT OF 1"(135) SOUP WELL&RUN DRAIN Q 227A LINE DIRECTLY BACK TO _ - 314"(60) REAR SOUP WELLS Q 80 CF - 1'(195) HORIZONTAL 90°BEND TO 3/4"(1B0) N 180 CFH '. ROOF 227A 1"(90) RUN TOWARDS FRONT OF N PROVIDE PRESSURE REGULATOR COUNTER c� OF SOUP WELL VALVE,INLET PRESSURE 2 PSI, - 90°BEND DIRECTLY OUT J OUTLET PRESSURE 7'W.C.,TOTAL GAS 1.114"(285) 90"BEND STRAIGHT DOWN LOAD IS 180 CFH.FIELD VERIFY EXACT 2P0 LOCATION. 1--(90) UJ 1-114"(1,364) 220 INSTALL BALL VALVE 1-1/4"(375) VERTICA'.LY Q - 1"(629) 1-1/2"(535) 60 3/4" ( ) U) - 1-1/2"(455) TEE DRAIN DIRECTLY ql-_ 1"(735) OUT OF SOUP WELL . 314"(180) 3/4"(80) PROVIDE MAXITROL VENT LIMITER 90°BEND STRAIGHT BACK Q PRESSURE REGULATOR VALVE,INLET 0 - PRESSURE 2 PSI,OUTLET PRESSURE RTU-1 PROVIDE MAXITROL VENT LIMITER 7"W.C.,TOTAL GAS LOAD IS 200 CFH. 3/4"(180) PRESSURE REGULATOR VALVE,INLET FIELD VERIFY EXACT LOCATION. DRAIN LINE TO RUN BEHIND 90°BEND STRAIGHT DOWN 180 CFH PRESSURE 2 PSI,OUTLETPRESSURE UNDERSHELVES DOWN 1"(629) 7"W.C.,TOTAL GAS LOAD IS 200 CFH. BELOW COUNTER BASE 0 3/4"(180) FIELD VERIFY EXACT LOCATION. 314"(200) 1"(20D) 0 3/4"(449) Z ENGINEER 2 MUA-1 DRAIN LINE TO DOWN BELOW I HEREBY CERTIFY THAT THESE Rau HAVE BM PRE- 269 CFH NOTE: PARED uaERMYSUPEmnsa+�THAT ToTHE BEST PROVIDE PRESSURE REGULATOR COUNTER BASE TO HUB DRAIN a- VALVE,INLET PRESSURE 2 PSI, PITCH ALL DRAIN LINE @ DP urATIONS AND ORD ANSAME COMPLY OFPORT AND,OREGON of GON OUTLET PRESSURE 7-W.C.,TOTAL GAS 3/4"(269) 1/a"FOR EVERY 1"FOR REunNNG o STRUCTURES AND DINGGS. LOAD IS 180 CFH.FIELD VERIFY EXACT 1"(269 ADEQUATE DRAINAGE I LOCATION. ) HWH-1 200 CFH ENMEER PROVIDE PRESSURE REGULATOR 1 0 SOUP WELL DRAIN DETAIL Drawn By Checked By VALVE,INLET PRESSURE 2 PSI, NTS o OUTLET PRESSURE 7"W.C.,TOTAL GAS CW SK d LOAD IS 269 CFH.FIELD VERIFY EXACT Scale Dat0 rnI LOCATION.' -G 1/4"=V-0" 01-06-2015 T 1 1 PLUMBING RISER-GAS Job 14-2115 3NTS O rn Sheet No. P3.0