Report (34) "� � l W6(/07`-s7` 824 SE 12th Avenue Portland,Oregon 97214 FIELD OBSERVATION REPORT 22- WMTS Tel(503)616-9425 www.gcnweb.com PROJECT ID DATE REPORT NO. 1062 -Summit Ridge July 18, 2016 24 OWNER/CLIENT OWNER/CLIENT REPRESENTATIVE DAY OF WEEK PAGE D R Horton (DRH) Don Durst Monday 1 of 1 GENERAL CONTRACTOR GENERAL CONTRACTOR REPRESENTATIVE ARRIVAL TIME DEPARTURE TIME DHI Todd Kurilo 1300 1400 GRADING CONTRACTOR GRADING CONTRACTOR REPRESENTATIVE WEATHER/TEMPERATURE PERMIT G-Cam Excavation Sergey Cloudy, 75' F Project# 1062 TYPE OF WORK SOURCE AND DESCRIPTION OF FILL MATERIAL GCN REPRESENTATIVE Structural Subqrade NA Bob Pendell LOCATION OF WORK CONTRACTORS EQUIPMENT OBSERVED IN USE Lot 1 51 CONTRACTOR ACTIVITY,OBSERVATIONS,CONCLUSIONS,RECOMMENDATIONS: I made this visit at the request of Don Durst to observe the excavated structural subgrade for lot 151. I used a Y2 inch diameter steel foundation rod to probe footing subgrade. During the probe I observed the structural subgrades to be stiff soil and dense rock. In our opinion the building pad has been prepared in general accordance with our recommendations and will support expected foundation for a single family home. A Preliminary report is provided solely as evidence that the field observation was performed. Observations,and/or conclusions,and/or recommendations FINAL ❑ PRELIMINARY conveyed in the final report may vary from and shall take precedence over those indicated in a preliminary report. A final report is an instrument of professional service. Any condusions drawn from this report should be discussed with and evaluated by the professional involved. ITEMS TO OBSERVE,CHECK,OR TEST DURING NEXT VISIT FIELD REPRESENTATIVE SIGNATURE DATE Bob Pendell July 18, 2016 GCN's professionals are represented on site solely to observe operations of the contractor identified,to form opinions about the adequacy of those operations,and to report those opinions to our dient. The presence and activities of our field representative do not relieve any contractor from its obligation to meet contractual requirements.We rely on the contractor to comply with the plans and specifications throughout the duration of the oroiect.irrespective of the presence of our representative.The contractor retains sole responsibility for site safety and the methods.operations.and sequences. III► M.S7;2m' I, SHAUN P. FIDLER HEREBY CERTIFY HUB & TACK STAKING WAS PERFORMED ON 7/20/16 AND THAT THE STAKES WERE SET IN THE LOCATIONS SHOWN S88'32'31"E 40.00' F4 ON THIS MAP AND MEET THE • REQUIRED SETBACKS PER THE SITE PLAN PROVIDED BY THE CLIENT. REGISTERED 40.52' PROFESSIONAL ND SURVEYOR x80 - G OZZ r v221 0 JULYORE12,ON 2005 $ s2� 27"' , i o �• SHAU50333P. 1DLER `1rn� RENEWAL DATE DECEMBER 31, 2017 r 151 r 2 g g 5.00• --� 7.25' -N-- 61Z '� _27 ' 9z4 • STAKEOUT 8218 LOT 151 SUMMIT RIDGE NO. 5 20.65' SE 1/4 SEC 9, T2S, R1W, W.M. N88'32'31"W 40.00' '5101 CITY OF TIGARD WASHINGTON COUNTY, OREGON .aas.fio JULY 22, 2016 IBM DRAWN:RAR/RLMc CHECKED: SPF SCALE 1"=20' ACCOUNT # 144 SW BLACK WALNUT ST Y:\144-598\DWG\L151SR.DWG NOTE: CMT SURVEYING AND CONSULTING THIS DRAWING IS NOT INTENDED TO BE USED FOR 9136 SE ST HELENS SUITE J THE PURPOSES OF A MORTGAGE LOAN INSPECTION CLACKAMAS, OR 97015 PHONE (503) 850-4672 FAX (503) 850-4590