Loading...
Plans SW SUMMERFIELD DRIVE Measured distance of $5.39 feet 7'11"from house wal 9500 SW to fence line. RECEIVED 19.74 Ft. Summerfield AUG 2 0 2012 i CRY OF now BUILDING I MOON 15.14 ft N illilloo, -1/4$ / % i 98.34 feet 48' 144 CIU OF TICAD Approved_ a sS -- ,-[ ii---' Conditionally Approved [ ] shed addition "` See Letter to Foflow low [ ] 3'1l" x 12' long Attached tt ' Permit Number:k12 -0(56 6 A.. - :61•57:r) . 144ltf-04 (moi 115.06 ft total By:_ Wei 4,- ' Date: OMR / 51' Approved puns shall be on job site. OFFICE COPY ?//(i, 72_ 16.06' 0fi_ A .6.6.6.6 . ..6.606.6. ..6. I I I I I I 1. j1 1 iI l� i 4x12 LEAN TO SHED PLANS DRAWING INDEX Page 1 Title Sheet Page 1.1 Notes Page 1.2 Notes Page 2 Floor Plan, Typical Page 3 Exterior Elevations Page 4 Skid Foundation Plan Page 5 Floor Framing Plan Page 6 Wall Framing Plans Page 6.1 Wall Framing Notes Page 7 Roof Framing and Sheeting Plans Page 7.1 Roof Framing Notes Page 7.2 Truss Details Page 7.3 Rafter Birdsmouth Template Bottom Page 7.4 Rafter Birdsmouth Template Top Page 8 Section Page 8.1 Wall Details Page 8.2 Details Copyright©2010 icreatables.All rights reserved.All images and information contained in these plans are copyrighted Title Sheet 1 and may not be distributed,modified or reproduced in whole or in part without the prior consent of Icreatables,Ilc. ROOFING(R7) existing structurk I_----_--_____l 1x6 RAKE FACIA(T2) pimmili igimmEm mg=ming=mm. METAL DRIP EDGE(R5) 1x4 EVE FACIA(T2) , miiimir T1-11 TEXTURED — - Ni- , o T" PLYWOOD SIDING(W7) `D - 1x4 CORNER TRIM(T1) ; F.. • DOOR(see door plans) ,, 1x4 DOOR TRIM(T1) RAMP 1 2x10 PT Amill N — 2X4FLOOR JOISTS(F1) ' /" PLYWOODted`� .FOUNDATI•. .t. structure . I� ground cloth under w hilti r' GROUND LEVEL compacted gravel 1 FRONT ELEVATION RIGHT SIDE ELEVATION J i i I 1 . -1111111111111111111111111111111 r I _ -_ TAW- REAR REAR ELEVATION note:attached to existing structure. no rear elevation possible SIDING AND ROOFING MATERIALS CODE DESCRIPTION LENGTH QTY. W7 4fL x 8ft.T1-11 per plan 7 T4 1x4 Trim 8' 8 T6 1x6 Trim 10' 6 R5 1Y2"x 1Y2"Roof Drip Edge 10' 4 R6 151b.Roofing Felt 1 roll R7 Shingles 213 Square(60 SF) Ramp or stair materials are not shown Exterior Elevations 3 12' EXISTING HOUSE WALL Mf _ y K r n n �� R a._ W2 F4 W7 7 4! ,' VIII - - . FLOOR PLAN X"= 1'-p„ See wall framing plans for stud layout and material take off. Floor Plan 2 `STEPS FOR FRAMING A SHED FLOOR 1-LAYOUT THE SHED FLOOR RIM JOISTS-Cut the rim joists to the length shown on the plans.Put the two rim joists next to each other on edge with the crowned edges up.Tack the joists together using two 8d nails.Use the layout dimensions from the Floor Framing Plan to mark the joist layout on both of the joists at the same time.Put a mark on the side of each joist location line to show which side of the line the joist goes so you don't get confused when attaching the floor joists.Separate the tin joists and put one at each end on top of the 6x6 rails. 2-INSTALL THE FLOOR JOISTS-Cut and install the Floor Joists to the length shown on the Floor Framing Plan.Crown each joist before installing it. Start by installing the two end joists and install the floor joists between the rim joists on their respective layout marks.Put 3 nails through the rim joist into each floor joist. 3-SQUARE THE FLOOR JOISTS-Square up the newly framed floor joists before sheeting them.See the sheet 1.2 for more information on how to square a floor.Attach the Rim Joists to the 6x6 rails by toe nailing them and using the A23 clip and 8d naffs. 4-INSTALL THE FLOOR SHEETING-Install the sheeting as shown on the floor framing plan with the long dimension of the O.S.B.or plywood running perpendicular to the floor joists. -Test Fit the first full size sheet of floor sheeting.If it fits correctly,remove it and apply construction adhesive to the tops of the floor joists. -Start at the corner that has the ftp 14)5"distance between the floor joists.Put the sheeting on the joists so that the tounge edge is over the rim joist and one of the ends is flush with the end joist.The other end should be in the center of the floor joist below it. -Attach the floor sheeting to the floor joists using an 8d ring shank nail every 6"along the edges and 12"in the middle of the floor sheeting. -Install a complete row of floor sheeting before installing a second row. -The second row should start with at staggered Layout with 4'overlaps when possible,this greatly increases the strength of the floor.Make sure the tongue-and-groove joint is tight by hitting a block of wood against the tongue edge to press the joint together. -Make sure the edges of the floor sheeting are in line with the edge of the rim joists and on the center of joists in the middle of the floor. -Trim any sheeting overhanging the joists ends. 2 x 2x4 on ends in simpson 4x4 clips 12' 2x10 x 12 ft PT anchored to existing foundation F10+F12 i > F1 47" F3 BELOW F11+F10 • 4x4 PT under FLOOR FRAMING PLAN joists -- ; F4 47" 12'. FLOOR SHEETING PLAN FLOOR FRAMING MATERIALS CODE DESCRIPTION LENGTH QTY. Fl 2x4FloorJoist 8' 6 2x10 Rim Joist 12'-0" 1 F4 4'x8'xx"O.S.B.T.&G. 4'x8' 2 F10 SIMPSON A23 CLIP 11 F11 SIMPSON HU 4x4 clip 4 F12 2x4 joist hanger 11 Skid Floor Framing Plan 5 ' r 3'4/2" i W2 I I ` C� iV i0 iD W1 { W2 1134 . .1'-4". f 1, /" / • `' 3,- " / J4 • LEFT WALL FRAMING PLAN W3 W2 F 4 m _ iD W1 W1 W2 W3 1'-03/4 1-4"1-4" 71 4" �1'-4" 1,_1y- 1-0. . J 1.�. 1 4_ t 12' 3'-5" / 47" FRONT WALL FRAMING PLAN RIGHT WALL FRAMING PLAN WALL FRAMING MATERIALS CODE DESCRIPTION LENGTH QTY. W1 2x4 Wall Stud 8'-0" 26 W2 2x4 Wall Plate,short 10'-0" 3 W3 2x4 Wall Plate,long 12-0" 6 W4 2X4 Header 8'-0" 2 W5 2X4 Trimmer 8'-0" 2 W7 4ft.x 8ft.Textured T1-11 •Siding,See elevations sheet 3 Wall Framing Plans 6 R2 R2 En ;:r', R2 R2 12' ROOF SHEETING PLAN R4 _- W3 - — i R1-- -- R4 1' 114' 2 2 2, 2, 2'-0�" 12' ROOF FRAMING PLAN Roof Framing-Sheeting Plan 7 t C k r/ j r i vie j W1 • W6 / �\ • l F2 ._... F1 ' F3 II i FINISHED GRADE (SLOPE AWAY) BUILDING SECTION 1'-0" See floor and wall plans for material call out definitions. • Section - Detail 8