Plans (25) cAo« - vvy
IP' _ _ _ _ ROOF
- OVERHANG
__
NE
• CEIVED
FEXT VFD ild VFD O /�w/ MAY 1 2016
(FUTUTU RE) T-1
�a
J
/'S 1 Y OF i IGARO
SD-3 /a„7 _______ , a-a -6631 HPU-I UI7' 0 DI V MS'ION
a F SD I SD-2 10” _ , /,-_,, (f// t f
x
EL-I
EF FLOW SW 1 TCH NixcA"- / 1 I I
SD-3 SD-2 SD-I •
MCC MCC MCC MCC, �►EA 400 CFM 400 CFM 400 CFM
a 6631 AHU-I (A) (B) (C) •• (D) , MCP RTU EA�-w ED-I _
/_
�► I I EL-I�:: 14,E
CO I PVC L I NESET DUCT ,t_ SD-1 77
? SF FLOW SWITCH, SYSTEM, SEE SPECS EF FLOW SWITCH, COORD W/ ELEC 6631 SF-I W/
o :c8 COORD W/ ELEC DOWN FILTER BOX
AHU-I, LOCATED 1N CONTROLI — —4
-.----6631 EF-I ROOM, NOT SHOWN IN THIS 6631 DH-I (BEHIND
v
-- SECTION FOR CLARITY /�
Nmew, 6631 AHU-1) -
SEAL OPENINGS 4"
d SL-I�� I
o ROUTE AIR HANDLER CONDENSATE OUTSIDE 9 ` ,'
o d OA PER CODE AND MFR REQUIREMENTS, TIGHT o \ —� T� �I
W/ INTERIOR WALL I
N
(ffllllll r..:-..
28'-8"
o- - iunnw
co EG-2 SG-2 --
PLAN VIEW AT CONTROL ROOM _
Or)
\
SCALE 3/8"=I'-0" \
V o EG-1 SG-I
a, aa
0 11 11 11,11111 1111 I ;
5 o
e
-- — a SECTION
E III .aSCALE: 3/8"=1'-0"
1IIIIIIIIIIIIIIIIIIIIIIIIIIII .illi(II(IIIIIIIIIII♦1liii 1111111119
- y _ _ NOTES:
E _rte /"1
N ,' _ EG-I I. SE: SHEET M-4-FOR HVAC SCHEDULES. EQUIPMENT MANUFACTURERS AND MODEL NUMBERS ARE PROVIDED FOR REFERENCE ONLY AS BASIS FOR DESIGN AND
L— EG-2 SHALL BE USED TO ESTABLISH EQUIPMENT SIZES AND REQUIRED PERFORMANCE. APPROVED EQUAL MANUFACTURES WILL BE ACCEPTED.
N2. SHOWN SIZES OF EQUIPMENT MOUNTING PLATFORMS, FLOOR AND WALL PENETRATIONS SHALL BE VERIFIED PRIOR TO FABRICATION OR ORDERING OF
.,---
9° L - EQUIPMENT. CEILING PENETRATIONS ARE SHOWN 1N APPROXIMATE LOCATIONS AND SHALL BE COORDINATED WITH ROOF TRUSS LAYOUT. PROVIDE CEILING ACCESS.
FEXT 4 �,: 3. THE HVAC CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION WITH THE GENERAL CONTRACTOR REGARDING THE FINAL DUCTWORK ROUTING AND THE
° SIZES AND LOCATIONS OF CEILING, WALL AND FLOOR PENETRATIONS PRIOR TO HVAC EQUIPMENT AND DUCTWORK INSTALLATION.
t a OA SG-1
4. LOCATE ALL CONTROLS, PANELS, AND DISCONNECT SWITCHES APPROXIMATELY 4 FEET ABOVE FLOOR. COORDINATE WITH ELECTRICAL.
SG-2
5. ALL DUCTWORK TO HAVE EQUIVALENT AREA UNLESS OTHERWISE SHOWN OR SPECIFIED. RECTANGULAR DUCT WORK SHALL BE USED IN CONTROL ROOM AND VALVE
o T-2 DOWN VAULT. ROUND DUCT WORK IS ACCEPTABLE UPON APPROVAL. PROVIDE MOUNTING & TRANSITIONS TO ALL EQUIPMENT AND ACCESSORIES AS NECESSARY AND AS
Z ` ' A ( N RECOMMENDED BY MANUFACTURER. PROVIDE TURNING VANES AT ALL BENDS, SEE SPECIFICATIONS.
U I J 6. ALL REFRIGERANT PIPING SHALL BE INSULATED IN ACCORDANCE WITH OREGON ENERGY EFFICIENCY CODE.
0
V
I " ,a •p a 7. PROVIDE SUPPORTS ON ALL SUPPLY AIR, RETURN AIR, OUTSIDE AIR AND EXHAUST AIR DUCTS PER SMACNA. ALL HARDWARE SHALL BE STAINLESS STEEL.
E 4" 8. PROVIDE FLEXIBLE DUCT CONNECTIONS ON ALL FAN INSTALLATIONS.
PLAN VIEW AT BOTTOM OF VAULT
9. CONTRACTOR TO SUBMIT INSTALLATION DETAILS FOR REVIEW BY ENGINEER.
SCALE: 3/8"=1'-0"
upNOTICE AMB , �� SHEET
1 0 h DESIGNEDrx /� - �3 Marra�Sm�th�Assoaat�,Inc.
°� I ' DAK j�neep�
CleanWater\ Services HVAC PLAN AND SECTION
_� =: _ �= El a l:a Planners M-3
OIL' a
a1 IF THIS BAR DOES DRAWN bt El.-
�� r Our commitment is clear.
x NOT MEASURE 1• AS 9„
.. ,. x W is= 121 S.A.Salmon,Suite 900 PHONE 503-225-9010 RIVER TERRACE NORTH PUMP STATION
t, j NOT TO THEN DRAWING
CHECKED Fd BAR6���� _SS - 1 Portland,Oregon 97204 PA% 503-225-9022
NO. DATE BY REVISION RENEWS 12-31-15 AND FORCE MAIN PROJECT NO.6631 50 of 89
PROJECT NO.: 14-161 1.204 1 SCALE: AS SHOWN I DATE: DECEMBER 2015
illilik ,' - AIR HANDLER UNIT THERMOSTATS HVAC ABBREVIATIONS
SUPPLY FAN COOLING UNIT HEATING UNIT NO. CONTROLS COMMENTS AHU AIR HANDLING UNIT
MANUFACTURER 6631 HEATING & COOLING EA EXHAUST AIR
NO. LOCATION CFM ESP (IN FAN RPM HP TOTAL CAPACITY SENSIBLE (MBH) CONTROL TOTAL CAPACITY VOLTS/PHASE CONTROL & MODEL T_I AHU-I SET POINTS
WG) (MBH) (kW) ED EXHAUST DAMPER
6631 6631 LUXAIRE, T6 2 6631 6631 DH-I HEATING SET POINT EF EXHAUST FAN
AHU-I CONTROL ROOM 1190 - 1050 )i 35 30 T-1 7.7 208-230/1 T-I AHV36C
EG EXHAUST GRILLE
OPTIONS AND ACCESSORIES LOUVERS EL EXHAUST LOUVER
MANUFACTURER & ESP EXTERNAL STATIC PRESSURE
NO. TYPE SIZE MODEL (INCHES WATER GAUGE)
fHPU HEAT PUMP UNIT
SL-I DRAIN, BLADE 24"x24" GREENHECK
+w sE�r" EL-I DRAIN, BLADE 24"x24" GREENHECK MBH THOUSANDS OFBTU'S PER HOUR
t -� 1 > ,,, FANS`
. y OA OUTSIDE AIR
1.= NO. TOTAL CAPACITY COND FAN HP VOLTS/PHASE MA& MODELRER NO. SERVICE CFM SP. IN WG HP VOLTS/PHASE CONTROL COMMENTS
663I VALVE VAULT 600 0.5 1f3 120/I MANUAL W/ 2" FILTER BOX HEATERS RA RETURN AIR
6631 3-TON Y4 208-230/1 LUXAIRE, SF-I SA SUPPLY AIR
HPU-I THJD36S 6631N0. LOCATION TYPE SIZE VOLTS/ CONTROL SD SUPPLY DAMPER
EF-I VALVE VAULT 600 0.5 Ys 120/I MANUAL PHASE
6631 SF SUPPLY FAN
DH-1 VALVE VAULT INLINE 10 kW 480/3 T-2 SG SUPPLY GRILLE
D I FFUSERS/GR I LLES .. UH UN I T HEATER
LOCATION NO. CFM FRAME SIZE DESCRIPTION MANUFACTURER &
MODEL
SD-1 400 10"x I6" ADJ I-WAY_ TITUS 250-AA
SD-2 400 10"x16" ADJ I-WAY T I TUS 250-AA
CONTROL
ROOM SD-3 400 10"x16" ADJ I-WAY TITUS 250-AA
o RG-1 1200 24"x20 FIXED W/ TITUS 350-FSF2
1-- F I LTER
0 SG-4 300 I2"XI2" ADJ TITUS 300-FL
VALVE SG-5 300 12"X12 ADJ TITUS 300-FL
o VAULT EG-I 300 12"X12" FIXED TITUS 350-ZFL
a EG-2 300 12"X12" FIXED TITUS 350-ZFL
Y
O
T-2
d CR3
HP H H-
`r 480V{T o 6631 -�- +.
0 30 o DH-I
0 -L. 24V
N LOCAL DISCONNECT, TYP CR3 TRANS TO
4 s FROM LIGHTING CONTROL PANEL, CEILING
s r- ' SEE SHEET E-17 FOR CONTROL
DUCTWORK
L. SCHEMATICS
663s -0 210OV ",HPU-I I ' ;/= .. - \•
',
CC-LCP-3 ��
o CC-HPU-I �'� SF-I 1111 .1.
124V CONTROL FLOW SL-I
o -I. 6631 SWITCH U MIMI liii
.-.�OA
ill
j 12010V SF-1 o--o-- A TO LIGHTING CONTROL PANEL,
I SEE SHEET E-17 FOR CONTROL
— — 1�____20V ,_i SCHEMATICS 6631 AHU I 111111
FILTER ACCESS
NOTES: El
LP 6631 I. PROVIDE LOCAL DISCONNECT CC-LCP-I ® hal 6631 SF-I W/
240V "•AHU-1 , FILTER BOX
2 10 • FOR ALL HVAC EQUIPMENT. III IR
% C H EF-I ® RG-1 I� 6631 DH-I
O 2. SEE SHEET E-17 FOR VALVE FLOW
VAULT AIR FLOW SW INTEGRATION LP ": 6631 SWITCH 11 1 ® AHU
24V T-1 AND GO/NO GO LIGHTING. 120V{ EF-I 0-C--iATO LIGHTING CONTROL PANEL, IE `I f� CONDENSATE
oi 3. SEE SHEET E-I FOR ELECTRICAL �_ .LP { TSEE r 66T -17 FOR CONTROL IJeammmo DRA I N
aT 11111111111111 .111 :
a CONTROL ROOM 1 LEGEND. I 20V
* C=COOL, H=HEAT 4. COORDINATE INSTALLATION OF CC-LCP-2
.. 0 HVAC EQUIPMENT WITH
t u CONTROL ROOM PA ELRICAL LIGHTING CONTROL VALVE VAULT
0
SECTION
HVAC SCHEMAT I CS SCALE: 3/8"=1'-0" 9
it SCALE: NTS e
1
co
SHEET
- NOTICE - DES
DEAM SIGNED �' Qix `Wi - � M Smith&Assoaates Inc.
0 1� c 44 � f HVAC SCHEDULES, SECTION AND
DAK ����� a",.,, CleanWater Services
DRAWN it __i � Engineers/Planners SCHEMATICS M-4
Our commitment is clear.
a1 IF
MEASURBAR 1 DOES AS a ,,,,r„t,,. ,e _� 8 v 121 S.1.Salmon,Suite 900 PHONE 503-225-9010 RIVER TERRACE NORTH PUMP STATION
p, THEN DRAWING IS CHECKED Fd' • �A`�+ Portland,Oregon 97204 FAX 503-225-9022
a NOT TO SCALE, M now 6 AND FORCE MAIN PROJECT NO. 6e31 51 of 89
eNO. DATE BY REVISION RENEWS -31-15 PROJECT NO.: 14-1611.2041 SCALE: AS SHOWN'DATE: DECEMBER 2015