Loading...
Correspondence (4) Sherman Engineering, Inc. (503) 230-8876 Ph I 4 I 0 NW Kearney#5 17, Portland, OR 97209 (503) 226-4745 Fa.x MEMORANDUM //,(5 %?( 6 00)-�,3 c AO SW ee2✓r ( S7 TO: Mr. Peter Magaro, Architect ' 3s )- 10570 SW Citation Drive Beaverton, OR 97008 "1 Jl( 6 C --L, DATE: June 13, 2007 / q / 41 / yv FROM: Don P Sherman, PE Principal RE: Cedar Ridge plans Hillsboro, Oregon NOTE: This memo is to inform you of our recommendations for a clarification and a change to the original design. On our design we only show one holdown in corners with abutting shear walls because the design forces are required in one `direction at a time and one holdown may work for both directions. Make a note that the larger of the two holdowns must be used. • Also we understand a STHDI4 holdown has been misplaced. We recommend using a HTT22 in a epoxy setting per our detail RI. If you have any questions please give me a call. r, 44....e-r-1\9-c-N .1, A CC: Dean Grey @,Comcast.net EXPIRES:fa. File-Magaro06l 307.doc