Loading...
Correspondence (2) 1 ,.1412002 16:40 5032546761 ROWELL ENGINEERING PAGE 02/02 nd 4S.E. 102 UOWELA PUNEFERINg � DEAN �iaPORTLAND; OR. . 97216 — STRUCTURAL ENGINEERS PH: (503) 254-62s FAX: (503) 254-6761 /i4ST L , 00037 October 14, 2002 1 / SiLe. &V -k/r SUBJECT' Final Periodic Structural Observation Report PROJECT: Sageland Park 11-Plex JLS Homes City of Tigard Building Dept. In accordance with the provisions of the State of Oregon 1998 Structural Specialty Code, Section 1702, this letter has'been prepared to certify that, to the best of my knowledge, the work has been accomplished in accordance with the approved plans, specifications, approved change orders, and applicable workmanship provisions of the 1998 OSSC. The shop drawings of the steel frames, accomplished by royal Oak Metal Craft Inc. have been reviewed and found acceptable. Respectfully submitted, Todd Rowell PE c<0 PROFFs '- N �5���GI �9 -37 8367PE o / 7+ O OREGON , >+ CT 22,\"9-. EXPIl DEc. 311 a - .