July 24, 2002 1 [ $U'
PROJECT: Sageland Park Rowhouses
JLS Investments
SUBJECT: Mis Aligned Holdowns from Main Floor to Basement Level
•
Some of the holdown bolts specified to be installed in the front foundation of the
project rowhouses are not vertically in line with the holdowns from the main floor.
The mis-alignment of the bolt requires that the holdown stud be installed about
four inches out of plumb with the holdown stud on the main level.
. In order to provide load path continuity from the main level holdown to the
• foundation an additional stud is required to be fastened to the lower holdown
stud as shown in the enclosed bolted connection detail. A new 4x6 member and
a plywood filler are to be installed to re-align the holdown studs.
r � PRot •
'� tNFF9�b .
5.43eir A
" OREGON
1)7-7:22,N'3v
7. Ro •
EXPiREB:DEC.31. OZ
UY/LY/LV VL Ll.`FJ :JVJLJYOf Dl I\tJVYLLL 1-I 1C41l1L.LI\1I 1'1 1 P'1,AL VJ
Jl e, W 17M itricK-
.
• FlIk )4 • ag- 7/z4/0
HARM ft del_ , ��r•r.,. PRa
I ��. Ft
1 rr. r
i ir
'Skafte.P \ A �T22,1° \v
i • \
(6 am)
p(QIRS: DEG. 31, 02- I
f )
MMc Vt 1ek- 140 = 74604
Pfsti 4x10 J
� � , 4x«.75 !` = 2220
P tS9QD
ZZ?D 1( 1.33 ie 3 yrs = 8550#
_7,..-:-..-.7._—i-:-= 0800*7 74ceo" oic
t,
�___ =__,� (3� STs A7 3 o.c,
___________, yyLt
6
4466 ,L6/11._
__ E
......"_,_,L ,„,„„u,,... BO BA (ATTU-
_ - t
ROWELL ENGINEERING& DESIGN By_ 1P _Date 7 ,x(02.