Loading...
Report R00 i 13580 SW Galbreath Drive oofing Sherwood,Oregon,97140 everything your roof needs Tel : 503.227.ROOF Fax:503.625.0528 May 2, 2016 Mr. Ned McCall McCall Oil and Chemical Company 5480 NW Front Street Portland, Oregon 97210 RE: Tigard Allied Building Products Roofing, insulation and Sheet Metal Replacement located at 114440 SW Tiedemen Road Tigard, Oregon 97223 (Rev. 1 dated 5/19/2016). Dear Ned, As per the request of Ted Nisley of Allied Building Products, we have the following inspection and proposal for your consideration. General Scope 1 . Provide a pre-roofing conference with all necessary parties involved with this project. This would include the owner or owner's representative, Fisher Roofing project manager and site foreman, sub-contractors, tenant representative, building engineer, site manager and any others that are critical to a smooth and successful project. Our goal is to have a clear understanding of expectations and address any concerns before we begin. 2. The Fisher Roofing foreman assigned to this project will remain the foreman throughout the entire project. Contact information will be provided during the pre-roofing conference. 3. The site will be cleaned and free of debris on a daily basis and the roof system will be watertight at the end of the shift. 4. Roofing materials and equipment will be secured at all times whether on the ground or on the roof. 5. If so required, a portable toilet will be set onsite in an agreed upon location. It is our goal to remain outside the building interior as much as possible. 6. All OR-OSHA and or WISHA safety standards will be strictly adhered to including fall and ground protection. Ccs#4970 www.fisherroot.com 503.227.ROOF 503.227.7663 7. Upon request MSDS information will be provided for the products used and stored on this project. At anytime, MSDS information is always available through our main office. 8. Upon request we will provide our standard certificates of insurance. 9. Any dry rot or otherwise damaged decking or framing will be replaced on a time and materials basis (this includes the existing barrier board). Our standard rates are $75.00 per man hour and materials plus 20% markup on materials for overhead and profit. This will be invoiced in addition to the sum of the contract. Tear off Scope 1. Remove the existing roofing assembly down to the last removable layer and dispose of offsite in a legal manor. It may be unfeasible to remove the last layer of roofing when hot asphalt or adhesive has been installed directly to the decking or substrate. Prior to the project commencement, roofing core sample/s will be taken and analyzed for asbestos content. If the results of the testing are positive, special methods for removal and disposal may be required, which can affect the pricing below. 2. Any dry rotted or otherwise damaged decking or structure will be replaced on a time and materials basis as outlined above. 3. The dumpster or dump truck will receive cones and barrier tape to alert pedestrians and workers on the ground of possible hazards from the debris overhead. Tarps will be placed on the exterior walls for protection and if necessary, an enclosed trash chute will be installed. 4. We will not be responsible for cleanup of falling dust and debris inside the building. 5. Once the abandoned HVAC unit has been removed existing curb and install missing decking making the decking continuous and even. 6. Apply for and secure reroofing permit. Roofing, Insulation and Sheet Metal Scope 1 . Sweep or power blow substrate or barrier board clean in preparation for the new roofing system. 2. Office Roof area only; furnish and install a new 1/4" per foot gross slope 1 pcf tapered insulation system loose laid, followed by one layer of Densdeck fire rated protection board and mechanically attach to the wood substrate. 3. Warehouse roof area only; furnish and install one layer of Densdeck fir rated protection board and mechanically attached with threaded fasteners and 3" steel insulation plates. 4. The Entry Canopy: furnish and install one layer of 3.5" VERSICO EPS insulation and quarter diamond EPS cricket against the warehouse wall to divert the water to the south end and install a new leader head and downspout. Please note: The 3.5" insulation will completely cover the steel pipe framing which is a problematic condition. This also will create a smooth surface across the entire roof area and carry water along the back wall into a new leader head and downspout. 5. Furnish and install new wood nailers on the office roof and warehouse to accommodate the new insulation package. . 6. Build a new roofing curb for the existing condenser unit to remain. This will shift the load to the structure of the building and not rest on the roofing membrane as with the current condition. 7. Furnish and install new TPO base flashings on all roof curbs. 8. Furnish and install new base flashings at all walls up a minimum height of 8" or to the existing transition flashing. Seal the base flashing with compression sealant and fabricate and install new counter flashings over the base flashings. 9. Clean the existing drain bowl assembly in preparation for the new flashings. Please note: Any damaged or missing parts will be replaced on a time and materials basis. 10. Furnish and install new TPO roof drain flashings set in compression sealant. 11 . Furnish and install new factory TPO pipe boot flashings with new stainless steel clamping ring and caulking sealant. When factory boots cannot be installed, field fabricated flashings will be necessary. 12. Furnish and install new factory pitch pockets at line sets, flex conduits and small diameter pipes. When factory pitch pockets cannot be used we will fabricate and install custom clad sheet metal pocket as required. Prime and install factory pitch pocket filler. 13. Furnish and install new T-joint covers at all T joints as required by the manufacturer. 14. Fabricate and install new 26 ga. pre-painted baked enamel finished standing seam coping cap sheet metal flashings set in a continuous sheet metal face clip. 15. Fabricate and install new 26 ga. pre-painted sheet metal wall and curb counter flashings as required. 16. After probing all seams, furnish and install cut edge sealant on all exposed scrim edges. 17. Furnish and install two new walk pads located where a ladder would be placed to access or roof hatch location. Two will be installed between the eastside separation walls. 18. Furnish and install new metal access ladder mounted on the warehouse wall between the office and warehouse roofs 19. Upon completion clean up and haul away all related construction debris. 20. Upon completion and payment provide warranties as agreed upon in this contract including our 10-year workmanship warranty and the manufacturer's (VERSICO) 20-year No Dollar Limit Labor and Materials Warranty. r r VERSIWELD TPO Code Approval Guide Underwriters Laboratories FM Approvals January 2013 Versico P. 0. Box 1289, Carlisle, PA 17013-0925 Phone 800-992-7663 www.Versico.corn V E ROOFING SYSTEMS