Loading...
Plans VOELKER ENGINEERING INC. 1911 116th Avenue NE Bellevue, Washington 98004 425-451-4946 charlesOvoelkereng.com Joe SHEET NO. i 3 v(--il rot&e_w Gt)‘-t-ii-e--c4i , /• 1 ab:ULAN:2(2.SR LOT156156 cf. 12022.2 DATE 6/28/2016 I \a...N.1v \\.\-:,./. 1 4 I i iLF 1 Ib" I la" \ STEP gI 2 STIP C) NOTE: FOUNDATION HALL STEPS SUOMI FOR DESIGN INTENT. 0 i. A T-4" /14d4d9 4 r ACTUAL STEP HEIGHT I f. 4 AI er IS' LOCATIONS MAY VARY TO FIT 30x30x10 -o VW tote,. • 5Met 2 SITE CONDMONS.RETAINING (4)44 EN -.):— VI SM. e STEP WALL SCHEDULE PROVIDES 1 FLEXIBILITY TO FIT SITE .;?aulawnsummumuc c —1----- ? CONDITIONS dlIMUIP 101•11111.0111,41 , i I --- is I r I GARA6t' E LA 1 I' : I IS" m a STEP STEP 2 0 isi i- ? p k Ili ig ')Ailli I I 16" i,..:,.:aiiiiii, lb y STEP 1 IN i ''''1.a: ir STEP ilkT.O.N e 0'4" 6"x1.-5* ..10. . . N, (2)*4 ' 3 2 .. () Approx location of pipe through foundation stemwall ?-4. 1 ARA*41- 'PP4c' ELECT m METER ( in (1.) 0 G.) TOP OF 6ARA6E 5Llta 8* ..$ BELOW TOP OF HALSIM. 2: ? i I , , 6" s 3 I 2 I_Ai CONTINUOUSI A FOOTING 6', (2>: ' 5714° ....1 1. zi li:k4rD5 1 40 i — ...1 1 , 10_,,L 121 .7-6.x17-0N1*-5THICK FOOTING 00 4Y.Zi) gilt try ' EN (4)114 LONG 4 104015'O.G.SHORT 6 — ‘ f I 4* 0 S 4 Ark . 2 5/4" INSTALLATION OF OF PIPE IN WALL, CUT HORIZONTAL REBAR — APPROVED 6.ze- 6 6,,,,,,t ( li Ae, tcx nPfl .S:-.\•‘,"1 (; 1 N 4 "ce., Ad ci To hist 410) c- 0 0 is-so Izt 151 3 / 111P` 2 EGO N 0 't, 25 4 '-'S VO - EXI'lRES: 6/25/ 7