Report fil.797(/ -ctrI
824 SE 12th Avenue
l 3t" 0 16( a71- tit- S
Tel(503)616-9425 Eo CONSULT
Portland,Oregon 9721
16-94257214 FIELD OBSERVATION REPORT G- NORTHWEST
tS TS
www.gcnweb.com
PROJECT ID DATE REPORT NO.
1062 - Summit Ridge June 22, 2016 20
OWNER/CUENT OWNER/CUENT REPRESENTATIVE DAY OF WEEK PAGE
D R Horton (DRH) Don Durst Wednesday 1 of 1
GENERAL CONTRACTOR GENERAL CONTRACTOR REPRESENTATIVE ARRIVAL TIME DEPARTURE TIME
DHI Todd Kurilo 0730 0800
GRADING CONTRACTOR GRADING CONTRACTOR REPRESENTATIVE WEATHER/TEMPERATURE PERMIT
G-Cam Excavation Sergey Sunny, 60° F
TYPE OF WORK SOURCE AND DESCRIPTION OF FILL MATERIAL GCN REPRESENTATIVE
Subgrade NA Bob Pendell
LOCATION OF WORK CONTRACTORS EQUIPMENT OBSERVED IN USE
Lot 163
CONTRACTOR ACTIVITY,OBSERVATIONS,CONCLUSIONS,RECOMMENDATIONS:
I made this visit at the request of Don Durst to observe the excavated structural subgrade for lot 163. I used a Y2 inch
diameter steel foundation rod to probe footing subgrade.
During the probe I observed the structural subgrade to be very stiff soil and very dense rock.
In our opinion the building pad has been prepared in general accordance with our recommendations and will support
expected foundation for a single family home.
A Preliminary report is provided solely as evidence that the field observation was performed. Observations,and/or conclusions,and/or recommendations
FINAL [] PRELIMINARY conveyed in the final report may vary from and shall take precedence over those indicated in a preliminary report. A final report is an instrument of
professional service.Any conclusions drawn from this report should be discussed with and evaluated by the professional involved.
ITEMS TO OBSERVE,CHECK,OR TEST DURING NEXT VISIT
FIELD REPRESENTATIVE SIGNATURE DATE
Bob Pendell
GCN's professionals are represented on site solely to observe operations of the contractor identified,to form opinions about the adequacy of those operations,and to report those opinions to our client.
The presence and activities of our field representative do not relieve any contractor from its obligation to meet contractual requirements. We rely on the contractor to comply with the plans and
specifications throughout the duration of the proiect irrespective of the presence of our representative. The contractor retains sole responsibility for site safety and the methods.operations.and sequences.