Loading...
Report fil.797(/ -ctrI 824 SE 12th Avenue l 3t" 0 16( a71- tit- S Tel(503)616-9425 Eo CONSULT Portland,Oregon 9721 16-94257214 FIELD OBSERVATION REPORT G- NORTHWEST tS TS www.gcnweb.com PROJECT ID DATE REPORT NO. 1062 - Summit Ridge June 22, 2016 20 OWNER/CUENT OWNER/CUENT REPRESENTATIVE DAY OF WEEK PAGE D R Horton (DRH) Don Durst Wednesday 1 of 1 GENERAL CONTRACTOR GENERAL CONTRACTOR REPRESENTATIVE ARRIVAL TIME DEPARTURE TIME DHI Todd Kurilo 0730 0800 GRADING CONTRACTOR GRADING CONTRACTOR REPRESENTATIVE WEATHER/TEMPERATURE PERMIT G-Cam Excavation Sergey Sunny, 60° F TYPE OF WORK SOURCE AND DESCRIPTION OF FILL MATERIAL GCN REPRESENTATIVE Subgrade NA Bob Pendell LOCATION OF WORK CONTRACTORS EQUIPMENT OBSERVED IN USE Lot 163 CONTRACTOR ACTIVITY,OBSERVATIONS,CONCLUSIONS,RECOMMENDATIONS: I made this visit at the request of Don Durst to observe the excavated structural subgrade for lot 163. I used a Y2 inch diameter steel foundation rod to probe footing subgrade. During the probe I observed the structural subgrade to be very stiff soil and very dense rock. In our opinion the building pad has been prepared in general accordance with our recommendations and will support expected foundation for a single family home. A Preliminary report is provided solely as evidence that the field observation was performed. Observations,and/or conclusions,and/or recommendations FINAL [] PRELIMINARY conveyed in the final report may vary from and shall take precedence over those indicated in a preliminary report. A final report is an instrument of professional service.Any conclusions drawn from this report should be discussed with and evaluated by the professional involved. ITEMS TO OBSERVE,CHECK,OR TEST DURING NEXT VISIT FIELD REPRESENTATIVE SIGNATURE DATE Bob Pendell GCN's professionals are represented on site solely to observe operations of the contractor identified,to form opinions about the adequacy of those operations,and to report those opinions to our client. The presence and activities of our field representative do not relieve any contractor from its obligation to meet contractual requirements. We rely on the contractor to comply with the plans and specifications throughout the duration of the proiect irrespective of the presence of our representative. The contractor retains sole responsibility for site safety and the methods.operations.and sequences.