Loading...
Report (20) FILE COPY Yst-itocci - oc) JOB NAME: Alberta Rider ElementarySchool ` Ll�� St /3 2 City of Tigard JOB ADDRESS: SW 130th Ave. & SW Bull Mountain Road Building Department DATE: January 5, 2005 13125 SW Hall Blvd. SHEET 1 OF 5 Tigard, Oregon 97223 MCE Project# 041081 STRUCTURAL PLAN REVIEW#2 Plans and Revised Details Dated Dec. 20, 2004, Dec. 29, 2004 and Jan. 4, 2005 Building Permit BUP2004-00529 Item Page No. Comments Date No. Completed/Comments 1 S1.0 Structural Notes Clarify concrete strength and use for 12-29-04 Concrete specifications 3500 P.S.I. concrete 3300 2 S1.0 Structural Notes Clarify noted differences in lap lengths 12-22-04 (regarding Detail Reinforcing specifications 10/S6.3 only; others to 3300 follow). Completed 12-29-04 3 S1.0 Structural Notes, Clarify locations and reinforcing 12-29-04 reinforced brick masonry, spacing of areas which are brick or structural calculations, CMU. specifications 04210, 04220 4 S1.0 Structural notes Floor live load for library noted as 120 12-29-04 General Notes P.S.F. UBC Table 16-A notes 125 P.S.F. submit calculations, connections, details and footings with correct load. 5 Detail 10/S6.3 Submit calculations and details for 12-22-04 (with additional different types of retaining walls and information as provided by reinforcing steel laps, include retaining WDY, sheet SK101 dated wall at elevator. December 20, 2004). Completed 12-29-04 6 Details Submit calculations for anchor bolts 12-29-04 15/S6.1, 17/S6.1, 18/S6.1, including spacing. 20/S6.1, 4/S3.4, 5/S3.4 7 Details Submit calculations for footing designs. 12-29-04 A/S7.1, B/S7.1, C/S7.1, D/S7.1, E/S7.1 8 Details Submit calculations for loading 12-29-04 A/S2.1, B/S7.1, C/S7.1, combinations including lateral and D/S7.1, E/S7.1 vertical. 9 Calculations for lateral Forces and ties (sector A to Sector B) 12-29-04 (L1 through L 21) for lower floor are not consistent. 10 Details Submit calculations for anchors and 12-29-04 8/S3.4, 10/S6.2, 25/S6.2, bearing at different conditions. 26/S6.2, 27/S6.2, 3/S6.3, 12/S6.3, 13/S6.3, 15/S6.3, 7/S6.4, 23/S6.4, 24/S6.4, 27 & 27A/S6.4, 3/S6.5, 21 & 21A/S6.5, 20/S6.5, 2/S6.6, JOB NAME: Alberta Rider Elementary School City of Tigard JOB ADDRESS: SW 130th Ave. & SW Bull Mountain Road Building Department DATE: January 5, 2005 13125 SW Hall Blvd. SHEET 2 OF 5 MCE Project# 041081 Tigard, Oregon 97223 STRUCTURAL PLAN REVIEW#2 Plans and Revised Details Dated Dec. 20, 2004, Dec. 29, 2004 and Jan. 4, 2005 Building Permit BUP2004-00529 Item Page No. Comments Date No. Completed/Comments 12/S6.6, 13 & 13A/S6.6, 14/S6.6, 15/S6.6, 19/S6.6, 20/S6.6, 24/S6.6, 25/S6.6, 6/S6.8, 15/S6.8, 1/S6.9, 2/S6.9, 5/S6.9, 7/S6.9 and 11/S6.9 11 Detail 10/S3.4 Submit calculations and detail for two Not Used anchors. 12 Detail A/S4.1 Submit calculations and details for 12-29-04 reinforcing steel of vertical elements each side of openings between grids 5 to 6. 13 Detail D/S4.1 Submit calculations and details for 12-29-04 reinforcing steel vertical elements between grids 3 to 4. 14 Detail 11/S6.1 Submit calculations and details for top SK 117 reinforcing steel in concrete beam. 12-29-04 15 Detail 16/S6.1 Clarify length of base plate. 12-29-04 16 Details 14/S6.1 Submit calculations and details for 12-29-04 plate welded to steel column. 17 Details 21/S6.1, 22/S6.1, Submit calculations for columns and 12-29-04 27/S6.1, 28/S6.1, 29 pilasters, including lateral loading. A&B/S6.1 18 Details 14/S6.2, 21/S6.2, Submit completed details. 12-29-04 22/S6.2 19 Detail 11/S6.4 Clarify length of top plate. 12-29-04 20 Detail 23/S6.4 Clarify length of tab plate. 12-29-04 21 Detail 25/S6.4, 19/S6.5 and Clarify connections for end plate. 12-29-04 20/S6.5 JOB NAME: Alberta Rider Elementary School JOB ADDRESS: SW 130th Ave. & SW Bull Mountain Road City of Tigard Building Department DATE: January 5, 2005 SHEET 3 OF 5 13125 SW Hall Blvd. MCE Project# 041081 Tigard, Oregon 97223 STRUCTURAL PLAN REVIEW#2 Plans and Revised Details Dated Dec. 20, 2004, Dec. 29, 2004 and Jan. 4, 2005 Building Permit BUP2004-00529 Item Page No. Comments No. Date 22 Detail 13/S6.5, S3.3E and Clarify conflict of materials noted on Completed/Comments 12-29-04 S3.3W detail versus noted on plans. 23 Detail 12/S6.6 Submit calculations for vertical and 12-29-04 lateral load to masonry. 24 Detail 23A/S6.7 Clarify HSS weld to drag strut. 12-29-04 25 Detail 3/S6.9 Submit calculations for connection of 12-29-04 plate to vertical truss angle. 26 Drawing S3.2W Submit calculations for footings on grid 1-4-05 E at grids 4 and 5. 27 Drawing S3.3W Submit calculations and details for 1-4-05 canopy at grid A and grids 6 through 7. RJ13 - Cantilever deflection 28 Drawing S3.3E and S3.3W Submit calculations and loading for 12-30-04 trusses between grids 11 and 12 and grids B to H and between grids 7 and 8 and grids B to H. 29 Calculation sheets RF-2 RB16 noted in calculations but not on 12-27-04 and RF-8 plans. Clarify. 30 Calculation Sheet RF-5 RB-8 noted in calculations as W24x62. 12-27-04 noted on plans as W21 x57. Clarify. 31 Calculation sheet RF-6 RB-10 noted in calculations different 12-27-04 than beam noted on plans. Clarify. 32 Calculation sheet RF-7 RB-13 high and low beam span in 1-4-05 calculations shorter than noted on plan. Submit calculations. 33 Calculations sheet RF-9 Submit calculations for HSS 14x4x3/16 12-27-04 with cantilever loading. 34 Calculations sheet RF-9 RB-18 noted in calculations different 12-27-04 than channel noted on plans. Clarify. 35 Calculations sheet RF-10 RJ-2 noted in calculations different 12-27-04 than RJ-2 noted on plans. Clarify. JOB NAME: Alberta Rider Elementary School City of Tigard JOB ADDRESS: SW 130th Ave. & SW Bull Mountain Road Building Department DATE: January 5, 2005 13125 SW Hall Blvd. SHEET 4 OF 5 Tigard, Oregon 97223 MCE Project#041081 STRUCTURAL PLAN REVIEW#2 Plans and Revised Details Dated Dec. 20, 2004, Dec. 29, 2004 and Jan. 4, 2005 Building Permit BUP2004-00529 Item Page No. Comments Date No. Completed/Comments 36 Calculations sheet RF-11 RJ-5 noted in calculations different 12-30-04 (grids 3 to 4 and 4 to 5) than RJ-5 noted on plans. Submit calculations. 37 Calculations Sheet RF-15 RG-2 noted in calculations different 12-27-04 than RG-2 noted on plans. Submit calculations. 38 Calculations sheet FF-3 FJ-1 noted in calculations different than 12-27-04 FJ-1 noted on plans. Submit calculations. 39 Drawing S3.2 W Submit calculations for FJ-1 at exit 12-27-04 area grids 8 to 10 and grid L to M and grids 12 to 16 and grid L to M. 40 Calculations sheet FF-3 and FJ-2 and FB-1 at library. Submit 12-27-04 FF-4 calculations and details with 125 P.S.F. loading. 41 Calculations sheet FF-4 FJ-4 noted in calculations different than 12-27-04 FJ-4 noted on plans. Submit calculations. 42 Calculations sheet FF-5 FB-2 noted in calculations different 12-27-04 than FB-2 noted on plans. Submit calculations. 43 Calculations sheet FF-5 FB-3 submit calculation at exit area 12-27-04 grids 8 to 10 and grid L to M and grids 12 to 16 and grid L to M. 44 Calculations sheet FF-5 and FB-4, FB-5 and FB-6 noted in 12-27-04 FF-6 calculations different than noted on plans. 45 Calculations sheet FF-6 FB-8 noted in calculations has a 12-27-04 reduced live load. Submit calculations and details per section 1607.5. 46 Special Inspection Special inspection per section 1701 is Per the City throughout required for concrete, welding, construction reinforcing steel, bolting, adhesive anchors, expansion anchors, anchor bolts at braced frames, headed stud anchor, masonry and epoxy anchors. 47 Structural Observation Structural observation per section 1702 Per the City throughout is required for foundation reinforcing construction steel, masonry, structural steel erection, steel decking and braced JOB NAME: Alberta Rider Elementary School City of Tigard JOB ADDRESS: SW 130th Ave. & SW Bull Mountain Road Building Department DATE: January 5, 2005 13125 SW Hall Blvd. SHEET 5 OF 5 Tigard, Oregon 97223 MCE Project#041081 STRUCTURAL PLAN REVIEW#2 Plans and Revised Details Dated Dec. 20, 2004, Dec. 29, 2004 and Jan. 4, 2005 Building Permit BUP2004-00529 Item Page No. Comments Date No. Completed/Comments frames. 48 General Submit one set of reinforcing steel Per the City throughout shop drawings, which have been construction reviewed and initialed by Project Engineer, to be filed with the City of Tigard before placement. 49 General Submit one set of steel open-web joists Per the City throughout and girder shop drawings, which have construction been reviewed and initialed by Project Engineer, to be filed with the City of Tigard before placement. 50 General Submit one set of light gage metal Per the City throughout framing shop drawings, which have construction been reviewed and initialed by Project Engineer, to be filed with the City of Tigard before placement. 51 General Submit one set of steel decking shop Per the City throughout drawings, which have been reviewed construction and initialed by Project Engineer, to be filed with the City of Tigard before placement. 52 General Submit one set of stair framing shop Per the City throughout drawings, which have been reviewed construction and initialed by Project Engineer, to be filed with the City of Tigard before placement. 53 General Submit one set of miscellaneous steel Per the City throughout shop drawings, which have been construction reviewed and initialed by Project Engineer, to be filed with the City of Tigard before placement. 54 General Approved resolution of the above items Per the City throughout shall be incorporated into submittal construction plans before a permit will be issued. Submit four (4) sets of revised plans to the City of Tigard.