Loading...
Report /14,sr,2eM6-001,28 13 6/c 4_ Gtv‘t( v4/ t 824 SE 12th Avenue Portland,Oregon 97214 FIELD OBSERVATION REPORT CONSULTANTS Tel(503)616-9425 www.gcnweb.com PROJECT ID DATE REPORT NO. Summit Ridge June 16, 2016 19 OWNER/WENT OWNER/CLIENT REPRESENTATIVE DAY OF WEEK PAGE D R Horton (DRH) Don Durst Thursday 1 of 1 GENERAL CONTRACTOR GENERAL CONTRACTOR REPRESENTATIVE ARRIVAL TIME DEPARTURE TIME DHI Todd Kurilo 1230 1330 GRADING CONTRACTOR GRADING CONTRACTOR REPRESENTATIVE WEATHER/TEMPERATURE PERMIT G-Cam Excavation Sergey Heavy Rain, 60° F TYPE OF WORK SOURCE AND DESCRIPTION OF FILL MATERIAL GCN REPRESENTATIVE Subgrade NA Bob Pendell LOCATION OF WORK CONTRACTORS EQUIPMENT OBSERVED IN USE Lot 154 CONTRACTOR ACTIVITY,OBSERVATIONS,CONCLUSIONS,RECOMMENDATIONS: I made this visit at the request of Don Durst to observe the excavated structural subgrade for lot 154. I used a 14 inch diameter steel foundation rod to probe the upper and lower footing subgrade. During the probe I observed the structural subgrade to be very dense. In our opinion the building pad has been prepared in general accordance with our recommendations and will support expected foundation for a single family home. A Preliminary report is provided solely as evidence that the field observation was performed. Observations,and/or conclusions,and/or recommendations ® FINAL PRELIMINARY conveyed in the final report may vary from and shall take precedence over those indicated in a preliminary report. A final report is an instrument of professional service. Any conclusions drawn from this report should be discussed with and evaluated by the professional involved. ITEMS TO OBSERVE,CHECK,OR TEST DURING NEXT VISIT FIELD REPRESENTATIVE SIGNATURE DATE Bob Pendell GCN's professionals are represented on site solely to observe operations of the contractor identified,to form opinions about the adequacy of those operations,and to report those opinions to our dlent. The presence and activities of our field representative do not relieve any contractor from its obligation to meet contractual requirements. We rely on the contractor to comply with the plans and specifications throughout the duration of the project.irrespective of the presence of our representative.The contractor retains sole responsibility for site safety and the methods.operations.and sequences. 4 F S88'32'31"E 50.00' n x I, SHAUN P. FIDLER HEREBY CERTIFY THIS EXCAVATION STAKING ( / WAS PERFORMED ON 5/9/16 e/Y AND THAT THE STAKES WERE SET IN THE LOCATIONS SHOWN 39.60 ON THIS MAP AND MEET THE REQUIRED SETBACKS PER THE SITE PLAN PROVIDED BY THE CLIENT. 2520. REGISTERED W I M Q PROFESSIONAL . o ND SURVEYOR NI.Z JUORE2, 2005 N SHAUN P. FIDLER ` 50333 x'' 19.50' RENEWAL DATE DECEMBER 31, 2017 x x 610L 25,,,—— a,216 J C N Ole 24.67 le STAKEOUT _y R) 6'PUE 6'PUE 1 N6812'31"W 36.00' 143291 x LOT 154 SUMMIT RIDGE NO. 5 x435.20 SE 1/4 SEC 9, T2S, R1 W, W.M. TOM SW BLACK WALNUT ST CITY OF TIGARD . _ — _ _ _ A WASHINGTON COUNTY, OREGON ARPIL 30, 2016 — - DRAWN: RAR CHECKED: SPF SCALE 1"=20' ACCOUNT # 144 Y:\144-598\DWG\L154SR CMT SURVEYING AND CONSULTING NOTE: 9136 SE ST HELENS ST, SUITE J THIS DRAWING IS NOT INTENDED TO BE USED FOR PO BOX 3251 CLACKAMAS, OR 97015 THE PURPOSES OF A MORTGAGE LOAN INSPECTION PHONE (503) 850-4672 FAX (503) 850-4590 41111 0 0