Portland,Oregon 97214 FIELD OBSERVATION REPORT CONSULTANTS
Tel(503)616-9425
www.gcnweb.com
PROJECT ID DATE REPORT NO.
Summit Ridge June 16, 2016 19
OWNER/WENT OWNER/CLIENT REPRESENTATIVE DAY OF WEEK PAGE
D R Horton (DRH) Don Durst Thursday 1 of 1
GENERAL CONTRACTOR GENERAL CONTRACTOR REPRESENTATIVE ARRIVAL TIME DEPARTURE TIME
DHI Todd Kurilo 1230 1330
GRADING CONTRACTOR GRADING CONTRACTOR REPRESENTATIVE WEATHER/TEMPERATURE PERMIT
G-Cam Excavation Sergey Heavy Rain, 60° F
TYPE OF WORK SOURCE AND DESCRIPTION OF FILL MATERIAL GCN REPRESENTATIVE
Subgrade NA Bob Pendell
LOCATION OF WORK CONTRACTORS EQUIPMENT OBSERVED IN USE
Lot 154
CONTRACTOR ACTIVITY,OBSERVATIONS,CONCLUSIONS,RECOMMENDATIONS:
I made this visit at the request of Don Durst to observe the excavated structural subgrade for lot 154. I used a 14 inch
diameter steel foundation rod to probe the upper and lower footing subgrade.
During the probe I observed the structural subgrade to be very dense.
In our opinion the building pad has been prepared in general accordance with our recommendations and will support
expected foundation for a single family home.
A Preliminary report is provided solely as evidence that the field observation was performed. Observations,and/or conclusions,and/or recommendations
® FINAL PRELIMINARY conveyed in the final report may vary from and shall take precedence over those indicated in a preliminary report. A final report is an instrument of
professional service. Any conclusions drawn from this report should be discussed with and evaluated by the professional involved.
ITEMS TO OBSERVE,CHECK,OR TEST DURING NEXT VISIT
FIELD REPRESENTATIVE SIGNATURE DATE
Bob Pendell
GCN's professionals are represented on site solely to observe operations of the contractor identified,to form opinions about the adequacy of those operations,and to report those opinions to our dlent.
The presence and activities of our field representative do not relieve any contractor from its obligation to meet contractual requirements. We rely on the contractor to comply with the plans and
specifications throughout the duration of the project.irrespective of the presence of our representative.The contractor retains sole responsibility for site safety and the methods.operations.and sequences.
4
F S88'32'31"E 50.00' n
x I, SHAUN P. FIDLER HEREBY
CERTIFY THIS EXCAVATION STAKING
( / WAS PERFORMED ON 5/9/16
e/Y AND THAT THE STAKES WERE
SET IN THE LOCATIONS SHOWN
39.60 ON THIS MAP AND MEET THE
REQUIRED SETBACKS PER THE
SITE PLAN PROVIDED BY THE
CLIENT.
2520. REGISTERED
W I
M Q PROFESSIONAL
. o ND SURVEYOR
NI.Z JUORE2, 2005
N SHAUN P. FIDLER
` 50333
x'' 19.50' RENEWAL DATE DECEMBER 31, 2017
x x
610L 25,,,—— a,216
J
C N
Ole
24.67
le
STAKEOUT
_y R) 6'PUE 6'PUE
1 N6812'31"W 36.00' 143291 x LOT 154 SUMMIT RIDGE NO. 5
x435.20 SE 1/4 SEC 9, T2S, R1 W, W.M.
TOM
SW BLACK WALNUT ST CITY OF TIGARD
. _ — _ _ _ A WASHINGTON COUNTY, OREGON
ARPIL 30, 2016
— - DRAWN: RAR CHECKED: SPF
SCALE 1"=20' ACCOUNT # 144
Y:\144-598\DWG\L154SR
CMT SURVEYING AND CONSULTING
NOTE: 9136 SE ST HELENS ST, SUITE J
THIS DRAWING IS NOT INTENDED TO BE USED FOR PO BOX 3251
CLACKAMAS, OR 97015
THE PURPOSES OF A MORTGAGE LOAN INSPECTION PHONE (503) 850-4672 FAX (503) 850-4590
41111 0 0