Loading...
Report (53) 0N - I //4 J/( ^6-e)c{3L V3Vw- //C ��FOOSINFORMA?7oa1&48 ExwusTm NQDm GpNFIG MAX'HOOD HOOD WI TAG MODEL LENGTH COOKING TOTAL CONSTRUCTION END ROW TEMP. EXH.CFM WIDTH LEND HEIGHT DIA. CFM SP, END SS I F� ND-2 9'Q00' DKai 5424 ep 2025 10' 19' 4' 2025 -0.341' Where Exposed ALONE ALONE ' MOOD INFORMATION HOOD FILTE S) UO.ITTCS) CADINETSS) FIRE _ NQ TAG TYPE QTY.HEIGHT LENGTH EFFMICRONS 2 9 QTY. TYPE WIRE LOCATION SUE SWITCHES SYSTCMIM%'ING GUARII TYPE SIZE MODEL* QUANTITY PIPING WGHT 1 FUSIOSS Bafft`with Handles 8 30X 3 L55 Series E26 Na Riot 12'x54'x24' Ansut R102 3.0/L5 YES 415 ere OPTIONS LDS TAG OPTION BACKSPLASH 60.00' Filth X 120.00' Long 430 SS Vertical 1 KID FUSIQd RIGHT QUARTER END PANEL 23' Top Width, 0' Bottom Width, 23' WO430 SS .yA LEFT QUARTER END PANEL 23' Top With, 0' Bottom Width, 23' High 430 SS „°� '� i#„ � INSULATION FOR BACK OF HOOD 5 k . +' .1 * �� L s OPTIONS ONLY,BACKSPLASH 00.00' High X 120.0' Long 430 SS Vertical •'t 2 ADOBO OPTIONS ONLY,LEFT QUARTER END PANEL 23' Tap Width, 0' Batton Width, 23' High 430 SS 1' LAYER OF INSULATION FACTORY V1 'r u L !rj INSTALLED IN INTERNAL BACK STANDOFF. MEETS 0 INCH REQUIREMENTS FOR 12, �s "i' CLEARANCE TO COMBUSTIBLE SURFACES. ,ii1, Willi -Z4,44A' y;11 t ,4 1 `‘,,t....,.....,4 x - , :: 3' �i .... -y-- ..Field Cut 1 pi., 0' X 19' Exhaust Riser 54' U.L. Listed L55 Series E26 Canopy Light Fixture - High Temp Assembly 1.--9-_-• t01ty dd abine•. 9' 0.00'Nom./9' 0,00'OD — 12' -- 10`-0.00. Overall Length PLAN VIEW — Hood #1 (KOI FUSION) 9' 0.00" LONG 5424ND-2 . JOBKOI FUSION & ADOBO a (kr Portland, OR, 97214 � ' ' ` 024T! 5/2/2016 JOB ,#' 1548896 Mart* y Bre # 1 DR4IPN BY REV SOMA' 3/8' = 1'-0' 54' L55 SERIES E26 CANOPY LIGHT FIXTURE - FIELD CUT EXHAUST RISER HIGH TEMP ASSEMBLY, INCLUDES CLEAR THERMAL AND SHOCK RESISTANT GLOBE (L55 FIXTURE) HANGING ANGLE ►� !;4: HOOD TABLE 11111.- 20' SS BAFFLE WITH ■ n HANDLES AND HOOK l%�' 1' LAYER OF INSULATION FACTORY INSTALLED IN 3' INTERNAL STANDOFF. MEETS 0 INCH REQUIREMENTS FOR % 24' NOM. CLEARANCE TO COMBUSTIBLE SURFACES. IT IS THE RESPONSIBILITY OF THE ARCHITECT/OWNER TO ENSURE THAT THE HOOD CLEARANCE Or FROM LIMITED-COMBUSTIBLE AND COMBUSTIBLE MATERIALS IS IN COMPLIANCE WITH 23' LOCAL CODE REQUIREMENTS, GREASE ARAIN 48.0' MAX WITH REMOVABLE CUP 23' LEFT AND RIGHT QUARTER END PANELS BACKSPLASH 80.00' HIGH X 120.00' LONG 80' AFF REFERENCE BYUIPMENT BY OTHERS / 11 rr SECTION VIEW - MODEL 5424ND-2 HOOD - #1 (KOI FUSION) ✓OBKOI FUSION & ADOBO rr LOC4TION Portland, OR, 97214 .111/ 111 (�i���) - "` Lldrr' 5/2/2016 APB # 1548896 Y i„te; DFG / 2 DRAW BY Ram SCALA' 3/8' = 1'-0' 'ST FAN INFORMATION — Job#1641'896 0. •NR TAG FAN UNIT MODEL # CFM ESP. RPM H.P. B.H.P. 0 VOLT FLA WIGHT SONES 1 KM FUSION EF NCA16HPFA 2025 1.100 U13 L000 06790 1 208 4.9 157 10.5 MUA FAN INFORMATION — Job#1548896 FAN IMIT TAG FAN UNIT MODEL I BLOWER HOUSING CFM ESP. RPM HP. B.H.P. 0 VOLT FLA tW BGHT s.) SONES 2 KOI FUSION MAU Al-G10 Gil Al 1924 0.750 908 1.000 0.5950 1 208 4.9 267 18.7 FAN OPTIONS FAN UNIT TAG OPTION(Qty. -Descr.) Na - 1 1031 FUSION EFI -Grease Box 1 - Extra Set of Belts 2 KO[FUSION MAU 1 -Extra Set of Belts 1 -Motorized Backdroft Dapper for Size 1 Housing FAN ACCESSORIES FAN EXHAUST SUPPLY UNIT TAG Na. GREASE GRAVITY WALL SIDE GRAVITY MOTORIZED WALL CUP DAMPER MOUNT DISCHARGE DAMPER DAMPER MOUNT 1 KM FUSION EF YES 2 KM FUSION MAU YES "MB ASSEMBLIES NO. FSM WEIGHT ITEM SIZE 1 *1 41 LBS Curb -26.500'V x 26.500'. x 20.00014 Vented Hinged 2 # 2 29 LBS Curb 2L000'W x 21.000'L x 2011 3_ 50 LBS Curb 32500'W x 32.5001. x 20.00014 Vented Hinged FAN #1 NCAI6HPFA — EXHAUST FAN <KIl FUSION EF) 3ie FEATURES' i/2' 39 41P /- MO NNTED FANS -MESIASANT NODE.-AM® DA VENTED - -AMCA Sa1N0 AND AIR CERTIFIED CURB ni -v1RrNG FROM Marv:rD nIscvtEct sWm3Mend -WEAHIGH HEAT CP DISCONECT20' j� ^ �~- -HER NEAT 8 MATIIN 300'F tl49'C) ,b(//S-GREASE Q.ASIIFICATIDH TESTDMG TEST .� 20 GAUGE STEEL 33 3/4 '�,' I ,,_' 5/e EXHAUST F I T OPERATE C ITINUCUSLY CONSTRUCTION ",�„� LWTILMALE FAIL P AIR AT RE 0491D LNTIL AU.FAN PARTS HAVE REACHED THERMAL cam mons AND WITHM ANY 11II__-' DETERIORATING EFFECTS TO WOULD CAUSE UNSAFE THE WHiCFI J `"` ..`` 3'FLANGE EXHAUST FAN N1ST OPERATE CONTBAIWSLY ABNORMAL FLARE-LP TEST ��A ROOF OPENING a ' AT 608,F WHILE EXHAUSTING A GREASE VAPORS 24 �/ 24 DIMENSIONS 15!CHUTES WITHOUT TIE FAN DECIOWO1 16 Ire DAMAGED TO ANY EXTENT THAT COAD CAUSE _ e4 AN UNSAFEtXIBRTIQt I ' OPTIONS GREASE BOX L .^ /`.J EXTRA SET OF BELTS DUCTWORK BETWEEN EXHAUST RISER 104 HOOD AND FAN MY OTHERS) JOBKOI FUSION & ADOBO �!�i - LOCATION Portland, OR, 97214 (� / F��� 4 0 .17 Are 5/2/2016 JOB 1548896 o\ a� k '44 -" ,Ri.r DAChe7 BRA IFN BY R5'V SOWS 3/8' = 1'-0' FAN#AI-G10 - SUPPLY FAN (KCI FUSION MAU) CURB*3 CADGED CRD32.5X20E r*UNTEMPERED SUPPLY UNIT WITH 10' BLOWER IN SIZE #1 HOUSING OFT , 2. INTAKE HOOD WITH EZ FILTERS -ATTACHED RIMED BASE 3. DOWN DISCHARGE - AIR FLOW RIGHT -} LEFT 4, EXTRA SET OF V-BELTS, ONLY TO BE ORDERED AS FAN OPTION AT TIME FAN IS ORDERED, 5. MOTORIZED BACK DRAFT DAMPER 16' X 18', STANDARD GALVANIZED CONSTRUCTION, 1 1/4' REAR FLANGE, WITH MS4104F MOTOR, WALL SUPPLY MOUNT, FOR SIZE 1 UNTEMPERED FAN HOUSING (5191) BLOVER DISCHARGE CURB 324110.0„ VENTED 1 3/4' �. • Cts r -1 -- 2a' „ 13 1/4' I I I I �.�` S:G 7RUCTIQ4 E1� I I 11 ., GAUGE 3 7/8' EL 3' FLANGE FLEX CONDUIT FOR FIELD VIRING 27 3/8'--- 76 1/2' 32 1/8' LIFTING LUG q---.---p _- — 1 - AIRFLOW -- Ili rDISCW6ECT SERVICE AD�.��'LOW 29 3/4' SWITCH BLOWER/NOM ACCESS DOOR 00 24' SERVICE 3 ' F � 16 1/4' 20' EQUIPMENT CURB I-�_�� f 21'—I I---21' ROOF OPENING 2' SMALLER THAN CURB DIMENSION. ✓OBKOI FUSION & ADOBO .r : _ LOCATYON Portland, OR, 97214 TT!!I' ���` ` DATA' 5/2/2016 .19087 OB 1548896 a �1I aI '_ ^"", DIM II8 DR FNBY REV SCALE' 3/8' = i'-0' ft FastWrEtr,+ ilk ThermaCeramics Commercial Kitchen Grease a Duct FIR410,fra Air Ventilation Duct '"-"' Fire Protection Systems Product Data and installation Guide op a?, ,-: 0 0.00...- (r4) ALA 1 a , `5''' (7) artiTa* ►i;,iia n„ ^ ?ol z , NFPA 96 IMC „ a `'. , 3 1 i' 1,Product Description-New and Improved FastWrap+ Thermal'Ceramics new and improved FireMaster FastWrap+ 1�,;iii 1 .,, one-layer, totally foil-encapsulated, non-combustible 2000°F (1093°C)rated,low biopersistence,flexible fireproofing wrap specif- 3.Physical Characteristics ically tested to provide a 1 or 2 hour fire rated enclosure for hori- FireMaster Product Unit Size tlnits!'Wtl zontal and vertical commercial kitchen grease and air ventilation Ctn. Ctn. ducts. The core blanket chemistry is alkaline-earth silicate wool free ” of binders and lubricants. FastWrap+is classified Omega Point FastWrap+ Roll 1Wxm4 x81 1 kg)s, by g (38.1 mm x e?�mm x 7.6 m) (17 Laboratories and Underwriter's Laboratories Listing and Follow-up Fastwrap+ Roll 1112"x 48"x 25' 1 75 lbs. Service Program to ensure uniform thickness and density speciifica- (38.1 mm x 1.2 m x 7.6 m) (34 kg) tions, thus providing consistency in end physical properties for FastWrap+Collar Roll 13x"x 6"x 25' 4 53 lbs. required fire ratings. FastWrap+ is a proven performance alterna- (38.1 mm x 152 mm x 7.6 m) (24 kg) tive through extensive testing to 1 or 2 hour fire-resistance rated Color White blanket with silver foil encapsulation shaft enclosures. With its excellent insulating capability of with- standing fire condition temperatures up to 2000°F (1093°C),it pro- 4.Specifications tects combustible constructions at zero clearance throughout the This specification guide covers the application of Thermal Ceramic entire enclosure system. When the duct penetrates fire rated walls FireMaster FastWrap+and An approved silicone firestop sealant. and floors, art approved silicone firestop sealant used in combina- tion with FastWrap+ provides an alternate means of protection to Application Fire Enclosure System Through. rigid shafts by maintaining the integrity of the 1 or 2 hour tire rated pP wall and floor assembly. FireMaster FastWrap+is resistant to mold Resistive i yste atlotr growth in test conditions of 75-95% relative humidity (ASTM Rating System enetD6329). Grease Ducts 1 or 2 1 layer,i FastWrap+,perimeter OPT FS 587F hours and longitudinal overlap 3°(75 mm), UL C-AJ-7098 Product Features GD 544 F,GD 562 F,UL G-14 •One-layer system with 3 optional installation techniques Air Ducts 2 hours 1 layer,"1% FastWrap+,perimeter 0-M-7095, •Low biopersistent insulation blanket and longitudinal overlap 3" UL-W-L-7121 •Does not contain low temperature fiberglass or mineral wool (75 mm),UL V-19 UL-F-C-7036 •Shaft alternative to rigid board systems •Zero clearance to combustibles protection throughout the entire 5.Performance enclosure system A.Thermal Ceramics FireMaster FastWrapf •Lightweight,flexible wrap saves labor Rammabtlity(ASTM#84fUL 723) •Passive fire proof material does not shrink,become brittle,or Foil: Flame spread 5 lose fire fighting capabilities with age Smoke developed 10 •Totally foil encapsulated system protects against material degra- Blanket: Flame spread 0 dation,and potential fire hazards Smoke developed 0 •Product markings on foil ensure proper material identification for Thermal Resistance R value per ASTM C 51 easy inspections 4.15 per inch at 70°F(21°C) •Wide variety of through-penetration systems •Resistant to mold growth B.Fire Stop Sealants 2.Applications Tremas Inc. pyre Sit sealant or Fyre-Sil SA •1 or 2 Hour Commercial Kitchen Grease Duct Enclosure Sealant(for floor assembiies •1 or 2 Hour Air Ventilation Duct Enclosure only) Specified Technologies Inc. Penal 300 Rectoseal 835+Sealant HILTI Construction Chemicals, FS One eatant Division of HILTI Inc. a ,- exposed alternate with blankets with covered edges,as shown in Agency , Reference Standard/file No Figures 1 and 3. The visible edges of the longitudinal Overlaps alternate their directions and appear on every other blanket Omega Point Laboratories,Inc."Listing#11660-3 . Underwriters Laboratory Grease Duct Enclosures(YYET): R14229;Fire Resistive Ventilation Duct •Butt Joint&Collar System-Adjacent blankets are butted tight_ ly together and a 6" (152 mm) wide collar of FireMaster Assemblies(HMI):V-19;Through- Penetration FireStop System(XHEZ): FastWrap+is centered over the joint,overlapping each blanket by : : C-AJ-7095,C-AJ-7098 3" (75 mm)as shown in Figures 1 and 3. NFPA Complies with NFPA 96,2001 Edition •2&3 Sided Enclosure System When space does not allow for International Mechanical Code Section 506.10.3 Commercial Kitchen full wrap enclosure on all four sides of the duct, the FireMaster Grease Ducts and Exhaust Equipment, FastWrap+ may be installed on 2 or 3 sides of the duct and Section 507 Commercial Kitchen Hoods, mechanically attached to a concrete or CMU assembly on the 2003 Edition unexposed side of the duct. New York MEA 412-02-M,413-02-M International Code Council SBCCIGeneral: Legacy Report No.9424E To minimize waste, FireMaster material should be relied out tautly SOCA Legacy Report No.22.25 before measuring.Cut edges of the blanket shalt be taped with alu- City of Los Angeles RR8425 minum foil tape to prevent exposed edges of the insulation from California State Fire Marshal '2440-1361:103 wicking moisture from condensation or grease from a compromised 2440-1361:105 leaking duct joint into the material and causing degradation of the 6.installation fire barrier. The FireMaster FastWrap+ material may be installed A qualified contractor in accordance with manufacturer's instruc- with either a mechanical banding system or insulation pins and clips tions and referenced standards shall install the new or original (see Mechanical Attachment Methods below and Figures 1 and 3). FireMaster FastWrap+ system using the installation methods as When using the banding technique,caution shall be taken to ensure described in sections A-D. See Figures 1 - 4 complete drawing that the bands are not fitted too snug as which could result in cut- details. ting into the blanket. To prevent blanket sag on ducts with dimen- Materials and Equipment: sions greater than or equal to 24" (600 mm), insulation puts, long pment; enough to extend through the layers of blanket insulation,are weld- FireMaster FastWrap+ blanket, 11/2" (38.1 mm) thick, 6 pcf (96 ed to the duct in columns spaced 12" (305 mm)apart, between 6" kg/m?),24"(600 mm),or 48"(1.2 m)wide,and 25'(7.6 m)long rolls; and 12"(152 and 305 mm)from each edge and 10W"(267 mm)on optional 6"wide x 20'long(150 mm x 6 m)rolls center along the bottom horizontal and outside vertical duct runs. •FireMaster FastWrap+;25' (7.6 m)standard length,48" (1220 Insulation pins that extend beyond the blanket wrap shall be tuned mm)wide blanket helps to minimize waste down to eliminate sharppoints. •Aluminum foil tape Support hanger systems do not •Aluminum tape mm)wide filament tapeneed to be wrapped provided that the steel hanger rods are at least' {optional) a minimum of 9/e" (9.5 mm)diameter and the steel.angle is a mini •Carbon steel or stainless steel banding material, minimum Y2" mum of 11"x 11/2"x'/s" (38 mm x 38 mm x 3.2 mm), or SMACNA (12.5 mm)wide,minimum 0.015" (0.38 mm)thick,with steel equivalent support system(SMACNA band stra su banding clips p pport systems •Hand banding tensioner and crimping tool do not apply). Horizontal trapeze support systems may be incorpo- •Minimum 12 gage steel insulation pins;galvanized steel speed rated into the wrap enclosure. clips,minimum 1W (38 mm)x 11/2" (38 mm)square or 11"die. A. Overlap Wrap Telescope Installation (38 mm),or equivalent sized cup-head pins;capacitor discharge FireMaster FastWrap+commercial kitchen grease or air ventilation stud gun duct 1 or 2 hour enclosure includes a one-layer wrap construction •Access door hardware:four galvanized steel threaded rods, 1/4" applied directly to all surfaces of the duct (Figures 1 and 3). The with Ya" FireMaster FastWrap+blanket is wrapped one layer t� "(38.1 mrn) diameter(6.35 mm)by 41/"to 5" long (114 to 127 mm) (6.35 mm)wing nuts and'/a" (635 mm)washers;4" (102 mm) or 2" (50 mm)thick around the perimeter of the duct with a length long steel tubing to fit threaded rods cut to provide enough excess to overlap itself not less than 3" (75 •An approved silicone firestop sealant mm). Adjacent blankets are placed to overlap the previous blanket not less than 3" (75 mm). The overlap made by adjacent blankets Storage: forms the"longitudinal"overlap. The overlap a blanket makes with The FireMaster FastWrap+ and an approved silicone firestop itself is called the"perimeter"overlap.The wrap layer may be held sealant must be stored in a dry warehouse environment on pallets. temporarily in place with filament tape 1%"(38 mm)from each blan Pallets should not be stacked. ket edge and in the center of the blanket until the mechanical band PsraratorY Work: ing or pinning and clip attachment method is secured. FireMaster FastWrap+ is installed with common tools, such as B.Checkerboard Wrap Installation knives, benders and capacitor discharge guns for applying insula- FireMaster FastWrap+is cut to completely wrap around the perime- tion pins. In order to install the duct fire stop system, the surfaces ter of the duct with enough excess to provide an overlap of not less of all openings and penetrating items need to be clean, dry, frost than 3" (75 mm)(Figures 1 and 3). The blankets with both edges free,and free of dust. exposed alternate with blankets with covered edges as shown in Installation techniques for Thermal Ceramics FireMaster Figures 1 and 3. The visible edges of the longitudinal overlaps alter- FastWrap+(Figures 1 and 3): nate their directions and appear on every other blanket. A 3" (75 mm) longitudinal overlap is installed onto the previous adjacent •3" (75 mm)Overlap Wrap Telescope - Each blanket overlaps wrap forming a "checkerboard" construction. The wrap layer may one adjacent blanket, and each blanket has one edge exposed be held temporarily in place with filament tape 11/2" (38 mm)from and one edge covered by the next blanket as shown in Figures 1 each blanket edge and in the center of the blanket until the mechan- and 3.The visible edges of the longitudinal overlaps all point in 'cal banding or pinning and clip attachment method is secured. the same direction. •Overlap Checkerboard Pattern - Blankets with both edges C.Butt Joint I Collar Installation of an approved silicone firestop sealant into the opening to the ,FireMaster FastWrap+is installed in a single layer directly to the recess around the top surface of the floor or wall through- ' duct with a tight butt joint construction (Figures 1 and 3).The penetration opening. FireMaster FastWrap+ material may be held in place with fila- Grease Duct Access Door installation ment glass tape 11/2"(38 mm)from each blanket edge and in the Four galvanized steel threaded rods, W'diameter(6.35 mm)by 4,••••••‘ center of the blanket temporarily until the mechanical banding or 4,�"to 5"long{114 to 125 mm)are welded to the duct at the cor- pinnng and clip attachment method is secured. A B" (152 mm) nem of the door opening. Four 5" (125 mm)long 12 gage insu- wide FireMaster FastWrap+ Coiiar is centered over the joints lation pins are welded to the door panel for installation of the overlapping on each side of the blanket joint 3" (75 mm). blanket. Two layers of FireMastterFastWrap+are installed on the D. 2&3 Sided Wrap System door. The first layer Is cut and placed on the pins and over the When space does not allow for a complete wrap applied to the access opening with a 1/2" (13 mm)overlap. When the door is duct on all four sides,the FireMaster FastWrap+can be installed installed, this first layer is compresses and fitted against the in a single layer on the 2 or 3 sides of the unexposed duct and wrap surrounding the door opening to form a tight butt joint. The mechanically attached to a concrete or CMU assembly. The second layer is centered over the first piece so that a minimum FireMaster FastWrap+ is installed on the duct as described in 1" (25 mm)overlap exists around the perimeter. it is essential one of the three installation methods described above with the that this layer fit tightly against the wrap surrounding the access starting edge of the blanket attached to the concrete or CMU door opening with no through openings. The second layer is assembly and then wrapped around the duct until the other end impaled over the pins and both layers are locked in place with can be affixed to the other concrete or CMU assembly, thus speed clips. Pins that extend beyond the, outer layer of encapsulating the duct with insulation around all accessible FireMaster FastWrap+ shall be turned down to avoid sharp sides. The blanket is to flange out onto the concrete or CMU points on the door. assembly. it should be secured to the adjoining assembly with The insulated door panel and the steel tubes are placed over the minimum Vie (4.7 mm) diameter, 4" (100 mm) long concrete threaded rods and held in place with washers and wing nuts. anchors,footed to a minimum 1'/z" (38 mm)wide x 91,s" (4.7 mm) The steel tubes hold the door to the duct and protect the wrap thick steel strip/strap with pre-drilled holes spaced a maximum from damage as the door is removed. Alternatively, insulated 10" (254 mm)on center. The FireMaster FastWrap+ insulation pre-fabricated access doors are available from FireMaster deaf- wrap is secured to the duct with banding (see Mechanical ers See the Thermal Ceramics FireMaster FastWrap+Design Attachment Methods for insulation Wrap section below or and Installation Manual for complete installation and drawing Figures 1 and 3). The ends of the banding are to loop into the details. steel strips/straps that foot the blanket to the concrete floor or wall,and are tightened down. The trapeze support system may 7.Maintenance be incorporated within the wrap system. No maintenance is required when installed in accordance with Thermal Ceramics installation instructions.Once installed,if any , ., Mechanical Attachment Methods for insulation Wrap section that is greater that 8"x 8" is damaged or it the overlap 1.Banding-'/z" (127 mm)wide carbon steel or stainless steel area is damaged,the following procedures will apply: banding, 0.015 (0.376 mm)thick, is placed around the entire •The damaged section should be removed by cutting the steel perimeter of the insulated duct with maximum 10W (267 mm) banding or removing the clips holding it in place spacing centers and 11/2" (38 mm)from each blanket edge or 1" •A new section of the same dimension should be cut from a (25 mm)from each collar edge when using the butt joint and col- roll of FireMaster FastWrap+,either 24" (610 mm)or 48" lar method. When banding, filament tape can be used to tern- (1220 mm)wide.Cut edges of the blanket shall be taped to porarily hold the blanket in place until the banding is applied. prevent exposed edges of the insulation from wicking The banding is placed around the material and tightened so as moisture or grease Into the material and degradation of the to firmly hold the FireMaster FastWrap+ in place against the fire barrier duct,but not cause any cutting or damage to the blanket. •The new section should be placed per Thermal Ceramics 2.Pinning-Min.12 gage,5"long(125 mm)steel insulation pins manufacturer's installation Instructions ensuring the same are welded to the duct at all blanket overlap locations (see overlap that existed previously Figures 1 and 3)spaced in rows max.101e (267 mm)on center •The steel banding should be placed around the material and and maximum 8" (200 mm)apart. An insulation pin is located tensioned so as to sufficiently hold the FireMaster in the middle of the perimeter overlap and center spaced FastWrap+in place without cutting the blanket between the pins. Pins are locked into place with 11 " (38 mm) •If the blanket has not been damaged but the foil has ripped, diameter square or round, galvanized steel, speed clips or cup seal the opening with aluminum foil tape head pins. Pins that extend beyond outer blanket wrap layer For damaged areas less than or equal to 8"X.8"the following shall be turned down to eliminate sharp edges or the excess procedure may be used. length cut off. •The damaged section should be removed by cutting out a square or rectangular that includes the damaged area and NOTE: Pinning is required for ducts larger than 24"x 48". does not exceed 8"in width or length. Through-Penetration Firestop System •A repair section should be cut from a section of FireMaster When the duct penetrates a concrete or drywall fire rated wall, FastWrap+that is 1"wider and 1"longer than the damaged ceiling,or floor,an approved fire stop system must be employed. area that has been removed. Cut edges of the blanket shall (Figures 2 and 4). FireMaster FastWrap+ approved through be taped to prevent the exposed edges of the insulation from ;. penetration fire stop systems are listed in Section 4, wicking moisture or grease into the material. Specifications. •A single min.12 Gauge insulation pin min.3"long should be welded to the grease duct in the center of the repair area. To fire stop the through penetration void area, cut strips of (Note:Cup head pins may also be used.) FireMaster FastWrap+4112" (106 mm)wide and as long as the opening and install at a minimum 50%compression. install the strips so that they are recessed 14" (6.35 mm)from the top sur- face of the wall or floor. Install a minimum 14" (6.35 mm)depth •The repair section is to be centered on the opening and *Minimum 3/a" (9 mm)diameter all thread steel rods do not impaled upon the insulation pins.All overlaps should be have to be insulated tucked into the repair opening to provide a tight fitting joint. •Horizontal support members may be incorporated into the insulation is held in place with a 11/2"square or round galea- enclosure wrap nized or stainless steel speed clip or a minimum 1"diameter •The integrity of FireMaster FastWrap+system is limited to cup head pin.The excess portion of the pin shall be cut off the quality of the installation and/or turned down to eliminate sharp edges. 'For personal protective equipment recommendations as the MSDS, •The joint should be sealed using aluminum foil tape. Thema]Ceramics a a trademark of Morgan crucible Company plc. FireMasterand FastWrap are trademarks of Thermal Ceramics Inc.Feallerap products are manufactured by S.Limitations Thermal Ceramics Inc.fkeMasror Duct Systems are distributed by authorized thetribotars •FireMaster FastWrap+shall be installed in accordance with mrd no longer by 3M. Thermal Ceramics-Installation instructions Domed and FyreSiiare tradenames ofDemon inc. •Multiple steel ducts in a single FireMaster FastWrap+enclo- PensiL a t ate R.$ro, ET rles Mn. sure system are not permitted for commercial kitchen grease Fs one isa traderrame ofH/tnfnc. ducts.Multiple steel ducts in a single enclosure are permitted for air ventilation ducts Special Note: •Grease Duct Sizes>24"x48" (600 mm x 1200 mm)insula- The original FlreMaster FastWrap+ 2" technical tion is attached using steel pins data and installation sheet is still available elec- •Air Ducts:when maximum duct size dimensions are greater tronicaily at www.thermmaiceramics.com inthe data than 84 x 21" (2100 mm x 525 mm)in cross section, rein- sheets section. force the duct with steel angles sufficient to support the total weight of the duct assembly and the FireMaster FastWrap+ enclosure 4,_i.r') �f ler'i t aI creram ics Ft iti(078? Fire Protection Systems New and improved FireMaster 1'P' ...---,.., FastWrap+Commercial Kitchen Grease or Air Ventilation Duct „`:'''N 1 or 2 Hour Shaft Alternative 0 `r► �, ,1/401,-‘,,Zero Clearance to Combustibles / ‘.--. 0se” Q �,, Q 1111V- 11I „•::.. ternate PinniAl Technique 4111 ,•: — .,' Grease Ducts Oniy: • ,�' \1 ,,,o.„,o.. In Cross Section *Ivo, ; „, �*. Pinning Technique v� ,.•\,\ o. Required. \ ' 0 \ 0 yr_, i,rr 0 \.: /' Butt Joint Option 0 0 / ”' Cross Section View OPL Design No.130 544 F and GD 562 F Figure 1 ``; DI Design No.G-14 and V-19 Drawing No,FMFW1.5001-1Q Q 1 One layer FireMaster FastWrap+1Vz"thick a- '- , it , r 2 Steel banding lz"wide minimum � � ..••"L" 3 3"minimum longitudinal overlap 111111111111111111MMININIM 4 3"minimum perimeter overlap Overlap Wrap Option 5 6"wide FastWrap+collar(for Butt Joint option) 0 Cross Section View pmts.« 6 Firmly butted joint(for Butt Joint option) 7 1001'12 gauge steel insulation pin with VA"x 11/2"or 11/2" r ._■r diameter galvanized speed clips(for alternate pinning) aa. Note:The Integrity of FireMester Duct Systems is limited to Checkerboard Wrap Option the quality of the installation. Section View Ilf/27/1 Air Handling Systems ohns Manville� 4 `.4 Linacoustic® RC Fiber Glass Duct liner with Reinforced Coating System MAY 3 1201 a,2: ' `V OFTI(;Atill Description i i M Linacoustic RC insulation is a flexible duc mer ma a from strong glass fibers bonded with a thermosetting resin.The airstream surface is protected with JM's exclusive Reinforced Coating system,which combines our state-of-the-art Permacote' coating with aflexible _ � , glass mat reinforcement to provide a smooth airstream surface. �; x, � t Fautuey""Applied fudge Coating Edge coating is factory applied to the edges of the liner core,ensuring coverage of the leading edges per NAIMA/SMACNA requirements.Shop fabrication cuts maybe coated with SuperSeafe edge treatment(refer to publication AHS-202). * - rt U:•us Linacoustic RC insulation is specifically designed for lining sheet metal ducts in air conditioning,heating and ventilating systems,providingt'sv=fat {ti>. superior acoustical and thermal performance. Improves indoor Building Environment.Linacoustic RC duct liner improves indoor environmental quality by helping to control both General Properties temperature and sound. Operating temperature{max.)—ASTM C411 250°F(121°C) Resistant to Dust and Dirt.The tough acrylic polymer Permacote coating Air velocity(max.)—ASTM C1071 6,000 fpm(30.5 mjsec) helps guard against the incursion of dust or dirt into the substrate, Water repellency—INDA 1ST 80.6 �6 minimizing the potential for biological growth. Fungi resistance—ASTM C1338 Does not breed or promote Fungi resistance—ASTM G21 No growth Wilt Net Support Microbial Growth.Permacote coating is formulated Bacteria resistance—ASTM G22 No growth with an immobilized EPA-registered protective agent to protect the coating from potential growth of fungi and bacteria. 'Standard Thicknesses aro)Par;liaging Thickness Roll Length Roll Widths for Linacoustic RC duct liner meets all requirements for fungi and bacterial 9resistance.Tests were conducted in accordance with ASTM C1338 and in mm lineal feet lineal meters in mm ASTM 621(fungi testing)and ASTM G22(bacteria resistance testing), %z 13 100,150,200 31,46,61 34 to 36 864 to 914 Detailed information is available in Johns Manville fact sheet HSE-103FS. 1 25 50,100,150,200 15,31,46,61 44 to 48 1118 to 1219 Note:As with any type of surface,microbial growth may occur in 11/2 38 50,100 15,31 56 to 60 1422 to 1524 accumulated duct system dirt,given certain conditions.This risk is minimized with proper design,filtration,maintenance and operation of 2 51 50 15 66 to 72 1676 to 1829 the HVAC system. "Availatrtern34^(6.4mm)increment Cleanability.If HVAC system cleaning is required,the Reinforced Coating Contact your Regional Sales Office for stock items and availability of airstream surface may be cleaned with industry-recognized dry methods. special sizes. See the North American Insulation Manufacturers Association(NAIMA) is faro Burning/1i rra€:i»r1 lir. "Cleaning Fibrous Glass Insulated Air Duct Systems" Sr' t. _ s Linacoustic RC duct liner meets the Surface Burning Characteristics and Highly Resistant to Water.The reinforced coating surface provides Limited Combustibility of the following standards: superior resistance to penetration of incidental water into the fiber glass wool core. Standard/Test Method • ASTM E84 fir 4d.n f asildinz iInribtites • UL 723 • NFPA 255GREENGUARD certification is not intended for Maximum Flame Spread Index 25 • NFPA 90A and 90B Maximum Smoke Developed Index 50 residential environments.Instead,the certification • NFPA 259 is intended only for buildings meeting ASHRAE • CAN/ULC S102-M88 62.1-2007 commercial building ventilation rates. GREENGUARD UL labels supplied on packages when requested on order. This certification is proof that the product meets the GREENGUARD Environmental Institute's indoor air t°°•`a`F" t°� p,oaJtiliottiriunitistiotit Specification Corns lidiire • ASTM C1071,Type 1 quality standards and product emission standards `-"" J • ICC Compliant for VOCs. • California Title 24 • MEA#353-93-M • Conforms to ASHRAE 62 • SMACNA Application Standards for Duct Liners • NAIMA Fibrous Glass Duct Liner Installation Standard • Canada:CGSB 51-GP-11M and CAN/CGSB 51.11 HVAC-329 1/8/16(Replaces 3/14) PROseal° Premium Grade Water Based r r Nigh Velocity Duet Sealant ICRtPTTLt eta, $a. �r 2 ' a f� � z?,. "r` }. rF PROseal is a premium water based high velocity duct sealant. s* s�t S' (� it 'ii hor/outdoor grade • Will not drip or sag ' Por applications up to 15"WG • Mild odor • Low brush drag and spreadability • UL 1.81B-M Listed • Parnanendy sells metal duct systems • UL 723 Classified To seal metal duct systems against air leaks in low,medium,and high • Highly crack resistant • IPPD'Compliant,VOC content pressure duct systems • Remains flexible • Conforms to requirements of • Excellent UV,Flexibility;and NFPA 90A and 90B ' � � Mold Resistant Properties • Manufactured by S.M.W.I.A. .,, ,a i ,I ' _ , "_ .... ,,,,,,,..,....„,,,,44-.....,,, 'r Paintable with latex m epoxy Local 12 ASE based paint BASE BSynthetic latex emulsion Cray " TYPE i g-i tr `ill iyI' :j DENSITY: Water Base 11.3+/-.3 lbs per gallon SOLID CO TENTS: 68%+/-3% Surface Preparation:For good brushabili store at room temperature at VOC CONTENT: 35(1,000 c.p.s. least 24 hours before applying.Surfaces should be clean,dry and free of any dirt,oil,grease,water or foreign matter. ASTMD3690-65(13): 27 gIL APPLICATION TEMPERATURE: 35°F to 110°F Application:(DO NOT THIN)Do not apply when rain or freezing SERVICE TEMPERATURE: 0°F to 220°F temperatures will occur within 36 hours. STORAGE TEMPERATURE: 35°F to 110°F DRY TO TOUCH: 1 hour(approximate) When Used In ConjunctionWith Sheet Metal:Apply by brush,hand, CURE TIME 24 to 2 hours+ trowel or spray PROseal should be applied to duct connections according (dr nding on humidity application, to all applicable SMACNA standards.Apply to the inside of female fittings and temperance) and outside of male fittings.Assemble the joint. FLASH POINT: No flash to boiling Brush sealant over the assembled joint.Thoroughly cover joint and screws FLEXIBILITY: Excellent with a 2"to 3"wide band.Assembly should cure for 24-72 hours before MOLD RESISTANCE: Excellent FREEZE RESISTANCE: STABILITY 5 Celle pressure testing the system.Since field temperature/humidity conditions ADHESION STRENGTH: may vary,longer set times may be required for specific installations,Apply �� ata rate of 50 sq.ft,per gallon(1/32"thick). ASTM C794: B Stainless Steel7.7 PLl ASTM D2202: When Used in Conjunction With UL 181 Listed Flexible Air Ducts: SHORE HARDN : 0 Apply by brush a 1/16"(25 sq.&.per gallon)coating and allow to dry a COVERAGE: 87 minimum of 24-72 hours.Since field temperature/humidity conditions 25 sq.h./gal,at 1/16" may vary,longer set times may be required for specific installations.Use ODOR: Mild- s9 t't1 al.at 1/32" with mechanical fasteners per Air Duct installation instructions. SHELF LIFE: Mild(wet)None(dry-) 1 year(unopened container) Clean Up:Use warm,soapy water to cleats up sealant while it is still wet. CURED SEALANT: Tough and permanently flexible PACKAGING: 1/12 gallon cubes(24 tubes/case) When Used Innc Conjunction With with Cover:Allow any sealant cure 1 gallon pail(4 pails/case) idly before encapsulating duct ends with ProGuard,or any duct cover 5 allon ail products. You may set the duct upright on a palate and encapsulate just 54 gallon drum the top,allowing air to flow through the bottom until cu the sealant has njd Cis!) 0404. elAyiNo '� US ,:fr , Du r-,am w r n<ri,ar.PRO al,wh,n proles-rip fnsratird and mamamcd,wn11 hr fn-r.form •' .D defects in material and workmanship,and will comply with all Writmea Specifications made by LISTED CAULKINGS AND Ductraate at the time of sale, Doctorate's warranty shall run fora period of one year from the One SEALANTS dare of manufuture. SURFACE BURNING CHARACTERISTICSa''n•�z}'Lia'it°°am Si RF The warranty stated above is in lieu of all other warranties,repress or implied,including but not _._. hrmr°d ro the rrnphcd wartandcs of mew/tANTABrLITY AND FITNESS FOR A ""'°� SURFACE BURNING C[i 1AAC2Ettj$T((� PARTICULAR PURPOSE.Although Ducezum may have suggested[be product,or provided written or oral advice to the Purrdraset:it is the Purchasers responsibility to test and determine the USC-Cirwifitatioa ed to Ino suitability of PROseal,for the intended use and purpose.and Purchaser andior its customer assumes FLAME SPREAD Applied 0 startle Reinforced Cement Board t all risk and liability wha soever regarding sorb suitability. SMOKE DEVELOPED u Limitation of Liability -Tbsrcd area a m two?D vid-strips R in,on renter,-,wmn�72 ,:;nr of rhr nxr Ir.the ev.ut of bos h tai d,c above waneut}t Ducmw4,sol:oh6 uor sample area as a coverage tate of li sq.ft per gallon. t*'t exrinsive r mrd >. defective products, ;u'' J hall he,ti In of rim is mason,repair Cr replacementshallof Illy liability prndnrts,er CNC-Classification Applied to Inorganic Reinforced t refund of e applicable portion of die purchase price. Ductmate shall have no liability for cars of FLAME SPREAD D aed �$Dead removal or reinstallation of the product.The Pun:haser agrees that no ocher remedy,including but not SMOKE DEVELOPED D limited m lass of profits,Ions sales,injury m person or pr petty,or any other special,incidental or r-Tcstrd as applied in two 5D rsurr wide strips 2D0 mm on center covert 2 c uenrial damages,shall be available to the Purchaser for any claim arising out of this Agreement, r rs sample ar e c coverag}rate°f 0.61 m 00 n rn/c g` percent eE die gurdtrsa of wtrerher web alarm is made in r°nrrao or to rort,inoltodav,mar,bays tort.In no - ---- __ event will Duectuare be obligated to pay damages to the Purchaser in any amount meending the Purchaser paid the KEEP OUT OF REACH OF CHILDREN. Consult MSDS(Material Safety Data Sheet)eBefore Using ��defective product. , ; Distributed By: `" Malign, ,,,, 401., km • Charleroi,PA Lodi,CA F �I Itir 210 Fifth Street 810 S.C1uffAvenue Charleroi,PA 15022 Lodi,CA 95240-9141 www.ebprogram.org printed on pier that meas Ductmate is a proud member of the following organizations: 724-258-0500 209-333-4680 This stmt data is p the Certified Fiber Sourcing requirements cite Y4. _ 1-800-245-3188 • www.ductnate.cuss SF1 program and contains 10%recycled content v _. i � � I Del -��! rw<rawrxutwassan°, 0 Copyright Ductmate Industries,Inc.All rights trsemed. 169-02/16