Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Report (50)
PLUMBING FEES MECHANICAL FEES FEE SCHEDULE(for special information use checklist) RESIDENTIAL EQUIPMENT/SYSTEMS FEE SCHEDULE Description Qty. Fee(ea.) Total Description Qt' I Fee(ea.) I Total New 1-&2-family dwellings Heating/Cooling (includes 100 ft.for each utility connection) Air conditioning or heat pump* 14.00 SFR(1)bath 249.20 Furnace 100,000 BTU(ducts/vents) 14.00 SFR(2)bath 350.00 Furnace 100,000+BTU(ducts/vents) / 17.90 17 90 SFR(3)bath / 399.00 3 7,-c-60 Gas heat pump 14.00 Each additional bath/kitchen 45.00 Duct work 14.00 Rain Drain,single family dwelling 65.25 Hydronic hot water system 14.00 Fire sprinkler-sq.ft. 0 to 2,000 115.00 Residential boiler Fire sprinkler-sq.ft. 2,001 to 3,600 160.00 (for radiator or hydronic system) 14.00 Fire sprinkler-sq.ft. 3,601 to 7,200 220.00 Unit heaters(fuel,not electric) Fire sprinkler-sq.ft. 7,200 and greater 309.00 (in wall,in-duct,suspended,etc.) 14.00 Site Utilities Flue/vent(for any of above) 10.00 Catch basin/area drain 16.60 Repair units 12.15 Drywell/leach line/trench drain 16.60 Other Fuel Appliances Footing drain- 1"100' 55.00 Water heater ( 10.00 /0 Gas fireplace Footing drain-each additional 100' 46.40 � 10.00 - Manufactured home utilities 110.00 Flue vent(water heater/gas fireplace) 10.00 Manholes Log lighter(gas) 10.00 16.60 Wood/Pellet stove 10.00 Rain drain connector 16.60 Wood fireplace/insert 10.00 Sanitary sewer-Ist 100' I 55.00 Chimney/liner/flue/vent 10.00 Sanitary sewer-each additional 100' 46.40 Other: 10.00 Storm sewer-1°100' / 55.00 Environmental Exhaust&Ventilation Storm sewer-each additional 100' 46.40 Range hood/other kitchen equipment I 10.00 jo- Water service- 1s`100' / 55.00 Clothes dryer exhaust / - 10.00 Water service-each additional 100' 46.40 ��-. Fixture or Item Single duct exhaust Absorption valve 16.60 (bathrooms,toilet compartments, utility rooms) 6.80 3 L - Backflow preventer 27.55 Attic/crawl space fans 10.00 , Backwater valve 16.60 Other: Clothes washer 3 .16.60 10.00 Fuel Piping Dishwasher 16.60 **(S5.40 for first 4,$1.00 each additional) Drinking fountain 16.60 Furnace,etc. I ** Ejectors/sump 16.60 Gas heat pump ** Expansion tank 16.60 WalVsuspended/unit heater ** Fixture/sewer cap 16.60 Water heater / ** Floor drain/floor sink/hub 16.60 Fireplace - ** Garbage disposal / 16.60 Range / ** Hose bib e? 16.60 BBQ ** Ice maker / 16.60 Clothes dryer(gas) - ** Interceptor/grease trap 16.60 Other: ** Primer 16.60 Total: c" G. t/'� Roof drain(commercial) 16.60 Mechanical Permit Fees Sink/basin/lavatory ////t-/ 16.60 Subtotal: $ /®f. 3d Tub/shower/shower pan 3 16.60 Minimum Permit Fee$72.50 $ Urinal 16.60 Plan Review Fee(25%of Permit Fee) $ Water closet 16.60 State Surcharge(8%of Permit Fee) $ i•46. Water heater ? 16.60 TOTAL PERMIT FEE $ Other: Other: Other Inspections and Fees: Plumbing Permit Fees I. Inspections outside of normal business hours(minimum charge-two Subtotal $ T9'.700 hours)are$62.50 per hour. Minimum Permit Fee$72.50 $ 2. Inspections for which no fee is specifically indicated(minimum charge- Residential Backflow Minimum Fee$36.25 halfhour)$62.50 per hour. Plan Review(25%of Permit Fee) $ 3. Additional plan review required by changes,additions or revisions to plans(minimum charge of one-half hour)at$62.50 per hour. State Surcharge(8%of Permit Fee) $ 3/.9,Z 4. Stamp extra set of building plans at$62.50 per set. TOTAL PERMIT FEE $ *Residential A/C or heat pump requires site plan showing placement of unit. is\Building\Forms\ResPlanCheckFees.doc 04/03 Page 2